Italy and the Nuclear Question: Why This Book Was Written
Italy has returned to the nuclear question at a moment when energy policy has become inseparable from geopolitics, industrial competitiveness, technological sovereignty and national security. What until a few years ago still appeared to be a politically closed subject has gradually re-entered the sphere of legitimate public policy, not because the historical controversies surrounding nuclear power have disappeared, but because the strategic environment in which those controversies are being reconsidered has changed profoundly.
The Italy of the late 1980s was confronting the consequences of Chernobyl, a strong anti-nuclear political mobilisation and a national referendum that transformed the public legitimacy of the country’s existing nuclear programme. The Italy of 2011 was reacting to Fukushima and to the attempted reintroduction of nuclear power promoted by the Berlusconi government. The Italy of the mid-2020s is facing a different set of pressures: the consequences of the war in Ukraine, the fragility of imported energy supplies, high and volatile gas prices, the need to decarbonise an industrial economy, the rapid expansion of renewable generation, the growing importance of electricity grids and storage, the emergence of data centres and artificial intelligence as large new sources of electricity demand, and the increasingly explicit European concern with technological and energy sovereignty.
It is within this changed strategic landscape that nuclear power has returned to Italian policy.
The return itself, however, is often described far too simplistically. Public discussion tends to move quickly between opposite slogans. Nuclear power is presented either as the indispensable answer to Italy’s energy dependence or as an unnecessary and outdated distraction from renewables. New reactor technologies are sometimes described as if they had already solved the economic and industrial problems that affected earlier nuclear programmes, while opponents sometimes treat the historical referenda as though they had constitutionally removed nuclear technology from Italian public policy forever.
Neither interpretation is sufficient.
The reason I wrote this book is precisely to move beyond that binary language and examine what an Italian nuclear programme would actually mean in practice.
The central conclusion that emerged during the research is that Italy is not deciding whether to buy a reactor. It is deciding whether it is prepared to rebuild an entire nuclear system.
A reactor is only the most visible component of that system. Behind it lies a chain of institutions, infrastructures and long-term obligations that are often invisible in political debate. A future Italian nuclear plant would require a legally coherent licensing regime, an independent regulator with enough qualified personnel to evaluate the design, a competent owner and operator, a site capable of satisfying seismic, hydrological, environmental and emergency-planning requirements, a grid connection capable of integrating a large new source of concentrated generation, a reliable fuel chain, qualified industrial suppliers, specialised workers, safeguards, physical protection, cybersecurity, waste infrastructure, spent-fuel storage, decommissioning funds and eventually a credible geological disposal strategy.
And all of that must be financed.
That point is particularly important because the economic discussion surrounding nuclear power is too often reduced to a single number. A reactor is described as costing a certain amount per kilowatt, or its future electricity is compared with the LCOE of solar or wind generation. But a national electricity system does not operate on isolated technology costs. It operates continuously, through winter and summer, through periods of low wind and high demand, through grid contingencies, droughts, geopolitical shocks and changing industrial consumption.
The cost that matters is therefore the cost of the entire system capable of delivering reliable electricity under those conditions.
A nuclear plant has financing costs, fuel costs, waste liabilities and decommissioning obligations. A system without nuclear power requires alternative investment in renewable generation, storage, grids, programmable low-carbon capacity, imports, demand flexibility or technologies such as carbon capture. The correct comparison is not nuclear against solar. It is one complete energy system against another.
This distinction becomes especially important in Italy because the country’s future electricity demand is likely to be substantially higher than it is today. Transport is becoming electrified. Heating is moving toward electricity. Industrial processes are changing. Hydrogen production may become an important source of electricity demand. Data centres and artificial intelligence are creating new high-load consumers. As a result, the Italian electricity system that might exist in 2040 or 2050 will be fundamentally different from the one operating today.
The question is therefore not whether nuclear energy should replace renewables. It should not, and that is not what the official Italian scenarios suggest. Italy will require very large quantities of renewable generation under virtually every credible decarbonisation pathway.
The real question is what supplies the difficult part of the system once renewable penetration becomes extremely high.
How much storage is required? How much flexible generation remains necessary? How much electricity should Italy expect to import? How much gas with carbon capture is needed? How much grid reinforcement? How much long-duration flexibility? And at what point does a certain quantity of firm low-carbon nuclear generation reduce the total cost or strategic vulnerability of that system?
That is the counterfactual examined in the book.
The same discipline is applied to reactor technology itself. Small modular reactors are frequently presented as though modularity automatically eliminates the historical economic problems of nuclear construction. It does not. Factory production, standardisation and modular construction are technically credible ideas, but the economic promise depends on repetition. A single first-of-a-kind reactor can still be expensive. The real test begins with the second, third and fourth units. If they do not become faster, cheaper and easier to license, the industrial hypothesis behind modular construction has not been demonstrated.
That is why this study distinguishes continuously between a design that exists on paper, a design that has been licensed, a reactor under construction and a reactor that has actually operated commercially.
The distinction may appear obvious, but it is frequently lost in political communication.
Italy is in an unusual position because it can wait for foreign evidence. Projects in Canada, the United States, the United Kingdom and elsewhere are already generating precisely the information Italy will eventually need: real construction schedules, actual costs, regulator performance, factory production, fuel availability, commissioning and first operating experience. Italy does not need to pretend that this evidence already exists. It can observe it.
The same principle applies to fuel.
Not all new reactors rely on the same fuel architecture. Conventional water-cooled reactors use relatively mature low-enriched uranium fuel chains. Some advanced reactors require HALEU, whose commercial supply infrastructure is still developing. Others propose MOX or closed fuel cycles involving plutonium-bearing materials, reprocessing and much more complex safeguards and fuel-management systems.
These distinctions are strategically significant because a reactor can be technically ready while the fuel system required to operate it is not.
Waste creates a similar problem.
No new nuclear programme can be considered complete if the back end is treated as a problem for another generation. Italy already possesses a very long nuclear legacy. The country’s former reactors stopped generating decades ago, yet decommissioning and waste management continue today. That experience should fundamentally shape any new programme.
The lesson is straightforward: electricity revenue ends; nuclear liabilities do not.
For that reason, a credible new Italian programme should begin with decommissioning funds, spent-fuel strategy and waste architecture already defined. The National Repository cannot be treated as a substitute for reactor-site waste planning, and the absence of a mature geological disposal solution for high-level waste remains one of the most important institutional issues Italy would eventually have to resolve.
The book also devotes considerable attention to safety, but deliberately avoids treating safety as a political slogan.
A reactor cannot be assumed to be safe because it is smaller, because it is passive or because it belongs to a new technological generation. Safety has to be demonstrated through design-specific evidence.
That means examining real accident sequences, external hazards, source terms, containment performance, common-cause events and multi-module sites. It means considering earthquakes together with loss of off-site power, flooding together with access impairment, heatwaves together with drought and high cooling-water temperatures. Fukushima demonstrated why correlated events matter more than isolated design assumptions.
The relevant question is always the same: what happens to the complete site under the actual accident conditions being analysed?
This becomes particularly important for SMRs. A smaller module can contain less fuel and produce less absolute decay heat than a large reactor, which can be a genuine safety advantage. But a site containing several modules may contain a substantial total radioactive inventory, and a common external event can affect several of them simultaneously. Spent-fuel stores must also be considered.
The correct safety unit is therefore not always the individual reactor module. It is the complete site.
The book also examines a less visible but equally important issue: whether the Italian State itself is institutionally capable of returning to nuclear power.
Italy possesses important nuclear institutions and expertise, but operating a commercial nuclear fleet requires capabilities different from those needed to supervise decommissioning and radioactive waste. The country would need to reinforce regulatory expertise, rebuild operator capability, develop specialised training pipelines and establish clear institutional separation between the organisations promoting the programme, the companies operating plants and the regulator responsible for nuclear safety.
That separation is fundamental.
The institution that wants the project to succeed cannot be the same institution that decides whether the plant is safe enough to operate.
Similarly, Italy cannot allow a foreign reactor vendor to become the de facto source of all technical knowledge inside the national programme. A sovereign nuclear programme requires an owner capable of understanding and challenging its supplier.
The same concept applies to software, maintenance, spare parts and intellectual property. A reactor can operate for sixty years or more. The vendor that supplies it today may be acquired, reorganised or no longer exist decades later. Procurement therefore has to address lifecycle dependence at the beginning of the project, not after the problem appears.
The financing question is just as consequential.
Nuclear plants require large amounts of capital years before they generate revenue. This makes the cost of capital extremely important. The same physical reactor can produce radically different lifetime economics depending on the interest rate, construction duration and revenue model.
Italy therefore cannot simply ask how much the reactor costs. It must decide who carries the risk.
Will private investors finance construction? Will the State provide guarantees? Will consumers support the project through a regulated mechanism? Will there be a Contract for Difference? A Regulated Asset Base model? State equity? Long-term corporate PPAs? Some combination of these instruments?
Every financing structure transfers risk differently between investors, consumers and taxpayers.
There is no model in which the risk disappears.
The challenge is to allocate each risk to the actor best able to control it.
This is why the book ultimately treats nuclear power not as an energy technology but as a national institutional commitment.
The decision would extend across political cycles. A reactor ordered in the 2030s could still be operating around the end of the century, while its waste and decommissioning obligations would continue even longer.
Italy’s historical experience makes this especially relevant.
The country has already experienced nuclear development, withdrawal, attempted return, another withdrawal and a new return to policy consideration. That history creates a risk that is often underestimated: political discontinuity itself has an economic cost.
Investors price political uncertainty. Industrial suppliers hesitate to invest if the programme may disappear after the next election. Universities cannot build long-term training pipelines if demand for expertise repeatedly vanishes. Regulators cannot maintain specialised capability if the national policy changes completely every decade.
A credible Italian nuclear strategy must therefore become more durable than the political cycle that launches it.
This does not mean eliminating democratic disagreement. Governments should remain free to decide whether to expand or reduce a nuclear programme.
But safety regulation, waste funding, safeguards, technical standards and institutional competence should not disappear with each electoral change.
The geopolitical dimension of the issue is equally important.
Italy’s energy system has historically depended heavily on imported fuels. The shock following Russia’s invasion of Ukraine demonstrated how quickly that dependence can become a question of national security and industrial competitiveness.
Nuclear power would not make Italy energy independent. Uranium, enrichment, fuel fabrication and some reactor technologies would still involve international supply chains.
But nuclear fuel dependence has different characteristics from gas dependence. Gas requires continuous high-volume supply. Nuclear fuel is extremely energy dense and can be stored far in advance.
The strategic question is therefore not whether nuclear removes dependence. It is whether it creates a more diversified and manageable dependency structure than the system it partially replaces.
This is the broader meaning of technological sovereignty.
Sovereignty is not the absence of international dependence. In a modern industrial economy, that is unrealistic. Sovereignty means understanding dependencies, diversifying them and retaining enough national capability to prevent any one supplier, country or technology from becoming systemically indispensable.
That principle runs through the entire study.
The book therefore does not conclude that Italy must build nuclear reactors.
It also does not conclude that Italy should exclude nuclear power before the evidence is available.
The stronger conclusion is that Italy should preserve the option while subjecting it to increasingly demanding tests.
There is no reason to make one irreversible decision today.
Italy can strengthen its regulator, train specialists, qualify industrial suppliers, study sites, evaluate financing models and monitor foreign projects while simultaneously accelerating the investments that the country already needs regardless of nuclear power: renewables, grids, storage, efficiency and electrification.
Then, when a real Italian nuclear project reaches the point of final investment decision, the State should ask whether the evidence supports proceeding.
Is the reactor actually buildable at an acceptable cost?
Is the fuel secure?
Is the site viable?
Is the regulator ready?
Is the waste pathway credible?
Is the financing model sustainable?
Does the project improve the total Italian energy system relative to the strongest available non-nuclear alternative?
If the answer is yes, Italy will possess a rational basis for proceeding.
If the answer is no, the State should be willing to stop.
That final point is perhaps the most important.
A serious national programme must define not only the conditions for advancing, but also the conditions for refusing to advance.
Strategic analysis is not valuable because it removes uncertainty. It is valuable because it prevents political ambition, industrial enthusiasm or ideological opposition from being mistaken for evidence.
That is the purpose of this book.
It attempts to describe Italy’s nuclear question as it actually exists today: legally open, politically significant, technically possible, institutionally demanding, financially unresolved and strategically important.
The objective is not to tell the reader whether Italy should be “pro-nuclear” or “anti-nuclear”.
It is to show what the decision really contains.
Because when a country chooses an energy system, it is never choosing only how electricity will be produced.
It is choosing what technologies it will master, what risks it will carry, what infrastructure it will finance, what dependencies it will accept and what capabilities it intends to preserve for the generations that follow.
The full study can be downloaded below.
STRATEGIC-TECHNICAL ASSESSMENT
Source classification
[L] — Law, parliamentary act, official legislative record, Constitutional Court or Official Gazette
[G] — Government, regulator or state-owned programme documentation
[I] — Primary industry, operator or nuclear-regulator documentation
[S] — Authoritative technical or institutional secondary source
[M] — Media report or attributed public statement not equivalent to a legally binding decision
[U] — Analytical judgement, uncertainty, scenario or contested proposition
Opening Chapter — Purpose, Method and Strategic Value of This Study
Italy has re-entered the nuclear debate at a moment when energy policy is no longer separable from national security, industrial competitiveness, fiscal policy, technological sovereignty, climate strategy and the resilience of the European economic system.
For that reason, the return of nuclear power to Italian public policy cannot be analysed adequately through the conventional language of political advocacy.
The issue is not whether nuclear energy should be described as modern or obsolete, safe or dangerous, cheap or expensive, strategic or unnecessary.
Each of those formulations is too broad to support a decision of the scale now potentially facing the Italian State.
The relevant question is much more demanding:
Under what legal, technological, industrial, financial, environmental, regulatory and geopolitical conditions could a renewed Italian nuclear programme create net strategic value — and under what conditions should Italy refuse, delay or redesign that programme?
This book has been constructed to answer that question.
Its purpose is therefore neither to advocate the return of nuclear power nor to reproduce the arguments historically used to oppose it.
Its purpose is to establish, with the highest practicable level of documentary discipline, what Italy is actually deciding.
That distinction is essential.
A reactor programme is not a single infrastructure project.
It is an institutional commitment extending across:
- governments;
- generations of regulators;
- multiple industrial cycles;
- electricity-market reforms;
- fuel contracts;
- geopolitical changes;
- plant operation;
- waste management;
- decommissioning.
The effects of the decision can therefore extend for a century or more.
A policy of this duration cannot be evaluated through political slogans, vendor presentations or isolated engineering metrics.
It requires a national-system perspective.
This study has consequently been designed to provide that perspective.
The central objective: transform the nuclear debate into a decision architecture
Italy’s nuclear discussion has historically been unusually polarised.
Chernobyl, the 1987 referenda, the subsequent shutdown of the Italian nuclear programme, the attempted Berlusconi-era relaunch, Fukushima and the 2011 referendum all contributed to a political culture in which nuclear power acquired symbolic importance far beyond its direct share of the electricity system.
The result has often been a debate organised around incompatible absolutes.
For one side, nuclear power can be presented as the indispensable solution to energy dependence and decarbonisation.
For the other, it can be presented as intrinsically unnecessary, uneconomic or politically illegitimate.
Neither starting point is sufficient for a government decision.
The approach used throughout this book is therefore deliberately different.
The study asks, sequentially:
- What has actually become lawful?
- What still requires legislation or delegated regulation?
- Which institutions must exist before a reactor can be licensed?
- Where could a reactor physically and legally be placed?
- Which technologies have genuine construction or operating evidence?
- Which rely on fuel chains that do not yet exist at mature commercial scale?
- Which Italian companies possess actual nuclear references?
- What waste streams would a new fleet create?
- Who would finance the programme?
- Who would own and operate the plant?
- Who would bear cost overruns?
- What additional grid, storage, cooling, transport and emergency infrastructure would be required?
- What happens if nuclear is not built?
- What conditions should cause the State to stop the programme?
The objective is not to produce a single simplistic answer.
The objective is to define the conditions under which different answers become rational.
That is the difference between advocacy and strategic assessment.
The report is built around evidence hierarchy, not narrative convenience
The reliability of a report of this kind depends less on the number of sources cited than on the discipline with which different forms of evidence are separated.
Throughout this study, a strict distinction is maintained between:
- law;
- government policy;
- regulator evidence;
- industrial claims;
- model outputs;
- political statements;
- analytical inference.
These categories are not interchangeable.
A ministerial statement that first nuclear power could arrive in a particular year is not equivalent to:
- a licensed schedule;
- a construction contract;
- a final investment decision.
A vendor statement describing a reactor as ready for deployment is not equivalent to:
- completed construction;
- first criticality;
- commercial operating history.
A political commitment to support nuclear energy is not equivalent to:
- a reactor authorisation.
A modelled €17 billion reduction in system cost is not equivalent to:
- €17 billion of guaranteed public savings.
A connection request for a data centre is not equivalent to:
- operating electricity demand.
A company theoretically capable of producing a nuclear component is not equivalent to:
- a currently nuclear-qualified supplier.
The entire report is structured around maintaining these distinctions.
This prevents one of the most common failures in large infrastructure policy: allowing expectations, ambitions and scenarios gradually to acquire the status of facts.
The reader should therefore interpret every major conclusion through the hierarchy:
ENACTED FACT
↓
VERIFIED PROGRAMME STATUS
↓
SUPPORTED ANALYTICAL INFERENCE
↓
SCENARIO
↓
POLITICAL OR INDUSTRIAL AMBITION
The higher the level of uncertainty, the stronger the qualification applied.
This methodological discipline is especially important because the nuclear sector contains exceptionally long development cycles.
Between political announcement and commercial operation there can be:
- legal reform;
- technology selection;
- site selection;
- environmental review;
- regulatory review;
- financing;
- procurement;
- manufacturing;
- construction;
- commissioning;
- fuel loading;
- first criticality;
- power ascension;
- commercial operation.
These stages must never be collapsed into the generic word “project.”
The study treats the reactor as only one component of the nuclear system
One of the central conclusions emerging from the research is that technology selection alone is insufficient.
The correct unit of analysis is not:
the reactor
but:
the complete reactor–fuel–site–grid–operator–waste–finance–regulatory system.
This changes the interpretation of many apparently attractive reactor technologies.
A design may possess:
- strong passive safety;
- low unit power;
- advanced industrial heat capability;
and still be strategically weak for Italy if:
- the fuel cannot be contracted;
- the regulator lacks the required capability;
- the waste pathway is unresolved;
- the vendor creates unacceptable long-term dependence;
- the system cannot be financed competitively.
Conversely, a mature conventional water-cooled SMR may possess a less ambitious technological profile while offering:
- greater fuel maturity;
- deeper regulatory evidence;
- more accessible operating knowledge.
Neither outcome establishes a universal winner.
It demonstrates why national procurement must be multi-dimensional.
The same principle applies to sites.
An existing 380 kV grid connection does not make a site licensed.
A former nuclear location does not make it automatically reusable.
A coastal site does not automatically solve cooling-water constraints.
A brownfield industrial site does not automatically simplify physical security.
Every apparent advantage creates a second-order question.
That second-order analysis is one of the defining characteristics of this book.
The report places uncertainty inside the decision rather than hiding it
Government reports can create false confidence when uncertainty is treated as an editorial weakness.
For nuclear policy, uncertainty is itself one of the decision variables.
Important unresolved variables include:
- FOAK construction cost;
- future SMR serial-production economics;
- Italian nuclear WACC;
- storage costs in the 2030s;
- CCS performance and cost;
- HALEU availability;
- public acceptance;
- site availability;
- future electricity demand;
- future data-centre load;
- political durability.
The appropriate response is not to eliminate uncertainty through unsupported estimates.
It is to structure the programme so that future evidence changes decisions.
This produces a gate-based strategy.
UNCERTAINTY TODAY
↓
FOREIGN FOAK EVIDENCE
↓
ITALIAN REGULATORY WORK
↓
SITE EVIDENCE
↓
FINANCING EVIDENCE
↓
UPDATED DECISION
The State does not need perfect knowledge before beginning preparatory work.
It does need substantially stronger evidence before making irreversible commitments.
That distinction allows Italy to preserve nuclear optionality without prematurely locking itself into one technology or vendor.
The study is written for both political decision-makers and technical institutions
The intended readership of this book is deliberately broader than the nuclear technical community.
A modern nuclear programme cannot be governed by engineers alone.
Nor can it be governed effectively through political decision without engineering evidence.
The relevant decision-makers include:
- Presidency of the Council;
- Parliament;
- MASE;
- MEF;
- MIMIT;
- MAECI;
- ISIN;
- Terna;
- Civil Protection;
- regional governments;
- prospective operators;
- industrial companies;
- financial institutions;
- universities and research centres.
Each sees a different nuclear problem.
The regulator asks:
Is the installation safe?
The Treasury asks:
What contingent liability is the State accepting?
The grid operator asks:
Can the network integrate the plant?
The industrial ministry asks:
What strategic capability remains in Italy?
The operator asks:
Can the plant be built and operated reliably?
The local authority asks:
What risk, infrastructure and benefit does the territory receive?
The government must integrate all of these perspectives.
That is why this book intentionally crosses disciplinary boundaries.
It combines:
- constitutional law;
- nuclear regulation;
- reactor engineering;
- fuel-cycle analysis;
- grid planning;
- industrial policy;
- environmental risk;
- public finance;
- procurement;
- geopolitics.
A national nuclear decision cannot be reduced to any one of them.
The time dimension is fundamental
A further principle of the study is the separation of immediate, medium-term and long-term policy.
Italy’s energy problems operate on different clocks.
The country must act immediately on:
- grids;
- renewable deployment;
- storage;
- energy efficiency;
- electrification;
- gas diversification.
A nuclear programme cannot materially solve Italy’s 2026–2030 electricity constraints.
It is principally relevant to the system that could emerge from the mid-2030s through 2050 and beyond.
This prevents a common policy error:
using future nuclear power as a justification for delaying infrastructure that Italy requires before nuclear can possibly operate.
The relationship should instead be complementary.
2020s
RENEWABLES
GRID
STORAGE
EFFICIENCY
+
NUCLEAR OPTION DEVELOPMENT
↓
2030s
EVIDENCE-BASED NUCLEAR DECISION
If nuclear passes the required gates, it enters the later system.
If it does not, Italy must possess a credible non-nuclear pathway.
The report therefore examines both.
The geopolitical perspective is broader than energy independence
The term energy sovereignty appears increasingly in European political discourse.
It can easily become misleading.
No plausible future Italian energy system is completely sovereign in the literal sense.
A renewable-heavy system depends on:
- technology;
- critical minerals;
- storage supply chains;
- grids.
A gas system depends on:
- pipelines;
- LNG;
- foreign producers.
A nuclear system depends on:
- uranium;
- conversion;
- enrichment;
- fuel fabrication;
- reactor technology.
The relevant objective is not autarky.
It is:
avoidance of excessive strategic concentration.
The geopolitical analysis in this book therefore focuses on the architecture of dependence.
It asks whether Italy is replacing:
DEPENDENCY A
with:
DEPENDENCY B
or creating a more diversified and resilient system.
This distinction is particularly important after the energy shock that followed Russia’s invasion of Ukraine.
The events of 2022 did not prove that nuclear power is automatically necessary.
They demonstrated the strategic cost of concentrated energy dependence.
That lesson applies equally to future nuclear vendor selection.
Italy should not reduce gas dependence only to become structurally dependent on:
- one reactor vendor;
- one fuel supplier;
- one foreign software ecosystem.
Safety and security are treated as enabling conditions, not political arguments
No economic result overrides nuclear safety.
No geopolitical argument overrides nuclear safety.
No construction schedule overrides nuclear safety.
At the same time, safety analysis must remain technical.
The book therefore rejects categorical claims such as:
- “SMRs are inherently safe”;
- “Generation IV eliminates accidents”;
- “small reactors need no emergency planning.”
The correct sequence is always:
DESIGN
↓
HAZARD
↓
ACCIDENT ANALYSIS
↓
SOURCE TERM
↓
CONSEQUENCE
↓
REGULATORY DECISION
The same standard applies to cybersecurity, physical protection and safeguards.
This allows safety to remain a professional discipline rather than a rhetorical weapon used either to promote or reject technology.
The political history is included because political durability affects engineering and finance
The analysis of the 1987 and 2011 referenda is not an historical appendix.
It is directly relevant to programme economics.
Nuclear investment requires decades of political continuity.
Repeated policy reversals increase:
- investor risk;
- financing cost;
- supplier uncertainty;
- workforce attrition.
Italy’s nuclear history therefore becomes a current financial variable.
The State must demonstrate that technical institutions can survive political change.
This is why regulator independence, decommissioning funds, safeguards and waste policy should not be reconstructed after every election.
A sustainable nuclear programme requires a stable institutional core even if political majorities continue to disagree over fleet size or timing.
What the reader should expect from the chapters that follow
The chapters proceed from law to implementation.
They examine:
- the legal reconstruction of Italian nuclear policy;
- multi-level government and regional authority;
- site feasibility;
- the Italian nuclear industrial base;
- global SMR and advanced-reactor reality;
- fuel and waste;
- environmental, grid and safety constraints;
- programme risks;
- deployment sequence;
- strategic options;
- the political history of Italian nuclear withdrawal and return;
- financing;
- institutional architecture;
- procurement and fleet operations;
- the complete nuclear versus no-nuclear counterfactual.
The result is intentionally broader than a technology report.
It is an assessment of whether Italy can build a complete nuclear system.
The governing principle of the entire study
The study can ultimately be reduced to one analytical rule:
No single attractive characteristic should be allowed to compensate for a fundamental programme failure.
- A cheap reactor with no licence path is not viable.
- A mature reactor with no acceptable site is not viable.
- A safe reactor with no bankable financing is not viable.
- A financeable reactor without secure fuel is not viable.
- A technically advanced reactor that creates unacceptable strategic dependence is not automatically desirable.
- A politically attractive project whose waste cannot be managed is not sustainable.
Therefore the Italian programme must pass all major gates simultaneously.
LAW
↓
INSTITUTIONS
↓
TECHNOLOGY
↓
SITE
↓
SAFETY
↓
FUEL
↓
WASTE
↓
GRID
↓
FINANCE
↓
PROCUREMENT
↓
OPERATOR
↓
FID
The purpose of this book is to make every one of those gates visible.
That visibility is itself a form of strategic protection.
It allows political decision-makers to distinguish:
- what is already known;
- what remains uncertain;
- what can be accelerated;
- what cannot safely be compressed;
- where Italy possesses genuine strategic advantages;
- where political ambition exceeds current evidence.
The ambition of the study is therefore not to tell the Italian State what conclusion it must reach.
It is to make it substantially more difficult for the State to reach that conclusion on the basis of incomplete information.
That is the standard against which every chapter that follows should be read.
EXECUTIVE ABSTRACT
Italy crossed a significant parliamentary threshold on 23 September 2026, but it did not thereby authorise the construction of a nuclear power station. The Senate approved DDL No. 1924, Delega al Governo in materia di energia nucleare sostenibile, with 81 votes in favour, 51 against and 7 abstentions, completing parliamentary consideration following approval by the Chamber of Deputies on 4 June 2026. At the factual cut-off of this report, however, the Senate’s legislative database continued to classify the measure as “approved definitively, not yet published.” The legally precise position is therefore that Parliament had completed approval of an enabling measure, while promulgation, publication and entry into force had not yet been recorded by the Senate source used for this assessment. The legislation is consequently neither a reactor construction licence nor a site designation. [L]
Article 1 is the programme’s immediate legal pivot. It delegates the Government to adopt one or more legislative decrees within twelve months from the date on which the law enters into force. The delegated framework is exceptionally broad: it encompasses the production and use of sustainable nuclear energy, fuel manufacture and reprocessing, decommissioning of existing installations, radioactive-waste and spent-fuel management, research and fusion, and the reorganisation of institutional responsibilities. The twelve-month period must therefore not be measured from the Senate vote of 23 September. Nor does parliamentary approval establish a legally fixed first-power date. [L]
The technology perimeter also requires precision. The final parliamentary text requires eligible technologies to be identified according to the principle of technological neutrality, using the best nuclear technologies, including modular or advanced technologies recognised under relevant international definitions. It therefore provides a legal framework capable of accommodating SMRs and advanced reactors without reducing the statute to an SMR-only law. Location procedures are likewise still to be operationalised: Article 3 requires the implementing system to define criteria and procedures for localisation on application by project proponents, applying national, European and international technical and safety standards. Consequently, there is no nationally selected reactor site at the cut-off date. [L]
The public financial commitment contained in the enabling measure is equally different from the financing required for an actual reactor programme. Article 5 allocates €20 million for each of 2027, 2028 and 2029, or €60 million across those three years, from resources assigned to MASE under the existing state investment framework. A further €1.5 million in 2026 and €6 million in 2027 is authorised for specified delegated activities. These appropriations should be understood as programme-enabling expenditure. They do not constitute the capital budget for one SMR, still less for a national reactor fleet, and the legislation itself recognises that additional measures may be required where delegated decrees generate expenditure that cannot be accommodated within existing resources. [L]
The scale discussed in national energy planning is considerably larger, but it remains scenaristic. The 2024 PNIEC models a conservative nuclear pathway of approximately 8 GW by 2050, supplying around 11% of electricity demand; it also identifies a technical-economic potential of approximately 16 GW, corresponding to around 22% of demand if the full estimated potential were developed. The PNIEC itself presents the nuclear component as a long-term scenario rather than a committed procurement schedule and makes clear that it does not alter the country’s 2030 policy assumptions. These figures should therefore be used as planning envelopes, not as evidence that Italy has ordered 8 or 16 GW of reactors. [G]
Italy meanwhile starts from zero operating domestic nuclear power reactors. Its four former commercial units — Latina, Garigliano, Trino and Caorso — are shut down and form part of the national decommissioning legacy. The industrial response to possible re-entry is nevertheless real. Nuclitalia, established in May 2025 by Enel, Ansaldo Energia and Leonardo, is owned 51%, 39% and 10% respectively and was created to assess advanced nuclear technologies, initially with a focus on comparatively mature water-cooled SMR designs, their techno-economic suitability and potential industrial partnerships. It is a technology-assessment and industrial-development vehicle; it is not yet a licensed plant developer with an Italian construction project. [I][S]
The same discipline is necessary when describing the global SMR market. The IAEA has identified two SMR designs already in commercial operation: Russia’s floating Akademik Lomonosov, commercially operating since 2020, and China’s HTR-PM, which entered commercial operation in December 2023. Western deployment has moved beyond the purely conceptual stage but has not yet produced a mature commercial fleet demonstrating serial factory economics. Canada’s CNSC issued Ontario Power Generation a licence in April 2025 to construct the first BWRX-300 at Darlington; the first regulatory hold point was removed in March 2026 and OPG subsequently applied for an operating licence. In the United States, the NRC issued the construction permit for TerraPower’s Natrium project in March 2026. These are important regulatory and construction milestones, but construction authorisation, commissioning and sustained commercial fleet operation remain distinct stages. [I]
Italy’s earliest-power debate must therefore be treated as a schedule-risk problem rather than repeated as a political date. Minister Pichetto Fratin stated on 18 September 2026 that nuclear generation could be considered for 2033–2034 “at best.” Separately, Edison, EDF, NUWARD and Italian industrial partners signed a June 2026 declaration directed toward a European SMR programme with the stated objective of initial plants operating in 2035. Neither statement constitutes a licensed Italian project schedule. For state planning, this report will therefore examine three explicit programme bands: an earliest credible FOAK case of 2034–2036, a central planning case of 2037–2040, and a delayed case beyond 2042. The first band requires exceptionally favourable conditions: rapid implementing decrees, early selection of a substantially mature design, an acceptable site, adequate regulator capacity, financing closure, grid readiness and construction execution without material FOAK disruption. [G/I/M/U]
Radioactive waste is the programme’s clearest inherited structural constraint. Italy still has no operating National Repository. The proposed CNAI contains 51 potentially suitable areas, but after the voluntary-expression phase produced no self-nominations the site-selection process remained in progress through the Strategic Environmental Assessment route. Sogin reported that the overall national decommissioning programme had reached 47.7% completion at 31 December 2025. Its management continued in 2026 to identify 2039 as the programme objective for completing the National Repository, but that date is an implementation target, not a licensed guarantee. [G]
The back end is also more complex than the phrase “national repository” suggests. The IAEA ARTEMIS review describes the envisaged repository as providing near-surface disposal for very-low- and low-level waste while centralised storage would accommodate intermediate-level waste, high-level waste and spent fuel. The same review recorded that the then-formal 2019 National Programme did not contain a developed geological-disposal plan and recommended that Italy proceed with a programme providing geological disposal as the final destination for spent fuel and high-level radioactive waste. Thus, construction of a surface repository would resolve a major national infrastructure deficit without, by itself, answering the entire high-level-waste and spent-fuel end-state question. [G/I]
The industrial base is genuine but must not be inflated. AIN’s president has stated that approximately 60–70 Italian companies already operate at high levels in the international nuclear sector. Broader historical estimates of around 400 potentially relevant companies describe a convertible industrial population rather than a census of currently nuclear-qualified suppliers. The distinction is decisive: pressure-boundary fabrication, nuclear welding, materials traceability, QA, safety-class instrumentation and nuclear construction require qualifications and documentary controls that ordinary oil-and-gas, power-generation or mechanical capability does not automatically confer. Chapter 4 will therefore reconstruct the industrial base company by company, dividing the documented nuclear core from adjacent and potentially convertible suppliers rather than reproducing headline counts. [I/S]
Three risks dominate the opening programme assessment. First is institutional execution: within a short political window Italy must convert broad delegated principles into a stable licensing regime, reinforce regulatory capacity, define responsibilities and establish a site process that can withstand technical, environmental, regional, municipal and judicial scrutiny. Second is FOAK economics and delivery: the Western SMR market is only now generating genuine construction evidence, so assumptions of serial modularity, compressed schedules or predictable overnight costs remain partly unproven. Third is the back end and social licence: the unresolved repository programme, the ultimate disposal route for high-level waste and spent fuel, territorial consent, workforce capability and the financing of long-duration liabilities can delay or discredit the programme even if reactor technology itself is technically viable. [U]
The strategic decision is consequently not a binary slogan of “nuclear versus no nuclear.” The Government faces at least four materially different architectures: (i) purchase or partner around a comparatively mature Western water-cooled SMR while maximising Italian industrial participation; (ii) place greater strategic weight on Italian-linked advanced-reactor technologies and accept a later, more development-intensive deployment path; (iii) strengthen Italy primarily as a nuclear component, engineering, decommissioning and technology exporter while postponing a domestic FOAK; or (iv) defer irreversible domestic new-build commitments until regulatory, siting and waste-management gates have reached defined levels of maturity. This report will not select one of those political choices. It will establish the factual conditions, costs, dependencies, risks and decision gates under which each becomes executable or ceases to be credible. [U]
The immediate state task in late 2026 is therefore not to announce where a reactor will be built or to pretend that a 2030s commissioning date is already secured. It is to determine whether Italy can transform the parliamentary delegation into a licensable, financeable, technically defensible and auditable national programme integrating reactor technology, siting, regulator independence, grid infrastructure, industrial qualification, waste management, workforce formation, security, public finance and long-term liabilities within a single governmental architecture.
EXECUTIVE DECISION TABLE
| Issue | Certified position at 26 September 2026 | Status |
|---|---|---|
| Parliamentary status | DDL 1924 finally approved on 23 September; Senate database still states “not yet published” | [L] |
| Senate vote | 81 in favour, 51 against, 7 abstentions | [L] |
| Delegated-decree clock | 12 months from entry into force of the law | [L] |
| Construction authorisation | No reactor construction authorised merely by parliamentary approval | [L] |
| Sites selected | None | [L/G] |
| Technology rule | Technological neutrality; best technologies including modular and advanced reactors | [L] |
| Final safety-authority structure | Still to be defined through delegated implementation | [L] |
| 2027–29 investment provision | €20m/year; €60m total | [L] |
| Additional specified funding | €1.5m in 2026; €6m in 2027 | [L] |
| PNIEC conservative pathway | ~8 GW by 2050; ~11% electricity demand | [G] |
| PNIEC full estimated potential | ~16 GW; ~22% electricity demand | [G] |
| Operating Italian nuclear power reactors | 0 | [G/S] |
| Operating commercial SMR designs globally identified by IAEA | Akademik Lomonosov; HTR-PM | [I] |
| Darlington BWRX-300 | Construction licence issued; construction-stage regulatory process under way | [I] |
| Natrium Kemmerer | NRC construction permit issued March 2026 | [I] |
| Ministerial first-power statement | 2033–34 “at best”; not a statutory or licensed schedule | [M] |
| Edison/EDF/NUWARD industrial objective | First plants operational in 2035; not an Italian licence schedule | [I] |
| Report planning bands | 2034–36 earliest credible / 2037–40 central / >2042 delayed | [U] |
| National Repository | Not operating | [G] |
| CNAI | 51-area proposal; siting process unresolved | [G] |
| Sogin decommissioning progress | 47.7% at 31 December 2025 | [G] |
| Repository programme target | 2039 objective; not a licensing guarantee | [G] |
| Current specialised nuclear industrial core | Approximately 60–70 companies according to AIN/CDP evidence | [I/S] |
| “400–500 companies” claim | Potential/convertible industrial universe; not accepted as nuclear-qualified census | [U] |
INDEX OF THE CERTIFIED REPORT
The report remains limited to the ten mandatory chapters established in the commissioning brief. No eleventh substantive chapter will be created.
Chapter 1 — Legal reset and what the 2026 law actually does
Parliamentary status; promulgation and entry into force; exact content of the delegation; legal consequences of the 1987 and 2011 referendums; technology neutrality; implementing decrees; Euratom obligations; environmental assessment; licensing; State aid; EU taxonomy; expenditure already authorised versus plant financing still undefined.
State, regional, autonomous-province and municipal powers; special-statute protections; Constitutional Court jurisprudence; MASE, ISIN/future authority, ARERA and Sogin; public consultation; voluntary siting; compensation mechanisms; institutional veto points; documented regional positions and litigation exposure.
Chapter 3 — Site screen: where a first Italian SMR could physically and legally stand
A national multi-criteria screen based on seismic hazard, hydrogeology, flooding, tsunami exposure, water availability, heat stress, grid access, population density, transport logistics, protected landscapes, industrial brownfields, former nuclear sites and thermal-generation sites. Sites will be classified Tier A, B and C without inventing coordinates or presenting any location as already selected.
Chapter 4 — The Italian nuclear industrial base as it is, not as headlines describe it
Company-by-company reconstruction of the documented nuclear supply chain: operator and asset owner; NSSS/OEM partnerships; EPC; heavy components; forgings; pressure vessels; piping and valves; digital I&C; casks and fuel-cycle services; decommissioning; waste; engineering; research; fusion; naval applications and testing. Nuclear-qualified companies will be separated from adjacent or potentially convertible companies.
Chapter 5 — Global SMR/AMR reality and the designs Italy can actually choose
Operating, commissioning, constructing, licensed and conceptual technologies will be separated. Assessment will cover the 50–200 MWe band requested by the commission and the approximately 300–400 MWe class increasingly relevant to Italian industrial discussions. Each credible design will be examined by output, coolant, spectrum, fuel, enrichment, licensing maturity, first-unit evidence, industrial linkage to Italy and programme showstoppers.
Chapter 6 — Fuel cycle, radioactive waste, and the missing National Repository
Legacy inventory; foreign reprocessing; residue-return obligations; Sogin sites; CNAI; National Repository; high-level waste; spent fuel; geological disposal; VLLW, LLW, ILW and HLW distinctions; new-build waste implications; decommissioning funds and allocation of long-term costs.
Chapter 7 — System, environmental, seismic and security impacts
Grid integration; capacity value; renewables interaction; inertia; industrial heat and hydrogen; data centres; water availability; dry cooling; Mediterranean heat and drought; seismic and hydrogeological hazards; accident source terms; emergency planning; physical protection; cyber security; insurance and nuclear liability; transboundary notification.
Chapter 8 — Critical path risks: the failure modes that kill the programme
Regulatory delay; inadequate regulator staffing; failure to obtain a volunteer site; constitutional and administrative litigation; FOAK cost escalation; financing and cost of capital; imported-design dependence; fuel and enrichment risk; HALEU constraints; skills; nuclear-grade manufacturing capacity; water; climate resilience; waste stalemate; political reversal and contingent state liabilities.
Chapter 9 — An installation plan with clocks, owners and kill-switches
2026–2050 implementation plan with named institutional owners, measurable milestones and decision gates. Three timing cases: disciplined FOAK 2034–36; central 2037–40; delayed beyond 2042. Technology selection, site qualification, regulatory development, environmental review, financing, construction, commissioning, NOAK replication and repository dependencies will be assigned explicit stop/go criteria and auditable KPIs.
Chapter 10 — Issues not in the political brief, and the decision the government actually faces
Electricity-system alternatives; interconnection; renewables and storage; gas plus CCS; industrial heat; water; insurance; workforce academy; fuel security; export strategy; EU Nuclear Alliance; licensing cooperation; naval and maritime reactor governance; fusion and DTT/ITER; Mediterranean energy security; information ethics after the 1987 and 2011 referendums; and the conditions under which the four principal national strategic architectures are viable.
REFERENCES — OPENING PACKAGE
The references below are the load-bearing sources actually used for this opening package. The complete 25–40-source consolidated source map required by the mandate will be issued after Chapter 10.
[L1] Senate of the Republic — Atto Senato No. 1924, Delega al Governo in materia di energia nucleare sostenibile, legislative status, updated through 23 September 2026.
Senate — DDL 1924 legislative record
[L2] Senate of the Republic — Final Assembly record, sitting No. 458, 23 September 2026, DDL 1924. Contains the approved Articles 1–5 and final parliamentary proceedings.
Senate — Final sitting of 23 September 2026
[L3] Senate of the Republic — Article 1, DDL 1924: twelve-month delegation from entry into force.
Senate — DDL 1924 text
[L4] Senate of the Republic — Article 5, DDL 1924: financial provisions.
Senate — Article 5 financial provisions
[L5] Senate Budget Service — DDL 1924 technical and financial dossier, including the €20m/year 2027–2029 provision and additional delegated expenditure.
Senate — Technical and financial dossier on DDL 1924
[L6] Constitutional Court of Italy — 2011 nuclear referendum admissibility record.
Constitutional Court — 2011 nuclear referendum decision record
[G1] MASE — Piano Nazionale Integrato per l’Energia e il Clima, June 2024.
MASE — PNIEC 2024 full document
[G2] Chamber of Deputies Research Service — 2026 dossier on DDL 1924 and PNIEC nuclear scenarios; records the approximately 8 GW conservative case and approximately 16 GW / 22% full-potential case.
Chamber of Deputies — Nuclear programme dossier
[G3] Sogin — National Repository and Technology Park: current siting process, CNAI, absence of voluntary nominations and continuation through Strategic Environmental Assessment.
Sogin — National Repository and Technology Park
[G4] Sogin — MASE publication of the proposed CNAI containing 51 areas.
Sogin — 51-area CNAI publication
[G5] Sogin — 2025 financial results, published 6 August 2026; national decommissioning completion reported at 47.7%.
Sogin — 2025 financial results and decommissioning progress
[G6] Sogin — Senate hearing on the nuclear delegation law, 2026; confirmation of the 47.7% decommissioning metric and the 2039 repository objective.
Sogin — 2026 Senate hearing
[G7] IAEA — ARTEMIS Mission to Italy, radioactive waste, spent fuel, decommissioning and remediation. Describes the planned National Repository architecture and identifies geological disposal as the final destination required for spent fuel and HLW.
IAEA — ARTEMIS Mission Report on Italy
[I1] Ansaldo Energia — establishment of Nuclitalia, 14 May 2025; Enel 51%, Ansaldo Energia 39%, Leonardo 10%.
Ansaldo Energia — Creation of Nuclitalia
[I2] Edison — 25 June 2026 declaration with EDF, NUWARD and Italian industrial partners regarding the European SMR programme and the stated 2035 operating objective.
Edison — EDF/NUWARD/Italian industry SMR declaration
[I3] IAEA — SMR Platform booklet; operating SMR references including Akademik Lomonosov and HTR-PM.
IAEA — Small Modular Reactor Platform booklet
[I4] Canadian Nuclear Safety Commission — Darlington New Nuclear Project; BWRX-300 construction licence, regulatory hold points and 2026 operating-licence application.
CNSC — Darlington New Nuclear Project
[I5] U.S. Nuclear Regulatory Commission — advanced-reactor licensing highlights; Natrium construction permit issued 9 March 2026.
U.S. NRC — Advanced Reactor Highlights
[I6] Associazione Italiana Nucleare — Stefano Monti interview on the existing specialised supply chain; approximately 60–70 Italian companies described as operating at high international nuclear level.
AIN — Italian nuclear industrial base interview
[S1] Cassa Depositi e Prestiti — assessment of the Italian nuclear industrial base, identifying approximately 70 specialised companies and distinguishing existing supply-chain competence from future deployment potential.
CDP — Italian nuclear sector: status and prospects
[S2] World Nuclear Association — Italy country profile, updated May 2026; historical reactor status and absence of operating domestic reactors.
World Nuclear Association — Nuclear Power in Italy
[M1] ANSA, 18 September 2026 — attributed statement by Minister Gilberto Pichetto Fratin that nuclear generation could arrive in 2033–2034 “at best”; treated in this report as ministerial political timing, not a licensed schedule.
ANSA — Pichetto Fratin on 2033–2034 timing
CHAPTER 1 — LEGAL RESET AND WHAT THE 2026 LAW ACTUALLY DOES
1.1 Executive legal finding
Italy had completed the parliamentary approval of a new enabling framework for sustainable nuclear energy by the factual cut-off of 26 September 2026. It had not, however, yet created an operative legal right to construct a reactor, selected a site, granted a nuclear construction licence, adopted a national nuclear programme, established a final new licensing authority, committed public financing for a reactor project, or fixed a legally binding first-power date.
On 23 September 2026, the Senate gave final approval to DDL No. 1924, Delega al Governo in materia di energia nucleare sostenibile, by 81 votes in favour, 51 against and 7 abstentions, with 140 senators present and 139 voting. The bill had previously been approved by the Chamber of Deputies on 4 June 2026. At the report cut-off, the Senate’s official legislative record continued to state: “approvato definitivamente, non ancora pubblicato” — finally approved, not yet published. The distinction is legally material. Parliamentary approval had been completed, but publication and entry into force had not yet occurred according to the controlling parliamentary record available on 26 September. [L]
The new framework is therefore best described, at the cut-off, as a parliament-approved delegation law awaiting completion of the constitutional publication/entry-into-force sequence, not as an Italian reactor-construction law already capable of supporting physical works. Its central function is to empower the Government to create the detailed legislative framework that does not yet exist. [L]
This distinction must remain intact throughout the national programme:
| Legal stage | Position at 26 September 2026 | Consequence |
|---|---|---|
| Parliamentary approval | Completed | Parliament has approved the delegation framework |
| Promulgation/publication | Not recorded as completed in Senate status at cut-off | The report cannot treat 23 September as the entry-into-force date |
| Entry into force | Pending at cut-off | Twelve-month delegation clock had not yet begun on the evidence available |
| Legislative decrees | Not yet adopted | Detailed new-build regime does not yet exist |
| National nuclear programme | Mandated for future definition, not yet adopted | No final capacity, technology or site programme exists |
| Reactor technology selection | None | No vendor or design has been selected by law |
| Site designation | None | No municipality or industrial site has been legally selected |
| Environmental approval | None for a new Italian power reactor | Project-specific VIA and other assessments remain future requirements |
| Nuclear construction authorisation | None | No reactor may be represented as authorised for construction |
| Commercial support mechanism | None defined | No CfD, RAB, sovereign loan, state guarantee or regulated strike price exists |
| Commercial operation date | None legally established | 2033–35 statements remain political/industrial objectives |
The practical legal reset is consequently substantial but incomplete. Parliament has authorised the Government to rebuild the nuclear legal architecture. It has not pre-authorised the projects that might eventually be processed through that architecture.
1.2 The twelve-month clock: what actually starts it
Article 1 delegates the Government to adopt one or more legislative decrees within twelve months from the date of entry into force of the law. It does not say twelve months from the final parliamentary vote. That difference becomes particularly important because, at the cut-off, the legislation had not yet been recorded as published. [L]
For programme-management purposes, the correct reference date should therefore be defined as:
T0 = date of entry into force of the enabling law
All statutory countdowns should be measured from T0.
The procedure for the delegated legislation is itself unusually consequential because the future nuclear framework must pass through a multi-institutional sequence. MASE is the proposing ministry, but the decrees are to be prepared in concert, according to their respective competences, with MIMIT, Defence, University and Research, Health, Infrastructure and Transport, Culture, Labour, Civil Protection and Sea Policies, Sport and Youth, and MEF. An agreement in the Unified Conference must be acquired. The Council of State then has 45 days to issue its opinion; expiration of that period does not prevent the Government from continuing. Draft decrees are subsequently transmitted to the competent parliamentary committees, including those responsible for financial matters, which have 30 days to issue opinions. [L]
The law also contains a procedural safeguard against the delegation expiring while parliamentary scrutiny is still under way. If the parliamentary opinion period falls within the final 30 days of the delegation period, or after it, the delegation deadline is extended by 90 days. Where parliamentary committees specifically identify provisions as inconsistent with the statutory principles and criteria and the Government chooses not to comply, it must retransmit the text with its reasons and any amendments; the committees then have a further ten days for their final opinions. [L]
After each legislative decree enters into force, the Government has a further 24 months in which it may adopt corrective and supplementary legislative decrees using the same procedure and within the same principles and criteria. The legal build-out is therefore structurally multi-stage: the first twelve months are intended to create the core framework, but subsequent corrections may continue for two years after individual implementing decrees take effect. [L]
Statutory clock
| Period | Legal action | Decision significance |
|---|---|---|
| T0 | Enabling law enters into force | Delegation clock begins |
| T0 to T0+12 months | Government adopts one or more legislative decrees | Core nuclear legal architecture must be created |
| During decree preparation | Unified Conference agreement | Territorial-government involvement enters national rulemaking |
| During decree preparation | Council of State opinion, 45 days | Administrative-law review |
| Draft decree stage | Parliamentary committee review, 30 days | Subject-matter and financial scrutiny |
| Near delegation expiry | Possible 90-day statutory extension | Prevents parliamentary review from exhausting delegation |
| After each decree | Up to 24 months | Corrective and supplementary decrees possible |
The practical implication is that statements suggesting that Italy obtained an immediately operational reactor regime on 23 September 2026 are legally inaccurate. What Parliament created was a time-bounded mandate to construct that regime.
1.3 What Parliament has actually delegated
The scope of the delegation is broader than the construction of electricity-generating reactors. Article 1 expressly covers four overarching legal areas: sustainable nuclear production and use; nuclear-fuel fabrication and reprocessing; decommissioning, radioactive waste, spent fuel and fusion; and the reorganisation of institutional functions and existing nuclear legislation. “Sustainable nuclear” is explicitly linked to the EU sustainable-finance taxonomy. [L]
Article 2 expands these headings into a national programme covering essentially the entire civil nuclear life cycle.
Statutory perimeter of the delegation
| Area | What the future decrees are authorised to regulate | What does not yet exist |
|---|---|---|
| National programme | Development and use of sustainable nuclear and fusion in the Italian energy mix | Final programme, capacity trajectory and procurement plan |
| Programme governance | Approval, implementation and monitoring responsibilities | Final institutional allocation |
| Public information | Information and training instruments concerning nuclear technologies | Full implementation mechanism |
| EU/international alignment | Alignment with EU law and international obligations | Detailed consolidated nuclear code |
| Legacy facilities | Decommissioning, dismantling and future use of former nuclear sites | Automatic permission to reuse any old site for new nuclear |
| New nuclear plants | Experimentation, siting, construction/installation, operation and decommissioning | Any project-specific authorisation |
| Cogeneration | Nuclear production of electricity, hydrogen and heat | Commercial project |
| Fuel cycle | Fuel fabrication and reprocessing facilities | Italian commercial power-reactor fuel-cycle facility |
| Waste and spent fuel | Temporary storage and final disposal facilities | New repository or geological disposal facility |
| Marine applications | Nuclear energy applications in naval/maritime sector | Operational maritime nuclear licensing regime |
| Fusion | Research, development, use and regulatory framework | Commercial fusion programme |
| Research and innovation | Incentives and support for fission and fusion R&D | Automatic entitlement to subsidy |
| Territories | Promotion and territorial-value measures | Defined compensation schedule |
| Workforce | Training of technicians, engineers, researchers and other specialists | National workforce academy and quantified pipeline |
| Safety governance | Reorganisation of supervision and control; possible new independent authority | Final authority architecture |
| Financial guarantees | Guarantees covering the entire plant life cycle | Complete guarantee design |
| Market support | Possible support for reactor construction and nuclear/fusion generation | CfD, RAB, state loan or guarantee |
| Electricity market | Integration of nuclear production with market rules | Final market design |
[L]
The law therefore reaches far beyond generation. It deliberately connects reactors with fuel, waste, decommissioning, workforce, institutional capacity, financial guarantees and market design. That is an important improvement in legal architecture compared with treating nuclear generation as an isolated power-station decision. It also means that the delegated legislation will fail its statutory purpose if it regulates the front end — construction and licensing — while leaving the back end, regulator resources, operator liabilities or waste end-state insufficiently specified. [U]
1.4 Technology neutrality: the final law is broader than an “SMR-only” statute
One of the most important legal conclusions in this chapter is that the final parliamentary text does not create an express statutory prohibition on every large Generation III or III+ reactor.
Article 3 requires future implementing legislation to identify eligible plant types according to technological neutrality, using the “best nuclear technologies,” including modular or advanced technologies, in accordance with IAEA conventions or definitions and EU sustainability and safety criteria. The word “including” is legally different from “limited to.” [L]
The statutory perimeter should therefore be represented as follows:
Legally established: technology-neutral selection subject to sustainability, safety, EU-law and programme criteria.
Politically and industrially prominent: SMRs, advanced modular reactors and other advanced systems.
Not established in the final statutory text: a categorical legal exclusion of every larger Generation III/III+ design solely because of electrical output or reactor size.
That distinction matters for the later technology down-select. Government policy may choose to prioritise SMRs or AMRs. Economic modelling may conclude that particular large-reactor configurations are inconsistent with Italian system, financing or siting constraints. A future national programme might therefore narrow the actual field considerably. But those would be programme or implementation choices, not the same thing as a prohibition already enacted by Parliament.
The final text also ties eligibility to “sustainable nuclear” under the applicable EU taxonomy, rather than inventing an autonomous Italian definition detached from EU requirements. [L]
This legal formulation has two implications.
First, the technology-selection process must be based on stated criteria capable of surviving administrative and judicial review. A government cannot credibly invoke technological neutrality while designing selection rules that are covertly vendor-specific without objective technical justification. [U]
Second, technology neutrality does not mean technical equivalence. A light-water SMR with an advanced Western licensing dossier, a lead-cooled fast reactor requiring a different fuel strategy, a high-temperature gas reactor, a microreactor and a gigawatt-class Generation III+ reactor present fundamentally different licensing, waste, financing, grid and industrial requirements. The statute leaves the door open; the future programme must perform the engineering discrimination. [U]
1.5 The national programme will become the central policy instrument
The delegation requires creation of a national programme for sustainable nuclear and fusion. Its statutory objectives include decarbonisation, energy security, resilience and independence, avoidance of supply interruption, energy-cost containment and industrial competitiveness. These are legislative objectives; they are not findings that any specific reactor technology has already been proven to deliver them at a particular cost. [L]
The distinction is important. Parliament has defined the purposes against which the programme should be constructed. It has not answered the underlying empirical questions.
The future programme must therefore convert political objectives into auditable propositions:
| Statutory objective | Evidence the national programme will need |
|---|---|
| Decarbonisation | Life-cycle emissions, delivery date and displaced marginal generation |
| Security of supply | Capacity contribution, outage assumptions, fuel inventories, grid resilience |
| Energy independence | Uranium, conversion, enrichment, fabrication and vendor dependencies |
| Supply resilience | Fuel contracting, inventory strategy and geopolitical concentration |
| Cost containment | CAPEX, financing cost, strike-price requirement, system costs and contingencies |
| Competitiveness | Industrial electricity impacts and opportunity cost against alternatives |
| National/EU supply chain | Nuclear-qualified capacity rather than general mechanical-industry potential |
| Safety | Design maturity, regulatory reference, site hazard and emergency framework |
| Waste sustainability | Waste volumes, spent-fuel route, repository and geological-disposal strategy |
[U]
A legally sound programme should not use statutory objectives as assumed outcomes. It should demonstrate, technology by technology and scenario by scenario, whether the contemplated fleet can meet them.
No Italian municipality, former nuclear site, thermal-power site, military installation, industrial zone or port had been legally designated for a new power reactor by the enabling act.
Article 3 calls for future siting criteria and procedures, on application by project proponents, consistent with national, EU and international standards. It also permits the legal framework to address cases in which areas meeting relevant characteristics are identified ex ante, but requires consultation of the municipalities concerned and assessment of territorial promotion, compensation and cumulative impacts. [L]
The law therefore creates neither an imposed national reactor map nor an unconditional municipal veto.
For radioactive-waste and spent-fuel facilities, the delegation expressly calls for the possibility of self-candidacies and requires new Strategic Environmental Assessment procedures for planning instruments concerning eligible areas. [L]
This should prevent three categories of legal overstatement:
- A former nuclear site is not automatically authorised for a new reactor because nuclear infrastructure existed there historically.
- A large thermal brownfield is not automatically suitable because it possesses grid and cooling infrastructure.
- A municipality mentioned in technical or political discussion is not a selected site until it has passed the future statutory and regulatory process.
The actual national site screen belongs in Chapter 3.
The delegated framework is intended to establish integrated authorisation procedures under MASE for experimentation, construction, installation and operation of nuclear facilities and associated works. Parliamentary explanation of the approved text states that the resulting title may replace multiple administrative authorisations, concessions, licences, nulla osta and acts of consent. [L]
But the same text contains an explicit boundary: environmental-assessment decisions are excluded from that substitution mechanism. They remain governed by Part II of Legislative Decree No. 152/2006 and the relevant EU-law framework. [L]
The practical distinction is fundamental.
An integrated authorisation can rationalise administrative procedure. It cannot lawfully transform mandatory environmental assessment into an internal administrative box that disappears when the integrated title is issued.
Nor can integration eliminate the independent nuclear-safety function required by Euratom law.
Council Directive 2009/71/Euratom, as amended, requires Member States to maintain a national nuclear-safety framework providing safety requirements, licensing, supervision and enforcement. It further requires a competent regulatory authority that is effectively independent from undue influence and functionally separate from bodies involved in promoting or using nuclear energy. [L]
Accordingly, future Italian legislation may create a single administrative window, coordinate time limits and consolidate the formal title, but it must still preserve substantive regulatory independence in nuclear-safety decision-making. [L/U]
That is particularly important because MASE simultaneously has policy responsibilities relating to the national energy programme. EU law makes it legally unsafe to interpret ministerial procedural coordination as authority to subordinate the independent safety judgment to energy-policy promotion. [U]
The parliamentary text does not itself abolish ISIN or automatically create a successor authority.
Article 2 authorises the Government to reorganise the safety, supervision and control system, including through the reorganisation or suppression of existing bodies, and expressly permits the Government to evaluate the establishment of an independent administrative authority for nuclear safety. The language is enabling, not self-executing. [L]
This conclusion is reinforced by the final Senate proceedings. An amendment that would have made establishment of the new independent authority mandatory was rejected. Separately, the Senate approved an order of the day asking the Government, if it chooses to establish such an authority, to preserve and enhance the technical and regulatory expertise already accumulated within ISIN and other public bodies. [L]
At the cut-off, therefore:
- ISIN continues to exist under the present legal framework;
- a replacement authority has not yet been constituted;
- the delegated legislation must decide the future architecture;
- whatever architecture is chosen must satisfy Euratom independence and resourcing requirements.
The staffing question is not secondary. Directive 2009/71/Euratom requires the competent regulatory authority to have adequate legal powers and human and financial resources. Independence without technical capacity would not satisfy the functional purpose of the EU requirement. [L]
A new-build programme therefore has a regulator-capacity gate before it has a reactor-construction gate.
1.9 The 1987 referendums: what they actually abolished
The legal history is routinely simplified into the proposition that “Italians banned nuclear power in 1987.” That formulation is politically understandable but legally imprecise.
Following the Chernobyl accident, three nuclear-related abrogative referendums were held in November 1987. The Constitutional Court’s admissibility decision identifies their precise objects. They concerned:
- statutory contributions paid to municipalities and regions hosting specified power plants;
- the provision giving CIPE a power to determine potential nuclear-plant areas where the ordinary siting procedure was not completed in time;
- ENEL’s legal power to establish or participate in companies with foreign entities for the purpose of building or operating nuclear installations abroad. [L]
The subsequent presidential decrees formally implemented the resulting abrogations. DPR No. 498/1987 removed the thirteenth paragraph of Law No. 8/1983 relating to the CIPE siting mechanism; DPR No. 499/1987 removed the specified hosting-contribution provisions; and DPR No. 500/1987 removed the relevant ENEL power concerning participation in foreign nuclear projects. [L]
Legal versus political effect of 1987
| Dimension | Effect |
|---|---|
| Direct legal effect | Abrogation of specified statutory provisions |
| Constitutional amendment | None |
| Permanent constitutional prohibition on nuclear generation | None enacted by the referendum itself |
| Immediate policy effect | Major political reversal of the existing nuclear programme |
| Subsequent governmental effect | Suspension/cancellation and eventual phase-out of the operating programme |
| Continuing relevance in 2026 | Constitutional referendum doctrine plus strong political and territorial precedent |
The 1987 vote therefore mattered enormously to the subsequent termination of Italy’s commercial nuclear programme. But its legal effect should not be rewritten retrospectively as an amendment to the Constitution stating that nuclear energy can never again be legislated.
The distinction matters because the Parliament of 2026 remains constitutionally competent to legislate in the energy field, subject to the constraints generated by referendum doctrine, EU law, Euratom law, environmental law and the constitutional allocation of state and regional competences.
1.10 The attempted nuclear return of 2009–2011 and the second referendum
The second legal episode is more directly relevant to the 2026 framework.
During the XVI Legislature, Italy established a new statutory pathway toward nuclear generation through Law No. 99/2009 and the implementing framework principally contained in Legislative Decree No. 31/2010. That regime addressed the localisation, construction and operation of new nuclear installations as well as associated infrastructure.
The Fukushima Daiichi accident in March 2011 fundamentally altered the immediate political environment. Decree-Law No. 34/2011, subsequently converted by Law No. 75/2011, suspended implementation of the new nuclear programme while retaining a future strategic-energy decision process. The Central Office for Referendums at the Court of Cassation considered that the revised legislation still left open a future nuclear option and transferred the pending referendum to Article 5(1) and Article 5(8) of the new decree-law. [L]
On 7 June 2011, the Constitutional Court, in Judgment No. 174/2011, declared the reformulated referendum admissible. The Court described the question as concerning the abrogation of the new provisions permitting the production of nuclear electricity within the national territory. [L]
The referendum of 12–13 June 2011 reached the constitutional participation threshold and the abrogative position prevailed. DPR No. 114/2011 subsequently gave formal effect to the result. [L]
The legal significance of 2011 is stronger for the present programme than a generic reference to “public opinion.” It created a constitutional-law question: to what extent may the ordinary legislature later re-enter a field in which provisions were abrogated through Article 75 of the Constitution?
The answer is neither “never” nor “immediately without constraint.”
1.11 Referendum doctrine: Parliament can legislate again, but it cannot simply nullify the referendum
The controlling Constitutional Court doctrine is more nuanced than both extremes often presented in political debate.
The Court has made clear that the ordinary legislature retains the power to legislate in a subject that has previously been affected by an abrogative referendum. The referendum does not freeze the legal field permanently. The Court summarises its doctrine by stating that, even after a successful referendum, the ordinary legislature retains power to intervene in that field, subject principally to the prohibition on restoring the abrogated legislation. [L]
The corresponding limit is equally real.
In Judgment No. 199/2012, the Constitutional Court invalidated legislation that effectively restored a legal framework abrogated by a referendum only 23 days earlier. The Court held that Article 75 prevents a formal or substantive restoration where the new legislation reproduces the principles and essential normative content of the abrogated scheme without a relevant change in circumstances. [L]
The Court’s reasoning is especially important for the 2026 nuclear programme because it identifies changed circumstances as relevant to the constitutional analysis. There is no fixed judicial rule stating that an abrogative referendum creates an eternal prohibition. Equally, the passage of time by itself is not a legislative blank cheque.
The constitutional question for the 2026 framework is therefore not simply:
“Was nuclear energy rejected in a referendum?”
The legally useful question is:
Does the 2026 legislation, and especially the forthcoming delegated legislation, constitute a genuinely new regulatory framework responding to materially changed legal, technological and factual circumstances, or does it merely reproduce the essential content of the framework previously removed by referendum?
That question cannot be answered definitively before the implementing decrees exist. [U]
Several changes since 2011 are potentially relevant to that eventual analysis: the EU’s 2050 climate-neutrality architecture; subsequent amendments to Euratom nuclear-safety law; evolution of EU radioactive-waste policy; the EU taxonomy; changes in European electricity-market design; the post-2022 security-of-supply environment; new reactor technologies; updated seismic and climate-risk assessment; and a fifteen-year interval since the 2011 vote. These facts may help demonstrate changed circumstances, but they do not immunise future decrees from constitutional review. [L/U]
A defensible implementation strategy should therefore avoid mechanically reviving the 2009–2010 framework. It should document why the new regime differs in safety governance, technology selection, environmental procedure, waste policy, territorial participation, financial liability, regulator independence and international/EU legal context. [U]
1.12 The referendums therefore create legal residue and political residue — but not the same thing
For government decision-making, the two effects should be separated.
Legal residue concerns Article 75 of the Constitution, the Constitutional Court’s prohibition on simple restoration of abrogated rules, and the need to demonstrate a genuinely new statutory architecture.
Political residue concerns public legitimacy, institutional trust, territorial consent and the fact that two generations of Italian nuclear policy were shaped by referendums associated respectively with Chernobyl and Fukushima.
The latter is politically substantial but should not be converted into a legal proposition that no future Parliament may ever legislate on nuclear energy.
Conversely, the fact that Parliament retains legislative power should not be converted into the opposite political proposition that the referendums are irrelevant. They remain part of the legal and institutional history against which siting, consultation and public-information policy will be judged.
Chapter 2 will examine that territorial and political architecture in depth.
1.13 State–regional relations: no blanket regional veto, but no lawful exclusion of regional participation
The 2026 legislation cannot be implemented as though nuclear regulation were exclusively a vertical relationship between MASE and a reactor developer.
The Constitutional Court has already addressed this issue in the context of the previous nuclear framework. In Judgment No. 33/2011, it held unconstitutional a provision of Legislative Decree No. 31/2010 insofar as the single authorisation procedure for construction and operation failed to secure adequate participation of the specifically affected Region before agreement in the Unified Conference. The ruling was grounded in the principle of loyal cooperation where state and regional competences intersect. [L]
The judgment did not establish an unlimited regional power to prohibit all nuclear activity. It established that constitutional allocation of powers cannot be bypassed by an authorisation architecture that reduces materially affected Regions to procedural irrelevance.
The 2026 text reflects that history. It requires an agreement in the Unified Conference during preparation of the legislative decrees and calls for identification of the cases in which agreements with Regions or in the Unified Conference are required, together with any legitimate use of national substitute powers under Article 120 of the Constitution. Article 120 itself requires substitute powers to be exercised in accordance with subsidiarity and loyal cooperation. [L]
The resulting legal position is therefore:
No automatic regional veto over national energy policy. No automatic national right to disregard constitutionally relevant regional participation.
The practical veto points, special-statute protections and region-by-region positions are examined in Chapter 2.
1.14 EU law permits Italy to choose nuclear — but does not exempt nuclear from EU law
Article 194(2) of the Treaty on the Functioning of the European Union preserves each Member State’s right to determine the conditions for exploiting its energy resources, choose between different energy sources and determine the general structure of its energy supply. Italy therefore does not need an EU political mandate to decide that nuclear power may form part of its national energy mix. [L]
That national competence is expressly exercised “without prejudice” to other Treaty provisions. Choosing nuclear does not suspend EU rules on environmental assessment, State aid, competition, electricity markets, public procurement where applicable, nuclear safety, radiation protection or radioactive waste.
The correct legal relationship is therefore:
Italy chooses whether to include nuclear. EU and Euratom law materially constrain how that choice is implemented.
Principal EU/Euratom legal layers
| Instrument | Core obligation | Direct significance for Italian new build |
|---|---|---|
| TFEU Art. 194 | Member State chooses its energy mix | Legal basis for Italian energy-source choice |
| Euratom Treaty | Nuclear-specific Community framework | Investment, safeguards, health/safety and waste obligations |
| Directive 2009/71/Euratom, amended by 2014/87 | National nuclear-safety framework and independent regulator | Licensing system and regulator independence are mandatory |
| Directive 2011/70/Euratom | Spent-fuel and radioactive-waste framework | Italy retains ultimate responsibility for waste it generates |
| Directive 2013/59/Euratom | Basic standards for ionising-radiation protection | Worker/public protection throughout life cycle |
| Directive 2001/42/EC | Strategic Environmental Assessment | Relevant to qualifying national plans/programmes |
| Directive 2011/92/EU, as amended | Project Environmental Impact Assessment | Nuclear power stations and major fuel/waste facilities fall within mandatory EIA categories |
| Regulation 2020/852 + Delegated Regulation 2022/1214 | Sustainable-finance taxonomy | Defines conditions for nuclear activities to qualify under taxonomy |
| TFEU Arts. 107–108 | State-aid control | Future public support may require Commission approval |
[L]
1.15 Euratom requirements begin before operation
A future Italian reactor project would enter the Euratom framework well before commercial operation.
Under Articles 41–43 of the Euratom Treaty, qualifying industrial nuclear investment projects are communicated to the European Commission, which discusses the project with the persons or undertakings concerned and communicates its views. The Treaty therefore creates a European-level investment-information mechanism separate from national construction licensing. [L]
Under Article 37 Euratom, a Member State must provide the Commission with general data concerning any plan for the disposal of radioactive waste in whatever form where implementation could result in radioactive contamination of the water, soil or airspace of another Member State. The Commission issues an opinion within six months after consulting the relevant expert group. [L]
These procedures cannot be treated as decorative post-licensing notifications. A mature Italian programme must build Euratom interactions into the critical path early enough that Commission review does not become a late schedule surprise. [U]
The same principle applies to nuclear safety. The Euratom Nuclear Safety Directive defines “licence” broadly enough to encompass legal responsibility for siting, design, construction, commissioning, operation and decommissioning. It requires an enforceable national framework, not merely a policy document. [L]
1.16 Radioactive waste remains legally linked to new build from the beginning
Directive 2011/70/Euratom establishes a principle that is particularly important for Italy: each Member State has ultimate responsibility for management of the spent fuel and radioactive waste generated in it. If material is shipped to another Member State or a third country for processing or reprocessing, ultimate responsibility for safe and responsible disposal, including resulting waste by-products, remains with the originating State. [L]
That prevents a legally serious Italian programme from treating foreign reprocessing as equivalent to exporting the long-term waste liability.
Article 3 of the 2026 enabling act expressly incorporates the principles of Directive 2011/70/Euratom into the delegated framework. [L]
The legal consequence is significant: a reactor procurement strategy cannot be separated from the spent-fuel strategy. Even where contracts envisage treatment or reprocessing abroad, Italy remains responsible for a legally credible final management route.
Chapter 6 examines the repository and geological-disposal gap in detail.
1.17 Strategic Environmental Assessment: the national programme cannot be designed in an environmental vacuum
The EU Strategic Environmental Assessment Directive, Directive 2001/42/EC, requires environmental assessment for qualifying plans and programmes prepared in sectors including energy and waste management where they set the framework for future development consent of projects falling within the EIA Directive. [L]
The future Italian National Nuclear Programme appears, on its intended function, capable of becoming precisely the type of national energy programme that may set the framework for later nuclear-project consent. The definitive application of the SEA regime will depend on the legal form and content of the programme and the implementing decrees, but a government implementation strategy that assumes the national programme can be insulated from SEA would carry significant litigation risk. [L/U]
This requires precision because the enabling legislation itself does not simply state in one sentence that every component of the national programme is automatically subject to a new VAS. It does, however, expressly require new Strategic Environmental Assessment procedures for planning instruments addressing areas eligible for radioactive-waste and spent-fuel facilities. [L]
For the broader programme, the safer legal design is to determine SEA applicability under Legislative Decree No. 152/2006 and Directive 2001/42/EC at the programme-design stage rather than attempt to defer strategic environmental issues until individual reactor applications. [U]
A programme-level SEA also has a substantive planning advantage: it permits cumulative comparison of reasonable alternatives — technologies, capacity paths, siting strategies, grid effects, water constraints and the no-programme alternative — before project-specific capital is committed.
That planning advantage is analytical; the legal requirement must still be determined under the applicable SEA rules.
1.18 Project-level EIA: a new reactor cannot escape it through procedural integration
The EU EIA Directive places nuclear power stations and other nuclear reactors in Annex I, with the narrow exception of very small research installations below the specified thermal threshold. Annex I also covers major nuclear-fuel, reprocessing, spent-fuel and radioactive-waste installations. These categories require project-level environmental impact assessment before development consent. [L]
Therefore, for a commercial Italian SMR, AMR or larger reactor:
EIA is not optional because the unit is “small.”
The acronym SMR does not create an exemption from EU environmental law.
An Italian integrated licensing system may coordinate the EIA with nuclear and construction procedures, but the enabling statute expressly preserves environmental decisions. A schedule claiming that an integrated MASE authorisation eliminates the environmental-assessment critical path should therefore be rejected. [L/U]
Environmental assessment will also need to interact with site-specific seismic, hydrogeological, cooling-water, climate, biodiversity, landscape and transboundary issues. These matters are examined in Chapters 3 and 7.
1.19 Taxonomy: what the EU classification does and does not mean
The 2026 delegation expressly links “sustainable nuclear” to the EU taxonomy created under Regulation (EU) 2020/852 and its delegated technical criteria. The relevant nuclear provisions are contained principally in Commission Delegated Regulation (EU) 2022/1214. [L]
For new nuclear installations, the delegated regulation includes an activity category covering construction and safe operation of new nuclear power plants using best-available technologies, where the construction permit is issued by 2045, subject to detailed technical and waste-related criteria. [L]
The technical screening regime is not merely a carbon-intensity test. It is connected to nuclear-safety law, IAEA/WENRA parameters and the radioactive-waste/decommissioning framework. Among the relevant taxonomy requirements are documented funding arrangements for radioactive-waste management and decommissioning, operational disposal pathways for lower waste categories, and a documented plan for a high-level radioactive-waste disposal facility to be operational by 2050 under the applicable criteria. [L]
The taxonomy should nevertheless not be misdescribed.
EU taxonomy does not constitute:
- a reactor construction licence;
- a nuclear-safety licence;
- a site authorisation;
- an EIA decision;
- a Commission State-aid approval;
- a sovereign credit guarantee;
- a guarantee that private investors will finance the project;
- a determination that a particular reactor is economical;
- a replacement for the National Repository or geological disposal.
It is fundamentally a sustainable-finance classification framework with technical screening conditions.
This distinction will matter directly to Italian financing. A technology may be taxonomy-eligible yet still be commercially unfinanceable without a long-term revenue mechanism; conversely, public support may still require separate State-aid approval even where the underlying technology qualifies under the taxonomy.
1.20 The taxonomy creates a specific waste-policy credibility test for Italy
Because the national delegation incorporates the EU taxonomy into its concept of sustainable nuclear, waste policy is no longer merely a distant back-end issue. It becomes relevant to the credibility of the front-end investment classification.
The taxonomy’s requirements concerning disposal planning mean that Italy cannot base a sustainable-finance strategy on the assumption that unresolved high-level waste can simply remain in indefinite interim storage without a documented end-state. [L/U]
This does not mean that Italy must possess a fully operating deep geological repository before adopting any nuclear implementing decree. It means that the policy, financing and licensing architecture must contain a credible route capable of satisfying the applicable taxonomy timetable and nuclear-waste law.
The distinction between the planned National Repository for lower-level waste and the still-unresolved geological end-state for high-level waste and spent fuel will be decisive in Chapter 6.
1.21 State aid: Parliament has enabled future support, but has not approved a financing model
Article 2 expressly allows the delegated legislation to regulate possible forms of support for the construction of nuclear and fusion plants and for energy production, provided they are consistent with the national programme. Article 3 similarly permits criteria governing possible support for operators. [L]
This is an authority to design a future support regime. It is not the support regime itself.
As of 26 September 2026 the law does not establish:
| Potential mechanism | Status in Italian 2026 law |
|---|---|
| Two-way Contract for Difference | Not established |
| Regulated Asset Base model | Not established |
| Sovereign construction loan | Not established |
| State credit guarantee | Not established |
| Fixed nuclear strike price | Not established |
| Capacity payment specific to nuclear | Not established |
| State equity commitment to a reactor SPV | Not established |
| Consumer nuclear levy | Not established |
| Guaranteed long-term PPA | Not established |
| FOAK loss-sharing mechanism | Not established |
| Cost-overrun guarantee | Not established |
| Political-shutdown compensation | Not established |
These cannot be inferred from a statutory phrase permitting future “support.”
1.22 EU State-aid control will be a separate project gate
If Italy eventually uses state resources or measures conferring a selective economic advantage to make a nuclear project financeable, the measure may constitute State aid under EU law. Article 108(3) TFEU generally requires planned new aid to be notified to the European Commission and prevents the Member State from implementing it before the required procedure has resulted in a final decision, unless an applicable exemption exists. [L]
EU case law establishes that nuclear generation is not categorically excluded from compatible State aid. In Austria v Commission, Case C-594/18 P, the Court of Justice upheld the Commission decision approving the Hinkley Point C aid package under Article 107(3)(c) TFEU. [L]
But Hinkley is not a blanket approval for future Italian support. Compatibility remains measure-specific.
The contemporary Czech experience illustrates the point. In the new Dukovany programme the Commission has separately examined instruments including state loans, long-duration two-way CfDs and protection against certain political risks. A December 2025 investigation into support for two additional units specifically examined necessity, proportionality, risk allocation and competition effects. [L/I]
For Italy, State-aid strategy must therefore be developed before reactor financing reaches financial close. It cannot be left as a final legal filing after the commercial model has already been negotiated.
1.23 Appropriated public money: €67.5 million is identifiable — but it is not reactor CAPEX
Article 5 contains the immediately quantifiable financial provisions of the enabling law.
It provides €20 million in each of 2027, 2028 and 2029, funded from resources assigned to MASE under the existing state-investment framework. This creates a three-year envelope of €60 million. [L]
Article 5 additionally authorises €1.5 million in 2026 and €6 million in 2027 for the public-information and consultation provisions contained in Article 3(bb) and 3(cc). [L]
The explicit appropriations can therefore be summarised as:
| Year | Programme/investment resources | Information/consultation resources | Explicit total |
|---|---|---|---|
| 2026 | — | €1.5m | €1.5m |
| 2027 | €20m | €6m | €26m |
| 2028 | €20m | — | €20m |
| 2029 | €20m | — | €20m |
| Total | €60m | €7.5m | €67.5m |
These sums should never be presented as the cost of the Italian nuclear programme.
The Senate Budget Service’s scrutiny of DDL 1924 treats the financial provisions as supporting the implementation of the delegation and raises separate questions around the future financial implications of institutional structures, support mechanisms and other delegated measures. [L]
A single commercial reactor would require capital measured in billions, not tens of millions. The €67.5 million explicit envelope is therefore properly classified as legal, institutional, preparatory, information and programme-enabling expenditure, not new-build CAPEX. [L/U]
1.24 The law deliberately leaves the central financing question unresolved
This is one of the most important fiscal findings of Chapter 1.
Parliament has created the authority to consider future support but has not answered who ultimately bears FOAK construction risk.
That unresolved question includes:
- who provides construction debt;
- how much equity a project company must contribute;
- whether the State participates directly;
- whether electricity consumers guarantee revenue;
- whether a CfD or equivalent instrument protects against low market prices;
- who carries interest-rate risk;
- who bears construction delay;
- who bears cost escalation;
- who bears vendor-design change risk;
- how nuclear-specific grid reinforcement is funded;
- how the decommissioning fund is capitalised;
- how waste levies are calculated;
- how long-term spent-fuel liabilities are provisioned;
- whether political or regulatory shutdown risk receives compensation;
- whether FOAK and subsequent NOAK projects receive the same support.
Until these questions are resolved, the programme has a legislative direction but no complete investment architecture.
That is not a drafting defect in itself; a delegation law is not expected to execute a multibillion-euro project-finance contract. But it becomes a programme risk if technology or site commitments are made before risk allocation has been defined.
1.25 Operator responsibility is expressly embedded in the statute
The final text directs the implementing legislation to require financial guarantees at the operator’s expense covering the full life cycle, including the resources required for deactivation, spent-fuel and waste management and final dismantling. It also directs that safety and radiation-protection control costs should be borne by nuclear operators. [L]
This is significant because the legal architecture does not treat decommissioning as a discretionary expenditure to be decided after reactor closure.
But operator liability on paper does not by itself eliminate sovereign fiscal exposure.
Where a state-backed CfD, loan, guarantee, compensation mechanism or public project company is later introduced, the State may assume specific commercial or political risks even while the legal operator retains decommissioning and waste obligations. The future decrees must therefore distinguish:
operator nuclear liability and lifecycle obligations
from
state commercial support and contingent fiscal liabilities.
The Court of Auditors and MEF should be able to identify each separately. [U]
1.26 Recognition of foreign regulatory work: a licensing accelerator, not automatic mutual recognition
The enabling framework contemplates recognition of licences, certifications and other regulatory titles from authorities in OECD Nuclear Energy Agency member states or other states with which appropriate bilateral arrangements exist. [L]
This is potentially important for the Italian schedule. Italy would be entering new build after decades without licensing a domestic commercial power reactor. Reusing safety assessments, design documentation, manufacturing qualifications and licensing evidence produced by an experienced reference regulator could materially reduce duplication.
But the mechanism must not be described as an automatic “licence passport.”
A foreign licence does not eliminate:
- Italian site-specific seismic assessment;
- hydrogeological qualification;
- cooling-water assessment;
- grid studies;
- Italian environmental assessment;
- emergency planning;
- Italian radiation-protection requirements;
- security review;
- Italian construction-law requirements;
- responsibility of the Italian competent safety regulator.
The correct concept is regulatory reliance and recognition where legally appropriate, not outsourcing sovereign safety responsibility. [L/U]
1.27 Minimum approval stack for a future project
The final decrees will determine the precise architecture, but the existing legal framework already makes it possible to identify the minimum categories that cannot simply disappear.
| Gate | Purpose | Status at 26 Sep 2026 |
|---|---|---|
| 1. Entry into force of delegation law | Activates delegation | Pending at cut-off |
| 2. Implementing legislative decrees | Creates operative nuclear framework | Not adopted |
| 3. National Nuclear Programme | Defines national objectives and technology/capacity framework | Not adopted |
| 4. Strategic environmental process where applicable | Assesses programme/planning alternatives | Future |
| 5. Regulator architecture | Establishes/strengthens competent independent safety function | Not finalised |
| 6. Site application/screen | Demonstrates candidate site’s eligibility | No site approved |
| 7. Project EIA | Environmental assessment of reactor and associated works | Mandatory future project gate |
| 8. Nuclear safety assessment | Design/site safety case | No Italian new-build approval |
| 9. Integrated MASE authorisation | Consolidated administrative development consent | Future regime |
| 10. Euratom investment communication | EU nuclear investment review | Future |
| 11. Euratom Art. 37 process where applicable | Cross-border radioactive-discharge assessment | Future |
| 12. State-aid approval if public support is aid | EU competition-law gate | Financing mechanism not yet designed |
| 13. Construction authorisation / first concrete | Physical build permission | None |
| 14. Commissioning authorisation | Testing and fuel-loading stages | None |
| 15. Operating licence | Commercial operation | None |
[L/U]
The exact sequencing may later be consolidated or partly parallelised. The substantive obligations cannot simply be deleted to compress a political schedule.
1.28 What must be completed during the delegated-decree period
The twelve-month delegation period should be treated as a state programme mobilisation window, not merely a legislative drafting exercise.
A credible minimum work programme is as follows.
| Workstream | Lead institutional responsibility | Required output | Deadline | Blocking consequence if absent |
|---|---|---|---|---|
| Nuclear legal code | MASE + Presidency + competent ministries | Coherent implementing decrees | T0+12m | No stable new-build regime |
| National Nuclear Programme | MASE with energy/research institutions | Technology/capacity/programme architecture | Within delegated implementation | No basis for coherent down-select |
| Safety authority | Government/Parliamentary delegated framework | Independent, resourced competent authority or strengthened compliant architecture | Before project safety review | Licensing cannot credibly proceed |
| Licensing procedure | MASE + safety regulator | Stage gates, documentation, timelines, responsibilities | T0+12m | Developers cannot prepare bankable applications |
| Siting rulebook | MASE + regions + regulator | Technical and procedural criteria | T0+12m | No defensible volunteer/site process |
| Environmental integration | MASE/environmental authorities | SEA/VAS, VIA/EIA and nuclear-procedure interface | T0+12m | Litigation and schedule risk |
| Waste/SNF integration | MASE + Sogin + regulator | Repository and long-term waste interface | T0+12m framework | Taxonomy and lifecycle credibility weakened |
| Financial guarantees | MEF + MASE | Operator guarantees, decommissioning/waste funding model | Before project authorisation | Long-duration liabilities unfunded |
| Market-support architecture | MEF + MASE + ARERA where relevant | CfD/RAB/loan/guarantee decision or explicit no-support model | Before procurement/financial close | No bankable revenue/risk allocation |
| EU State-aid strategy | MEF + MASE | Pre-notification/notification route where required | Before implementation of aid | Illegal-aid risk |
| Euratom compliance | MASE + regulator + Foreign Affairs/EU interface | Art. 37, 41–43 and directive-compliance roadmap | Before relevant project milestones | EU-law delay |
| Public participation | MASE + territorial authorities | Consultation and information architecture | During programme/siting design | Social/legal vulnerability |
| Workforce/regulatory staffing | Safety regulator, universities, ENEA and ministries | Recruitment and qualification plan | Start immediately after T0 | Regulatory bottleneck |
| Transitional law | Government | Rules for coexistence/repeal of existing nuclear law | T0+12m | Conflicting statutes and uncertainty |
[U]
The sequencing is critical. Site solicitation before siting rules, technology procurement before regulator readiness, or financial commitments before State-aid strategy would reverse the correct order of programme development.
1.29 Legal “kill switches” before an Italian FOAK commitment
A government-grade programme should define conditions under which an intended FOAK project does not proceed rather than treating every earlier political commitment as irreversible.
For legal purposes, the first unit should not pass into an irreversible procurement/construction commitment unless at least the following conditions exist:
- the delegation has been converted into operative implementing legislation;
- the regulator has demonstrable independence, legal power, specialist staffing and budget;
- the national programme has identified the role of the selected technology;
- the candidate design possesses an adequate reference licensing basis;
- the site process has complied with territorial and constitutional requirements;
- required SEA/VAS and EIA/VIA procedures are lawfully integrated;
- spent-fuel and radioactive-waste responsibilities are contractually and legally allocated;
- operator lifecycle financial guarantees are defined;
- the commercial financing model is complete;
- EU State-aid clearance has been obtained where required;
- relevant Euratom processes are incorporated into the critical path;
- there is no unresolved legal contradiction between the integrated MASE procedure and the independence of nuclear-safety decision-making.
[U]
Failure on these points should cause delay, redesign or termination of a project stage rather than administrative pressure to reinterpret the legal requirements.
1.30 Principal legal vulnerabilities at the start of the programme
Referendum-restoration litigation
Future decrees may be challenged on the argument that they unlawfully restore the substance of the framework rejected in 2011. The Government’s strongest legal defence will not be rhetoric about the age of the referendum; it will be a demonstrably new regulatory architecture responding to changed circumstances and materially updated safety, environmental, waste and institutional requirements. [L/U]
Regulator independence
A model in which the same policy administration effectively promotes the programme and controls final nuclear-safety judgment would face a serious Euratom-law problem. Procedural integration must preserve effective safety-regulatory independence. [L]
Regional participation
An authorisation system that reduces the affected Region to a purely formal role could collide with Constitutional Court precedent on loyal cooperation. At the same time, the precedent does not amount to a general unilateral regional veto. [L]
Environmental sequencing
Attempting to treat integrated permitting as a substitute for strategic or project environmental assessment would conflict with both the final delegation text and EU environmental law. [L]
Waste-law inconsistency
A programme that supports new reactors but leaves spent-fuel end-state responsibilities conceptually unresolved would be difficult to reconcile with the lifecycle approach embedded in the delegation, Directive 2011/70/Euratom and the taxonomy criteria. [L/U]
State-aid sequencing
A project whose economics depend on state support cannot assume that Parliament’s general enabling language constitutes European Commission approval. Notification and compatibility analysis are separate. [L]
Fiscal under-specification
The €67.5 million expressly appropriated across 2026–2029 cannot support reactor construction. A future financing mechanism capable of mobilising multibillion-euro capital remains to be legislated, negotiated or approved. [L/U]
1.31 What is lawful now, what requires a decree, and what requires a project licence
The distinction can be reduced to the following state decision matrix.
| Action | Parliamentary framework exists? | Implementing decree required? | Project authorisation required? |
|---|---|---|---|
| Develop government nuclear policy | Yes | No for policy work | No |
| Prepare implementing legislation | Yes, once law enters into force | This is the delegated function | No |
| Establish National Nuclear Programme | Mandated | Yes | No |
| Reorganise safety authority | Mandated/permitted | Yes | No |
| Define eligible technologies | Principle established | Yes | No |
| Define siting rules | Principle established | Yes | No |
| Invite/site project proposals | Framework contemplated | Yes | Later |
| Select a reactor vendor commercially | Not prohibited as preparatory activity | Operative legal framework required for bankable deployment | Yes before construction |
| Construct reactor | No existing general authorisation from DDL 1924 | Yes | Yes |
| Load nuclear fuel | No | Yes | Specific safety authorisation required |
| Operate commercially | No | Yes | Operating licence required |
| Build fuel-reprocessing facility | No | Yes | Yes |
| Build waste repository | Existing and future law interact | Further procedures required | Yes |
| Grant nuclear CfD/state guarantee | Not created | Additional legal/fiscal architecture likely required | EU State-aid review may apply |
This matrix is the legal baseline against which all subsequent programme claims should be tested.
1.32 Overall legal assessment
The September 2026 parliamentary decision is a genuine legal reset, but it is the beginning of the programme rather than its construction authorisation.
It does four strategically important things.
First, it restores an explicit parliamentary basis for the Government to legislate comprehensively for future nuclear energy after the post-2011 legal retreat.
Second, it deliberately adopts a whole-life-cycle perimeter: generation, fuel, waste, spent fuel, decommissioning, safety institutions, research, skills and market integration are treated as connected legal subjects.
Third, it adopts technology neutrality, with express inclusion of modular and advanced technologies, rather than legislating a single reactor design.
Fourth, it creates a statutory route toward integrated authorisation while preserving environmental procedures and requiring compliance with EU, Euratom and international rules.
What it does not do is equally important.
It does not select a reactor.
It does not select a site.
It does not authorise construction.
It does not establish a final independent safety authority.
It does not solve Italy’s waste end-state.
It does not provide reactor CAPEX.
It does not establish a CfD or other revenue-support mechanism.
It does not secure European Commission approval for future State aid.
It does not make a 2033, 2034 or 2035 commissioning date legally binding.
And it does not erase the constitutional and political consequences of the 1987 and 2011 referendums.
The legal task for the twelve-month delegation period is therefore considerably more demanding than drafting a permitting decree. Italy must construct a modern nuclear state architecture in which safety regulation, territorial participation, environmental assessment, lifecycle finance, radioactive-waste responsibility, EU competition law and Euratom obligations all function before an FOAK project becomes irreversible.
The decisive legal test of the programme will not be whether the Government can produce a decree saying that nuclear plants may be authorised. It will be whether those decrees create an architecture capable of surviving Constitutional Court review, administrative litigation, EU-law scrutiny, Euratom safety requirements, environmental assessment, territorial challenge and multibillion-euro project financing simultaneously.
At 26 September 2026, Parliament had opened that pathway. It had not yet completed it.
CHAPTER 1 — LOAD-BEARING SOURCE REGISTER
[L] Italian legislation, Parliament and constitutional jurisprudence
L1 — Senate of the Republic, Atto Senato No. 1924, official legislative status. Final parliamentary approval on 23 September 2026; status at cut-off: “approved definitively, not yet published.”
Senate — DDL 1924 official legislative record
L2 — Senate of the Republic, final electronic vote, sitting No. 458, 23 September 2026. 140 present; 139 voting; 81 in favour; 51 against; 7 abstentions.
Senate — final vote on DDL 1924
L3 — Senate of the Republic, DDL 1924, Article 1 and full delegated-legislation procedure. Twelve-month period from entry into force; Unified Conference; Council of State; parliamentary opinions; 90-day extension mechanism; corrective decrees within 24 months.
Senate — text of DDL 1924
L4 — Senate of the Republic, DDL 1924, Article 3 — principles and criteria. Technology neutrality, EU taxonomy, IAEA parameters, siting, territorial rules and lifecycle principles.
Senate — Article 3 of DDL 1924
L5 — Senate of the Republic, final sitting of 23 September 2026. Definitive parliamentary text, including safety-authority debate and approved order of the day concerning preservation of ISIN expertise.
Senate — final sitting record, 23 September 2026
L6 — Senate of the Republic, Article 5 financial provisions. €20 million annually for 2027–2029 and €1.5 million/€6 million for specified 2026/2027 information and consultation measures.
Senate — Article 5 financial provisions
L7 — Senate Budget Service, Dossier No. 377 on A.S. 1924. Fiscal scrutiny of the delegation and future financial implications.
Senate Budget Service — Dossier No. 377
L8 — Chamber of Deputies Research Service, Dossier No. 545/1, 25 May 2026. Legislative history, 1987 and 2011 nuclear referendums, previous new-build framework and DDL 2669.
Chamber of Deputies — nuclear delegation dossier
L9 — Constitutional Court, Judgment No. 25/1987. Precise legal subjects of the three 1987 nuclear-related referendum questions.
Constitutional Court — Judgment No. 25/1987
L10 — Official Gazette, DPR No. 499/1987. Abrogation of hosting-contribution provisions following the 1987 referendum.
Official Gazette — DPR No. 499/1987
L11 — Official Gazette, DPR No. 500/1987. Abrogation of the specified ENEL power concerning participation in nuclear projects.
Official Gazette — DPR No. 500/1987
L12 — Constitutional Court, Judgment No. 174/2011. Admissibility of the reformulated 2011 nuclear referendum.
Constitutional Court — Judgment No. 174/2011
L13 — Constitutional Court, Judgment No. 33/2011. Nuclear authorisation and constitutionally required participation of the affected Region under the principle of loyal cooperation.
Constitutional Court — Judgment No. 33/2011 materials
L14 — Constitutional Court, Judgment No. 199/2012. Prohibition on formal or substantive restoration of legislation abrogated by referendum without relevant changed circumstances.
Constitutional Court — Judgment No. 199/2012
L15 — Constitutional Court, institutional jurisprudence synthesis on the limits of the legislature after an abrogative referendum. Confirms that Parliament retains legislative competence while remaining subject to the prohibition on simply reviving the abrogated framework.
Constitutional Court — limits on post-referendum legislation
[L] European Union and Euratom law
L16 — Treaty on the Functioning of the European Union, Article 194. Member-State right to determine energy mix, subject to other Treaty rules.
EUR-Lex — TFEU Article 194
L17 — Euratom Treaty, consolidated version. Article 37 radioactive-waste notifications and Articles 41–43 nuclear investment communications.
EUR-Lex — Euratom Treaty
L18 — Council Directive 2009/71/Euratom and consolidated amendment framework. National nuclear-safety framework, licensing and effective independence of the competent regulatory authority.
EUR-Lex — Nuclear Safety Directive
L19 — Council Directive 2011/70/Euratom. National responsibility for spent fuel and radioactive waste, including material sent abroad for processing or reprocessing.
EUR-Lex — Spent Fuel and Radioactive Waste Directive
L20 — Council Directive 2013/59/Euratom. Basic radiation-protection standards for workers and the public.
EUR-Lex — Basic Safety Standards Directive
L21 — Directive 2001/42/EC. Strategic Environmental Assessment of qualifying plans and programmes, including energy and waste-management programmes establishing frameworks for future development consent.
EUR-Lex — Strategic Environmental Assessment Directive
L22 — Directive 2011/92/EU. EIA Directive; Annex I includes nuclear power stations/reactors, major fuel-cycle installations and specified spent-fuel/radioactive-waste facilities.
EUR-Lex — Environmental Impact Assessment Directive
L23 — Commission Delegated Regulation (EU) 2022/1214. Technical screening criteria for nuclear activities under the EU taxonomy, including the 2045 construction-permit criterion for qualifying new nuclear installations and waste/decommissioning requirements.
EUR-Lex — Nuclear and gas Taxonomy Delegated Regulation
L24 — TFEU Article 108. Prior Commission control of new State-aid measures and standstill obligation where applicable.
EUR-Lex — TFEU Article 108
L25 — Court of Justice of the European Union, C-594/18 P, Austria v Commission. Grand Chamber judgment concerning State aid for Hinkley Point C.
CJEU — Austria v Commission, Hinkley Point C
L26 — European Commission State Aid Register, SA.117794. Current example of Commission scrutiny of public support for additional Dukovany nuclear units.
European Commission — Dukovany State-aid case SA.117794
CHAPTER 2 — MULTI-LEVEL AUTHORISATION, REGIONS, AND THE POLITICS OF REFUSAL
2.1 Executive finding
Italy’s prospective nuclear authorisation system is not a vertically integrated State procedure in which the central Government can select a technology, designate a municipality and proceed directly to construction. Nor is it a federal-type system in which a Region or municipality possesses an unconditional legal veto over a nationally authorised nuclear programme.
The constitutional position lies between those two extremes.
Nuclear generation intersects at least two principal heads of constitutional competence: “production, transport and national distribution of energy,” a field in which State and regional competences interact, and “protection of the environment and ecosystem,” where the State possesses exclusive legislative competence. Radioactive-waste regulation engages the latter particularly strongly. Constitutional Court jurisprudence has repeatedly held that a Region cannot use its own legislation to make national nuclear law inapplicable throughout its territory; at the same time, where State action centralises administrative powers because of the national scale of the infrastructure, the principles of subsidiarity and leale collaborazione — loyal cooperation — require meaningful territorial participation. [L]
DDL No. 1924 reflects that constitutional history more clearly than some earlier accounts of the programme suggest. Every implementing legislative decree must be preceded by an intesa in the Conferenza Unificata. The future decrees must also identify the circumstances in which the agreement of the directly affected Region or, alternatively, the Unified Conference is required, and must regulate any exercise of the Government’s substitute powers under Article 120 of the Constitution. [L]
The final legislation also creates territorial consultation and possible compensation mechanisms. Where areas suitable for nuclear installations are identified ex ante, consultation of the municipalities concerned must be guaranteed. The future regime may provide environmental, territorial and economic compensatory measures, established during authorisation and financed by project proponents. Populations directly affected must receive targeted information and consultation. [L]
One material distinction must nevertheless be maintained. The final text explicitly provides the possibility of “autocandidature” — self-candidacies — for temporary-storage and final-disposal facilities for radioactive waste and spent fuel. It does not establish an equally explicit statutory municipal self-candidacy right for power reactors. For reactors and other nuclear installations, the final act establishes consultation, territorial measures, operator participation in territorial development and future siting rules, but leaves the precise localisation model to the implementing decrees. Calling the entire future reactor-siting system a legally completed “voluntary municipal candidacy model” would therefore overstate the law as approved at 26 September 2026. [L]
The institutional map is similarly unfinished. MASE is the policy and legislative pivot and is intended to become the administrative centre of an integrated authorisation system. ISIN remains the existing nuclear-safety and radioprotection regulator at the cut-off. The enabling legislation permits a reorganisation of existing bodies and evaluation of a new independent administrative authority; it does not itself abolish ISIN or create the successor authority. ARERA remains central to the economic regulation and recognition of legacy nuclear costs, while Sogin remains the state company responsible for decommissioning legacy installations and for the National Repository and Technology Park under the existing framework. None of those roles should be collapsed into a single “nuclear authority.” [L][G]
The political geography is already differentiated. In the institutional consultation on the enabling legislation, the Regions and Autonomous Provinces eventually expressed a majority favourable position conditional on stronger regional involvement, while Sardinia, Tuscany and Umbria maintained formal opposition. Lombardy has instead adopted measures supporting the advanced-nuclear industrial and research supply chain, without thereby agreeing to host a reactor. Emilia-Romagna has adopted a specific institutional position seeking to exclude the former Caorso site from renewed nuclear generation. Several Regions, including Sardinia, Lazio and Puglia, have separately opposed proposed locations for the National Repository. These categories are legally distinct: opposition to a waste repository is not evidence of opposition to every future reactor, and support for an industrial supply chain is not consent to a reactor site. [G]
The principal governance risk is therefore not a single formal “regional veto.” It is a stack of legally different blocking points: mandatory intergovernmental agreements, independent safety determinations, environmental decisions, territorial consultation, cultural and landscape constraints, administrative appeals, constitutional litigation and, eventually, EU/Euratom processes. A programme can be delayed or invalidated by mishandling any one of these even where no territorial government possesses an absolute power to prohibit national nuclear policy.
2.2 The constitutional architecture: nuclear power crosses several competences at once
Article 117 of the Constitution does not contain a single heading called “nuclear energy.” Instead, a nuclear project intersects multiple constitutional subjects.
For new power plants, the most important is production, transport and national distribution of energy. Constitutional Court jurisprudence has treated nuclear electricity generation as falling substantially within this energy field. At the same time, nuclear safety, radioactive contamination and radioactive-waste management engage the State’s exclusive competence for the protection of the environment and ecosystem. Territorial planning, health protection, civil protection, transport infrastructure, landscape protection and economic development can bring additional State, regional and local responsibilities into the same project. [L]
This produces what the Constitutional Court has historically described through the logic of overlapping competences.
The State possesses exceptionally strong powers because:
- the electricity system is national;
- nuclear safety has consequences extending beyond municipal and regional borders;
- radioactive-waste obligations are national and intergenerational;
- Euratom obligations are borne by the Italian Republic;
- emergency planning and physical security require uniform national standards;
- the consequences of a failure to manage legacy waste cannot be allocated exclusively to one host territory.
Regions nevertheless possess constitutionally protected interests because a nuclear installation has direct consequences for:
- territorial planning;
- regional energy policy;
- health organisation;
- infrastructure;
- civil protection;
- environmental monitoring through regional agencies;
- water and land use;
- local economic development;
- the municipalities physically hosting or surrounding the installation.
This overlap explains why Italian constitutional jurisprudence has rejected both a model of unilateral regional exclusion and a model of territorial irrelevance.
2.3 The Constitutional Court has already rejected unilateral “nuclear-free” regional legislation
The most direct precedent is Constitutional Court Judgment No. 331/2010.
Puglia, Basilicata and Campania had adopted regional provisions seeking, in different forms, to prevent nuclear-generation, fuel, spent-fuel or radioactive-waste installations on their territories in the absence of agreement with the State. The Court held the relevant provisions unconstitutional. [L]
The Court’s reasoning remains highly relevant to the 2026 programme.
For radioactive waste, regulation engages the State’s exclusive constitutional competence for environmental protection. For nuclear generating installations, the applicable constitutional field includes the concurrent energy competence. The Court nevertheless held that the forms and methods of State–Region collaboration must be defined by the competent national legislator. A Region cannot simply enact a territorial prohibition and thereby disapply national legislation it considers undesirable or unconstitutional. Its remedy is constitutional litigation, not unilateral legislative nullification. [L]
The Court’s formulation was unusually clear: adequate participation by the interested Region may be constitutionally necessary, but the Region cannot transform that requirement into an autonomous legislative power to exclude application of national law throughout its territory.
Consequence for the 2026 programme
A resolution stating that a Region is politically opposed to nuclear power is institutionally significant.
A regional statute declaring the entire regional territory legally unavailable to a future nuclear programme is a different proposition and would face the precedent established by Judgment No. 331/2010.
Accordingly:
political refusal ≠ legally conclusive territorial prohibition.
But the inverse is also incorrect:
absence of a regional veto ≠ permission for the State to exclude the Region from the decision process.
2.4 Judgment No. 278/2010: centralisation requires loyal cooperation
In Judgment No. 278/2010, the Constitutional Court reviewed the 2009 national legislation that attempted to reopen the Italian nuclear programme. Multiple Regions challenged the delegation framework.
The Court accepted that national-scale energy infrastructure can justify the allocation of administrative functions to the State through the constitutional principle commonly described as “chiamata in sussidiarietà” — central assumption of functions where uniform national exercise is required. But such centralisation is constitutionally tied to mechanisms of loyal cooperation with territorial institutions. [L]
The consequence is important for the new programme.
The national character of nuclear safety and electricity policy provides strong grounds for State leadership. It does not permit the Government to use national importance as a legal synonym for unilateralism.
The implementing decrees must therefore perform two functions simultaneously:
- preserve a nationally coherent licensing and safety system; and
- provide constitutionally adequate participation for affected Regions.
If the framework overcorrects toward territorial vetoes, national programme execution may become impossible. If it overcorrects toward central administrative substitution, it becomes vulnerable to constitutional challenge.
The legal architecture must therefore distinguish participation, agreement, binding technical safety consent, consultation and political assent rather than treating all five as the same instrument.
2.5 Judgment No. 33/2011: the affected Region cannot be reduced to a spectator
Constitutional Court Judgment No. 33/2011 further refined this principle when examining Legislative Decree No. 31/2010.
The Court declared part of the former authorisation framework unconstitutional because the Region directly affected by a proposed installation was not assured an adequate formal role before the national authorisation decision. The Court required an obligatory regional contribution within the cooperative procedure, even though that contribution did not equate to an unrestricted power to extinguish national policy. [L]
The judgment is particularly important for the 2026 implementing decrees because it demonstrates that formal consultation at a late stage is not necessarily sufficient.
If technical criteria, central-government decisions or preliminary site designations effectively determine the site before the Region enters the process, a nominally later regional procedure may no longer constitute meaningful co-determination. The Court’s earlier nuclear jurisprudence leaves room for constitutional conflict where procedural design makes territorial participation merely ceremonial. [L]
For programme design, this creates a basic principle:
The State can lead the process, but it should not pre-decide the territorial outcome before the constitutionally relevant cooperative stage has real content.
2.6 DDL 1924 incorporates that jurisprudence into the new delegation
The final 2026 text contains two distinct levels of intergovernmental agreement.
First, all implementing legislative decrees themselves require prior agreement in the Unified Conference. Article 1(2) provides that the decrees are adopted on proposal of MASE, jointly with the competent ministries, only after acquisition of the intesa in the Conferenza Unificata, as well as the opinion of the Council of State and parliamentary scrutiny. [L]
Second, Article 3 requires the decrees to determine, in accordance with loyal cooperation:
- the cases in which the agreement of the directly affected Region is necessary;
- the cases in which agreement in the Unified Conference is necessary; and
- the modalities under which the Government may exercise substitute powers under Article 120 of the Constitution. [L]
This is materially stronger than a generic requirement to “hear the Regions.”
It means that territorial-government participation is embedded both:
upstream, when the national regulatory architecture is written; and
downstream, where the future decrees identify project-specific circumstances requiring regional or intergovernmental agreement.
The precise downstream balance is deliberately left to the decrees.
2.7 The Unified Conference is therefore a real programme gate
The Conferenza Unificata brings together the State–Regions Conference and the State–Cities and Local Autonomies Conference. For the nuclear delegation, its importance is not advisory only.
Article 1 expressly requires intesa before each legislative decree. [L]
That creates an important distinction from the Council of State opinion. The law provides a 45-day period for the Council of State and expressly states that the Government may proceed after expiry of that period. The Unified Conference agreement is formulated differently: the statute requires its prior acquisition.
This does not mean that territorial actors obtain a permanent constitutional power to prevent every possible decree indefinitely. Italian public law contains mechanisms for addressing failed intergovernmental agreement, and the future framework will have to operate within broader constitutional doctrine. But from a programme-management standpoint, treating the Unified Conference as an inconsequential consultation stage would be legally unsafe.
Practical implication
Drafting the implementing decrees within MASE and presenting a completed text to the Regions at the end of the twelve-month period would create avoidable schedule and litigation risk.
The intergovernmental negotiation must occur during, not after, drafting.
2.8 The 30 July 2025 institutional consultation anticipated the central dispute
The formal intergovernmental consultation on the Government’s original draft already showed where the territorial conflict would concentrate.
On 30 July 2025, the Conference of Regions and Autonomous Provinces moved from an earlier negative technical assessment to a majority favourable institutional position conditioned on requiring stronger regional participation and agreement on the future implementing decrees. Sardinia, Tuscany and Umbria maintained negative positions. ANCI, representing municipalities, also supported the framework subject to greater municipal involvement in consultation and consideration of territorial compensation. The Government representative accepted the institutional conditions during the Unified Conference proceedings. [G]
This episode matters because the concern raised by the territorial institutions was not simply ideological support or opposition to fission. Much of the institutional dispute concerned who would possess meaningful procedural power when the detailed rules were written and when sites were eventually considered.
The final parliamentary text subsequently incorporated a mandatory Unified Conference agreement for the decrees and a broader loyal-cooperation provision for future regional agreements. [L][G]
The institutional history therefore indicates that territorial participation was not an incidental amendment. It became part of the structural legal bargain underlying the delegation.
2.9 Special-statute Regions and the Autonomous Provinces
Article 4 contains a specific safeguard clause for the Regions with special statutes and the Autonomous Provinces of Trento and Bolzano.
The law and its implementing decrees apply to them compatibly with their respective statutes and implementing provisions, also taking account of Constitutional Law No. 3/2001. [L]
This provision matters because an ordinary delegation law cannot silently erase competences protected by constitutional-level special statutes.
It does not, however, create a blanket nuclear veto for every special-statute territory.
The actual division of competence will depend on:
- the specific autonomy statute;
- its implementing legislation;
- whether the issue concerns energy, environment, land-use planning, health, transport or another matter;
- whether the relevant State competence is exclusive;
- the constitutional principle of loyal cooperation;
- the exact mechanism established by the implementing decrees.
Therefore, special-statute status increases the need for a statute-specific legal analysis; it does not support the generic conclusion that a special-statute Region can automatically exclude national nuclear infrastructure through a unilateral political resolution.
Programme requirement
Before any national site screen reaches candidate-site status in a special-statute Region or autonomous province, the Government should maintain a dedicated competence matrix identifying:
- State-exclusive powers;
- regional/provincial legislative powers;
- transferred administrative functions;
- required agreements;
- planning competences;
- environmental and landscape functions;
- civil-protection responsibilities;
- judicial routes available in the event of competence conflict.
This analysis should precede developer engagement rather than being performed after a site has acquired political momentum. [U]
2.10 Municipalities: politically indispensable, constitutionally important, but not established as absolute veto holders
Municipalities will experience the most immediate consequences of siting but do not possess the same constitutional legislative status as Regions.
The final enabling act nonetheless gives them a defined role.
Where the future system identifies ex ante areas possessing the characteristics to host nuclear-generation, fuel-cycle or waste facilities, the legislation requires consultation of the municipalities concerned. The decrees may also provide territorial-promotion and development measures and must address cumulative impacts where energy installations are already present or authorised in the same territory. [L]
Article 3 additionally requires:
- widespread information for directly affected populations;
- consultation procedures for those populations;
- transparency toward citizens and local administrations concerning nuclear-safety and radioprotection controls. [L]
What the final enabling act does not state is equally important.
It does not establish that:
- a municipal council vote automatically blocks a reactor;
- a local consultative referendum has automatic binding force over the national authorisation;
- every reactor must originate from municipal self-candidacy;
- refusal by one municipality automatically terminates all national proceedings.
Those questions will depend on the implementing decrees and other applicable law.
The political reality may nevertheless be more restrictive than the formal law. A technically suitable reactor project imposed on a municipality against sustained local opposition may generate litigation, planning resistance, consultation disputes and financing uncertainty even where the municipality lacks a formal legal veto.
The distinction between legal authority and social licence must therefore remain visible.
2.11 A critical correction: “voluntary siting” is not one uniform legal concept in the final law
The 2026 legislation is sometimes described as establishing a general voluntary-candidacy system.
The final text is more precise.
For radioactive-waste and spent-fuel facilities
Article 3 explicitly requires the future localisation discipline to contemplate the possibility of self-candidacies for:
- temporary storage of radioactive waste and spent fuel;
- final disposal of radioactive waste;
- final disposal of spent fuel where it is not reprocessable, recyclable or reusable within the statutory framework.
It also requires new Strategic Environmental Assessment procedures for relevant planning instruments concerning eligible areas. [L]
For new reactors and other nuclear installations
The final text establishes:
- future localisation criteria;
- applications by proponents;
- municipal consultation where suitable areas are identified ex ante;
- possible territorial promotion and compensation;
- population-information and consultation requirements;
- loyal-cooperation mechanisms involving Regions.
But it does not use the same explicit “autocandidature” wording to create a completed municipal self-candidacy regime for reactors. [L]
The legal distinction should be preserved in all government communications.
Correct formulation
Waste facilities: explicit statutory possibility of self-candidacy.
Power reactors: future proponent-led localisation framework with territorial consultation and possible compensation; exact degree of voluntariness remains to be established by decree.
This distinction will become decisive in Chapter 3 when individual areas are screened.
2.12 Public consultation is mandatory in principle, but the exact architecture is unfinished
Article 3(cc) requires capillary information for directly affected populations and consultation procedures. Article 3(bb) separately requires a national information campaign on nuclear energy focusing particularly on safety and sustainability. [L]
These are not identical functions.
A national information campaign is government communication.
A site consultation is a decision-process safeguard.
The two should not be merged institutionally.
A credible consultation system should allow the population and territorial authorities to examine, at minimum:
- the proposed technology;
- alternative sites;
- site-selection methodology;
- seismic and hydrogeological studies;
- cooling-water requirements;
- environmental impacts;
- emergency arrangements;
- transport routes;
- spent-fuel and waste strategy;
- projected construction employment;
- permanent employment;
- property and land-use effects;
- local infrastructure requirements;
- compensation proposals;
- decommissioning obligations.
[U]
The parliamentary history is also relevant. Proposals for a broader mandatory public-debate mechanism were debated during the legislative process but did not become the final statutory model. Consequently, the final law’s mandatory baseline is information and consultation, with the detailed form still to be designed; it should not be represented as though Parliament had already enacted a French-style national public-debate architecture for each proposed reactor. [L]
This leaves an important design choice for the decrees.
A minimal notice-and-comment process may satisfy the literal delegation poorly and create constitutional or administrative-law exposure. A structured process allowing evidence, alternative analysis and reasoned governmental responses would provide a more defensible administrative record. [U]
2.13 Compensation: legally contemplated, not yet quantified
The final law explicitly permits the future framework to require the authorised nuclear operator to participate in the promotion, development and enhancement of the host territory.
It provides for consideration of:
- environmental compensation;
- territorial compensation;
- economic compensation.
These measures would be determined in connection with the authorisation and financed by the project proponents, not automatically from general regional budgets. [L]
The enabling act does not specify:
- a €/MW formula;
- a percentage of CAPEX;
- an annual hosting payment;
- free electricity;
- reduced electricity tariffs;
- tax-sharing;
- municipal equity;
- community ownership;
- infrastructure funds;
- duration of payments.
Any such figures reported before the decrees would therefore be policy proposals, not existing legal entitlements.
Compensation must also be separated from safety
A host-community benefit cannot lawfully substitute for:
- nuclear-safety compliance;
- EIA findings;
- seismic qualification;
- radiological protection;
- regulator approval.
The future regime should therefore maintain a clear institutional separation between:
technical eligibility of the site
and
distribution of territorial benefits once a technically eligible site is considered.
Otherwise compensation could be perceived as purchasing acceptance of a site that has not yet satisfied safety criteria. [U]
2.14 Legacy compensation mechanisms provide experience but not an automatic new-build formula
Italy already has experience with territorial compensation around legacy nuclear facilities.
For example, the continuing decommissioning process at Caorso has generated territorial measures for municipalities in the affected area, and the 2026 Transparency Table described an agreement making resources available for redevelopment of the Middle Po Valley, including funds deriving from environmental compensation under existing legacy legislation. [G]
These arrangements provide institutional experience in:
- distributing benefits among multiple municipalities;
- defining affected territories;
- linking payments to legacy nuclear activity;
- maintaining local transparency structures.
They should not, however, be mechanically imported into new-build legislation.
A new reactor represents a different economic asset, risk period and revenue structure from the decommissioning of a closed plant.
The future decrees therefore require a specific new-build compensation model rather than assuming that legacy nuclear payments solve the question.
2.15 MASE: policy owner and future administrative pivot
The Ministry of the Environment and Energy Security occupies the central governmental position in the emerging architecture.
Under DDL 1924:
- the legislative decrees are proposed by the Minister of Environment and Energy Security;
- the national programme is to be created within the delegated framework;
- the future legislation is expected to organise integrated authorisation processes;
- MASE remains the national ministry responsible for energy-policy direction and key environmental functions. [L]
MASE should therefore be understood as the programme and administrative policy pivot, not as a replacement for an independent nuclear-safety regulator.
That separation is essential.
The ministry will have an institutional interest in implementing national energy policy. The safety regulator must be capable of concluding that a proposed design, site or operating condition is unacceptable even where the project is a government priority.
The integrated procedure should therefore be constructed as:
one coordinated administrative pathway
rather than:
one institution exercising every substantive judgment.
At 26 September 2026, ISIN — the National Inspectorate for Nuclear Safety and Radiation Protection — remains the existing Italian regulatory body in the nuclear-safety and radioprotection field.
ISIN describes its current responsibilities as including technical and regulatory activities concerning nuclear installations, radioactive waste and spent fuel, nuclear material, radiological sources and transport, together with inspection, control and participation in European and international nuclear-safety structures. It participates in ENSREG, WENRA and relevant Euratom expert mechanisms. [G]
The 2026 delegation permits:
- reorganisation of existing bodies;
- possible suppression or redistribution of functions;
- evaluation of establishing a new independent administrative nuclear-safety authority.
It does not itself establish that new authority. [L]
During the final Senate proceedings, an order of the day called on the Government, should it establish a new authority, to preserve and enhance the technical and regulatory competence accumulated within ISIN and other public institutions. That is relevant evidence of parliamentary concern about institutional continuity but is not equivalent to the creation of the new authority. [L]
Transition risk
The most dangerous institutional configuration would be an extended transition in which:
- ISIN loses staff or authority;
- the successor authority is not yet fully operational;
- prospective developers submit major new-build dossiers;
- responsibility for technical decisions is unclear.
The decrees should therefore provide explicit continuity rules covering:
- personnel;
- pending authorisations;
- technical guides;
- inspections;
- enforcement;
- international representation;
- document custody;
- funding;
- recruitment.
[U]
The regulator transition must not become a licensing vacuum.
2.17 Nuclear safety is a substantive blocking condition, not simply another stakeholder opinion
The safety regulator’s role differs fundamentally from a Region’s political position or a municipality’s consultation response.
A safety authority applies legal and technical criteria.
If a design or site fails mandatory nuclear-safety requirements, the issue is not resolved through territorial compensation or an intergovernmental political agreement.
Accordingly, the future system must differentiate:
| Institution | Nature of intervention |
|---|---|
| MASE | programme, policy and integrated administrative authorisation |
| Nuclear-safety regulator | independent technical safety/radioprotection judgment |
| Region | constitutionally protected territorial and sectoral participation |
| Municipality | host-community participation, local information and territorial interests |
| Environmental authority | environmental assessment under applicable law |
| Sogin | legacy decommissioning/repository operator under current law |
| ARERA | economic regulation of specified legacy nuclear costs; future role subject to legislation |
| Proponent/operator | project application, financing, construction and lifecycle obligations |
The existence of an “integrated authorisation” should never erase these functional differences.
2.18 ARERA: important for legacy nuclear economics, not the nuclear safety regulator
ARERA’s existing nuclear role concerns primarily the economic treatment and recognition of specified legacy nuclear costs, not reactor safety.
Its June 2025 Deliberation 261/2025/R/eel confirms that ARERA continues to determine nuclear charges associated with decommissioning, closure of the fuel cycle and related Sogin activities using economic-efficiency criteria. It also records that, from 2023, these nuclear costs ceased to be borne directly by electricity users and became charges on the State budget, while ARERA retained its cost-determination functions. [G]
The same decision records that, under Article 26 of Legislative Decree No. 31/2010, Sogin is responsible for end-of-life nuclear installations and the National Repository and Technology Park.
For the new-build programme, ARERA’s future role is not yet fully defined.
Potential future responsibilities could include aspects of:
- electricity-market treatment;
- regulated revenue;
- customer impacts;
- tariff mechanisms;
- regulated infrastructure interaction.
But unless and until delegated legislation assigns such powers, it would be incorrect to describe ARERA as the future economic regulator of new nuclear projects in the same way that it currently scrutinises legacy decommissioning costs. [U]
2.19 Sogin: legacy operator and repository developer, not automatically the future reactor operator
Sogin’s current statutory mission concerns closure of the historical Italian nuclear cycle.
Under existing law and regulatory practice, its responsibilities include:
- maintaining legacy nuclear sites in safety;
- decommissioning former nuclear installations;
- managing associated radioactive waste;
- closure activities for the historic fuel cycle;
- localisation, design, construction and future operation of the National Repository and Technology Park. [G]
Sogin has also developed structured regional Transparency Tables around legacy sites. In 2026 these continued in Piemonte, Emilia-Romagna and Campania, bringing together regional governments, municipalities, ISIN, environmental bodies, health institutions and stakeholders. [G]
These mechanisms represent an existing institutional asset for transparency.
They do not mean that Sogin automatically becomes:
- purchaser of new reactors;
- owner of the future nuclear generation fleet;
- new-build licensing authority;
- safety regulator.
Any such future role would require a separate legal basis.
2.20 The distinction between reactor siting and repository siting must be maintained
A recurring governance error is to merge opposition to the National Repository with opposition to new generating reactors.
The two processes involve different:
- legal bases;
- technologies;
- hazards;
- land requirements;
- economic structures;
- host-community effects;
- operators;
- timelines.
A Region may oppose the National Repository while taking no formal position on a future SMR.
A Region may support nuclear industrial R&D while opposing use of one specific former nuclear site.
A municipality may reject a waste site but later consider an energy facility, or vice versa.
The national programme should therefore maintain separate territorial-position registers for:
- new generating reactors;
- fuel-cycle installations;
- temporary spent-fuel/radioactive-waste storage;
- National Repository;
- future geological disposal;
- legacy decommissioning.
Without this separation, political mapping becomes analytically misleading.
2.21 Documented regional positions on the 2025–2026 nuclear framework
The following table includes only positions supported by identifiable institutional records available at the report cut-off.
| Territory | Documented position | Scope | Legal consequence |
|---|---|---|---|
| Sardinia | Region formally opposed the enabling bill in July 2025 and maintained its negative position when the Conference of Regions adopted a majority conditional position. It objected particularly to the perceived weakness of territorial involvement and siting safeguards. | DDL / new nuclear framework | Political and institutional opposition; not in itself a legally conclusive territorial ban. |
| Tuscany | Region voted against the nuclear delegation in the Conference of Regions on 30 July 2025, citing lack of sufficiently shared State–Region programming and concern over siting/economic criteria. | DDL / new nuclear framework | Formal regional institutional opposition; no automatic veto created by that vote. |
| Umbria | Region issued a negative opinion on the delegation and publicly stated opposition to both fission plants and radioactive-waste facilities in the region; the regional government also announced readiness to challenge the legislation before the Constitutional Court. | DDL / reactors / repository | Political position plus announced litigation intention. The announcement itself was not a Constitutional Court judgment and does not establish a legal regional prohibition. |
| Lombardy | Regional Council measures support an advanced-nuclear technology supply chain, company mapping, research, industrial qualification, Euratom participation and specialised training. | Industrial/research policy | Evidence of industrial-policy support. Not evidence of consent to host a reactor. |
| Emilia-Romagna | Regional order adopted 23 December 2025 directs the Giunta to seek agreement with the Government to exclude a nuclear return at the former Caorso site and continue its decommissioning/redevelopment pathway. | Specific former reactor site | Site-specific institutional opposition. It is not equivalent to a legally binding regional prohibition on all nuclear activities throughout Emilia-Romagna. |
This evidence demonstrates that an Italian national programme will encounter different kinds of territorial politics, not a single North–South or government–opposition divide.
2.22 Sardinia: two separate refusals must not be confused
Sardinia provides the clearest example of why issue separation is necessary.
In December 2024, the Region documented a unanimous institutional position opposing location of the National Repository on the island. Sixteen municipalities associated with the eight identified areas participated in the regional process, and the Region cited environmental, landscape, agricultural and water-supply concerns. [G]
In July 2025, Sardinia separately opposed the Government’s broader nuclear delegation, criticising the proposed governance and territorial role of Regions. [G]
These are therefore two distinct documented positions:
repository refusal
and
opposition to the legislative new-nuclear framework.
Sardinia’s special-statute status adds a further legal dimension because Article 4 of the delegation preserves the special-statute competence framework. But even taken together, these factors should not be simplistically restated as an uncontestable constitutional “Sardinian veto” over all possible national nuclear measures.
Any future Sardinian project would require a dedicated special-statute and constitutional analysis.
2.23 Tuscany: institutional opposition focused substantially on governance
Tuscany’s official July 2025 position opposed the delegation and criticised the absence, in its view, of sufficiently shared programming and structured State–Region decision-making.
The Region specifically connected its opposition to:
- territorial participation;
- siting methodology;
- economic sustainability;
- the role of Regions in matters involving concurrent competences. [G]
The significance for the national programme is procedural as much as political.
A future government should not infer that adoption of stronger loyal-cooperation procedures automatically produces Tuscan acceptance of a reactor. Nor should it infer that Tuscany’s 2025 negative vote gives the Region a unilateral statutory veto.
What can be established from the official record is narrower: Tuscany formally opposed the delegation in 2025 and identified State–Region governance as one basis for that position.
2.24 Umbria: explicit refusal and announced constitutional litigation
Umbria’s position was among the most explicit.
On 29 July 2025, the Region issued a negative opinion and stated publicly that it opposed both fission plants and radioactive-waste repositories in Umbria. The regional environment and energy councillor also announced that the Region was prepared to challenge the legislation directly before the Constitutional Court. [G]
That litigation statement must be reported precisely.
It was an announced intention, not an adjudicated constitutional dispute.
As of the cut-off, it therefore demonstrates elevated litigation risk but should not be reported as though the Constitutional Court had already accepted an Umbria challenge or suspended the legislation.
This is precisely the type of distinction that the national programme’s legal-risk register must maintain.
2.25 Emilia-Romagna: Caorso is not automatically a reusable nuclear site
Emilia-Romagna’s December 2025 order is important for the future site screen.
The Regional Assembly directed the Giunta to seek an agreement with the Government aimed at excluding the return of nuclear generation to the former Caorso site, to continue monitoring decommissioning through Transparency Tables and to support alternative redevelopment based on renewables and hydrogen. [G]
The order demonstrates that historic nuclear use does not create current territorial consent.
Caorso possesses characteristics that could make it relevant to a technical screen — legacy grid connections, industrial infrastructure and nuclear history — but the regional institutional record contains an explicit site-specific objection.
Chapter 3 must therefore classify technical reuse potential and territorial acceptability separately.
No former NPP should be upgraded automatically to a priority site merely because a reactor existed there before 1987.
2.26 Lombardy: industrial support is not equivalent to siting support
The opposite analytical mistake is possible in Lombardy.
Regional measures support:
- mapping nuclear-related industrial capability;
- company qualification and certification;
- nuclear research;
- advanced technology;
- participation in Euratom and European SMR programmes;
- specialist workforce development. [G]
This provides evidence of a proactive industrial and research posture toward advanced nuclear technologies.
It does not establish:
- selection of a Lombardy reactor site;
- agreement by a municipality to host a reactor;
- environmental approval;
- regional consent to a specific new-build project.
Therefore the report will not classify Lombardy as an automatically consenting host region merely because its government supports a nuclear industrial supply chain.
2.27 Repository opposition in other Regions must remain in the repository category
Several other territorial positions belong specifically to the National Repository process.
Puglia, for example, has formally supported municipalities opposing proposed repository locations and has based that position on regional technical and territorial analysis. [G]
Lazio has adopted institutional positions opposing proposed National Repository locations in the Viterbo/Tuscia areas.
These records demonstrate the political difficulty of waste siting.
They do not, without separate evidence, prove that every one of those Regions has adopted an identical position toward every possible future reactor technology or generating site.
This distinction becomes particularly important because Chapter 3 will evaluate large industrial and legacy sites outside the CNAI repository process.
2.28 Regional refusal cannot be analysed without municipal refusal
Regional government positions are only one layer.
A potential site can encounter opposition from:
- the host municipality;
- adjacent municipalities;
- provinces or metropolitan authorities;
- regional government;
- regional legislature;
- local health authorities;
- basin authorities;
- park authorities;
- regional environmental agencies;
- heritage authorities;
- organised civil society;
- landowners.
These actors do not all possess the same legal authority.
But together they can create a cumulative schedule effect even when none individually holds an unconditional statutory veto.
A serious siting process should therefore map the functional radius of institutional opposition, not only the host municipality’s council resolution.
For example, cooling-water infrastructure, transmission lines, heavy-haul transport corridors and emergency-planning arrangements may extend beyond the nominal reactor municipality.
A “volunteer municipality” cannot by itself neutralise legitimate interests of surrounding territories.
2.29 Territorial consultation should occur before irreversible vendor/site coupling
One of the most damaging programme structures would be:
- select a vendor;
- announce a preferred former nuclear or thermal site;
- negotiate financing;
- then begin territorial consultation.
By that point, consultation would reasonably be perceived as seeking approval for a predetermined outcome.
The legal framework instead supports a sequence in which:
national technology requirements → site-screen criteria → territorial dialogue → detailed site investigation → project selection → authorisation
remain sufficiently distinct to permit genuine alternatives.
This does not require the State to grant every local preference determinative force.
It requires the administrative record to demonstrate that consultation occurred while alternatives were still capable of influencing the decision. [U]
That principle is important both for constitutional loyal cooperation and for defensibility before administrative courts.
2.30 Article 120 substitute powers are an exceptional mechanism, not an ordinary siting shortcut
The enabling act expressly requires the future decrees to define the modalities for Government substitute powers under Article 120 of the Constitution. [L]
This provision should not be interpreted as creating a routine mechanism by which the national executive can override any regional disagreement.
Article 120 substitute powers operate within constitutional constraints and the principle of loyal cooperation.
For nuclear programme design, three stages should therefore be separated:
- negotiation and ordinary cooperative procedure;
- formal identification of persistent institutional disagreement;
- only where statutory and constitutional conditions exist, possible substitute action.
Using substitute powers too early would create precisely the litigation risk that the cooperative architecture is intended to reduce.
A programme schedule should consequently never assume that regional disagreement can be converted into a fixed 30- or 60-day override interval unless the final decrees lawfully establish such a mechanism and it survives constitutional scrutiny.
2.31 “Veto” is the wrong generic word for the approval stack
The governance system contains several different kinds of legal effect.
| Instrument | Effect | Can it stop/delay project? |
|---|---|---|
| Nuclear-safety refusal | Binding technical/legal barrier | Yes |
| Negative EIA/environmental decision | Depending on applicable law, can prevent development consent | Yes |
| Required State–Region intesa | Legally significant cooperative gate | Potentially, subject to statutory conflict-resolution mechanism |
| Unified Conference intesa on implementing decrees | Mandatory upstream legislative-process requirement | Yes, as a major decree-process gate |
| Special-statute competence | May require additional legal/administrative accommodation | Potentially |
| Municipal consultation | Must influence administrative record but is not established as absolute veto | Can delay/challenge; not automatic veto |
| Regional political resolution | Political/institutional position | No automatic legal prohibition |
| Municipal council motion | Political/local administrative evidence | No automatic national-law veto unless specific law gives such effect |
| Constitutional Court judgment | Can invalidate legislation | Yes |
| TAR/Consiglio di Stato ruling | Can annul or suspend administrative acts where legal conditions are met | Yes |
| Public campaign/protest | Political/social constraint | No direct legal veto, potentially major execution effect |
| Compensation negotiation | Territorial/economic instrument | Can delay agreement but cannot cure safety non-compliance |
This matrix is more accurate than describing Italy as either a “centralised” or “local-veto” nuclear system.
2.32 Administrative litigation will be a normal programme risk, not an exceptional event
A future Italian reactor authorisation would produce a dense administrative record involving:
- siting criteria;
- environmental assessment;
- landscape constraints;
- water permissions;
- grid infrastructure;
- procurement;
- consultations;
- regional agreements;
- municipal acts;
- nuclear-safety determinations;
- emergency planning.
Any materially defective act may provide a route to administrative litigation.
Likely claims could concern:
- lack of competence;
- procedural omission;
- inadequate reasoning;
- defective environmental assessment;
- failure to examine alternatives;
- insufficient public participation;
- failure to acquire a legally required agreement;
- inconsistency with territorial planning;
- landscape or cultural-heritage protection;
- unequal treatment between candidate sites;
- failure to disclose or consider relevant technical evidence.
[U]
The appropriate response is not to eliminate judicial review. It is to construct a sufficiently robust record that review does not expose avoidable procedural defects.
2.33 Constitutional litigation remains a separate and potentially more consequential channel
Regions may challenge State legislation directly before the Constitutional Court under the applicable constitutional framework where they allege infringement of their competences.
Conversely, the State can challenge regional legislation that encroaches on State competences.
The 2010–2011 nuclear cases demonstrate both sides of this dynamic.
The most plausible constitutional disputes in the new framework concern:
- inadequate regional participation;
- excessive regional attempt to prohibit national infrastructure;
- use of substitute powers;
- special-statute competences;
- allocation of environmental versus energy powers;
- redesign of the nuclear-safety authority;
- legislation alleged to violate referendum-related constitutional doctrine.
[L/U]
The programme should therefore treat the Constitutional Court not as a remote contingency but as part of the reference class derived from Italy’s previous nuclear attempt.
2.34 The regulator itself must be protected from territorial and central political pressure
An integrated and cooperative authorisation process creates a risk of excessive political negotiation around technical safety judgments.
The future decrees should make explicit that neither:
- regional agreement,
- municipal support,
- economic compensation,
- Cabinet endorsement,
- MASE programme approval,
can substitute for the technical safety findings required from the competent regulator.
This is particularly important where a municipality volunteers or strongly supports a project. Local acceptance cannot convert a seismically, hydrologically or technically unsuitable location into a licensable nuclear site.
Similarly, regional refusal cannot require the regulator to characterise a technically suitable site as unsafe.
The regulatory and political tracks must meet in the final authorisation but remain analytically independent.
2.35 Regional environmental agencies will become operationally important even without being nuclear regulators
The future national nuclear-safety authority will not operate alone.
Regional environmental agencies already conduct monitoring and technical activities around legacy nuclear sites. Sogin’s 2025 and 2026 Transparency Tables show participation by bodies such as ARPA Piemonte and ARPA Campania/ARPAC, alongside ISIN and regional authorities. [G]
For new build, regional agencies may become relevant to:
- baseline environmental radioactivity;
- water monitoring;
- air and soil monitoring;
- environmental-assessment evidence;
- independent regional technical review;
- emergency monitoring;
- public data.
They should not be confused with the national nuclear-safety regulator, but excluding them from the monitoring architecture would discard decades of territorial institutional capacity.
2.36 Emergency planning adds another layer of State–territorial interdependence
Nuclear emergency planning cannot be confined to the reactor perimeter.
Depending on the final design, source term and emergency-planning requirements, implementation can involve:
- Prefectures;
- Civil Protection;
- Regions;
- municipalities;
- health systems;
- fire services;
- law-enforcement agencies;
- environmental monitoring networks;
- transport authorities.
The final licensing structure must therefore ensure that a project’s emergency arrangements are feasible not just technically but institutionally.
A site cannot be considered implementation-ready if the reactor design is licensable but the surrounding territory lacks:
- viable emergency access;
- population-notification arrangements;
- monitoring capacity;
- health-service planning;
- evacuation/shelter arrangements where required;
- institutional command protocols.
Chapter 7 will analyse these physical and security requirements.
2.37 Compensation should be transparent enough for Court-of-Auditors scrutiny
The future compensation system can itself generate governance risk.
If negotiated case by case without transparent criteria, different host territories may receive materially different arrangements without a documented basis.
A government-grade framework should therefore specify at least:
- eligible geographical radius;
- beneficiaries;
- relationship between host and surrounding municipalities;
- environmental versus economic measures;
- one-off versus recurring payments;
- indexation;
- source of funds;
- treatment during construction delay;
- cessation or continuation after shutdown;
- relationship to property taxation;
- audit and publication rules.
[U]
The legislation already places contemplated measures on project proponents. The decrees should prevent them from becoming opaque side agreements.
The same rule should apply to infrastructure benefits such as:
- roads;
- grid upgrades;
- water systems;
- training centres;
- research facilities;
- local energy arrangements.
Territorial development may be legitimate compensation. It should remain auditable.
2.38 The information campaign requires institutional separation from consultation
The law mandates an information campaign concerning the safety and sustainability of nuclear energy.
That creates a governance challenge because MASE is simultaneously:
- sponsor of the legislation;
- future national-programme ministry;
- coordinator of the authorisation framework.
If the national information campaign is presented as persuasive advocacy rather than factual public information, later site consultation may suffer from an institutional credibility deficit.
The system should therefore distinguish at least three communications functions:
| Function | Purpose |
|---|---|
| National public information | Explain technologies, law, risks, waste and programme structure |
| Regulatory communication | Explain safety findings, inspections and technical decisions independently |
| Site consultation | Gather and answer territorial evidence and objections before decisions |
[U]
The regulator should communicate independently on safety.
The project proponent should identify its commercial interest transparently.
MASE should make clear when it is explaining government policy rather than issuing independent safety findings.
This separation becomes particularly important given Italy’s referendum history.
2.39 A national territorial database is required before serious site solicitation begins
The State should not rely on ad hoc political expressions of interest as the primary geographical filter.
The future programme requires a single national evidence base incorporating:
- seismic hazard;
- active faults;
- hydrogeological risk;
- flood risk;
- tsunami exposure;
- cooling-water availability;
- future climate/water stress;
- protected areas;
- Natura 2000 constraints;
- UNESCO/landscape constraints;
- agricultural-value zones;
- population density;
- emergency-access conditions;
- 380/220 kV grid nodes;
- heavy-load transport;
- ports;
- industrial brownfields;
- former power-generation sites;
- existing nuclear sites;
- military/security constraints;
- regional and municipal institutional positions.
[U]
Only after this technical screen should political willingness become a site differentiator.
Otherwise voluntary interest could create pressure to investigate locations that should already have been excluded on physical grounds.
2.40 Territorial refusal should therefore be classified by legal strength
For programme management, a future “regional positions dashboard” should not use only green/red colours.
At minimum, each position should be coded as:
| Code | Meaning |
|---|---|
| P1 | Public political statement |
| P2 | Municipal or regional council motion |
| P3 | Formal Giunta/regional administrative position |
| P4 | Position adopted in State–Region institutional procedure |
| L1 | Administrative appeal filed |
| L2 | Direct Constitutional Court challenge filed |
| L3 | Interim judicial suspension |
| L4 | Final judgment affecting programme |
| C1 | Required intesa withheld |
| C2 | Special-statute competence conflict |
| T1 | Technical environmental/safety objection |
| T2 | Technical exclusion from site criteria |
[U]
This prevents a press statement from being treated as equivalent to a final judgment and, conversely, prevents a technically significant legal objection from being dismissed as generic political opposition.
2.41 Governance architecture required before the first site can become “preferred”
The national programme should not confer preferred-site status until the following institutional work is complete.
| Requirement | Status at 26 Sep 2026 | Required before preferred-site decision |
|---|---|---|
| Implementing decrees | Not adopted | Yes |
| Rules defining Region/Unified Conference intese | Not final | Yes |
| Nuclear-safety authority architecture | Not final | Yes |
| National site criteria | Not final | Yes |
| Municipal consultation procedure | Principle enacted; detail missing | Yes |
| Population consultation procedure | Principle enacted; detail missing | Yes |
| Compensation methodology | Principle enacted; formula missing | Preferably yes |
| Special-statute competence matrix | Not programme-wide | Yes where relevant |
| EIA/SEA procedural interface | Existing law + future integration required | Yes |
| Emergency-planning interface | Existing institutions; new-build rules required | Yes |
| Litigation-management protocol | No dedicated programme framework | Advisable |
| Transparent territorial-position register | Not established | Advisable |
Until these elements exist, identifying a “preferred Italian SMR site” would be politically possible but institutionally premature.
A credible final architecture should assign responsibilities approximately as follows, subject to the implementing decrees.
| Actor | Core responsibility | Must not be confused with |
|---|---|---|
| Council of Ministers / Government | National policy, delegated legislation, strategic decisions and lawful substitute action | Nuclear engineering regulator |
| MASE | National nuclear programme, policy coordination, integrated authorisation architecture | Independent safety authority |
| ISIN / successor authority | Nuclear safety, radioprotection, inspection and technical control | Energy-policy promoter |
| MEF | Fiscal exposure, guarantees, public financing and contingent liabilities | Nuclear regulator |
| MIMIT | Industrial policy and supply-chain development | Site-safety authority |
| Ministry of Health | Relevant health/radioprotection responsibilities | Reactor owner |
| Civil Protection / Prefectures | Emergency preparedness and response | Nuclear design authority |
| Regions | Constitutionally protected territorial competences, planning and cooperative decision-making | Unilateral national-energy legislator |
| Municipalities | Local consultation, territorial evidence and host-community representation | Automatic safety authority |
| ARERA | Existing legacy nuclear cost regulation and future energy-market roles if assigned | Nuclear-safety regulator |
| Sogin | Legacy decommissioning and National Repository under current framework | Automatic future generation utility |
| Project operator | Application, financing, construction, operation, decommissioning and lifecycle liabilities | Public regulator |
| Environmental authorities | SEA/EIA and environmental conditions | Commercial project sponsor |
[L/G/U]
2.43 Critical institutional conflicts to prevent
MASE versus safety regulator
The ministry can coordinate the authorisation; it must not absorb independent safety judgment.
State versus Region
National strategic competence cannot become territorial exclusion from meaningful participation.
Regional participation cannot become unilateral legislative nullification of national law.
Region versus municipality
A regional government should not be assumed to speak automatically for a host municipality, nor vice versa.
Operator versus community
The developer may finance compensation but should not control the public consultation mechanism.
Sogin versus future operator
Legacy waste responsibilities should not be silently transferred to a future generation operator, or new-build liabilities shifted automatically to Sogin, without explicit legislation and funding.
ARERA versus MEF
Economic efficiency review of legacy costs should remain distinct from sovereign decisions on whether to guarantee or subsidise new-build financing.
Information versus advocacy
Public information required by statute should identify uncertainties and lifecycle obligations rather than functioning as a substitute for site consultation.
2.44 Litigation exposure by programme stage
| Stage | Principal litigation exposure |
|---|---|
| Implementing decrees | State–Region competence; insufficient Unified Conference agreement; delegation limits; referendum-related arguments |
| National programme | SEA/VAS applicability; procedural participation; inadequate analysis of alternatives |
| Site-screen rules | Discriminatory/inconsistent criteria; competence disputes; environmental omissions |
| Candidate-site designation | Regional agreement; municipal consultation; special-statute competence; technical criteria |
| Project EIA | Alternatives, biodiversity, water, cumulative impacts, public participation |
| Nuclear safety | Procedural legality; regulator independence; adequacy of technical process |
| Integrated authorisation | Missing opinions/intese; competence; procedural sequencing |
| Compensation package | Equality, public finance, transparency, State-aid implications where relevant |
| Substitute power | Article 120 conditions; subsidiarity; loyal cooperation |
| Construction | Compliance with authorisation conditions; procurement and project changes |
[U]
Litigation cannot be designed out of a democratic administrative system. Procedural defects can.
2.45 The programme should not attempt to “solve” opposition by weakening territorial procedure
The historic record of the 2009–2011 attempt provides an important institutional lesson.
The principal legal advantage of strong consultation and loyal-cooperation mechanisms is not that they guarantee territorial consent. They do not.
Their advantage is that they create a decision record capable of showing:
- who was heard;
- what technical objection was raised;
- whether it was substantiated;
- how alternatives were compared;
- why the final decision was taken;
- what mitigation or compensation was offered;
- which public authority assumed responsibility.
A procedurally stronger system may still approve a project opposed by a territory where national law lawfully permits that outcome.
But it does so from a more defensible constitutional and administrative basis.
2.46 Decision matrix: what a Region can and cannot do
| Action by Region | Legal assessment |
|---|---|
| Oppose national nuclear policy politically | Permissible |
| Adopt council/Giunta resolution opposing a site | Permissible political/institutional act |
| Submit technical objections in environmental procedure | Permissible and potentially material |
| Withhold an intesa where the statute requires one | Legally material; consequences depend on future conflict-resolution rules |
| Challenge State legislation before Constitutional Court | Available where constitutional standing/requirements are met |
| Challenge administrative authorisation through lawful judicial routes | Available subject to standing and procedure |
| Use regional legislation to make national nuclear law categorically inapplicable throughout the Region | Constitutionally vulnerable under Judgment No. 331/2010 |
| Override nuclear-safety requirements because Region supports project | No |
| Declare an unsafe site safe | No |
| Prevent the State from exercising every constitutionally assigned competence merely through political refusal | No automatic power established |
[L]
2.47 Decision matrix: what a municipality can and cannot do under the present enabling act
| Municipal action/status | Position at cut-off |
|---|---|
| Must be consulted where ex ante suitable areas are identified | Yes, principle enacted |
| Directly affected population must receive information/consultation | Yes |
| May receive territorial/economic benefits under future framework | Potentially yes |
| Possesses explicit statutory self-candidacy route for waste facilities | Future waste framework must allow possibility |
| Possesses explicit equivalent statutory self-candidacy right for every reactor | Not established in final enabling text |
| Possesses absolute reactor veto | Not established |
| Can provide technical/planning evidence | Yes |
| Can litigate where lawful requirements are satisfied | Yes, depending on act and standing |
| Can replace nuclear-safety authority | No |
[L]
2.48 Government implementation priorities for the first twelve months
To minimise institutional failure, the implementing phase should deliver, at minimum:
1. A State–Region competence protocol.
It should identify every authorisation stage at which regional intesa, opinion, participation or consultation is required.
2. A special-statute annex.
Separate treatment should be prepared for special-statute Regions and the Autonomous Provinces.
3. A regulator-continuity plan.
If ISIN is replaced or transformed, no gap in safety authority, staffing or international representation should occur.
4. A municipal consultation code.
The process should specify timing, evidence, response obligations and publication.
5. A compensation framework.
It should define eligibility, payer, formula, duration, surrounding municipalities and audit arrangements.
6. A site-position registry.
Political resolutions, technical objections, legal cases and formal intese should be recorded separately.
7. A dispute-escalation protocol.
Ordinary negotiation should precede any consideration of substitute powers.
8. A public-information firewall.
Government policy communication, independent safety communication and project consultation should remain institutionally distinguishable.
9. A transparency protocol.
The existing Sogin Transparency Table experience should be assessed for adaptation to new-build sites without treating Sogin as the future new-build regulator or operator.
10. A litigation-readiness file for every candidate site.
Constitutional competence, environmental process, land-use, cultural heritage, water, grid and consultation records should be assembled before site preference is announced.
[U]
2.49 Overall assessment
The Italian nuclear programme will operate within a system of shared but unequal authority.
The State possesses the strongest legal position over the national energy strategy, nuclear safety framework and radioactive-waste regulation. Constitutional jurisprudence does not permit individual Regions to neutralise national nuclear legislation simply by declaring their territories unavailable.
But the State’s strength is not equivalent to procedural freedom.
The Constitutional Court has repeatedly required loyal cooperation where centralised national action intersects regional energy and territorial competences. The 2026 enabling legislation has internalised this requirement more explicitly than the earlier framework: implementing decrees require an intesa in the Unified Conference, future legislation must identify project stages requiring agreement of the affected Region or the Conference, and Article 120 substitute powers must themselves be regulated within the constitutional framework. [L]
Municipalities acquire statutory consultation rights where areas are identified ex ante, while directly affected populations must receive information and consultation. Possible environmental, territorial and economic compensation is expressly contemplated and is to be financed by project proponents. [L]
The final law nevertheless stops short of making every reactor dependent on an explicit municipal self-candidacy. The explicit self-candidacy provision applies to waste and spent-fuel storage/disposal facilities. The precise reactor-siting system remains for the decrees to establish. [L]
Institutionally, MASE will coordinate the national programme and authorisation architecture, but nuclear-safety independence must remain structurally separate. ISIN remains the existing regulator unless and until new legislation changes that position. ARERA continues to scrutinise designated legacy nuclear costs, and Sogin continues to manage decommissioning and the National Repository programme. A credible new-build system must preserve those functional boundaries rather than construct a nominal “one-stop shop” that confuses policy promotion, safety regulation, environmental assessment and project ownership.
The political landscape is already heterogeneous. Sardinia, Tuscany and Umbria formally opposed the delegation during the territorial institutional process. Emilia-Romagna has specifically opposed reuse of Caorso for renewed nuclear generation. Lombardy has adopted policies supporting the advanced-nuclear industrial chain without consenting to any particular site. Waste-repository opposition in Sardinia, Lazio, Puglia and other territories belongs to a separate legal process and should not be transformed into unsupported claims about reactor siting. [G]
The principal conclusion is therefore not that the Regions possess a veto, nor that the State can override them at will.
It is that territorial legitimacy has become part of the legal critical path.
For the first Italian FOAK, technical siting, constitutional cooperation and public acceptance cannot be treated as sequential problems in which engineering comes first and politics is managed later. They must proceed together.
A site may be technically excellent and institutionally unusable.
A municipality may be politically willing and technically unsuitable.
A Region may oppose a project but lack an absolute legal veto.
The State may possess ultimate strategic competence yet lose years through defective consultation or unconstitutional procedural design.
The objective of the implementing decrees must therefore be to create a system in which those distinctions are resolved before, rather than after, a multibillion-euro project becomes politically and financially committed.
CHAPTER 2 — LOAD-BEARING SOURCE REGISTER
[L] Primary legislation and parliamentary record
L1 — Senate of the Republic, DDL No. 1924, Article 1. Mandatory intesa in the Unified Conference before adoption of the delegated legislative decrees.
Senate — DDL 1924, Article 1 and delegation procedure
L2 — Senate of the Republic, DDL No. 1924, Article 3. Loyal cooperation; circumstances requiring agreement of affected Regions or Unified Conference; Article 120 substitute powers; information and consultation.
Senate — DDL 1924, Article 3
L3 — Senate of the Republic, final Assembly record, 23 September 2026. Definitive Article 3 provisions concerning territorial participation, compensation, consultation, safety transparency and intergovernmental agreements.
Senate — final sitting on DDL 1924, 23 September 2026
L4 — Senate of the Republic, definitive text concerning Article 3(aa)–(cc). Agreement mechanisms, Article 120, national information campaign and consultation of affected populations.
Senate — final text, loyal cooperation and consultation provisions
L5 — DDL No. 1924, waste-siting provision. Explicit possibility of autocandidature for temporary-storage and final-disposal facilities for radioactive waste and spent fuel.
Senate — waste and spent-fuel self-candidacy provision
L6 — Chamber of Deputies Research Service, Dossier 545/1, 25 May 2026. Article 4 safeguard for special-statute Regions and Autonomous Provinces of Trento and Bolzano.
Chamber of Deputies — DDL nuclear delegation dossier and Article 4 safeguard clause
[L] Constitutional Court jurisprudence
L7 — Constitutional Court, Judgment No. 331/2010. Regional legislation cannot unilaterally make State nuclear policy inapplicable; distinguishes State environmental competence and energy competence while requiring adequate cooperative procedures.
Constitutional Court — Judgment No. 331/2010
L8 — Constitutional Court, Judgment No. 278/2010. National-scale nuclear functions, subsidiarity and requirement of loyal cooperation with territorial authorities.
Constitutional Court — Judgment No. 278/2010
L9 — Constitutional Court, Judgment No. 33/2011. Affected Region must have constitutionally adequate participation in the nuclear authorisation process; limits of purely centralised procedure.
Constitutional Court — Judgment No. 33/2011
[G] Existing institutional architecture
G1 — ISIN, institutional profile. Existing national nuclear-safety and radioprotection inspectorate and participation in ENSREG, WENRA and Euratom structures.
ISIN — institutional responsibilities and structure
G2 — ARERA, Deliberation 261/2025/R/eel, 18 June 2025. Economic regulation of legacy nuclear costs; Sogin responsibilities; transfer of nuclear charges from electricity users to the State budget from 2023 while retaining ARERA cost-recognition powers.
ARERA — Deliberation 261/2025/R/eel
G3 — Sogin, institutional responsibilities. Decommissioning, legacy waste management and National Repository programme.
Sogin — institutional profile
G4 — Sogin, Piemonte Transparency Table, 20 April 2026. Example of regional transparency architecture involving legacy sites and territorial institutions.
Sogin — Piemonte Transparency Table 2026
G5 — Sogin, Emilia-Romagna Transparency Table, 17 April 2026. Regional, municipal, ISIN and stakeholder participation around Caorso; territorial compensation associated with the legacy programme.
Sogin — Emilia-Romagna/Caorso Transparency Table 2026
G6 — Sogin, Campania Transparency Table, 16 July 2026. Example of institutional participation around Garigliano involving Region, municipalities, Prefecture, ISIN, environmental agencies and other bodies.
Sogin — Campania/Garigliano Transparency Table 2026
[G] Documented territorial positions
G7 — Autonomous Region of Sardinia, 30 July 2025. Formal negative position on the Government nuclear delegation; records that Sardinia, Tuscany and Umbria maintained opposition when the Conference of Regions moved to a majority conditional position.
Sardinia — official position on the nuclear delegation
G8 — Tuscany Region, 30 July 2025. Official record of Tuscany’s negative vote on the nuclear delegation and its State–Region governance concerns.
Tuscany — official position on the nuclear delegation
G9 — Umbria Region, 29 July 2025. Negative opinion on the delegation, stated opposition to fission plants/repository and announced intention to consider constitutional litigation.
Umbria — official position on the nuclear delegation
G10 — Lombardy Regional Council. Measures supporting advanced-nuclear supply-chain mapping, industrial qualification, research, training and European nuclear programmes; does not itself designate a reactor site.
Lombardy — advanced nuclear industrial-supply-chain act
G11 — Emilia-Romagna Official Bulletin, Order adopted 23 December 2025. Directs the regional government to seek exclusion of renewed nuclear generation at the former Caorso site and continue its alternative redevelopment/decommissioning pathway.
Emilia-Romagna — official Caorso resolution
G12 — Autonomous Region of Sardinia, 13 December 2024. Separate regional opposition to location of the National Repository in Sardinia; records involvement of sixteen municipalities and eight identified areas.
Sardinia — official National Repository position
G13 — Puglia Region. Regional and municipal opposition to candidate National Repository locations; relevant specifically to repository politics rather than automatically to future reactor siting.
Puglia — official National Repository position
END OF CHAPTER 2
CHAPTER 3 — SITE SCREEN: WHERE A FIRST ITALIAN SMR COULD PHYSICALLY AND LEGALLY STAND
3.1 Executive finding
Italy does not possess, as of 26 September 2026, an officially selected site for a new nuclear power reactor. Nor does the September 2026 enabling legislation convert the country’s former nuclear plants, fuel-cycle installations or large thermal-power brownfields into automatically eligible new-build locations. The correct state-level exercise is therefore a national site survey followed by progressively more detailed site evaluation, not the political nomination of a municipality followed by retrospective engineering justification.
The commissioning brief correctly requires the screen to combine nuclear safety, seismicity, hydrogeology, flooding, tsunami/coastal exposure, cooling-water reliability, climate stress, grid connection, large-component transport, population and emergency planning, protected landscapes, agricultural value, existing industrial infrastructure, former nuclear sites and large thermal brownfields. It also expressly prohibits false geographical precision or treatment of a legacy nuclear location as automatically reusable. Testo incollato
This chapter consequently uses screening evidence, not licensing conclusions. A location appears in the comparison because sufficient evidence exists to justify examination of its advantages and constraints. None is described as “approved,” “safe,” “suitable,” or “preferred.” Those findings could arise only after the future statutory siting criteria exist and after site-specific nuclear-grade investigations.
The most consequential national finding is that Italy’s apparently attractive brownfields divide into very different engineering classes.
Montalto di Castro combines an extraordinary nuclear-construction legacy, existing high-voltage infrastructure and major future grid investment, but the site is simultaneously an operating/redeveloping energy asset on the coast and requires a new nuclear-standard assessment of coastal, hydrological, ecological and land-use conditions. The original nuclear project was more than 70% complete when works were stopped after the 1987 policy reversal. Enel Corporate
Trino retains genuine power-reactor history and exceptionally strong transmission evidence through the 380 kV Trino–Lacchiarella corridor. Its former reactor, cooling system and Po abstraction history provide useful engineering knowledge, but this is not equivalent to contemporary site qualification. The Po basin’s severe 2026 water conditions mean that future cooling-water availability and flood/drought combinations must be treated as design-basis questions rather than assumed from historical operation. Sogin
Latina/Borgo Sabotino combines a former power-reactor site, a current 380 kV network presence and the major SA.PE.I. HVDC converter linking Lazio and Sardinia. It is coastal, however, and therefore requires explicit tsunami, coastal-flood, shoreline-evolution and seawater-heat-sink analysis under modern standards. Sogin
Caorso demonstrates why infrastructure memory is insufficient. The site retains nuclear history, Po cooling-water infrastructure and a 380 kV network node, yet the regional institutional record states that the former plant lies on the right bank of the Po within a floodplain area, and the Emilia-Romagna legislature has formally called for exclusion of renewed nuclear generation at the site. BURERT
Garigliano has authentic reactor history but presents a substantially different external-hazard problem: a river/coastal environment, current decommissioning obligations and a municipality classified in seismic zone 2 under the cited regional material. Modern licensing would require a site-specific probabilistic seismic-hazard assessment rather than reliance on the old municipal classification. Sogin
The principal large post-coal brownfields — Torrevaldaliga Nord at Civitavecchia and Federico II/Cerano at Brindisi — have major electrical and logistics advantages but no commercial nuclear-generation history. Both possess 380 kV transmission infrastructure, both are in active government-led reindustrialisation processes, and both compete with other proposed post-coal uses. Civitavecchia also benefits from a major commercial port; Brindisi from a substantial industrial port. Terna Download
Fiume Santo, in north-west Sardinia, combines an industrial power site, 380 kV infrastructure and dedicated maritime logistics, but the Sardinian government is pursuing coal-to-gas/site reconversion and has separately recorded institutional opposition to the national nuclear legislative framework. Its special-statute setting also creates an additional governance layer. Terna Download
Porto Tolle illustrates another form of incompatibility risk. The former thermal station lies in the Po Delta territorial system, where the Regional Natural Park and UNESCO Biosphere Reserve protect a high-value wetland, coastal and agricultural landscape; Enel has separately promoted a tourism-oriented redevelopment of the old power-station area. That combination creates a materially different land-use context from a conventional industrial brownfield. UNESCO
The national screen therefore does not produce one defensible “best Italian SMR site.” It produces a manageable set of site families requiring different Phase-II investigations.
3.2 Geographic reference set
The interactive map below identifies the principal locations assessed in this chapter. The pins are reference locations, not proposed reactor coordinates.
4,4
Use two fingers to move the map
Use ctrl + scroll to zoom the map
Montalto di Castro / Alessandro VoltaNuclear-history / thermal energy site
Trino former nuclear power plantFormer nuclear power plant
Latina former nuclear power plantFormer nuclear power plant
Caorso former nuclear power plantFormer nuclear power plant
Garigliano former nuclear power plantFormer nuclear power plant
Torrevaldaliga NordPost-coal industrial brownfield
Federico II / CeranoPost-coal industrial brownfield
Fiume Santo4,4•Thermal / port-industrial site
Porto TolleFormer thermal-power site
Espandi
3.3 The correct nuclear siting doctrine
The IAEA’s SSR-1, Site Evaluation for Nuclear Installations, requires nuclear siting to identify and evaluate natural and human-induced external hazards, population and land/water characteristics, emergency-planning feasibility and site-specific parameters necessary for design. Floods, seismic ground motion, fault displacement, hydrological conditions and combinations of hazards must be evaluated over the plant lifetime. Nucleus
The associated IAEA site-selection guidance also requires consideration of population distribution, geological conditions, capable faults, seismic shaking, groundwater, shoreline erosion, climate-driven changes in hazards and land/water use. Nucleus
This has an immediate consequence for Italy.
A screening study can identify locations deserving detailed investigation.
It cannot certify a site.
For nuclear purposes, national hazard maps are screening instruments. A licensing dossier would require site-specific field campaigns and quantitative hazard analyses.
National screen versus nuclear site evaluation
| Level | Appropriate evidence | What it can establish |
|---|---|---|
| National site survey | INGV, ISPRA, Terna, protected-area maps, population, industrial/port geography | Eliminate clearly problematic areas and identify candidate families |
| Regional screen | Basin plans, regional seismic/hydrogeological data, land-use planning, protected areas | Refine candidate zones |
| Site characterisation | Boreholes, geophysics, groundwater monitoring, meteorology, bathymetry, hydrology, transport studies | Generate site-specific parameters |
| Nuclear safety evaluation | PSHA, capable-fault analysis, external flooding, tsunami, ultimate heat sink, human-induced hazards | Determine whether proposed design can be safely located |
| Licensing | Regulator-reviewed safety/environmental case | Legal permission for project stages |
No site in this chapter has progressed beyond the first levels of that sequence for a new Italian power reactor.
3.4 Screening dimensions
The national comparison uses twelve principal dimensions.
| Dimension | Core question |
|---|---|
| Seismic hazard | What ground motion, fault displacement, liquefaction and earthquake-induced secondary hazards must the plant withstand? |
| Hydrogeology | Are groundwater, subsidence, erosion, landslide or foundation conditions problematic? |
| External flooding | River, pluvial, dam, storm-surge and combined-event exposure |
| Tsunami/coastal hazard | Run-up, draw-down, marine flooding, shoreline evolution and coastal erosion |
| Cooling / ultimate heat sink | Can safe heat rejection be assured under drought, heatwave and extreme-event conditions? |
| Grid | Is a robust 380/220 kV node available, and what reinforcements would be necessary? |
| Population / emergency planning | Is surrounding population and infrastructure compatible with effective emergency arrangements? |
| Heavy logistics | Can reactor modules, vessels and large transformers physically reach the site? |
| Protected land / landscape | Natura 2000, parks, cultural/landscape designations, high-value agriculture |
| Industrial brownfield value | Existing grid, roads, water works, industrial zoning, security perimeter and workforce |
| Existing nuclear liabilities | Would new build conflict with decommissioning, interim waste or contaminated structures? |
| Legal / territorial readiness | Land availability, municipal/regional procedure, existing redevelopment commitments and litigation exposure |
No numeric national weighting is imposed here because no final Italian nuclear siting regulation containing such weights existed at the cut-off.
3.5 Seismicity: ordinary building classification is not enough
Italy already possesses a national probabilistic seismic-hazard model, MPS04, used within the national seismic framework and available through INGV’s interactive tools. zonesismiche.mi.ingv.it
For nuclear purposes, that model should form a first screen, not the final site basis.
IAEA guidance requires specific assessment of:
- ground-motion hazard;
- capable fault displacement;
- liquefaction;
- settlement;
- landslide;
- earthquake-induced flooding;
- combinations with other external hazards. Nucleus
This distinction is particularly important because municipal seismic “zones” were designed for general construction regulation, not for final nuclear qualification.
For example, current regional material classifies Caorso in seismic zone 3, while technical microzonation explicitly notes that modern NTC practice uses site-dependent ground-motion parameters rather than a simple zone label. Mappa GIS Emilia-Romagna
Similarly, regional documentation places Sessa Aurunca, the Garigliano host municipality, in zone 2 and notes that NTC 2018 requires site-dependent assessment. VIA VAS
Therefore:
“lower seismic zone” must never be translated into “nuclear suitable.”
3.6 Flood and hydrogeological risk
ISPRA’s IdroGEO platform and national hydrogeological-risk reports provide harmonised national data on landslides and flooding. The platform can perform point-centred hazard checks, but nuclear licensing requires a substantially larger geographical and hydrological envelope than an ordinary address check. ISPRA
IAEA SSR-1 requires explicit evaluation of external flooding, including:
- precipitation;
- river floods;
- storm surge;
- wave action;
- tsunami;
- erosion;
- sediment effects;
- combinations of events. Nucleus
This criterion materially changes the interpretation of Po Valley sites.
Caorso
The Emilia-Romagna legislature describes the existing plant as located on the right bank of the River Po in a floodplain area. Sogin’s environmental documentation confirms that the Po remains the principal authorised water source for the site. BURERT
That is not proof that a modern protected SMR could never be engineered there.
It is proof that external flooding cannot be treated as a minor residual issue.
Trino
Trino historically relied on the Po, and Sogin records the former river barrier used to optimise reactor water supply. That structure has since been removed. Sogin
A new reactor would therefore require an entirely new hydraulic case covering:
- low flow;
- flood;
- sedimentation;
- future river morphology;
- competing abstractions;
- climate-change conditions.
Historical ability to cool the Enrico Fermi reactor does not demonstrate future water availability for an SMR fleet.
3.7 Water availability has become a first-order siting variable
The water question has changed materially since Italy last operated commercial reactors.
ISPRA calculated Italy’s renewable water resource in 2025 at approximately 128 billion m³, more than 7% below the long-term annual average and around 19% below 2024. ISPRA
More significantly for northern candidate sites, ISPRA recorded high water-severity conditions in the Po district in August 2026, after persistent above-normal temperatures and declining available resources. ISPRA
The Po Basin Authority had already reported sharply declining river flows in June 2026, restrictions on irrigation withdrawals in some areas and saline intrusion reaching roughly 16–20 km into branches of the delta. Autorità Fiume Po
This does not automatically exclude Trino or Caorso.
It changes the design question from:
Is a large river present?
to:
Can the plant demonstrate an assured ultimate heat sink and acceptable consumptive/thermal impact during future multi-week drought and heatwave conditions without compromising other priority uses?
That requirement affects the choice between:
- once-through cooling;
- wet cooling towers;
- hybrid cooling;
- air/dry cooling.
Lower-water systems can reduce abstraction but generally impose additional capital, footprint or thermal-efficiency penalties. The technology down-select in Chapter 5 must therefore be connected directly to the site-water analysis.
3.8 Coastal sites are not automatically safer from cooling-water constraints
The principal coastal candidates — Montalto, Latina, Civitavecchia, Brindisi, Fiume Santo and the Garigliano coastal/estuarine system — have a potential advantage over inland sites because a large marine heat sink is available.
That benefit comes with different external hazards.
The Italian Tsunami Hazard Model 2025 (ITHM25) covers the entire Italian coastline through probabilistic hazard curves at 1,085 coastal points, using return periods from 475 years to 9,975 years. Cat INGV
Consequently no Italian coastal site should be screened on the assumption that Mediterranean tsunami risk is negligible.
The site case must consider:
- earthquake-generated tsunami;
- submarine-landslide contribution where relevant;
- storm surge;
- extreme wave action;
- sea-level rise;
- shoreline erosion;
- salt-water intrusion;
- marine intake blockage;
- simultaneous loss of off-site power;
- future coastal morphology.
This is particularly important for an SMR design that markets a simplified or passive ultimate heat sink. Passive systems still require the site external-hazard envelope to be demonstrated.
3.9 Grid access is an advantage, not a substitute for a grid study
A first Italian SMR should not be evaluated as an isolated 300 MWe generator.
The relevant issues include:
- short-circuit levels;
- fault ride-through;
- reserve and contingency requirements;
- stability;
- transmission congestion;
- required N-1 reinforcements;
- ability to evacuate multiple units if a fleet is built;
- interaction with future HVDC infrastructure.
Terna’s current development programme foresees more than €23 billion of network investment in 2025–2034 and major Hypergrid reinforcements. Terna
Several candidate areas have unusually strong evidence of transmission infrastructure.
Trino
The 380 kV Trino–Lacchiarella link entered service in 2014 and strengthened the Piemonte–Lombardia transfer corridor. Terna Download
Caorso
Terna documentation identifies a 380 kV Caorso station. Terna Download
Montalto di Castro
Terna records a substantial 380 kV node at Montalto, and the planned Milano–Montalto Hypergrid project envisages two 1,000 MW HVDC circuits reaching a new converter station in Montalto di Castro. Terna Download
Latina/Borgo Sabotino
Terna data identify LATINA NUC on the 380 kV network. Borgo Sabotino is also the mainland end of SA.PE.I., the 1,000 MW HVDC link to Sardinia. Terna Download
Civitavecchia
Terna records Torrevaldaliga Nord generating units connected at 380 kV. Terna Download
Brindisi
The Brindisi/Federico II system is similarly represented on the 380 kV network. Terna Download
Fiume Santo
Terna documentation identifies the 380 kV Fiume Santo–Selargius infrastructure and its integration with Codrongianos. Terna Download
These are meaningful assets.
They do not show that a 300–1,200 MWe nuclear development can be connected without reinforcement.
A formal Terna connection study remains indispensable.
3.10 Population and emergency planning
IAEA site-selection guidance requires population distribution and projected development to be considered around candidate sites, while SSR-1 requires the site evaluation to establish whether effective emergency response arrangements can be implemented. Nucleus
This means the correct variable is not simply:
population inside the municipality.
The required analysis includes:
- settlement distribution around the site;
- seasonal tourism populations;
- hospitals and vulnerable facilities;
- industrial workers;
- ports;
- major road/rail constraints;
- evacuation routes;
- simultaneous natural-hazard scenarios;
- future urban expansion.
For this reason, a major industrial port can be both an advantage and a liability.
Civitavecchia provides excellent heavy-logistics capability, but port activities, passenger movements, industrial installations and surrounding urban development would have to be incorporated into the external-zone and human-induced-hazard assessment.
The same applies to Brindisi.
An isolated-looking industrial parcel on a map does not establish emergency-planning feasibility.
3.11 Human-induced hazards matter particularly at industrial brownfields
The IAEA requires nuclear site evaluation to address human-induced external events including:
- explosions;
- fires;
- hazardous-material releases;
- transport accidents;
- nearby industrial operations;
- electromagnetic interference. Nucleus
This is especially relevant for:
- Brindisi;
- Civitavecchia;
- Porto Torres/Fiume Santo;
- large integrated industrial zones.
Industrial co-location can reduce new infrastructure costs while simultaneously increasing external-hazard complexity.
Therefore an industrial brownfield should never receive an automatic positive score merely because it has:
- land;
- grid;
- port;
- workforce.
Its surrounding industrial risk inventory must also be modelled.
3.12 Heavy-component logistics
One of the strongest theoretical advantages of SMRs is factory manufacture.
That advantage disappears partly if modules cannot physically reach the reactor island.
The national logistics screen must consider:
- available port draught;
- berth dimensions;
- heavy-lift crane capability;
- roll-on/roll-off capability;
- bridge load limits;
- turning radii;
- road gradients;
- rail gauge;
- overhead lines;
- last-mile transport;
- security closures.
The coastal brownfields at Civitavecchia, Brindisi and Porto Torres/Fiume Santo begin with a structural logistics advantage because each has established commercial/industrial maritime infrastructure.
Brindisi port supports extensive cargo-handling operations. adspmam.it
Porto Torres has dedicated industrial-port facilities and historically handled solid and liquid fuels; the port authority records specialised industrial quays and heavy cargo-handling equipment. AdSP Mare di Sardegna
Civitavecchia is a major operating port with substantial freight and passenger traffic. portidiroma.it
For inland Trino and Caorso, the heavy-component route would need to be demonstrated by a dedicated transport survey. Historical reactor construction is not enough: modern SMR module dimensions, bridge standards and transport networks differ substantially from those of the 1960s and 1970s.
3.13 Environmental and protected-area screening
Nuclear siting does not automatically exclude every protected landscape, but the environmental burden increases sharply where a project conflicts with:
- Natura 2000 sites;
- parks;
- wetlands;
- protected coast;
- cultural landscapes;
- high-value agricultural systems.
Porto Tolle
The Po Delta is both a Regional Natural Park and a UNESCO Biosphere Reserve, incorporating wetlands, lagoons, dunes, agricultural land, fisheries and major biodiversity values. UNESCO
That does not constitute a one-line legal determination about every parcel of the former power station.
It does mean that the location cannot be treated like an ordinary unrestricted industrial estate.
Montalto
Regional environmental documentation confirms that the municipality contains geomorphological constraints and protected coastal/Natura features, including the ZSC Litorale a NW delle foci del Fiora. Regione Lazio
The chapter does not assert that the present thermal-plant parcel lies within that ZSC.
It identifies the need for a parcel-level ecological and landscape overlay before any nuclear conclusion is made.
3.14 Former nuclear sites: why they deserve examination — and why they receive no grandfather right
Sogin manages the four former commercial power stations at:
- Trino;
- Caorso;
- Latina;
- Garigliano. Sogin
These locations possess unique assets:
- historical nuclear land use;
- radiological-monitoring knowledge;
- security experience;
- nuclear-skilled local workforce memory;
- existing relationships with ISIN and local authorities;
- historical cooling and grid infrastructure.
But several of those same characteristics are liabilities.
The sites still contain:
- radioactive waste;
- interim stores;
- dismantling works;
- contaminated or controlled structures;
- decommissioning equipment.
New build could interfere physically, organisationally or radiologically with the old programme.
The IAEA specifically requires the interactions between existing and new installations on the same site to be assessed, including common-cause external events and emergency arrangements. Nucleus
Therefore:
nuclear history is evidence of infrastructure memory — not modern site qualification.
3.15 Montalto di Castro — the most unusual brownfield in the national inventory
Montalto is unique because it is neither merely a former thermal site nor merely a historical nuclear proposal.
Enel records that the location was originally selected in the 1970s for two 1,000 MW BWR units. Construction authorisation followed, reactor assembly began in 1985, and the works had exceeded 70% completion when the post-1987 policy reversal halted the nuclear project. The site was subsequently transformed into the Alessandro Volta thermal complex. Enel Corporate
As of 2026, the Alessandro Volta installation remains within an active environmental-authorisation regime, with MASE recording continuing AIA procedures and compliance verification. MITE
Existing advantages
- historical nuclear engineering and civil-development footprint;
- extensive electricity infrastructure;
- existing thermal-generation land;
- 380 kV transmission;
- planned major HVDC investment at Montalto;
- coastal access to a large heat sink;
- substantial industrial land-use history.
Unresolved gates
- modern PSHA and capable-fault analysis;
- coastal flooding and ITHM25 tsunami assessment;
- shoreline/sea-level evolution;
- groundwater and foundation reassessment;
- ecological and landscape constraints;
- interaction with current/future energy uses;
- land availability;
- heavy-module delivery route;
- population and emergency-zone assessment.
Critical point
The original 1970s nuclear licensing work cannot be reused as proof of present suitability.
The useful asset is historical site knowledge.
The safety case must be rebuilt to contemporary standards.
3.16 Trino — strong nuclear and transmission legacy, difficult water question
Trino operated Italy’s PWR Enrico Fermi station from 1965 to 1987 and remains an active Sogin decommissioning site. Reactor and auxiliary-building dismantling are still in progress. Sogin
Existing advantages
- genuine power-reactor operating history;
- existing controlled nuclear site;
- nuclear monitoring/institutional knowledge;
- 380 kV Trino–Lacchiarella infrastructure;
- historically demonstrated thermal-power evacuation;
- large industrial-energy corridor between Piemonte and Lombardia.
Unresolved gates
- continuing decommissioning and temporary radioactive-waste activities;
- Po flood modelling;
- ultimate heat-sink reliability;
- climate-driven drought;
- agricultural and water-use competition;
- groundwater;
- contemporary seismic/fault analysis;
- heavy-component transport;
- emergency-planning demographics.
Sogin records that the old wet cooling towers have already been demolished and that the former Po barrier used to optimise cooling-water supply was removed. Sogin
A new reactor therefore cannot be treated as a simple restart of existing cooling infrastructure.
2026 water warning
The Po district’s water-severity developments in summer 2026 materially strengthen the case for designing any Trino study around future low-flow conditions rather than twentieth-century hydrological averages. ISPRA
3.17 Latina / Borgo Sabotino — nuclear history plus a strategic grid node
The Latina Magnox plant operated from 1964 until 1986 and remains under Sogin decommissioning. Sogin
The site environment is explicitly coastal: Sogin’s monitoring network covers sea water, marine sediments, coastline sand, marine fauna and the nearby canal. Sogin
Existing advantages
- former commercial nuclear-power site;
- existing nuclear institutional presence;
- identified 380 kV node;
- SA.PE.I. HVDC infrastructure at Borgo Sabotino;
- marine heat-sink option;
- historic industrial-energy land use.
Unresolved gates
- tsunami and coastal flooding;
- erosion/sea-level scenarios;
- marine ecological impacts;
- water-intake/outfall design;
- population distribution;
- interaction with SA.PE.I. infrastructure;
- land availability during decommissioning;
- module-delivery route;
- modern site-specific seismic evaluation.
The SA.PE.I. link gives Borgo Sabotino unusual importance to the wider electricity system. That is an argument for detailed grid analysis, not automatic co-location.
3.18 Caorso — valuable infrastructure evidence, unusually difficult siting context
Caorso operated Italy’s largest commercial nuclear reactor and remains under decommissioning.
It also possesses documented 380 kV infrastructure and an existing water abstraction relationship with the Po. Terna Download
But two facts materially distinguish it from Trino and Latina.
First, the official Emilia-Romagna record describes the plant as being inside a Po floodplain area. BURERT
Second, the regional legislature’s December 2025 act directs the regional government to pursue an agreement with the national Government that would exclude renewed nuclear generation at Caorso and continue decommissioning and redevelopment. BURERT
Existing advantages
- former large nuclear-power site;
- existing nuclear-skilled institutional network;
- 380 kV node;
- historical water infrastructure;
- industrial land.
Major unresolved conditions
- floodplain external-hazard case;
- groundwater and Po morphology;
- extreme flood/drought combinations;
- continuing decommissioning;
- regional institutional opposition;
- territorial redevelopment commitments;
- contemporary seismic and geotechnical qualification.
The case illustrates why an old nuclear footprint cannot be equated with a modern siting conclusion.
3.19 Garigliano — historic reactor site with a higher external-hazard burden to resolve
Garigliano at Sessa Aurunca operated a 160 MWe BWR from 1964 to 1978 and is now a decommissioning site. Sogin
The environmental setting combines the Garigliano River, groundwater and the nearby Tyrrhenian coast; Sogin monitors all of those environmental media. Sogin
Regional technical material identifies Sessa Aurunca in seismic zone 2 while correctly noting that NTC 2018 requires site-dependent seismic assessment. VIA VAS
Existing advantages
- genuine reactor operating history;
- existing nuclear institutional footprint;
- existing radiological-monitoring network;
- water-source history.
Unresolved gates
- site-specific PSHA;
- fault-displacement assessment;
- river flood;
- coastal/tsunami interaction;
- groundwater;
- emergency planning;
- present EHV grid capacity;
- current heavy-component route;
- decommissioning interaction.
Compared with a pure industrial brownfield, Garigliano has much better nuclear-history evidence but a more demanding combination of external-hazard questions.
3.20 Civitavecchia / Torrevaldaliga Nord — powerful industrial logic, competing post-coal future
Torrevaldaliga Nord historically operated as a major coal-fired power station. Enel reported that its authorisation no longer allowed coal operation after 31 December 2025 and that it had applied for permanent closure. Enel
The site is connected to the 380 kV system. Terna Download
It also sits within one of Italy’s most capable commercial-port systems.
Existing advantages
- major generation brownfield;
- 380 kV grid;
- maritime logistics;
- industrial workforce;
- large existing energy footprint;
- potential access to seawater cooling.
Unresolved gates
- no commercial nuclear operating history;
- urban/port population;
- nearby industrial/transport hazards;
- tsunami/coastal assessment;
- air/sea/road transport interactions;
- emergency-planning feasibility;
- land availability;
- competing redevelopment.
The latter is substantial.
The Region, MIMIT, municipality and Invitalia have been evaluating 48 redevelopment proposals for the post-coal area, while in July 2026 MIMIT described an active process to make former power-station land available to new industrial investments. Regione Lazio
Any nuclear option would therefore enter an existing land-use and reindustrialisation competition; it would not be occupying an empty abandoned site.
3.21 Brindisi / Cerano — major grid and port assets inside an environmentally burdened industrial territory
The Federico II plant at Cerano was one of Italy’s largest coal-generation sites. Enel’s 2025 reporting states that coal operation could no longer continue after the end of 2025 under the existing permit framework and that permanent closure authorisation had been requested. Enel
Terna identifies the Brindisi system and the south-Brindisi generating complex on the 380 kV network. Terna Download
The Port of Brindisi supports extensive loading, unloading and movement of industrial cargo. adspmam.it
Existing advantages
- very large energy brownfield;
- 380 kV grid;
- major industrial port;
- skilled energy/industrial workforce;
- coastal cooling;
- large-module maritime delivery potential.
Unresolved gates
- nuclear-specific geological and seismic qualification;
- tsunami/coastal flooding;
- emergency planning;
- hazardous-industry interactions;
- cumulative environmental burdens;
- local land-use strategy;
- competing industrial redevelopment.
MIMIT is already coordinating the reindustrialisation of the Brindisi plant area, and the municipality was still discussing the site’s future with Enel in February 2026. Ministero dell’Interno
The site therefore combines strong physical infrastructure with a complex environmental and territorial decision environment.
3.22 Fiume Santo / Porto Torres — excellent logistics, island-system and governance complexities
Fiume Santo remains an important Sardinian power site.
Terna documents 380 kV transmission infrastructure associated with the plant, while the port system includes a dedicated Fiume Santo area and substantial industrial cargo capacity. Terna Download
Existing advantages
- large power-generation site;
- high-voltage network;
- industrial port and bulk-logistics infrastructure;
- coastal heat sink;
- existing energy workforce.
Material complications
The Sardinian regional government stated in February 2026 that reconversion of Fiume Santo was a priority, with the shared territorial position centred on coal-to-gas conversion and industrial redevelopment. Regione Sardegna
The operator separately described a coal phase-out expected around late 2028/early 2029 and an ongoing site-transformation process. EP Fiume Santo
In addition, Sardinia formally opposed the national nuclear delegation during the 2025 intergovernmental process, and its special-statute status adds another layer of legal analysis. Regione Sardegna
A Sardinian reactor would also have to be modelled as part of an island electricity system increasingly connected by HVDC, not simply as another mainland 300 MWe generator.
3.23 Porto Tolle — why a brownfield can lose its apparent infrastructure advantage
The former Porto Tolle thermal station is a large energy brownfield.
But its contemporary territorial context is fundamentally different from that of Civitavecchia or Brindisi.
The surrounding Po Delta forms a Regional Natural Park and UNESCO Biosphere Reserve characterised by:
- wetlands;
- lagoons;
- dunes;
- fisheries;
- high biodiversity;
- agricultural landscapes. UNESCO
The former power plant has additionally been linked to the DeltaFarm tourism redevelopment concept. Enel
This creates three simultaneous constraints:
- flood/deltaic external hazard;
- exceptional environmental sensitivity;
- competing territorial redevelopment.
It demonstrates that former generation capacity alone is a poor national siting criterion.
3.24 Non-generation nuclear sites should not be conflated with former power stations
Sogin also manages:
- EUREX Saluggia;
- ITREC Rotondella;
- IPU/OPEC Casaccia;
- FN Bosco Marengo;
- Ispra-1. Sogin
These sites prove the existence of nuclear infrastructure and expertise.
They do not provide evidence of prior suitability for commercial power reactors.
Their historical functions were different:
- fuel cycle;
- research;
- materials;
- experimental reactors;
- waste management.
Accordingly they should enter a power-reactor screen only if a future proponent produces a specific case demonstrating:
- sufficient land;
- EHV grid;
- cooling solution;
- external-hazard suitability;
- emergency-planning feasibility;
- compatibility with ongoing nuclear liabilities.
They should not be placed automatically alongside Trino, Latina, Caorso or Garigliano.
3.25 Comparative national evidence matrix
The table below deliberately avoids converting incomplete evidence into a pseudo-precise score.
| Location | Nuclear-power history | Strong EHV evidence | Large heat sink | Heavy maritime logistics | Principal identified issue | Current competing use / political fact |
|---|---|---|---|---|---|---|
| Montalto di Castro | Nuclear project >70% constructed, never operated | Yes — 380 kV + future HVDC | Coastal | Requires detailed route study | Coastal hazards, ecology, modern requalification | Operating/redeveloping energy complex |
| Trino | Yes — PWR operated | Yes — 380 kV | Po | Inland route to prove | Water scarcity, flood/hydrology, decommissioning | Active nuclear decommissioning |
| Latina/Borgo Sabotino | Yes — Magnox operated | Yes — 380 kV + SA.PE.I. | Coastal | Route/port study needed | Tsunami/coast, population, decommissioning | Active nuclear decommissioning |
| Caorso | Yes — BWR operated | Yes — 380 kV | Po | Inland route to prove | Floodplain, hydrology | Formal regional position against nuclear reuse |
| Garigliano | Yes — BWR operated | Current reuse to verify | River/coast | Route to prove | Seismic, flood, coastal interaction | Active decommissioning |
| Civitavecchia | No commercial nuclear history | Yes — 380 kV | Coastal | Major port | Population, industrial hazards, coastal risk | Large active reindustrialisation process |
| Brindisi/Cerano | No commercial nuclear history | Yes — 380 kV | Coastal | Major industrial port | Environmental burden, industrial hazards | Active reindustrialisation |
| Fiume Santo | No commercial nuclear history | Yes — 380 kV | Coastal | Industrial port | Island grid, coast, governance | Coal-to-gas/reconversion pathway; Sardinian opposition to nuclear framework |
| Porto Tolle | No | Grid history; current requirement to re-establish | Delta/coast | Possible marine access | Delta flood/ecology/landscape | Park/Biosphere setting and tourism redevelopment |
“Strong EHV evidence” means that current or identifiable Terna evidence exists for the surrounding electrical node. It is not a connection offer.
3.26 Site-family comparison
Former commercial nuclear sites
Trino, Latina, Caorso and Garigliano
Their advantage is knowledge:
- nuclear history;
- monitoring;
- controlled areas;
- public-institution relationships;
- some grid/water inheritance.
Their disadvantage is legacy:
- decommissioning;
- radioactive waste;
- old infrastructure;
- changed hazards;
- changed communities;
- no grandfathered licence.
Unfinished historic nuclear / operating-energy brownfield
Montalto di Castro
Its nuclear civil-engineering history is unique and its grid position unusually strong, but current use, environmental constraints and the forty-year regulatory gap require a complete modern requalification.
Post-coal coastal brownfields
Civitavecchia and Brindisi
Their strongest attributes are:
- ports;
- grid;
- industrial land;
- workforce;
- cooling.
Their principal weaknesses are:
- no reactor history;
- dense/complex industrial surroundings;
- competing redevelopment;
- coastal hazard;
- potentially difficult emergency-planning geography.
Island industrial brownfield
Fiume Santo
It combines infrastructure with a distinctive island-system and special-statute governance problem, plus an already declared alternative conversion trajectory.
Environmentally sensitive thermal brownfield
Porto Tolle
Its former energy role is outweighed in the contemporary screen by deltaic hydrology, protected-landscape context and advanced non-nuclear redevelopment.
3.27 Why the screen cannot use one national cooling assumption
A 300 MWe light-water SMR at Trino and a lead-cooled or gas-cooled advanced reactor at Montalto do not impose the same cooling requirements.
Similarly:
- a multi-module SMR site may eventually reject more heat than the initial FOAK;
- district heat or hydrogen production changes heat balances;
- dry cooling reduces water dependence but affects performance and layout;
- seawater cooling changes marine environmental obligations.
The site screen and technology screen must therefore converge iteratively.
The correct workflow is:
candidate geography → technology envelope → cooling concept → site hazard model → revised technology/site shortlist
rather than:
choose reactor → find somewhere to place it.
3.28 Future climate must enter the design basis
IAEA SSR-1 requires changes in external hazards over the installation lifetime to be considered. Site-selection guidance explicitly identifies climate evolution and changing land/water use as siting variables. Nucleus
For an Italian reactor entering operation in the late 2030s and potentially operating into the 2090s, relevant trends include:
- more severe heatwaves;
- changing river flows;
- prolonged drought;
- intense precipitation;
- coastal sea-level change;
- saline intrusion;
- wildfire conditions.
The 2026 Po water crisis demonstrates why using only twentieth-century averages would be methodologically inadequate.
3.29 A first SMR and a fleet require different site tests
A common siting error is to assess only the FOAK.
Suppose a site hosts one 300 MWe SMR successfully.
The State may later seek:
- two units;
- four units;
- six units.
That changes:
- cooling demand;
- grid evacuation;
- total radioactive inventory;
- construction logistics;
- emergency planning;
- workforce accommodation;
- waste volume.
The site evaluation should therefore examine both:
FOAK envelope
and
credible ultimate site capacity.
Otherwise Italy could spend billions licensing a first unit at a site that cannot support economical replication.
3.30 Former thermal sites should undergo a “brownfield reality test”
A brownfield provides value only where the useful assets remain usable.
For each thermal site, the State should inventory:
| Asset | Question |
|---|---|
| Grid station | Is voltage/capacity suitable for nuclear generation? |
| Cooling-water infrastructure | Can it meet nuclear reliability requirements? |
| Intake/outfall | Reusable, reconstructable or environmentally unacceptable? |
| Port | Can it handle actual SMR module dimensions? |
| Road | Can bridges and turns carry loads? |
| Buildings | Reusable or demolition liabilities? |
| Contamination | Hydrocarbon, ash, chemical or soil remediation required? |
| Security | Can nuclear protected area be separated from other users? |
| Land ownership | Is sufficient contiguous land controllable? |
| Redevelopment | Have competing projects already acquired rights? |
This test is particularly important at Civitavecchia and Brindisi because government-supported reindustrialisation processes are already active. Ministero dell’Interno
3.31 No fake GPS precision
This report deliberately does not publish hypothetical reactor coordinates.
At this stage, a coordinate would falsely imply that:
- property boundaries were checked;
- capable faults were cleared;
- flood elevations were modelled;
- geotechnical boreholes were completed;
- population zones were assessed;
- the regulator had reviewed the parcel.
None of those conditions exists.
The correct geographical unit in 2026 is therefore:
existing industrial/nuclear site or candidate area
rather than:
reactor island coordinate.
That follows the commissioning requirement expressly prohibiting fictitious precision. Testo incollato
3.32 Minimum Phase-II investigation package
Any location surviving a national desk screen should receive a common investigation package so that sites can be compared on equivalent evidence.
Geology and seismicity
- detailed geological mapping;
- capable-fault investigation;
- geophysical surveys;
- boreholes;
- site-specific PSHA;
- liquefaction;
- subsidence;
- settlement;
- slope stability.
Hydrology
- probable maximum precipitation;
- river flood modelling;
- dam-break contribution where relevant;
- groundwater;
- drainage;
- climate-adjusted low flows;
- sedimentation.
Coastal
- ITHM25 extraction and site-specific refinement;
- storm surge;
- wave run-up;
- erosion;
- sea-level scenarios;
- submarine-landslide review where relevant.
Cooling
- water rights;
- environmental flow;
- intake reliability;
- discharge temperature;
- wet/dry/hybrid alternatives;
- drought/heatwave operation.
Grid
- Terna connection study;
- short-circuit analysis;
- N-1;
- network reinforcements;
- multi-unit capacity.
Population and emergency
- permanent population;
- daytime population;
- tourism;
- roads;
- hospitals;
- vulnerable institutions;
- emergency response feasibility.
Logistics
- port survey;
- heavy-haul road survey;
- bridge load;
- turning radius;
- construction laydown;
- module dimensions.
Environmental
- Natura 2000;
- protected areas;
- landscape;
- archaeology;
- agriculture;
- surface and groundwater ecology.
Human-induced hazards
- industrial plants;
- pipelines;
- ports;
- hazardous-material stores;
- aviation;
- shipping;
- road/rail accidents.
Legal
- ownership;
- zoning;
- concessions;
- decommissioning obligations;
- regional and municipal procedures;
- competing redevelopment rights.
3.33 Data owners for the next stage
| Subject | Principal Italian data/institutional source |
|---|---|
| Nuclear safety criteria | ISIN / future competent regulator |
| Seismic national baseline | INGV |
| Hydrogeology/flood | ISPRA + Basin District Authorities |
| Tsunami | INGV / Civil Protection |
| Water resources | Basin District Authorities + ISPRA |
| Grid | Terna |
| Population | ISTAT |
| Protected areas | MASE / Regions / Natura 2000 authorities |
| Landscape/cultural assets | Ministry of Culture / Regions |
| Ports | Port System Authorities |
| Nuclear legacy | Sogin |
| Environmental monitoring | ISPRA/SNPA/ARPAs |
| Local planning | Regions / Provinces / Municipalities |
The site survey should use the same data freeze date and same assumptions for all candidates to prevent politically favoured sites from being assessed under different standards.
Before any site is described publicly as an Italian “preferred nuclear site,” the State should possess at least:
- preliminary site-safety report;
- site-specific seismic programme;
- flood/coastal hazard model;
- water/cooling feasibility;
- grid feasibility from Terna;
- population/emergency study;
- heavy-logistics study;
- environmental constraints map;
- land-control strategy;
- compatibility analysis with decommissioning or existing industry;
- territorial consultation record required by the future decrees.
Until then, terms such as “candidate area” or “area under technical investigation” are more accurate.
3.35 National comparative conclusion
Italy does possess a credible geography from which a serious future reactor-site process could begin.
It does not possess a pre-approved nuclear map.
The former reactor sites provide the strongest nuclear operating memory, but each carries a material modern constraint:
- Trino: Po hydrology and decommissioning;
- Latina: coast, tsunami/emergency context and decommissioning;
- Caorso: floodplain plus explicit regional opposition;
- Garigliano: seismic/river/coastal external hazards plus decommissioning.
Montalto di Castro is structurally different and deserves special attention in any future technical programme because Italy had already developed a very large nuclear project there and because the contemporary grid remains exceptionally important. The same evidence simultaneously prevents any simplistic conclusion: the modern site must be requalified from zero under current nuclear-safety, environmental and climate standards. Enel Corporate
The principal post-coal alternatives — Civitavecchia and Brindisi — demonstrate the industrial logic of brownfield siting: ports, transmission, workforce, cooling access and large industrial parcels. Their weakness is that those same industrial/urban environments create human-induced hazards, emergency-planning complexity and competition with advanced reindustrialisation programmes already under way. Ministero dell’Interno
Fiume Santo provides similarly powerful energy and port infrastructure but sits inside a different electrical, constitutional and political environment, with Sardinia currently pursuing another conversion trajectory.
Porto Tolle shows why a former large power station can cease to be a realistic analogue once flood/delta ecology, protected landscapes and subsequent redevelopment are considered.
The State’s immediate siting task is therefore not to announce a town.
It is to create a national nuclear site-survey programme that applies identical exclusion and comparison criteria across Italy and then subjects the surviving areas to several years of site-specific data acquisition.
The decisive principle is simple:
brownfield is not equivalent to nuclear-suitable; former nuclear is not equivalent to relicensable; coastal is not equivalent to water-secure; local willingness is not equivalent to technical eligibility; and technical eligibility is not equivalent to legal authorisation.
A first Italian SMR can be sited only where all five conditions converge:
nuclear safety + environmental compatibility + water/grid/logistics + territorial legality + long-term climate resilience.
CHAPTER 3 — LOAD-BEARING SOURCE REGISTER
Nuclear siting and safety standards
S1 — IAEA, SSR-1, Site Evaluation for Nuclear Installations. Requirements covering site suitability, external hazards, flooding, land/water use, population and emergency planning.
IAEA — SSR-1 Site Evaluation for Nuclear Installations
S2 — IAEA, SSG-35, Site Survey and Site Selection for Nuclear Installations. Population, geology, seismic hazards, groundwater, shoreline evolution and land/water considerations.
IAEA — SSG-35 Site Survey and Site Selection
S3 — IAEA, seismic-hazard guidance. Nuclear-specific ground-motion and fault-displacement assessment.
IAEA — Seismic Hazards in Site Evaluation for Nuclear Installations
S4 — IAEA, human-induced external-event guidance. Industrial accidents, explosions, transport events and hazardous-material releases.
IAEA — Human-Induced External Events in Nuclear Site Evaluation
National external-hazard evidence
G1 — INGV, MPS04 national seismic hazard model.
INGV — National seismic-hazard data
G2 — INGV, Italian Tsunami Hazard Model 2025 — ITHM25. Probabilistic tsunami-hazard curves for the Italian coastline.
INGV — Italian Tsunami Hazard Model 2025
G3 — ISPRA, Hydrogeological instability in Italy: hazards and risk indicators — 2024 edition.
ISPRA — Hydrogeological hazard report
G4 — ISPRA, IdroGEO platform. National landslide and flood-risk mapping.
ISPRA — IdroGEO national hydrogeological-risk platform
G5 — ISPRA, 2025 water-resource assessment. Approximately 128 billion m³ renewable resource; decline from historical levels.
ISPRA — 2025 water-resource assessment
G6 — ISPRA, national water-severity monitoring, updated 11 August 2026.
ISPRA — National water-severity status
G7 — Po River Basin District Authority, 25 June 2026. Reduced river flows and saline intrusion during 2026 water stress.
Po Basin Authority — June 2026 water conditions
Nuclear legacy sites
G8 — Sogin, Italian nuclear sites. Trino, Caorso, Latina, Garigliano and fuel-cycle/research installations.
Sogin — Italian nuclear sites
G9 — Sogin, Trino Nuclear Power Plant. Decommissioning status, former cooling towers, Po-water infrastructure and ongoing reactor dismantling.
Sogin — Trino site
G10 — Sogin, Latina environmental monitoring. Coastal and marine setting of the former reactor site.
Sogin — Latina environmental monitoring
G11 — Sogin, Garigliano environmental monitoring. River, groundwater and Tyrrhenian-coast monitoring.
Sogin — Garigliano environmental monitoring
G12 — Sogin, Caorso Environmental Declaration. Po water abstraction and existing site environmental conditions.
Sogin — Caorso Environmental Declaration
Electricity transmission
I1 — Terna, 2025 National Transmission Grid Development Plan. Current development architecture, Hypergrid and 2025–2034 investment.
Terna — National Electricity Transmission Grid Development Plan
I2 — Terna, Trino–Lacchiarella 380 kV infrastructure.
Terna — Trino grid infrastructure
I3 — Terna, Milano–Montalto Hypergrid project. Two 1,000 MW HVDC circuits toward Montalto.
Terna — Milano–Montalto HVDC project material
Montalto di Castro
I4 — Enel, Alessandro Volta Environmental Declaration. Historical nuclear project: two 1,000 MW BWRs; construction more than 70% complete before cancellation.
Enel — Montalto di Castro environmental and historical record
G13 — MASE environmental-authorisation database, Alessandro Volta plant. Current operating/AIA status and 2026 procedures.
MASE — Alessandro Volta environmental-authorisation record
Post-coal brownfields
I5 — Enel, 2025 Integrated Annual Report. Cessation of permitted coal use at Federico II and Torrevaldaliga Nord and applications for permanent closure.
Enel — Integrated Annual Report 2025
G14 — MIMIT, reindustrialisation of Cerano/Brindisi and Torrevaldaliga Nord/Civitavecchia.
MIMIT — Brindisi and Civitavecchia power-station reindustrialisation
G15 — Lazio Region, Civitavecchia redevelopment proposals. 48 projects under assessment.
Lazio Region — Torrevaldaliga Nord redevelopment process
G16 — Port System Authority of the Southern Adriatic Sea, Brindisi port operations.
Port of Brindisi — industrial cargo operations
Fiume Santo / Sardinia
G17 — Sardinia Region, 5 February 2026. Territorial strategy centred on Fiume Santo reconversion.
Sardinia Region — Fiume Santo reconversion strategy
I6 — Fiume Santo operator, 2026 sustainability update. Coal phase-out and transformation pathway.
Fiume Santo — 2025 Sustainability Report update
G18 — Port System Authority of the Sea of Sardinia. Porto Torres industrial and Fiume Santo maritime infrastructure.
Port System Authority — Porto Torres
Caorso territorial position
G19 — Emilia-Romagna Official Bulletin, December 2025. Former Caorso station identified as lying in a Po floodplain; Assembly directs the regional government to pursue exclusion of renewed nuclear generation at the site.
Emilia-Romagna — official Caorso act
Porto Tolle / Po Delta
G20 — UNESCO, Po Delta Biosphere Reserve. Ecological and territorial characteristics of the delta.
UNESCO — Po Delta Biosphere Reserve
G21 — Veneto Region, Po Delta Regional Park.
Veneto Region — Po Delta Regional Natural Park
I7 — Enel, Porto Tolle / DeltaFarm redevelopment.
Enel — Porto Tolle redevelopment
END OF CHAPTER 3
CHAPTER 4 — THE ITALIAN NUCLEAR INDUSTRIAL BASE AS IT IS, NOT AS HEADLINES DESCRIBE IT
4.1 Executive finding
Italy enters the prospective nuclear programme with a real, technically significant and internationally active nuclear industrial base, but not with the several hundred already qualified nuclear suppliers sometimes implied by political or media statements.
The most defensible current baseline is much narrower.
The 2024 Edison–Ansaldo Nucleare–TEHA assessment identified approximately 70 Italian companies specialised in the nuclear-energy sector. It estimated that their specifically nuclear-related activity generated approximately €457 million of value in 2022 and supported roughly 2,800 jobs. The same study modelled a much larger prospective industrial impact — up to €50.3 billion and 117,000 direct, indirect and induced jobs through 2050 under its deployment scenario — but those figures are scenario outputs, not a census of today’s nuclear workforce or contracted order book. [I/S]
Ansaldo Nucleare separately reported in 2024 that more than 70 Italian companies active in the nuclear supply chain attended its Cernavodă supplier initiative. That figure is consistent with the specialised-core estimate and materially different from claims that Italy already possesses four or five hundred nuclear-qualified companies. [I]
The distinction is fundamental because nuclear manufacturing is not synonymous with advanced manufacturing.
A company can possess:
- heavy machining;
- pressure-vessel experience;
- offshore fabrication;
- oil-and-gas welding;
- aerospace electronics;
- large EPC capability;
without being immediately qualified to manufacture a nuclear safety-class component.
The July 2026 agreement between Ansaldo Energia and RINA is unusually revealing in this respect. The programme is explicitly directed toward companies “not currently active in the nuclear sector” but possessing transferable industrial capabilities; RINA is to perform gap analysis and assist those companies through certification and qualification. In other words, the Italian industry itself recognises the difference between an adjacent capability and a nuclear-qualified supply chain. [I]
Italy nevertheless retains unusually strong positions in several areas:
- nuclear EPC and systems integration;
- heavy nuclear pressure components;
- forgings and large rings;
- high-integrity pipe fittings;
- nuclear welding and fabrication;
- thermal-hydraulic testing;
- spent-fuel and radioactive-material casks;
- decommissioning and radioactive-waste management;
- fusion magnets and vacuum-vessel structures;
- lead-cooled fast-reactor R&D;
- nuclear engineering education and research.
The industrial weakness is different.
Italy does not currently possess a complete sovereign reactor supply chain equivalent to France, the United States, Russia, China or South Korea. It does not possess an established domestic reactor-vendor organisation delivering a licensed commercial LWR-SMR, nor a current commercial power-reactor fuel-fabrication and enrichment chain. A future Italian FOAK would therefore require a foreign or multinational reactor technology platform, while Italian industry could potentially capture a substantial share of engineering, civil works, balance-of-plant, heavy components, testing, installation, digital systems, services and lifecycle activities.
The realistic national strategy is therefore not “Italy can already build an entire reactor alone.”
It is:
Italy already possesses a concentrated nuclear-qualified industrial core surrounded by a much larger manufacturing economy that could be progressively qualified for a domestic and export programme.
That is the distinction this chapter reconstructs company by company, as required by the commissioning mandate.
4.2 Why the “500 companies” narrative is analytically unsafe
Three populations are often confused in public discussion.
Population A — demonstrably nuclear-active organisations
These are companies, laboratories or public entities with direct evidence of:
- nuclear contracts;
- nuclear installations;
- nuclear manufacturing;
- nuclear testing;
- nuclear waste/decommissioning;
- nuclear R&D;
- nuclear-specific codes and certifications.
This population is comparatively small.
Population B — companies identified within the specialised nuclear supply chain
The TEHA/Edison/Ansaldo analysis identified approximately 70 specialised companies.
AIN’s current collective-members list likewise includes a concentrated population of manufacturers, utilities, engineering companies, certification bodies, research institutions and universities rather than hundreds of nominally nuclear manufacturers. [I/S]
Population C — potentially convertible Italian industry
Italy’s broader mechanical, pressure-equipment, steel, civil-engineering, electronics, automation, shipbuilding, energy and oil-and-gas sectors contain hundreds of firms that could theoretically enter nuclear supply chains.
They are potential supply-chain capacity.
They are not automatically nuclear-qualified.
This third population is where the “400–500 companies” narrative becomes plausible as an industrial-policy estimate but misleading as a statement of present capability.
Correct reporting rule
| Statement | Assessment |
|---|---|
| “Italy has approximately 70 specialised nuclear companies” | Supported as a study-based current industrial estimate |
| “More than 70 Italian nuclear-supply-chain companies participated in Ansaldo’s Cernavodă initiative” | Supported |
| “Italy has approximately 500 companies that could potentially contribute to nuclear” | Possible industrial-potential framing, depending on methodology |
| “Italy already has 500 nuclear-qualified companies” | Not supported |
| “Italy currently employs 117,000 people in nuclear” | False interpretation of a scenario study |
| “117,000 jobs could be activated under a long-term deployment scenario” | Scenario claim; must be labelled as such |
The 2026 Ansaldo–RINA qualification programme provides direct evidence that the wider industrial population still requires structured certification before entering the nuclear market.
4.3 Qualification methodology used in this chapter
The report does not use “nuclear-qualified” as a marketing adjective.
Each organisation is placed into one of four evidence classes.
Class NQ-1 — Direct nuclear-qualified / nuclear-production core
Public evidence shows one or more of:
- ASME nuclear certification;
- ISO 19443 nuclear-supply-chain certification;
- documented safety-class nuclear manufacturing;
- current reactor/fusion nuclear component contract;
- recognised nuclear testing capability;
- direct work on operating/new-build nuclear installations.
Class NA-2 — Direct nuclear-active organisation
The organisation performs genuine nuclear activity but is not being classified here as a safety-class component manufacturer.
Examples include:
- utilities/developers;
- decommissioning operators;
- reactor developers;
- nuclear research institutions;
- certification organisations;
- universities.
Class NC-3 — Nuclear-adjacent / structured conversion
The organisation has:
- a nuclear partnership;
- a feasibility study;
- a nuclear industrial-development programme;
- identifiable transferable capability;
but insufficient evidence is available to classify its principal production activities as currently nuclear-qualified.
Class AC-4 — Adjacent industrial capacity only
The organisation possesses relevant industrial capabilities, but the evidence reviewed for this chapter does not establish current nuclear qualification or a specific current nuclear manufacturing reference.
This classification is intentionally conservative.
A lower class does not mean that a company is incapable of entering nuclear.
It means the report will not substitute inference for documented evidence.
4.4 Consolidated industrial map
| Organisation | Principal role | Scale/type | Evidence class | Current documented nuclear relevance |
|---|---|---|---|---|
| Nuclitalia | Technology selection / industrial platform | Corporate JV | NA-2 | Evaluation of mature new-nuclear designs; initial water-cooled SMR focus |
| Enel | Utility / Nuclitalia shareholder | Large listed | NA-2 | 51% Nuclitalia shareholder |
| Ansaldo Nucleare | EPC, NSSS/BOP engineering, components, services | Major specialist | NQ-1 | AP1000, Cernavodă, Krško, ITER, LFR |
| Leonardo | Technology / electronics / security shareholder platform | Large listed/state-linked | NC-3 | 10% Nuclitalia; future nuclear-system contribution not yet defined |
| Edison | Developer/commercial programme | Large utility | NA-2 | EDF/NUWARD SMR development initiative |
| newcleo | LFR reactor developer | Advanced reactor developer | NA-2 | LFR programme; ENEA/European cooperation |
| Westinghouse Electric Italy | NSSS heavy manufacturing | Major manufacturing hub | NQ-1 | AP1000/AP300 and nuclear heavy components |
| Walter Tosto | Nuclear heavy fabrication | Specialist industrial | NQ-1 | ASME N certification; ITER vacuum vessel |
| ATB Riva Calzoni | Pressure vessels / casks / containment | Specialist industrial | NQ-1 | Nuclear-island equipment; casks; ASME III contract |
| SIMIC | Precision nuclear/fusion fabrication | Specialist industrial | NQ-1 | ITER coils/plates; 2026 ASME III containment-component contract |
| FOMAS Group | Nuclear forgings / rings | Specialist industrial | NQ-1 | Five decades of nuclear forgings; material-organisation capability |
| Tectubi Raccordi | Nuclear fittings / piping | Specialist industrial | NQ-1 | EPR/AP1000 supply; ISO 19443; ASME NCA |
| IBF / Tubacex | Nuclear tubing/fittings | Specialist industrial | NQ-1/NA-2 | Nuclear pressure-boundary tubing and coolant-loop components |
| Arvedi AST | Heavy forgings / nuclear materials | Major steelmaker | NA-2 pending current cert revalidation | Nuclear components and historic reactor vessel; latest public ASME NCA evidence expired 2025 |
| Belleli Energy | Pressure equipment / casks | Specialist industrial | NA-2 | Nuclear steam-generator/cask product capability |
| SIET | Thermal-hydraulic nuclear testing | Specialist laboratory | NQ-1 | NQA-1 system; testing for major reactor vendors; NRC recognition history |
| Sogin | Decommissioning / waste / repository | State-owned | NA-2 | Entire legacy fleet and national waste programme |
| Nucleco | Waste treatment / decommissioning | Specialist Sogin subsidiary | NA-2 | PWR/BWR/GCR and fuel-cycle decommissioning |
| RINA | Certification / qualification / engineering | Large service group | NA-2 | Nuclear-supply-chain qualification; maritime nuclear feasibility |
| ENEA | R&D / testing / LFR / fusion | Public research | NA-2 | EAGLES, ALFRED, LEANDREA, Brasimone, DTT |
| CIRTEN | University R&D and training | Academic consortium | NA-2 | Seven-university nuclear engineering network |
| ASG Superconductors | Superconducting fusion magnets | Specialist high-tech | NQ-1 | ITER and 18 DTT toroidal-field magnets |
| Eni | Fusion investor / energy industrial partner | Large listed/state-linked | NA-2 | CFS, DTT, UKAEA tritium programme |
| Fincantieri | Naval integration | Large listed/state-linked | NC-3 | newcleo/RINA nuclear-propulsion feasibility |
| MAIRE / NEXTCHEM | Process integration / hydrogen / industrial heat | Large listed EPC/technology | NC-3 | newcleo nuclear-powered e-Factory study |
| Valvitalia | Valves/actuation/fire systems | Major industrial | AC-4 | Relevant transferable manufacturing; current nuclear qualification not demonstrated here |
| ORION Valves | Industrial valves | Specialist | AC-4 | AIN member; nuclear-specific qualification not established by reviewed certification record |
| Saipem | EPC / complex construction | Large listed | AC-4 | Strong transferable EPC capability; no current specific nuclear qualification established in evidence set |
| Webuild | Major civil works | Large listed | AC-4 | Strong transferable civil capability; no current specific nuclear reference established in evidence set |
This table should be read as an evidence map, not as a procurement shortlist.
4.5 Nuclitalia — national technology-selection vehicle, not an Italian reactor OEM
Nuclitalia was formally incorporated in May 2025 with:
- Enel 51%;
- Ansaldo Energia 39%;
- Leonardo 10%.
Its mandate is to evaluate advanced nuclear technologies and market opportunities, initially concentrating on comparatively mature water-cooled SMRs, define requirements for the Italian system and analyse possible industrial partnerships and co-design arrangements. [I]
Nuclitalia therefore occupies an important position between:
state programme
and
commercial technology procurement.
It is not yet:
- an NSSS vendor;
- a reactor design authority;
- a licensed Italian nuclear operator;
- a reactor manufacturer.
The industrial significance lies instead in the possibility that Nuclitalia becomes the vehicle through which Italian requirements are translated into vendor selection and local-content arrangements.
That could give it disproportionate influence over which segments of the Italian supply chain become strategically relevant.
For example, selection of an integral PWR-SMR would favour:
- pressure-vessel forgings;
- nuclear fittings;
- steam-generator and primary-system components;
- ASME/RCC-M manufacturing;
- LWR testing capability.
Selection of an LFR would generate a materially different supply chain.
Nuclitalia therefore should be classified as NA-2: nuclear-active technology/investment platform, not as a nuclear manufacturing company.
Enel’s immediate documented role is its 51% controlling shareholding in Nuclitalia.
The group brings utility-scale:
- electricity-system knowledge;
- project development;
- power-market experience;
- large-capital-project governance.
But the new Italian vehicle was established specifically to assess technologies and industrial partnerships rather than to declare a preselected reactor technology.
Accordingly, the report should not describe Enel as the already designated Italian nuclear fleet operator.
That decision has not been made.
4.7 Edison — commercial programme builder, not NSSS manufacturer
Edison occupies a different position.
In June 2026 Edison, EDF, NUWARD and major Italian nuclear-industry companies formalised cooperation aimed at developing a European SMR programme, with an industrial objective of achieving initial units around 2035. The initiative connects Edison to:
- EDF nuclear operating experience;
- NUWARD technology development;
- Ansaldo and Italian supply-chain participation.
The activity is strategically relevant but still belongs to the development/industrial programme stage, not a licensed Italian project. [I]
Edison should therefore be treated as a potential:
- developer;
- programme sponsor;
- utility/commercial offtaker;
rather than an Italian NSSS manufacturer.
4.8 Ansaldo Nucleare — the centre of gravity of the Italian fission supply chain
No Italian industrial company has a broader currently documented fission role than Ansaldo Nucleare.
The company presents itself as an EPC contractor and system integrator with capabilities covering:
- engineering;
- procurement;
- manufacturing;
- installation;
- commissioning;
- operational support;
- decommissioning;
- waste systems;
- advanced reactors;
- fusion. [I]
Its documented reference set includes several technically important projects.
AP1000 Sanmen
For Westinghouse’s AP1000 at Sanmen Unit 1, Ansaldo Nucleare:
- designed and manufactured the passive heat exchanger for decay-heat removal;
- supplied it as an ASME Section III Division 1 Class 1 component;
- designed/manufactured/certified containment equipment to ASME III Class MC.
This matters because it demonstrates experience with actual Generation III+ safety-class hardware rather than generic energy engineering.
Ansaldo contributed to completion of Cernavodă Units 1 and 2, continues providing engineering and maintenance services and is positioning for the Unit 1 life-extension programme and future Units 3 and 4.
Krško
In June 2026 the company reported completion of two plant upgrades at Krško NPP and a further fire-protection revamp contract, demonstrating current work on an operating European power reactor.
ITER
Ansaldo is also active in ITER, including emergency electrical-distribution systems and remote-handling infrastructure. In May 2026 it completed manufacturing and integrated testing of an ITER Cask and Plug Remote Handling Tooling System under a Fusion for Energy contract.
Advanced reactors
Ansaldo Nucleare and ENEA are partners in the EAGLES consortium developing European lead-cooled fast-reactor technology, including ALFRED, EAGLES-300 and LEANDREA-related work.
Industrial conclusion
Ansaldo Nucleare is therefore NQ-1 and should be treated as:
- Italy’s principal nuclear EPC/system-integration nucleus;
- a potential localising partner for foreign reactor vendors;
- a coordinator of the specialist Italian supply chain.
This does not make Ansaldo a currently licensed standalone Italian LWR-SMR OEM.
Its strongest realistic role is as national nuclear integrator alongside a reactor technology owner.
4.9 Westinghouse Electric Italy — a genuine nuclear heavy-manufacturing asset
In March 2026 Mangiarotti S.p.A. was renamed Westinghouse Electric Italy S.p.A.
Westinghouse explicitly described the Monfalcone operation as a dedicated nuclear manufacturing hub supporting its global supply chain.
The company employs approximately 300 highly skilled professionals and is positioned to support:
- AP1000;
- AP300;
- projects in the United States;
- Poland;
- Bulgaria;
- global nuclear steam-supply-system heavy equipment. [I]
This is one of the most important industrial changes in Italy’s contemporary nuclear base.
Unlike a prospective supplier being invited to qualify, Westinghouse Electric Italy sits inside an established global reactor-vendor organisation.
Its industrial relevance extends to:
- heavy NSSS equipment;
- precision nuclear manufacturing;
- welding;
- large-component fabrication;
- global vendor QA.
Strategic implication
Westinghouse Electric Italy could serve as:
- an export manufacturing hub independently of Italian reactor choice;
- a domestic localisation anchor if an appropriate Westinghouse technology were selected;
- a training/qualification reference for surrounding suppliers.
Its classification is unambiguously NQ-1.
4.10 Walter Tosto — nuclear heavy fabrication backed by actual nuclear certification
Walter Tosto provides another clear example of the difference between transferable capability and direct nuclear capability.
The company’s own industrial chronology records:
- 2010 — participation with Ansaldo Nucleare and Mangiarotti in the ITER vacuum-vessel contract;
- 2011 — acquisition of an ASME N Stamp for nuclear work;
- 2014 — opening of a workshop dedicated to nuclear and clean operations. [I]
The ITER organisation confirms that the European vacuum-vessel contribution was manufactured by the AMW consortium — Ansaldo Nucleare, Mangiarotti and Walter Tosto — and documents the large ITER sectors under fabrication at Walter Tosto.
This is direct nuclear fabrication.
Walter Tosto should consequently be classified NQ-1 for:
- large welded nuclear structures;
- high-integrity fabrication;
- complex stainless-steel components;
- heavy machining.
Its relevance to future SMRs would depend on the vendor’s selected primary/containment architecture.
4.11 ATB Riva Calzoni — reactor pressure equipment and casks
ATB Riva Calzoni has current, direct nuclear evidence across both front-end plant equipment and back-end transport/storage.
The company states that it has been qualified by major nuclear engineering companies including Westinghouse, Framatome and GE for critical nuclear-island components and identifies capabilities extending from:
- reactor vessels;
- pressurisers;
- pressure vessels;
- nuclear research equipment;
- high-level-radioactive-material casks. [I]
ATB also operates a workshop specifically dedicated to nuclear manufacturing and has invested directly in its cask business.
In July 2026 ATB and SIMIC announced a new contract for key components of an ASME Section III containment vessel for an undisclosed major nuclear programme.
This is particularly significant because it demonstrates current 2026 nuclear safety-class manufacturing activity, not only historical qualifications.
ATB should therefore be classified NQ-1.
Its potential Italian programme roles include:
- reactor-pressure equipment;
- containment equipment;
- primary-system pressure components;
- spent-fuel/high-level-material casks.
4.12 SIMIC — one of Europe’s most substantial Italian fusion manufacturers, now also carrying fission evidence
SIMIC is frequently described principally through ITER, where the record is strong.
Its documented production includes:
- ten ITER toroidal-field coils;
- 70 radial plates;
- divertor cassette-body work;
- other major fusion hardware. [I]
The significance is not merely dimensional.
ITER production requires:
- special materials;
- extreme welding control;
- traceability;
- dimensional precision;
- quality documentation.
The July 2026 ATB–SIMIC contract materially strengthens the fission-side evidence by adding current ASME Section III containment-vessel component manufacturing.
SIMIC is therefore properly classified NQ-1 rather than “fusion-only.”
4.13 FOMAS — strategic forgings capability
Large high-integrity forgings are one of the most difficult supply-chain segments to recreate rapidly.
FOMAS is consequently strategically important.
Its February 2026 power-generation documentation states that it has supplied high-integrity open-die forgings to nuclear power plants for approximately 50 years and identifies itself as a long-standing European ASME material organisation.
The company specifically records delivery in the early 1970s of main inlet/outlet nozzle forgings for the Caorso BWR. [I]
Its contemporary nuclear product range includes forgings/rings for:
- Generation I–IV primary and secondary circuits;
- steam generators;
- primary heads;
- tube sheets;
- feed-water nozzles;
- nuclear waste management;
- fusion/ITER applications.
FOMAS should therefore be classified NQ-1.
For a domestic SMR programme, its relevance could extend to:
- reactor-vessel forgings;
- steam-generator forgings;
- nozzles;
- rings;
- primary-system structural material.
The exact localisation potential depends heavily on vessel diameter, integral-SMR architecture and vendor-approved material routes.
4.14 Arvedi AST — substantial nuclear metallurgical capability, but certification status must be revalidated
Acciai Speciali Terni has one of the deepest historical nuclear pedigrees in Italian metallurgy.
Its historical record includes production of the Garigliano reactor vessel, and the company states that it became Italy’s sole producer of certain stainless products for nuclear plants during the historical programme.
Its current Forging Division identifies products for:
- nuclear reactors;
- steam generators;
- pressurisers;
- pumps and valves;
- nuclear-waste transport containers.
Its 2024 report states that the Forging Division held certification as an ASME NCA-3800 Material Organisation, renewed in 2023 with validity through 2025.
That final date matters.
As of the September 2026 cut-off, the public evidence reviewed for this chapter does not establish whether that specific certificate was subsequently renewed.
The correct classification is therefore:
documented nuclear-capable metallurgical producer — current certification status to be revalidated before procurement.
The report should not silently extend a certificate beyond its published validity.
4.15 Tectubi Raccordi — one of the clearest nuclear-qualified SMEs/mid-sized specialists
Tectubi Raccordi represents the kind of supplier that makes the Italian nuclear base materially different from an ordinary heavy-industry cluster.
Its record spans:
- Caorso;
- Trino;
- Montalto;
- French Phénix/Superphénix programmes;
- EPR;
- AP1000;
- international nuclear installations. [I/S]
More importantly, its current 2026 quality documentation identifies:
- ISO 19443 nuclear supply-chain certification;
- ASME BPVC Section III NCA quality-system arrangements;
- nuclear-safety culture requirements;
- EDF qualification. [I]
Tectubi also describes its Castel San Giovanni equipment as operated to nuclear-quality standards and identifies itself as a long-standing supplier of nuclear piping/fittings.
Its current industrial role includes:
- elbows;
- tees;
- reducers;
- caps;
- special fittings;
- heavy bends;
- piping components.
Tectubi therefore belongs unambiguously in NQ-1.
4.16 IBF / Tubacex — specialised piping and coolant-loop components
IBF maintains a dedicated nuclear product capability covering high-specification tubes and pipes used for pressure/temperature applications and nuclear coolant boundaries. [I]
Its broader special-component portfolio includes:
- hot leg;
- cold leg;
- surge line;
- reactor coolant-loop fittings;
- manifolds;
- specialised bends;
- clad/overlaid components.
This is directly relevant to LWR primary systems.
IBF should therefore be treated as part of the documented nuclear piping/fittings base rather than the generic oil-and-gas population.
However, individual procurement qualification should still be checked against:
- applicable reactor code;
- vendor approved-supplier list;
- exact product classification;
- plant jurisdiction.
4.17 Belleli Energy — genuine nuclear product capability, but qualification must be contract-specific
Belleli Energy publicly maintains a nuclear product portfolio including:
- steam generators;
- feed-water heaters;
- pressure vessels;
- metal spent-fuel casks. [I]
The company therefore has documented nuclear-sector capability.
The evidence reviewed for this chapter is less specific than for Tectubi, Walter Tosto or ATB concerning current nuclear-code certification and recent safety-class contract references.
Belleli is consequently placed in NA-2, not because the company lacks nuclear competence, but because this report applies a stricter proof threshold before labelling the whole production base NQ-1.
A vendor procurement audit could readily change that classification for particular product families.
4.18 SIET — a rare strategic nuclear testing asset
SIET in Piacenza is one of Italy’s most underestimated nuclear capabilities.
The company was created in 1983 by ENEA and CISE specifically to conduct safety tests on nuclear-plant components and systems.
Its facilities can simulate thermal-hydraulic loops for:
- existing reactor technologies;
- new-generation plants;
- full or reduced scale. [I]
SIET states that its quality system operates in compliance with ISO 9001 and NQA-1, and identifies work or recognition connected to:
- ENEA;
- Enel;
- Ansaldo;
- General Electric;
- Westinghouse;
- Mitsubishi;
- Toshiba;
- Doosan;
- the US NRC.
This is highly significant for an SMR programme.
An Italian localisation strategy requires more than fabrication.
It requires independent/qualified facilities for:
- component qualification;
- thermal-hydraulic validation;
- safety-system testing;
- code verification;
- regulator/vendor evidence.
SIET therefore belongs in NQ-1.
Its strategic value may exceed its corporate size.
4.19 Sogin — Italy’s nuclear lifecycle operator
Sogin is not a reactor manufacturer.
It is nevertheless one of the most operationally nuclear organisations in the country.
The company is entirely owned by the Ministry of Economy and Finance and is responsible for:
- decommissioning Italy’s nuclear installations;
- radioactive-waste management;
- closure of the historic fuel cycle;
- siting, design, construction and future operation of the National Repository and Technology Park. [G]
Its remit in 2026 also includes new responsibilities associated with the RTS-1 Galileo Galilei research reactor and the EURACOS fissile-material repatriation programme.
This creates expertise in:
- decommissioning project management;
- radiological protection;
- waste conditioning;
- licensing interface;
- nuclear-site management;
- radioactive-material logistics.
Sogin should therefore be treated as NA-2 — core nuclear lifecycle operator.
It should not automatically be assumed to become owner/operator of the future generation fleet.
4.20 Nucleco — specialist waste and decommissioning capability
Nucleco, within the Sogin Group, is a particularly strong back-end specialist.
The company reports more than 30 years of nuclear decommissioning experience covering:
- PWR;
- BWR;
- GCR;
- reprocessing installations;
- uranium-thorium fuel cycle;
- MOX-related plants. [I/G]
Its activities extend from:
- decontamination;
- dismantling;
- waste treatment;
- characterisation;
- final site-release support.
Nucleco also manages radioactive waste originating outside the power sector, including medical, research and industrial sources.
A new reactor programme would therefore not be creating an Italian radioactive-waste services industry from zero.
The challenge is scaling and adapting existing back-end capability to a new-build fleet and, eventually, new spent-fuel inventories.
4.21 RINA — qualification infrastructure rather than component fabrication
RINA’s role is different again.
The July 2026 Ansaldo–RINA initiative is designed to move non-nuclear Italian manufacturers through:
- preliminary assessment;
- gap analysis;
- compliance planning;
- certification;
- qualification.
That positions RINA as an important industrial qualification multiplier.
RINA is also collaborating with Fincantieri and newcleo on the feasibility of maritime nuclear propulsion using lead-cooled reactor technology.
RINA therefore belongs in NA-2:
- nuclear engineering/certification;
- supply-chain qualification;
- maritime classification/interface.
It is not a nuclear hardware OEM.
4.22 ENEA — the state research backbone
ENEA is the institutional centre of Italy’s advanced-reactor research capability.
Its 2026 evidence is particularly strong in lead-cooled fast reactors.
At Brasimone and Casaccia, ENEA has developed or supported facilities for:
- heavy liquid-metal technology;
- reactor safety;
- thermal hydraulics;
- materials;
- component qualification.
In April 2026 ENEA reported results from the PASCAL programme on safety and reliability of lead-cooled reactors, including work supporting the ALFRED design.
ENEA is a member, with Ansaldo Nucleare, SCK CEN and RATEN, of the EAGLES consortium and participates in:
- ALFRED;
- EAGLES-300;
- LEANDREA.
In February 2026 EAGLES and newcleo agreed to cooperate on LEANDREA, targeted for SCK CEN in Belgium.
ENEA’s 2026 programme documentation also states that it cooperates with newcleo on LFR technology development and maintains leadership in heavy-liquid-metal technologies.
PRECURSOR
At Brasimone, ENEA and newcleo are developing PRECURSOR, a non-nuclear electrical simulator reproducing technological, thermal-hydraulic, monitoring and control aspects of a lead-cooled reactor.
Strategic importance
ENEA is not a reactor vendor.
Its role is instead:
- experimental infrastructure;
- safety research;
- technology development;
- scientific support;
- qualification;
- national knowledge preservation.
That makes ENEA one of the indispensable components of the programme even if Italy ultimately selects a foreign LWR-SMR rather than an Italian-linked LFR.
4.23 CIRTEN — the academic nuclear competence network
CIRTEN is the Inter-University Consortium for Nuclear Technology Research and connects seven Italian university nodes:
- Politecnico di Milano;
- Politecnico di Torino;
- Bologna;
- Padova;
- Palermo;
- Pisa;
- Sapienza University of Rome. [I/A]
Its research spans:
- nuclear safety;
- decommissioning;
- waste;
- fission;
- fusion;
- radiation applications.
The same universities sustain MSc and PhD programmes, with students in the nuclear-engineering programmes eligible for the European Nuclear Education Network EMSNE framework.
CIRTEN is therefore not merely an educational asset.
It is the principal academic mechanism through which Italy can rebuild:
- reactor-physics expertise;
- thermal hydraulics;
- safety analysis;
- materials competence;
- nuclear engineering PhDs.
Its constraint is scale.
A domestic fleet would require a workforce substantially larger than the present research/education ecosystem.
4.24 newcleo — Italian-linked reactor intellectual property, but not an operating reactor vendor
newcleo occupies a special category.
It is an advanced-reactor developer pursuing lead-cooled fast-reactor technology and collaborating extensively with the Italian research and industrial ecosystem.
Its Italian-linked work includes the ENEA facilities at Brasimone and Casaccia, where infrastructure has been developed to support liquid-lead reactor technology.
newcleo also entered the 2026 collaboration with the EAGLES consortium on LEANDREA.
The programme is therefore industrially real.
But newcleo should not be classified as a supplier of an available commercial reactor.
It remains a reactor developer, with development, demonstration, licensing and fuel-cycle milestones still ahead.
Industrial classification:
NA-2 — genuine advanced-reactor developer; not an operating commercial NSSS vendor.
That distinction becomes critical in Chapter 5.
4.25 ASG Superconductors — Italy’s strategic fusion-magnet manufacturer
ASG Superconductors is one of the clearest examples of high-value Italian nuclear technology.
The company has supplied major superconducting magnet systems for ITER.
ITER documentation identifies ASG participation in Europe’s toroidal-field coil programme.
In Italy, ASG is producing the magnetic core of DTT, including 18 superconducting toroidal-field magnets. ENEA presented the first completed unit at ASG’s La Spezia plant in May 2025.
ASG should therefore be classified NQ-1 for fusion/superconducting nuclear technology.
The capability is not directly transferable to manufacturing an LWR reactor vessel.
It is nevertheless strategically significant because the industrial disciplines overlap in:
- extreme engineering;
- materials;
- traceability;
- precision;
- cryogenics;
- large-component manufacture.
4.26 Eni — fusion industrialisation, not fission reactor manufacturing
Eni’s nuclear role is concentrated in fusion.
It is a strategic partner and investor in Commonwealth Fusion Systems, collaborates with ENEA on DTT, works with UKAEA on tritium-cycle technology and maintains research partnerships with MIT and Italian institutions. [I]
In 2025 Eni strengthened the CFS relationship through a commercial agreement concerning future electricity from the planned ARC programme.
Eni therefore belongs to the nuclear industrial map.
It should not be counted as an Italian fission NSSS or component manufacturer.
Its contribution is:
- capital;
- industrial-scale energy development;
- fusion commercialisation;
- plasma/fusion ecosystem support.
Fincantieri has entered a serious nuclear-adjacent development pathway with newcleo and RINA.
Since 2023, the companies have been studying potential nuclear maritime propulsion based on a compact lead-cooled reactor concept.
In 2025 Fincantieri and newcleo presented further work around a maritime LFR concept.
This is meaningful engineering activity.
However:
- no nuclear-powered Fincantieri vessel exists;
- no Italian civilian maritime-reactor licence has been issued;
- the shipyards should not be described as already nuclear-qualified for reactor installation merely because the companies have a feasibility programme.
Fincantieri therefore belongs in NC-3.
Its potential future role is substantial:
- naval integration;
- module integration;
- maritime structural engineering;
- ship systems;
- industrialisation.
But the nuclear qualification pathway is still ahead.
4.28 MAIRE / NEXTCHEM — industrial integration around nuclear heat and hydrogen
MAIRE’s NEXTCHEM has an explicit cooperation arrangement with newcleo concerning an “e-Factory for carbon-neutral chemistry.”
The concept explores using newcleo’s reactor technology to support low-carbon hydrogen and chemical production, while Tecnimont contributes engineering expertise. [I]
This gives MAIRE a genuine nuclear-linked industrial-development reference.
It does not transform MAIRE into a reactor OEM or automatically qualify its complete EPC supply chain for nuclear-island work.
MAIRE should therefore be classified NC-3:
- highly relevant process/EPC integrator;
- nuclear-linked industrial-heat/hydrogen development;
- qualification depth dependent on future work packages.
Leonardo owns 10% of Nuclitalia.
Its 2026 financial reporting describes Nuclitalia as a technology and industrial hub intended to support:
- research;
- engineering;
- supply-chain development;
- commercial development.
Leonardo itself possesses major capabilities in:
- electronics;
- cyber;
- command/control;
- sensors;
- safety/security systems.
But the public evidence reviewed for this chapter does not establish a defined safety-class nuclear I&C or reactor-control manufacturing work package under the Italian new-build programme.
Leonardo therefore belongs in NC-3.
The report should resist a common error:
Nuclitalia shareholding does not automatically nuclear-qualify Leonardo’s full product portfolio.
A future role in:
- cyber protection;
- physical security;
- digital I&C;
- sensing;
would require reactor-specific licensing and qualification.
4.30 Valves and actuation — a likely localisation opportunity but a qualification challenge
Italy possesses substantial industrial capability in valves and flow-control equipment.
AIN’s current membership includes:
- ORION Valves;
- Valvitalia;
- other specialist mechanical suppliers.
Valvitalia is a major Italian manufacturer of:
- valves;
- actuators;
- fittings;
- fire-protection systems;
with extensive test infrastructure.
ORION publishes API, PED, ATEX and SIL qualifications.
However, the specific public qualification evidence reviewed here does not establish that either company’s complete relevant product line presently holds the nuclear qualification required for safety-class SMR applications.
Therefore:
industrial potential — high.
Automatic nuclear qualification — not demonstrated.
This is precisely the kind of supplier category targeted by the Ansaldo–RINA conversion programme.
4.31 Saipem and Webuild — large-project capability must not be confused with nuclear qualification
Both Saipem and Webuild possess capabilities potentially relevant to nuclear new build:
- megaproject management;
- complex civil works;
- energy construction;
- heavy logistics;
- large international EPC execution.
Those capabilities could become strategically important in:
- conventional island;
- civil structures;
- cooling-water systems;
- marine works;
- site preparation;
- balance-of-plant.
But the evidence reviewed for this chapter does not establish a current company-wide nuclear-qualified status comparable with Ansaldo Nucleare or the specialist NQ-1 manufacturers.
They are therefore classified AC-4 pending project-specific evidence.
This is not a negative assessment.
It is a procurement distinction.
A company can be a world-class civil/EPC contractor and still require:
- nuclear QA;
- safety culture;
- nuclear document control;
- qualified welding;
- configuration management;
- supplier cascade controls;
before executing safety-related nuclear work.
4.32 The Politecnico di Milano supply-chain exercise confirms industrial depth
The Politecnico di Milano Nuclear Reactors Group assembled an Italian Nuclear Supply Chain for Small Modular Reactors industrial initiative specifically examining whether Italian companies could manufacture critical SMR components.
Its published assessment highlights Italy’s continued industrial involvement in European/international nuclear projects despite the absence of domestic generation and points particularly to participation in:
- Cernavodă;
- Mochovce;
- ITER;
- heavy component supply;
- reactor-pressure-vessel manufacturing chains. [S/A]
This is important evidence of industrial depth.
It should not be read as evidence that every participating company possesses identical qualification.
The value of the exercise lies precisely in identifying a supply-chain system, where different firms contribute:
- forgings;
- machining;
- welding;
- testing;
- piping;
- valves;
- QA;
- transport.
4.33 Italian firms are already embedded in foreign nuclear programmes
One of the strongest arguments against describing the Italian nuclear industry as “lost” is that several companies survived by exporting.
The evidence set includes:
China — Sanmen AP1000
Ansaldo Nucleare manufactured major ASME III components.
Ansaldo contributed to Units 1 and 2 and remains involved in life-extension/new-unit plans.
Slovenia — Krško
Ansaldo completed upgrades and obtained a new plant contract in 2026.
International EPR/AP1000 supply
Tectubi documents long-term nuclear fitting production for new-generation NPPs, including EPR/AP1000 markets.
ITER
Documented Italian participants include:
- Ansaldo Nucleare;
- Walter Tosto;
- Westinghouse Electric Italy/Mangiarotti historical ITER role;
- SIMIC;
- ASG Superconductors.
This export history has preserved capabilities that would otherwise have disappeared after 1987.
4.34 Fusion is a major part of Italy’s nuclear industrial capability — but it cannot be counted as LWR manufacturing capacity
Italian nuclear-industry statistics often combine fission and fusion competence.
That is legitimate when measuring broad nuclear science and engineering.
It becomes misleading when assessing readiness to build an SMR.
ITER/DTT capability demonstrates excellence in:
- superconducting magnets;
- vacuum vessels;
- remote handling;
- precision fabrication;
- cryogenics;
- specialised materials.
It does not automatically establish capability for:
- LWR reactor-pressure-vessel design authority;
- fuel fabrication;
- licensed nuclear I&C;
- reactor coolant pumps;
- reactor-core design.
Therefore the report maintains separate categories.
Fusion industrial leaders
- ASG Superconductors;
- SIMIC;
- Ansaldo Nucleare;
- Walter Tosto;
- Westinghouse Electric Italy/Mangiarotti;
- Eni;
- ENEA.
Fusion should be treated as a parallel high-technology national asset, not as proof that every fission supply-chain gap has been solved.
4.35 Fuel-cycle sovereignty remains the largest missing industrial block
The Italian industrial base is strongest in mechanical engineering.
It is weaker in the front end of the power-reactor fuel cycle.
Italy does not currently possess a complete sovereign commercial chain covering:
- uranium mining;
- conversion;
- enrichment;
- mass production of modern commercial LWR fuel assemblies.
That creates strategic dependency regardless of how much reactor hardware is localised.
For LEU LWR-SMRs, dependence would fall on international:
- uranium suppliers;
- converters;
- enrichment companies;
- fuel vendors.
For HALEU-dependent designs the dependency problem becomes more difficult.
For LFR/MOX or recycled-fuel systems the industrial and regulatory problem is different again and potentially more complex.
Accordingly, a claim such as “80% Italian content” would be strategically incomplete unless it distinguishes:
plant construction localisation
from
fuel-cycle sovereignty.
Chapter 5 addresses this technology-by-technology.
4.36 Digital I&C is a probable capability gap unless tied to a licensed reactor platform
Italy has deep electronics and automation industries.
But nuclear digital instrumentation and control is one of the most licence-sensitive parts of a reactor.
Safety-class digital I&C requires:
- deterministic safety architecture;
- software verification/validation;
- independence;
- defence against common-cause software failure;
- cyber requirements;
- regulator-accepted lifecycle standards.
Leonardo and other Italian companies may possess transferable capabilities.
That does not mean a domestic safety-class reactor-control platform already exists.
For the first FOAK, the realistic baseline should therefore be:
- reactor-vendor safety I&C;
- Italian participation where qualified;
- progressive localisation only after regulator/vendor acceptance.
Attempting to replace a mature vendor safety platform with an indigenous one solely to maximise national content could increase FOAK schedule and licensing risk.
4.37 The real localisation opportunity is much larger in balance-of-plant than in reactor intellectual property
For a mature foreign LWR-SMR, Italy could plausibly compete across a substantial fraction of the non-proprietary plant.
Potential high-local-content areas include:
- civil structures;
- conventional island;
- piping;
- fittings;
- valves;
- heat exchangers;
- pressure equipment;
- electrical systems;
- cable;
- HVAC;
- auxiliary systems;
- cooling-water infrastructure;
- fire protection;
- construction management;
- module assembly;
- commissioning;
- decommissioning services.
The most difficult localisation areas are likely to remain:
- reactor design authority;
- core design;
- licensed fuel;
- certain primary safety-class proprietary components;
- safety digital I&C;
- specialised reactor coolant equipment;
- vendor-specific intellectual property.
This distinction should drive industrial policy.
4.38 Qualification cannot be created by decree
The Government can:
- fund qualification;
- support certification;
- create training programmes;
- aggregate demand;
- negotiate local-content provisions.
It cannot legislatively declare a company nuclear-qualified.
Qualification is generated through:
- QA system;
- audited processes;
- material traceability;
- qualified personnel;
- welding procedure qualification;
- NDE qualification;
- design-code compliance;
- manufacturing records;
- supplier control;
- regulator/vendor acceptance.
For safety-class components, qualification may take years.
The Ansaldo–RINA programme is therefore strategically important because it starts from the correct premise: transferable competence requires structured conversion.
4.39 Nuclear codes are an industrial barrier to entry
The principal code families relevant to the future Italian supply chain are likely to include some combination of:
- ASME Boiler and Pressure Vessel Code Section III;
- RCC-M;
- RCC-E;
- ISO 19443;
- vendor-specific QA;
- national regulatory requirements.
The actual mix depends on reactor choice.
A US-derived SMR and a French-derived SMR could impose materially different manufacturing-code ecosystems.
This has an important consequence.
Technology selection is also a supply-chain selection
If Italy delays technology down-selection too long, suppliers may invest in the wrong:
- code system;
- welding qualifications;
- material route;
- digital QA;
- manufacturing process.
The State therefore cannot design its industrial policy independently from reactor procurement.
4.40 Company-level qualification matrix for first-wave localisation
| Company | First-wave plausible work | Nuclear evidence strength | Additional gate before Italian FOAK |
|---|---|---|---|
| Ansaldo Nucleare | EPC, systems, NSSS/BOP, integration | Very high | Vendor/project-specific design authority |
| Westinghouse Electric Italy | Heavy NSSS equipment | Very high | Vendor-specific order |
| Walter Tosto | Heavy welded structures | High | Selected code/vendor qualification |
| ATB | Nuclear pressure/containment/casks | Very high | Specific design/vendor approval |
| SIMIC | Precision structures/components | Very high | Product-specific qualification |
| FOMAS | Forgings/rings | Very high | Material/vendor specification |
| Tectubi | Nuclear piping/fittings | Very high | Project approved-supplier status |
| IBF | Coolant-loop piping/fittings | High | Product and code verification |
| Arvedi AST | Forged materials/components | High historically | Current nuclear certificate revalidation |
| Belleli | Pressure equipment/casks | Moderate/high | Current code/vendor audit |
| SIET | Thermal-hydraulic testing | Very high | Test-program qualification |
| RINA | Certification/engineering | High | Regulator/vendor scope |
| Leonardo | Cyber/electronics/security | Transferable | Nuclear safety/cyber qualification |
| Fincantieri | Maritime integration | Development stage | Complete maritime nuclear licensing framework |
| MAIRE | Industrial integration/BOP | Development stage | Nuclear QA for relevant work packages |
| Saipem | EPC/BOP/civils | Transferable | Nuclear QA/project qualification |
| Webuild | Civil structures | Transferable | Nuclear QA/project qualification |
| Valvitalia | Valves/actuators | Transferable | Nuclear product certification/vendor approval |
| ORION | Valves | Transferable | Nuclear-specific qualification |
4.41 Supply-chain bottlenecks likely to emerge first
Italy’s problem is unlikely to be an absolute absence of steel-working capacity.
The critical bottlenecks are more specialised.
Nuclear quality assurance personnel
Experienced personnel capable of managing:
- nuclear QA;
- configuration control;
- deviations;
- concessions;
- lifetime records;
will be scarce.
Nuclear welding
A larger fleet requires:
- qualified welders;
- welding engineers;
- procedures;
- automated welding;
- repair procedures;
- inspection.
NDE
Safety-class manufacturing requires a substantial increase in qualified:
- ultrasonic testing;
- radiography;
- penetrant testing;
- eddy-current;
- advanced phased-array methods.
Nuclear procurement
Ordinary industrial procurement tolerates supplier substitution more easily than nuclear manufacturing.
Nuclear procurement requires:
- approved suppliers;
- traceability;
- anti-counterfeit measures;
- controlled material certificates;
- lifetime quality records.
Regulatory interface
Italian companies accustomed to foreign vendor requirements still need a domestic interface with:
- ISIN/future regulator;
- MASE;
- environmental authorisation;
- project licence holder.
4.42 The qualification problem is larger for SMEs than for large industrial groups
A large industrial organisation can absorb:
- certification cost;
- dedicated nuclear QA staff;
- long customer qualification;
- delayed return on investment.
A specialist SME may possess excellent manufacturing capability but cannot justify nuclear certification without a credible pipeline.
This creates a classic programme-coordination problem.
No orders → no investment in qualification.
No qualified suppliers → low Italian content.
The State and major integrators therefore need to create early demand visibility without guaranteeing uneconomic contracts.
Possible instruments include:
- supplier qualification grants;
- training;
- export-credit support;
- vendor days;
- framework agreements;
- European alliance participation.
The July 2026 Ansaldo–RINA initiative is an early example of this approach.
The Romanian programme may become one of the most important routes for strengthening Italian nuclear capability before an Italian FOAK.
Ansaldo’s Cernavodă supplier initiative brought together more than 70 Italian companies for:
- Unit 1 life extension;
- Units 3 and 4 completion.
The associated memorandum described potential financing of up to €2 billion involving SACE, Ansaldo and Nuclearelectrica.
This creates an industrial-policy opportunity.
Italian companies can accumulate:
- current nuclear references;
- code experience;
- QA records;
- vendor familiarity;
before domestic construction begins.
From a national-industrial perspective, that may be more valuable than waiting for the first Italian order.
4.44 Italy should pursue “export before FOAK” where possible
The supply chain need not wait for Italy to approve a reactor.
The most rational industrial sequence is:
2026–2029
Qualify companies against existing European and North American projects.
2028–2032
Increase participation in:
- Cernavodă;
- UK nuclear;
- Polish nuclear;
- French programme;
- Canadian/US SMR supply chains;
- ITER/DTT;
- decommissioning.
Italian FOAK
Use suppliers already possessing recent export references.
This lowers the risk that the Italian first unit simultaneously becomes:
- a reactor FOAK;
- a regulator FOAK;
- a site FOAK;
- and a supplier FOAK.
The programme should minimise the number of first-of-a-kind variables occurring simultaneously.
4.45 The industrial geography is already concentrated
Italy’s nuclear-relevant companies form identifiable industrial clusters.
Liguria / Genoa–La Spezia
- Ansaldo Nucleare;
- Ansaldo Energia;
- Leonardo;
- ASG Superconductors;
- Fincantieri ecosystem.
Strengths:
- nuclear engineering;
- energy systems;
- naval;
- superconductivity;
- defence/cyber.
Lombardy
- ATB;
- FOMAS;
- heavy mechanical industry;
- specialist valves and metallurgy.
Strengths:
- forgings;
- heavy pressure components;
- precision manufacture.
Emilia–Piacenza corridor
- SIET;
- Tectubi;
- IBF-related production;
- nuclear component/testing capability.
Friuli-Venezia Giulia
- Westinghouse Electric Italy/Monfalcone.
Strength:
- dedicated reactor NSSS heavy manufacturing.
Abruzzo
- Walter Tosto.
Strength:
- large nuclear structures and high-integrity fabrication.
Umbria
- Arvedi AST/Terni.
Strength:
- heavy metallurgical forgings.
Lazio
- ENEA Frascati;
- Casaccia;
- DTT;
- research/waste institutions.
Emilia-Romagna / Brasimone
- ENEA lead-reactor technology infrastructure.
This geography matters because nuclear industrialisation is not merely a national statistic.
Skills, transport and training are locally concentrated.
4.46 Employment claims must distinguish current jobs from induced scenario employment
The TEHA/Edison work gives a useful example.
The study identified approximately:
- 2,800 currently supported jobs associated with the specialised nuclear value chain in the 2022 baseline;
- 117,000 potential direct, indirect and induced jobs under a long-horizon development scenario.
Those numbers do not measure the same thing.
The 117,000 figure cannot be described as:
- existing nuclear engineers;
- available welders;
- plant operators ready for recruitment.
Much of it is modelled:
- construction employment;
- induced activity;
- indirect supply-chain demand.
This distinction matters for workforce planning.
Italy may generate substantial employment while still experiencing acute shortages of:
- reactor physicists;
- nuclear safety analysts;
- licensed operators;
- nuclear QA managers;
- radiation-protection experts;
- ASME/RCC-M welding specialists.
4.47 The workforce constraint is therefore qualitative before it is quantitative
A national industrial strategy should maintain separate workforce indicators.
Category 1 — nuclear safety/regulation
Hardest to substitute.
Category 2 — reactor engineering
- physics;
- thermal hydraulics;
- fuel;
- safety analysis;
- severe accidents.
Category 3 — nuclear manufacturing
- QA;
- welding;
- NDE;
- material control.
Category 4 — general construction
Much larger population and easier to scale.
Category 5 — operations
Must be trained several years before commissioning.
Category 6 — decommissioning/waste
Existing Italian expertise is relatively stronger.
If these categories are aggregated into a single “jobs” number, the programme loses visibility of its real bottlenecks.
The Fincantieri–newcleo–RINA initiative gives Italy a credible route into maritime nuclear R&D.
But naval nuclear deployment introduces distinct requirements:
- marine classification;
- collision;
- sinking;
- port entry;
- security;
- liability;
- crew radiation protection;
- international maritime law;
- safeguards;
- emergency planning.
Accordingly, Fincantieri’s naval programme should be treated as an industrial technology-development track, not as evidence that Italy’s land-based reactor supply chain is complete.
The same separation should apply in reverse: a land-based nuclear supplier is not automatically qualified for naval propulsion.
4.49 Italy’s strongest strategic position may be as Europe’s component power
The industrial evidence suggests a strategy that does not require Italy to become a complete national reactor OEM.
Italy already has defensible comparative strengths in:
- pressure components;
- forgings;
- piping/fittings;
- welding;
- testing;
- EPC integration;
- casks;
- decommissioning;
- fusion;
- lead-reactor R&D.
Those capabilities can participate in:
- French programmes;
- UK new build;
- Romania;
- Poland;
- Canada;
- United States;
- future European SMRs.
This reduces the binary dependence on whether an Italian FOAK occurs in 2035 or 2040.
An export-oriented qualification strategy can generate industrial returns before domestic first power.
4.50 Industrial policy should not attempt artificial autarky
A sovereign supply chain does not mean every component must be Italian.
A forced national-content requirement can become counterproductive where it substitutes an unproven local product for:
- a licensed vendor component;
- a regulator-accepted reference design;
- a mature serial supplier.
For the FOAK, the better objective is:
maximum qualified Italian content compatible with reference-design integrity.
NOAK units can progressively increase localisation after:
- successful licensing;
- supplier qualification;
- manufacturing learning.
This reduces programme risk.
4.51 Recommended supply-chain segmentation for procurement
The national programme should divide the industrial base into five procurement groups.
Group A — already nuclear-qualified strategic suppliers
Examples:
- Ansaldo Nucleare;
- Westinghouse Electric Italy;
- Walter Tosto;
- ATB;
- SIMIC;
- FOMAS;
- Tectubi;
- SIET.
Priority:
retain, expand and export.
Group B — nuclear-active specialists requiring project-specific qualification
Examples:
- IBF;
- Belleli;
- Arvedi AST;
- RINA;
- specialised AIN suppliers.
Priority:
validate certifications and map vendor compatibility.
Group C — state/research nuclear infrastructure
- ENEA;
- Sogin;
- Nucleco;
- CIRTEN.
Priority:
regulatory, R&D, waste, workforce and testing integration.
Group D — advanced/new nuclear development
- newcleo;
- Nuclitalia;
- Edison/EDF partnership;
- EAGLES.
Priority:
technology maturation and down-select without readiness inflation.
Group E — adjacent industrial conversion
- Leonardo;
- Fincantieri;
- MAIRE/NEXTCHEM;
- Valvitalia;
- ORION;
- Saipem;
- Webuild;
- broader mechanical/electrical SMEs.
Priority:
qualification only where a defined reactor work package exists.
4.52 Minimum supplier census the State should build
Before reactor selection, MASE/MIMIT should maintain a controlled national database containing, for every supplier:
- corporate identity;
- ownership;
- employees;
- turnover attributable specifically to nuclear;
- active nuclear contracts;
- last completed nuclear contract;
- reactor/vendor references;
- ASME certificates;
- RCC-M qualifications;
- ISO 19443;
- NQA-1 experience;
- welding procedures;
- NDE qualifications;
- maximum component size/weight;
- clean manufacturing area;
- heavy transport access;
- export references;
- workforce age profile;
- investment required for SMR production;
- lead time;
- single-point-of-failure dependencies.
This would replace unsupported headline numbers with auditable industrial evidence.
4.53 Strategic industrial gaps
The evidence reveals at least eight important gaps.
1. No indigenous mature commercial LWR-SMR OEM
Italy possesses integrators and component manufacturers, but no currently commercial Italian LWR-SMR vendor.
2. Fuel-cycle dependence
No complete domestic commercial power-reactor enrichment/fabrication chain.
3. Digital safety I&C dependence
A vendor-linked platform will probably be required for FOAK.
4. Operator capability
Italy must rebuild a domestic commercial nuclear operating organisation.
5. Nuclear-qualified civil construction at fleet scale
Major constructors exist, but nuclear-specific fleet qualification must be demonstrated.
6. Regulatory-side engineering
Industry may scale faster than regulator technical staffing.
7. Serial SMR manufacturing
Italy possesses bespoke nuclear fabrication.
It has not yet demonstrated serial factory production of dozens of identical reactor modules.
8. Domestic reference project
Export capability exists without an Italian operating plant, but some suppliers cannot justify major new capacity without a bankable domestic/European order pipeline.
4.54 What a 300 MWe LWR-SMR could realistically source in Italy
Subject to vendor acceptance, the following localisation appears industrially plausible.
High plausibility
- civil works;
- conventional island;
- piping;
- fittings;
- structural steel;
- pressure equipment;
- forgings;
- selected heat exchangers;
- valves after qualification;
- cable/support systems;
- fire systems;
- installation;
- testing;
- logistics.
Medium plausibility / design-dependent
- reactor-pressure vessel;
- steam-generator modules;
- containment modules;
- selected primary components;
- digital subsystems;
- specialised pumps.
Low initial sovereignty
- reactor intellectual property;
- core design;
- licensed fuel assemblies;
- enrichment;
- proprietary safety software;
- specialised vendor reactor internals.
The precise percentages cannot be responsibly estimated before technology selection.
Any current claim that “X% of the plant will be Italian” should therefore be treated as commercial aspiration rather than engineering fact unless accompanied by a component-level bill of materials.
4.55 What an Italian LFR pathway changes
An Italian-linked LFR strategy produces a different industrial map.
It would increase the strategic relevance of:
- ENEA;
- Ansaldo Nucleare;
- newcleo;
- EAGLES;
- Brasimone infrastructure;
- advanced materials;
- liquid-metal components.
It would simultaneously introduce harder unresolved requirements involving:
- fuel;
- lead chemistry;
- pumps;
- structural materials;
- corrosion control;
- qualification;
- licensing;
- demonstration history.
Therefore the LFR pathway could offer greater Italian technological sovereignty while carrying greater FOAK technology risk.
The LWR-SMR pathway offers the opposite trade:
lower indigenous reactor-IP sovereignty, higher near-term licensing maturity.
That trade will be examined in Chapter 5.
4.56 Industrial conclusions
Italy does not need to reconstruct a nuclear industry from zero.
It possesses a real nuclear industrial core.
That core includes companies capable of demonstrating:
- ASME nuclear manufacturing;
- international new-build references;
- safety-class components;
- nuclear forgings;
- reactor piping;
- spent-fuel casks;
- nuclear testing;
- operating-plant modifications;
- decommissioning;
- fusion component manufacturing.
The strongest evidence resides in firms such as:
Ansaldo Nucleare, Westinghouse Electric Italy, Walter Tosto, ATB Riva Calzoni, SIMIC, FOMAS, Tectubi Raccordi and SIET.
Around that nucleus are genuine nuclear lifecycle and research organisations:
Sogin, Nucleco, ENEA, CIRTEN, RINA, ASG Superconductors, newcleo and the Nuclitalia/Edison industrial platforms.
Beyond them is a much larger ring of companies possessing valuable but not automatically nuclear-qualified capability:
Leonardo, Fincantieri, MAIRE/NEXTCHEM, major valve manufacturers, Saipem, Webuild and the broader Italian mechanical industry.
The strategic error would be to merge all three rings into the headline claim that Italy has “500 nuclear companies.”
It does not.
The opposite claim — that four decades without domestic generation have destroyed Italian nuclear industrial capability — is equally incorrect.
They are different propositions.
The evidence supports the following conclusion:
Italy has a small but unusually capable nuclear-qualified industrial core, a broader specialised nuclear ecosystem of roughly seventy organisations, and a much larger industrial population that could be converted only through investment, certification, codes, vendor qualification and sustained order visibility.
For government planning, that is stronger than a headline number because it identifies what can actually be procured.
The industrial task between 2026 and the first Italian FOAK is therefore not simply to “create a supply chain.”
It is to perform four different operations:
preserve the existing qualified core;
use foreign nuclear programmes to deepen current references;
qualify carefully selected adjacent manufacturers;
and avoid forcing localisation where it increases FOAK licensing risk.
Italy’s comparative industrial advantage is potentially substantial even without becoming a fully sovereign reactor OEM.
If policy is disciplined, Italy could emerge as one of Europe’s most important suppliers of nuclear components, engineering, testing, lifecycle services and advanced-reactor technology irrespective of whether its first domestic reactor is licensed in 2035, 2038 or later.
CHAPTER 4 — LOAD-BEARING SOURCE REGISTER
Industrial census and supply-chain baseline
S1 — Edison / Ansaldo Nucleare / TEHA Group, 7 September 2024. Identifies 70 specialised Italian nuclear companies, €457 million nuclear-related value and approximately 2,800 supported jobs in 2022; separately models €50.3 billion economic impact and 117,000 direct/indirect/induced jobs under a long-term nuclear deployment scenario.
Edison — New nuclear in Italy: industrial and economic study
S2 — Politecnico di Milano, Nuclear Reactors Group, Italian Nuclear Supply Chain for Small Modular Reactors. Industrial mapping and SMR component manufacturing study.
Politecnico di Milano — Italian Nuclear Supply Chain for SMRs
I1 — Associazione Italiana Nucleare — current collective members.
AIN — Collective members
Utilities, developers and integrators
I2 — Enel, 14 May 2025 — creation of Nuclitalia. Enel 51%, Ansaldo Energia 39%, Leonardo 10%; initial focus on mature water-cooled SMR technologies and industrial partnerships.
Enel — Establishment of Nuclitalia
I3 — Ansaldo Nucleare — corporate nuclear capabilities. EPC, systems integration, new build, decommissioning, waste, advanced reactors and fusion.
Ansaldo Nucleare — Nuclear offering
I4 — Ansaldo Nucleare — new-build reference projects. AP1000 Sanmen ASME III components, Cernavodă Units 1–2 and ongoing Romanian programme.
Ansaldo Nucleare — New nuclear builds
I5 — Ansaldo Energia — 2026 nuclear press releases. Krško upgrades, ITER and Italian supply-chain programme.
Ansaldo Energia — 2026 press releases
I6 — Ansaldo Nucleare, 16 April 2024 — Cernavodă Supplier Day. More than 70 Italian companies; SACE/Ansaldo/Nuclearelectrica financing framework up to €2 billion.
Ansaldo Nucleare — Italian supply-chain opportunities in Romania
I7 — Leonardo — Nuclitalia participation.
Leonardo — 2025/2026 corporate reporting on Nuclitalia
Nuclear heavy manufacturing
I8 — Westinghouse Electric Company, 3 March 2026. Mangiarotti renamed Westinghouse Electric Italy; approximately 300 employees; dedicated nuclear manufacturing hub for AP1000, AP300 and NSSS heavy equipment.
Westinghouse — Westinghouse Electric Italy
I9 — Walter Tosto — corporate industrial history. ITER vacuum-vessel contract, ASME N certification, dedicated nuclear workshop.
Walter Tosto — Company history
I10 — ITER Organization — European vacuum-vessel manufacturing. Ansaldo Nucleare, Mangiarotti and Walter Tosto AMW consortium.
ITER — Vacuum vessel manufacturing in Italy
I11 — ATB Riva Calzoni — nuclear equipment. Reactor vessels, pressurisers, nuclear-island pressure equipment and radioactive-material casks.
ATB — Nuclear heavy equipment
I12 — ATB/SIMIC, 28 July 2026. Contract for ASME Section III containment-vessel components.
ATB — 2026 nuclear component contract
I13 — SIMIC — fusion and nuclear manufacturing portfolio. ITER toroidal-field coils, radial plates and divertor structures.
SIMIC — Nuclear Fusion & Fission
I14 — FOMAS Group, 2026 nuclear power-generation documentation. Five decades of nuclear forgings and ASME material-organisation history.
FOMAS — Power Generation / Nuclear capability
I15 — Arvedi AST — nuclear applications. Forged reactor, steam-generator, pressuriser and nuclear-waste components.
Arvedi AST — Forging applications
I16 — Arvedi AST 2024 Report. ASME NCA-3800 Material Organisation certification recorded as valid to 2025; current renewal therefore requires confirmation.
Arvedi AST — 2024 corporate report
Piping, fittings, pressure equipment
I17 — Tectubi Raccordi — 2026 quality and certification system. ISO 19443 and ASME Section III NCA quality arrangements, EDF qualification.
Tectubi Raccordi — Quality and nuclear certifications
I18 — Allied Group / Tectubi — manufacturing capability. Nuclear-quality fittings and heavy bends.
Allied Group — Tectubi Raccordi
I19 — IBF / Tubacex — nuclear product capability. Nuclear tubing and pressure-boundary applications.
IBF — Nuclear
I20 — IBF — special coolant-loop components. Hot legs, cold legs, surge lines and specialised fittings.
IBF — Product range
I21 — Belleli Energy — nuclear and power equipment. Steam-generator, pressure-vessel and metal-cask capability.
Belleli Energy — Nuclear & Power
Testing, qualification and certification
I22 — SIET — institutional history and nuclear testing capability. Founded by ENEA/CISE for nuclear safety testing; NQA-1 system and international vendor/regulator references.
SIET — Nuclear testing history
I23 — RINA / Ansaldo Energia, 27 July 2026. Programme specifically intended to qualify Italian companies not yet active in nuclear.
RINA — Ansaldo Energia/RINA Italian nuclear supply-chain programme
Decommissioning and waste
G1 — Sogin — current institutional mission. State-owned decommissioning and radioactive-waste operator; National Repository responsibility.
Sogin — About the Group
G2 — Sogin — current nuclear-cycle activities. Four nuclear plants, fuel-cycle facilities, research reactor and radioactive-waste programme.
Sogin — Italian nuclear-cycle closure
I24 — Nucleco — nuclear decommissioning. More than 30 years of PWR/BWR/GCR and fuel-cycle decommissioning.
Nucleco — Nuclear decommissioning
Research, advanced reactors and fusion
G3 — ENEA, February 2026 — EAGLES/newcleo LEANDREA programme.
ENEA — EAGLES and newcleo on LEANDREA
G4 — ENEA, April 2026 — PASCAL and LFR qualification.
ENEA — Fourth-generation lead-reactor qualification
G5 — ENEA/newcleo — PRECURSOR programme at Brasimone.
ENEA — PRECURSOR lead-reactor simulator
A1 — CIRTEN — Italian nuclear university consortium.
CIRTEN — Nuclear technology research consortium
A2 — CIRTEN — nuclear education programmes.
CIRTEN — Nuclear education
G6 — ENEA, May 2025 — ASG Superconductors DTT magnet programme. Eighteen superconducting toroidal-field magnets.
ENEA — First DTT magnet completed by ASG
I25 — ITER Organization — ASG/SIMIC participation in ITER TF coils.
ITER — European ITER coil manufacturing
I26 — Eni — fusion partnerships. CFS, DTT, UKAEA and MIT-related programmes.
Eni — Magnetic-confinement fusion programmes
I27 — Fincantieri/newcleo/RINA — naval nuclear feasibility study.
Fincantieri — Nuclear naval propulsion feasibility programme
I28 — Fincantieri/newcleo, 2025 — maritime LFR development concept.
Fincantieri — newcleo maritime reactor collaboration
I29 — MAIRE / NEXTCHEM — newcleo cooperation. Nuclear-powered carbon-neutral chemical/hydrogen concept.
MAIRE — NEXTCHEM/newcleo programme
Adjacent valve industry
I30 — Valvitalia — industrial valves, actuators, fittings and testing capability.
Valvitalia — Corporate capabilities
I31 — ORION Valves — published certification portfolio.
ORION Valves — Qualifications and certificates
END OF CHAPTER 4
CHAPTER 5 — GLOBAL SMR/AMR REALITY AND THE DESIGNS ITALY CAN ACTUALLY CHOOSE
5.1 Executive finding
The global SMR market in September 2026 is no longer a purely conceptual market, but neither is it yet a mature commercial market in which Italy can select from multiple fully proven, serially produced reactor fleets.
Only a very small number of SMR-class designs have accumulated actual commercial operating experience. The IAEA identifies Russia’s Akademik Lomonosov, based on two KLT-40S reactors, as commercially operating since May 2020, and China’s HTR-PM as commercially operating since December 2023. The IAEA’s 2025 report still characterised these as the world’s principal commercial SMR operating references. [I]
A second group has now progressed materially beyond PowerPoint.
China’s ACP100/Linglong One, a 125 MWe integral PWR, remains in pre-commissioning in September 2026 rather than demonstrably established in commercial operation. [I/S]
Canada’s BWRX-300 at Darlington is under actual nuclear construction. The Canadian Nuclear Safety Commission issued the construction licence in April 2025; the first major regulatory construction hold point was released in March 2026; OPG installed the reactor-building basemat in April 2026; and an operating-licence application was filed in March 2026. OPG continues to target service by the end of 2030. [I]
The United States crossed a comparable threshold in advanced non-light-water technology when the NRC issued TerraPower’s Natrium project a construction permit in March 2026. Nuclear construction began in April 2026. Natrium is therefore not merely a conceptual sodium reactor; it is a licensed construction project, although it still requires an operating licence and depends on an emerging HALEU fuel chain. [I]
The Xe-100 has also advanced significantly. X-energy’s proposed four-module Long Mott project is under NRC construction-permit review; by September 2026 the environmental review had reached a FONSI, the ACRS had undertaken reactor-safety review, and the mandatory hearing was held on 22 September. A final construction-permit decision had not yet been issued at the cut-off. [I]
Several Western water-cooled competitors occupy a third category: serious regulatory programmes without an operating or currently constructing first commercial unit.
These include:
- Holtec SMR-300;
- Westinghouse AP300;
- Rolls-Royce SMR;
- NuScale US460;
- the redesigned EDF NUWARD.
Their maturity levels differ significantly.
Holtec completed UK GDA Step 2 in March 2026 and has submitted the first part of a US construction-permit application for two Palisades SMR-300 units. [I/G]
Westinghouse’s AP300 remains in NRC pre-application engagement rather than formal design-certification review. [I]
Rolls-Royce SMR is in UK GDA Step 3 and, critically, moved beyond design competition in 2026 when Great British Energy–Nuclear contracted for three units at Wylfa. It is still not an operating or constructing reactor, but it possesses a state-backed deployment programme. [G/I]
NuScale’s six-module US460 achieved US NRC Standard Design Approval in May 2025, but no US460 commercial project was under construction at the cut-off. [I]
EDF’s redesigned NUWARD moved in 2024 away from its original design toward a more conventional PWR architecture using proven technological building blocks. By 2026 EDF described a platform of up to approximately 400 MWe, with conceptual design targeted for completion in 2026 and commercialisation in the 2030s. It is therefore strategically relevant to Italy — especially because of the Edison/EDF/Italian-industry agreement — but it is not yet a licensed design. [I]
Italy’s indigenous-linked advanced-reactor options are further behind in deployment but potentially more important for technology sovereignty.
newcleo’s LFR-AS-200 is a 200 MWe lead-cooled fast reactor designed around MOX fuel. The US NRC began pre-application interaction with newcleo in March 2026, including a separate MOX fuel-fabrication discussion. [I]
EAGLES-300, led by Ansaldo Nucleare, ENEA, RATEN and SCK CEN, is a 300 MWe European lead-cooled fast-reactor programme. It entered an IAEA-coordinated international pre-licensing initiative, but the declared roadmap requires the LEANDREA and ALFRED demonstrators before commercial EAGLES-300 deployment, currently targeted for 2039. [I/G]
These distinctions determine the Italian choice.
If the national objective is an earliest credible FOAK in the 2030s, the most relevant design family is currently the Western light-water SMR, because it uses conventional LEU fuel, established water-reactor regulation, mature supply chains and — in the case of BWRX-300 — actual construction evidence.
If the national objective is greater Italian technological ownership and advanced fuel-cycle capability, lead-cooled fast reactors offer much greater domestic intellectual and industrial participation, but Italy must accept a later schedule and materially greater fuel, materials, licensing and FOAK risk.
These are not equivalent technology options.
The commissioning mandate explicitly requires this chapter to distinguish actual electricity-producing hardware from licensing, construction and paper concepts and to analyse both the 50–200 MWe band and the approximately 300 MWe class increasingly discussed in Italian policy.
5.2 Readiness classification used in this chapter
To prevent maturity inflation, the report uses seven distinct technology-status classes.
| Class | Meaning |
|---|---|
| R6 — Commercial operation | Reactor is producing electricity commercially |
| R5 — Commissioning / pre-commercial operation | Construction essentially complete; commissioning under way |
| R4 — Nuclear construction | Nuclear construction authorised and physically under way |
| R3 — Construction licence / mature deployment project | Construction authorisation exists or project has crossed equivalent binding deployment threshold |
| R2 — Design approval / advanced regulatory review | Design accepted or under substantive licensing assessment; no commercial reactor construction |
| R1 — Pre-licensing / design development | Formal regulator engagement but no construction/design licence |
| R0 — Concept / early development | Engineering/R&D programme without mature regulatory basis |
The difference between R2 and R4 matters more than vendor marketing descriptions such as “deployment ready.”
A reactor that has received a generic design approval has proved something important about the design.
It has not proved:
- construction cost;
- construction duration;
- commissioning performance;
- operating reliability;
- fleet-scale modular manufacturing.
5.3 Global reality at the cut-off
Commercially operating
Akademik Lomonosov — Russia
Two KLT-40S water-cooled reactor modules on a floating platform; commercial operation since May 2020. R6.
HTR-PM — China
High-temperature gas-cooled pebble-bed reactor system; commercial operation since December 2023. R6.
Pre-commissioning / late construction
ACP100 / Linglong One — China
125 MWe integral PWR; construction began in 2021; pre-commissioning still under way at the cut-off. R5.
Actual nuclear construction
BWRX-300 — Canada
Darlington Unit 1 construction under Canadian licence; reactor-building civil construction under way. R4.
Natrium — United States
345 MWe sodium fast reactor; NRC construction permit issued March 2026; nuclear construction commenced April 2026. R4.
Construction-permit review / early deployment
Xe-100 — United States
Four-module Long Mott project under NRC construction-permit review at cut-off. R2/R3 boundary; not yet authorised to construct.
Holtec SMR-300 — United States
Palisades Pioneer Units 1–2 application accepted in phased form; limited early work progressing, but full nuclear construction permit not yet issued. R2/R3.
Design/regulatory maturity without current commercial construction
NuScale US460 — United States
Standard Design Approval issued May 2025. R2.
Rolls-Royce SMR — United Kingdom
UK GDA Step 3; three-unit Wylfa development contract. R2/R3.
AP300 — United States
NRC pre-application engagement. R1.
NUWARD — France
redesigned PWR conceptual/design-development programme; no construction licence. R1.
Advanced-reactor development
newcleo LFR-AS-200 — European/US programme
NRC pre-application; MOX fuel-facility discussions; no reactor construction licence. R1.
EAGLES-300 — European programme
international pre-licensing and demonstrator roadmap; commercial deployment target 2039. R1.
This is the central reality check:
The Western SMR market has crossed from conceptual engineering into real licensing and construction, but only one Western commercial SMR design — BWRX-300 — was physically under licensed nuclear construction at the cut-off.
Natrium is also under construction but belongs to the more technically and fuel-cycle-demanding advanced-reactor class.
5.4 Consolidated design matrix
| Design | Country / vendor | Output | Coolant / spectrum | Fuel / enrichment | Status 26 Sep 2026 | First-unit evidence | Italian link | Principal Italian showstopper |
|---|---|---|---|---|---|---|---|---|
| BWRX-300 | US/Japan — GE Vernova Hitachi | ~300–327 MWe | Boiling light water / thermal | GNF2 LEU, ≤5% | R4 construction | Darlington, service target end-2030 | Italian supply chain potentially localisable; no dedicated Italian vendor agreement identified | Italy would still be first national licensing deployment; BWR technology/local fuel dependence |
| Holtec SMR-300 | US — Holtec | ~300–320 MWe | PWR / thermal | UO₂, ≤5% | R2/R3 | Palisades Pioneer project, early-2030s target | Italian heavy industry potentially compatible | Design still evolving; no first nuclear construction licence |
| AP300 | US — Westinghouse | ~300–330 MWe | PWR / thermal | AP1000-derived LEU fuel | R1 | No first plant | Westinghouse Electric Italy major manufacturing asset | No design approval/construction project yet |
| NUWARD | France — EDF/NUWARD | up to ~400 MWe | PWR / thermal | EDF-fleet conventional LEU architecture; MOX compatibility discussed | R1 | Lead unit planned Europe/France in 2030s | Very strong: Edison, Ansaldo, MAIRE, Italian suppliers | Major 2024 redesign; no completed licensing reference |
| Rolls-Royce SMR | UK | 470 MWe | 3-loop PWR / thermal | UO₂, ≤4.95% | R2/R3 | Three units contracted at Wylfa | Italian localisation possible but no primary Italian technology stake identified | Above Italian 300-MWe political reference; design not yet approved/operating |
| NuScale US460 | US | 77 MWe/module; 462 MWe plant | Integral PWR / thermal | Conventional LEU | R2 | NRC Standard Design Approval; no construction | Historical Ansaldo technical involvement with NuScale SG analysis | Lost first US deployment; no current FOAK under construction |
| Xe-100 | US — X-energy | 80 MWe/module; 320 MWe four-pack | Helium / thermal HTGR | TRISO HALEU ~15.5% | R2/R3 | Long Mott CP review | No substantial Italian industrial link identified | HALEU/TRISO supply chain; new HTGR licensing/operations |
| Natrium | US — TerraPower/GEH | 345 MWe, storage boost to ~500 | Sodium / fast | HALEU metal fuel | R4 construction | Kemmerer construction | No strong Italian reactor link | HALEU and sodium-fast-reactor technology; Italian licensing leap |
| newcleo LFR-AS-200 | Italian-led / European | 200 MWe | Lead / fast | MOX | R1 | No power reactor construction | Very high Italian R&D and industrial linkage | MOX plant, lead technology qualification, no commercial reference |
| EAGLES-300 | EU — Italy/Belgium/Romania | 300 MWe | Lead / fast | Fast-reactor fuel under qualification/closed-cycle pathway | R1 | LEANDREA then ALFRED; commercial target 2039 | Maximum Italian institutional involvement | Requires two demonstrator stages and fuel/material qualification |
| ACP100 | China — CNNC | 125 MWe | Integral PWR / thermal | Conventional LEU | R5 | Linglong One pre-commissioning | None material | China vendor/geopolitics, certification transfer, supply dependency |
| HTR-PM | China | ~200 MWe design output | Helium / thermal | TRISO fuel | R6 | Commercial since Dec 2023 | None | Chinese technology/IP/fuel/geopolitics; low operating maturity |
| SMART100 | Korea — KAERI | 110 MWe | Integral PWR / thermal | Conventional LWR fuel | R2/design approved lineage | No commercial plant | No material Italian industrial linkage identified | No operating reference; Korean domestic programme still developmental |
| KLT-40S | Russia — Rosatom/OKBM | 35 MWe/module | PWR / thermal | Russian naval-derived LEU | R6 | Akademik Lomonosov | None | Strategic/vendor dependency; floating/naval-derived architecture |
| RITM-200 family | Russia | ~50–60 MWe class | PWR / thermal | Russian fuel cycle | deployment/under construction | Yakutia/floating programmes | None | Geostrategic and fuel/vendor dependence |
The table deliberately includes technologies outside the Italian 300 MWe policy shorthand because they provide essential reference-class evidence.
5.5 BWRX-300 — currently the strongest Western construction reference
The BWRX-300 is a natural-circulation boiling-water reactor developed by GE Vernova Hitachi.
GE Vernova describes the design as approximately:
- 300 MWe net;
- 870 MWth;
- natural circulation;
- passive isolation-condenser safety;
- 60-year design life;
- 12–24 month refuelling interval. [I]
The Canadian licensing record describes Darlington’s proposed unit at approximately 327 MWe for regulatory purposes. [I]
The difference is not a contradiction: vendor “300 MWe class” naming and project-specific gross/net/regulatory values are not always identical.
Fuel
BWRX-300 uses commercially established GNF2 boiling-water-reactor fuel.
GE Vernova states that the fuel already has extensive fleet use and does not require HALEU. NRC records associated with the design identify conventional LEU up to approximately 5% enrichment. [I]
This is strategically important.
Italy would not need to create a new fuel technology qualification programme for the FOAK.
It would, however, remain dependent on foreign:
- uranium supply;
- conversion;
- enrichment;
- GNF fuel fabrication/licensing.
Construction status
Darlington is the most important Western reference-class evidence available to Italy.
CNSC issued the construction licence in April 2025.
By summer 2026:
- reactor-building excavation was complete enough for basemat placement;
- civil construction was progressing;
- an operating-licence application had already been submitted. [I]
OPG targets the first unit in service by end-2030.
Why it matters for Italy
It provides:
- a Western reference regulator;
- actual FOAK cost/schedule learning;
- conventional LEU fuel;
- industrial-scale utility sponsorship;
- a fleet plan of four units;
- design collaboration across Canada, US and Poland.
Italian industrial hook
The direct Italian link is weaker than for NUWARD or EAGLES.
However, the design’s conventional BWR architecture is compatible with portions of the Italian supply chain:
- FOMAS;
- Tectubi;
- ATB;
- Walter Tosto;
- SIMIC;
- Westinghouse Electric Italy only where vendor arrangements permit;
- Ansaldo Nucleare as potential local engineering/integration partner.
No primary evidence reviewed for this chapter establishes a formal Italian BWRX-300 localisation agreement.
That distinction should not be invented.
Showstoppers
- Italian licensing remains new;
- GEH supply-chain localisation would require negotiated vendor approval;
- Italy has no operating BWR operator organisation today;
- first-of-a-kind economics remain unproven until Darlington is completed;
- serial savings remain a vendor proposition rather than fleet-scale OECD evidence.
Schedule confidence
Darlington first power by 2030: MEDIUM-HIGH relative to other SMRs, not guaranteed.
For Italy, a BWRX-300 programme starting only after the 2026 decrees would necessarily lag the Canadian reference.
5.6 Holtec SMR-300 — serious PWR challenger, but still before full nuclear construction
Holtec’s SMR-300 is a pressurised-water reactor that evolved from its former SMR-160 design.
UK regulatory documentation describes:
- approximately 300–320 MWe electrical;
- roughly 1,050 MWth;
- pumped PWR primary circulation during normal operation;
- passive safety using a large annular water reservoir. [G]
Fuel
The UK GDA record states uranium-dioxide fuel enriched to up to 5% U-235.
This keeps the design within the mature conventional LEU fuel cycle. [G]
Regulatory maturity
Holtec completed UK GDA Step 2 in March 2026.
UK regulators concluded that no fundamental safety/security/environmental shortfall had been identified at that assessment level, but the design remains evolving and a detailed Step 3 assessment was not completed. [G]
In the United States, Holtec submitted a phased construction-permit application for Pioneer Units 1 and 2 at Palisades.
The NRC accepted Part 1 in February 2026. [I]
Holtec targets commissioning in the early 2030s. [I]
Strengths for Italy
- conventional PWR technology;
- conventional LEU;
- a US deployment project;
- UK regulator review;
- dry-cooling capability claimed by vendor;
- potentially good fit for Italian heavy manufacturing.
Weaknesses
- no operating reference;
- no completed first nuclear unit;
- design output and configuration have changed materially from SMR-160 to SMR-300;
- UK assessment stopped after Step 2;
- Palisades full construction authorisation remains incomplete.
Italian linkage
No primary source reviewed establishes a Holtec–Italian industrial consortium equivalent to the EDF/Edison/Ansaldo NUWARD initiative.
That reduces immediate local integration certainty.
Schedule confidence
First Holtec unit early 2030s: MEDIUM-LOW.
There is a real project, but construction-permit and first-of-a-kind execution risk remain.
5.7 Westinghouse AP300 — strong pedigree, weak deployment evidence so far
Westinghouse’s AP300 is based heavily on AP1000 technology.
The NRC describes it as a 300 MWe-class Generation III+ one-loop PWR based on AP1000 components, technology and licensing methodology. [I]
Westinghouse’s current product material describes approximately 330 MWe / 990 MWth, reflecting ongoing product evolution. [I]
Fuel
The vendor states that AP300 uses its established AP1000-derived fuel and supply-chain architecture.
No HALEU requirement is identified. [I]
Licensing status
As of the cut-off, AP300 remains in NRC pre-application engagement for a future design-certification application.
That is materially earlier than BWRX-300 and earlier than NuScale’s approved design. [I]
Italian industrial link
Westinghouse now owns Westinghouse Electric Italy, the former Mangiarotti operation at Monfalcone.
That gives the design a potentially important Italian industrial pathway through:
- NSSS heavy component manufacture;
- welding;
- reactor equipment;
- established Westinghouse QA.
Ansaldo Nucleare also has historical Westinghouse-linked reactor-engineering experience.
Strategic advantage
Unlike a wholly new advanced reactor, AP300 attempts to reuse:
- AP1000 safety methodology;
- AP1000 components;
- existing fuel;
- vendor supply chain.
This can lower technical novelty.
Showstopper
The key weakness is simple:
there is still no AP300 construction reference.
A design derived from an operating large reactor is not the same as an operating SMR.
Italy choosing AP300 early would therefore be relying heavily on design inheritance, not SMR construction evidence.
Schedule confidence
First AP300 deployment in early/mid-2030s: LOW-MEDIUM.
5.8 NUWARD — strongest bilateral Italian industrial pathway, but not yet a mature licensed design
The NUWARD programme changed significantly in 2024.
EDF abandoned the previous architecture and moved toward a redesigned PWR using more conventional and established technological building blocks.
EDF’s 2025/2026 reporting describes:
- output of up to 400 MWe;
- an optional cogeneration configuration;
- conventional PWR technology;
- conceptual design development through mid-2026;
- commercialisation in the 2030s. [I]
Fuel
EDF states that NUWARD is intended to leverage fuel architectures already used in the EDF fleet and has explicitly discussed possible future MOX compatibility.
The baseline therefore avoids HALEU dependence. [I]
Italian link
This is NUWARD’s strongest argument in the Italian context.
On 25 June 2026, Edison, EDF and NUWARD signed a declaration of intent with a substantial Italian industrial group including:
- Ansaldo Energia;
- Ansaldo Nucleare;
- MAIRE;
- Framatome;
- Tractebel;
- Arabelle Solutions;
- AIN;
- AIPE;
- ATB Riva Calzoni;
- Saipem;
- SIMIC;
- Tectubi Raccordi;
- Walter Tosto;
- Webuild.
The stated industrial objective is development of a European third-generation SMR programme with first units targeted around 2035. [I]
This is the deepest already-documented Italy-specific industrial framework among the foreign LWR-SMR candidates reviewed here.
Strengths
- EDF operating organisation;
- Framatome nuclear supply chain;
- conventional PWR;
- established European fuel cycle;
- strong Italian partner group;
- bilateral France–Italy industrial logic.
Weaknesses
The design was substantially reset in 2024.
As of 2026:
- no NUWARD reactor exists;
- no NUWARD construction licence exists;
- no operating reference exists;
- the new architecture was only completing conceptual design.
The 2035 target is therefore an industrial objective, not reference-class project evidence.
Schedule confidence
2035 first unit: LOW-MEDIUM.
Italian conclusion
NUWARD can be one of Italy’s most industrially attractive platforms without being the most technically mature reactor today.
Those are separate facts.
5.9 Rolls-Royce SMR — no longer merely a bid, but larger than the Italian political shorthand
The Rolls-Royce SMR is a 470 MWe three-loop PWR.
UK regulators describe it as still in design development but progressing through GDA Step 3. [G]
Fuel
Official UK material identifies:
- standard UO₂;
- maximum 4.95% enrichment;
- 17×17 PWR fuel;
- 18–24 month fuel cycles. [G]
This is a major strategic advantage because it avoids HALEU.
Deployment evidence
The UK programme materially advanced in 2026.
In April, Rolls-Royce SMR and Great British Energy–Nuclear signed the contract enabling work to begin on three units at Wylfa.
The company subsequently placed pre-production arrangements for major nuclear-island components, including reactor-pressure-vessel work. [I/G]
It remains not yet under reactor nuclear construction.
But it has moved from competition into a defined state-backed deployment programme.
Italy-specific question
At 470 MWe, the reactor sits outside the ~300 MWe political shorthand most often used in Italy.
That does not legally exclude it after Chapter 1’s technology-neutrality finding.
It changes:
- site size;
- grid consequence;
- FOAK CAPEX;
- cooling requirement;
- modular fleet logic.
Italian industrial hook
No primary evidence reviewed identifies the same formal Italian industrial coalition around Rolls-Royce as exists around NUWARD.
Italian component makers could nevertheless compete in the European supply chain.
Schedule confidence
First Wylfa unit in the 2030s: MEDIUM.
The design still requires completion of UK regulatory approval and actual construction.
5.10 NuScale US460 — strongest generic US design approval, weakest current FOAK evidence
NuScale provides a useful lesson in the difference between regulatory maturity and commercial deployment.
The US460 plant consists of:
- six modules;
- 77 MWe per module;
- 462 MWe total.
The NRC issued Standard Design Approval in May 2025 after completing its safety review. [I]
That is a substantial regulatory achievement.
Why it fits the requested 50–200 MWe analysis
Each individual 77 MWe module lies directly inside the commission’s requested lower-output band.
The plant itself, however, exceeds 400 MWe when six modules are deployed.
This illustrates an important distinction:
module power ≠ site power.
Commercial weakness
NuScale’s former Carbon Free Power Project was terminated in 2023.
No equivalent US460 project had begun construction by September 2026. [I]
The NRC has nevertheless resumed pre-application interaction concerning future US460 combined-licence applications.
Italian link
Ansaldo Nucleare publicly records historical technical participation in NuScale development through analysis of its helical-coil steam-generator concept. [I]
That is technically relevant but not equivalent to a current Italian deployment agreement.
Showstopper
The challenge is commercial rather than primarily regulatory:
- no active reference construction;
- six-module site configuration;
- economics have not yet been demonstrated through a completed project.
Schedule confidence
First commercial US460 fleet unit: LOW-MEDIUM until a project crosses construction threshold.
5.11 Xe-100 — highly relevant 80 MWe module, but fuel is the strategic constraint
X-energy’s Xe-100 is one of the most important genuine 50–200 MWe advanced-reactor candidates.
Each module produces approximately 80 MWe, and a four-module station produces approximately 320 MWe.
It is a high-temperature gas-cooled reactor using helium and TRISO particle fuel.
Fuel
X-energy’s fuel uses HALEU enriched to approximately 15.5% U-235. [I]
This immediately separates Xe-100 from LWR-SMRs.
It cannot simply order conventional European <5% LEU PWR/BWR fuel.
Its deployment requires:
- HALEU enrichment;
- TRISO particle manufacture;
- pebble-fuel fabrication.
X-energy signed a 2026 agreement with Centrus for HALEU enrichment services, and the company is building its TRISO-X fuel fabrication chain.
Licensing
Long Mott Energy submitted a construction-permit application in March 2025 for four Xe-100 modules.
By September 2026:
- environmental review had been completed with FONSI;
- technical review was advanced;
- ACRS meetings had occurred;
- a mandatory hearing took place on 22 September;
- no final construction permit had yet been issued at the report cut-off. [I]
Why Italy could be interested
The reactor’s approximately 750°C outlet-temperature class can support:
- electricity;
- industrial steam;
- process heat;
- hydrogen.
This aligns well with Italian:
- chemicals;
- refining;
- steel;
- industrial clusters.
Why Italy should not treat it like a PWR-SMR
It introduces simultaneously:
- new reactor technology;
- new fuel form;
- higher enrichment;
- new operating model;
- new licensing case.
Italian industrial hook
ENEA’s own technology overview identifies no current Italian industrial involvement in Xe-100. [G]
Showstopper
HALEU/TRISO dependency.
Schedule confidence
Long Mott deployment: MEDIUM once construction permit is issued; Italian replication materially later.
5.12 Natrium — the most advanced Western fast-reactor construction programme
Natrium is a 345 MWe sodium-cooled fast reactor coupled to molten-salt thermal storage that can temporarily raise electrical output to approximately 500 MWe. [I/G]
Fuel
The NRC identifies the reactor as using HALEU metal fuel. [I]
This is not a conventional LWR fuel chain.
Licensing status
The NRC issued the construction permit on 9 March 2026.
TerraPower began nuclear construction in April.
The company expects to submit an operating-licence application in 2028. [I]
The UK regulators also began GDA Step 1 for Natrium in June 2026. [G]
This makes Natrium one of the strongest advanced-reactor programmes in the Western world.
Strengths
- actual construction;
- large DOE backing;
- thermal storage enabling flexible electrical output;
- coal-site replacement architecture;
- genuine fast-reactor deployment programme.
Italy-specific weakness
Italy would have to develop licensing competence simultaneously in:
- sodium fast reactors;
- sodium fire/chemical hazards;
- metallic HALEU fuel;
- thermal-energy storage interface.
There is no strong Italian vendor/industrial co-development link comparable with EAGLES/newcleo.
Showstopper
The principal Italian barrier is not that Natrium is “unproven on paper.”
It is fuel and technology-system dependence on a US advanced-reactor ecosystem.
Schedule confidence
Kemmerer programme: MEDIUM.
For Italy, a Natrium FOAK before the late 2030s would be extremely ambitious.
5.13 newcleo LFR-AS-200 — strongest Italian-led commercial advanced-reactor candidate
newcleo’s LFR-AS-200 is a:
- 480 MWth;
- 200 MWe;
- pool-type;
- liquid-lead-cooled;
- fast-spectrum reactor.
The US NRC describes the design as operating at atmospheric primary-system pressure and using MOX fuel. [I]
It is therefore directly inside the user-requested 50–200 MWe band at its upper boundary.
Fuel architecture
MOX is not a small detail.
newcleo’s business/technology model is closely associated with recycling plutonium and uranium from existing spent fuel into new reactor fuel.
The US NRC opened separate pre-application interaction in March 2026 concerning a new MOX fuel fabrication facility. [I]
This means reactor deployment and fuel-fabrication development are interdependent.
Regulatory maturity
The US NRC began LFR-AS-200 pre-application interaction in March 2026.
In France, the regulator received safety-options material for newcleo’s smaller LFR-AS-30 programme in December 2025. [G]
No commercial newcleo reactor is under construction.
Italian technological link
The linkage is much deeper than for any foreign LWR design.
newcleo operates/develops R&D infrastructure with ENEA at:
- Brasimone;
- Casaccia.
The company has constructed lead-reactor test infrastructure and participates with EAGLES in the LEANDREA programme. [G]
Advantages for Italy
- significant Italian engineering identity;
- Italian R&D;
- fast-spectrum fuel-cycle potential;
- high-temperature industrial applications;
- 200 MWe output;
- low-pressure primary system.
Risks
- no commercial reactor;
- MOX fabrication dependency;
- no European commercial lead-reactor operating reference;
- lead corrosion/material qualification;
- fast-reactor licensing;
- fuel-cycle safeguards;
- higher programme complexity.
Schedule confidence
A vendor ambition of early-2030s commercial deployment should be treated LOW confidence until a nuclear demonstrator crosses licensing/construction thresholds.
5.14 EAGLES-300 — Italian technological sovereignty with an explicit longer clock
EAGLES-300 is a different proposition from newcleo even though both are lead-cooled fast reactors.
The consortium comprises:
- Ansaldo Nucleare;
- ENEA;
- RATEN;
- SCK CEN.
The commercial reactor is 300 MWe. [I/G]
Development structure
The programme is explicitly staged:
- LEANDREA — Belgian technology/material/fuel demonstrator;
- ALFRED — Romanian performance demonstrator;
- EAGLES-300 — commercial reactor.
The consortium currently targets LEANDREA completion around 2034 and EAGLES-300 commercial deployment around 2039. [I/G]
Regulatory significance
In September 2025, EAGLES became the first pilot project under the IAEA’s Nuclear Harmonization and Standardization Initiative international pre-licensing work involving regulators including Italy’s ISIN. [I/G]
This gives Italy early regulatory involvement.
It does not constitute a reactor licence.
Technology
EAGLES-300 is:
- liquid-lead cooled;
- fast-spectrum;
- low-pressure;
- passive heat-removal-oriented;
- designed for high-temperature cogeneration;
- compatible with closed-fuel-cycle ambitions.
Italian advantage
This is the design with the strongest institutional Italian technology stake:
- Ansaldo Nucleare;
- ENEA;
- ISIN pre-licensing involvement;
- Italian advanced-reactor supply chain.
Showstopper
Its schedule is intrinsically inconsistent with portraying it as the easiest route to Italian first power by 2033–35.
The project’s own roadmap places commercial deployment in 2039 after two demonstrators.
Schedule confidence
2039 commercial target: MEDIUM-LOW, because it depends on successful sequential demonstrators.
Italian strategic interpretation
EAGLES is potentially a national technology-sovereignty programme.
It is not a substitute for an early-2030s licensed Western LWR-SMR if early power is the overriding objective.
5.15 ACP100 / Linglong One — China’s most relevant water-cooled SMR reference
The ACP100 is a 125 MWe-class integral PWR developed by CNNC.
Construction began in July 2021.
IAEA material expected electricity production in 2026, but September 2026 reporting still described the unit as undergoing pre-commissioning tests. [I/S]
This distinction matters.
The plant should not yet be cited as a mature operating SMR.
Why Italy should nevertheless study it
ACP100 provides valuable engineering evidence on:
- integral PWR construction;
- module installation;
- commissioning;
- Chinese SMR supply-chain execution.
Why it is not a straightforward Italian candidate
An Italian deployment would raise major questions concerning:
- European regulatory acceptability;
- supply-chain dependence;
- digital/I&C trust;
- safeguards;
- strategic dependence;
- technology-transfer terms.
The issue should not be reduced to a simplistic claim that Chinese nuclear technology is legally prohibited in Italy.
The problem is one of strategic compatibility and long-term sovereign dependency.
Given the availability of Western LWR alternatives, a Chinese NSSS would likely face a substantially higher political, regulatory and security burden.
5.16 HTR-PM — operating evidence, but not a direct Western procurement template
China’s HTR-PM entered commercial operation in December 2023.
The system uses:
- two high-temperature gas-cooled reactor modules;
- helium coolant;
- pebble/TRISO fuel;
- one turbine;
- design output approximately 200 MWe. [I/S]
This makes it enormously important as technology evidence.
It proves that modular high-temperature gas reactors can move beyond experimental scale.
But Italy cannot simply treat HTR-PM operating experience as a transferable commercial tender specification.
The design is embedded in a Chinese:
- vendor structure;
- fuel supply;
- licensing system;
- industrial ecosystem.
Its value to Italy is therefore primarily reference class and technical evidence, not near-term procurement attractiveness.
5.17 Russian SMRs — operating evidence that Italy should study but not confuse with realistic procurement
Russia’s Akademik Lomonosov is the world’s first commercial SMR-class installation recognised by the IAEA.
It uses two KLT-40S reactors and entered commercial operation in 2020. [I]
Russia is also developing land-based/floating plants based on the more modern RITM-200 family, including the Yakutia programme. IAEA material has referred to a 2028 commissioning horizon for the land-based project. [I]
These designs matter because they provide:
- operating modular PWR evidence;
- Arctic/floating experience;
- compact reactor operating data.
For Italy they are not realistic baseline procurement candidates under the current European geopolitical environment.
This conclusion should nevertheless be formulated accurately:
- EU nuclear trade with Russia is not comprehensively equivalent to an absolute universal legal ban;
- but reactor-vendor dependence would create substantial sanctions, finance, security, fuel, political and strategic-autonomy exposure.
Therefore Russia should remain in the reference-technology set, not the realistic Italian procurement shortlist.
5.18 Korea — SMART100 as a technically credible 110 MWe comparator
Korea’s SMART lineage deserves attention because it sits directly inside the requested lower-output class.
KAERI states that the original SMART received Korean standard design approval in 2012.
The upgraded SMART100 is approximately:
- 365 MWth;
- 110 MWe;
- integral PWR;
- passive safety;
- three-year refuelling cycle. [I]
It represents genuine regulatory design maturity.
The weakness is deployment.
No commercial SMART100 reactor had created the kind of operating/construction reference available to BWRX-300 or ACP100.
Italian relevance
Korean industry brings:
- mature nuclear construction capability;
- large PWR experience;
- strong manufacturing.
But Italy currently lacks the industrial and bilateral SMR framework visible in the Franco-Italian NUWARD track.
SMART therefore belongs in the secondary technology-monitoring portfolio, not the leading Italian industrial pathway at this stage.
5.19 CAREM25 — important historical comparator, but below the requested power band
Argentina’s CAREM25 is approximately 27–32 MWe, depending on project configuration descriptions, and therefore falls below the requested 50–200 MWe band.
It is nevertheless historically important because it was among the world’s earliest integral-PWR SMR construction programmes.
Argentina’s nuclear regulator continues to describe CAREM25 as under construction, while official project material confirms its prototype status and integral PWR architecture. [G]
Construction began in 2014.
This long timeline is itself a warning.
CAREM demonstrates that:
small reactor size does not automatically produce a short project schedule.
For Italy, CAREM is primarily a reference-class lesson about FOAK duration and domestic technology development.
5.20 The 50–200 MWe band is technologically diverse
The commission’s requested 50–200 MWe range should not be treated as one market segment.
It contains fundamentally different designs.
| Design | Module output | Technology | Fuel problem |
|---|---|---|---|
| NuScale module | 77 MWe | Integral PWR | Conventional LEU |
| Xe-100 | 80 MWe | HTGR | HALEU TRISO |
| SMART100 | 110 MWe | Integral PWR | Conventional LWR fuel |
| ACP100 | 125 MWe | Integral PWR | Conventional LEU |
| newcleo LFR-AS-200 | 200 MWe | Lead fast reactor | MOX |
| HTR-PM system | ~200 MWe | HTGR | TRISO |
| RITM family | ~50–60 MWe | Compact PWR | Russian fuel chain |
A 100 MWe SMR can therefore be more fuel-cycle complex than a 300 MWe PWR.
Power output is a poor proxy for technological risk.
5.21 The 300–400 MWe class is where Italy’s near-term procurement debate becomes most concrete
The approximately 300–400 MWe reactor class occupies a distinctive position in the Italian new-nuclear debate because it sits between two very different technology and investment models.
At one end are microreactors and smaller SMRs of approximately 5–200 MWe, whose principal attractions are small increments of capacity, specialised industrial applications and potentially simpler project financing, but which would require a comparatively large number of individual modules to make a material contribution to Italy’s national electricity balance.
At the other end are conventional gigawatt-class reactors, which can deliver very large blocks of dependable low-carbon electricity but require correspondingly larger single-project capital commitments, stronger grid nodes and a greater concentration of project and construction risk.
The 300–400 MWe class is therefore strategically relevant because it is large enough for one reactor to constitute a material electricity-system and industrial asset while remaining small enough to permit incremental fleet construction rather than a single multigigawatt commitment.
The principal technologies in or close to this class that merit Italian government monitoring are:
- GE Vernova Hitachi BWRX-300;
- Holtec SMR-300;
- Westinghouse AP300;
- EAGLES-300;
- TerraPower Natrium — 345 MWe nuclear island;
- EDF/NUWARD — up to approximately 400 MWe.
They are not, however, six technically equivalent procurement choices.
They occupy radically different positions in:
- licensing maturity;
- construction maturity;
- fuel-cycle requirement;
- technology type;
- supply-chain readiness;
- Italian industrial participation;
- commercial deployment evidence.
That difference is more important than the similarity of their nameplate electrical outputs.
5.21.1 Why this capacity range matters for Italy
A reactor in the 300–400 MWe range has several characteristics that explain its prominence in Italian industrial discussion.
First, it represents a meaningful but not system-dominating generation increment.
Three or four 300 MWe-class reactors correspond approximately to 0.9–1.2 GW of capacity. This creates a potential pathway for progressive replacement or reuse of former thermal-generation areas without requiring the State to commit immediately to a single 1.5–1.7 GW nuclear unit.
Second, this scale creates investment granularity.
A 300 MWe reactor should not be described as cheap simply because it is small. Current evidence from Canada’s Darlington programme demonstrates that a first BWRX-300 remains a multibillion-dollar infrastructure project. OPG’s approved first-unit budget is approximately CAD 6.1 billion, together with around CAD 1.6 billion of infrastructure and systems common to the planned four-unit site. The four-reactor programme is currently estimated at approximately CAD 20.9 billion, including interest, escalation and contingency. [I]
The relevant advantage is therefore smaller indivisible project exposure, not necessarily a lower cost per installed kilowatt.
Third, 300–400 MWe modules allow a staged fleet architecture.
A State or operator can potentially:
- develop one FOAK;
- observe licensing and construction performance;
- proceed with additional modules;
- share part of the infrastructure between units.
Darlington illustrates precisely this logic. The Canadian site is planned for up to four BWRX-300 units, while the first reactor alone has received a construction licence. [I]
Fourth, this class is potentially compatible with several of the high-voltage industrial and former-generation nodes identified in Chapter 3.
However, the existence of a 380 kV node does not prove that a particular reactor can be connected without reinforcement. A 300–400 MWe machine still requires a formal Terna connection, stability, short-circuit and N-1 assessment.
The correct conclusion is therefore:
The 300–400 MWe class has attractive grid and project granularity for Italy, but no brownfield or 380 kV connection should be represented as pre-qualified for one of these reactors.
5.21.2 The six relevant designs are at very different stages
| Design | Nominal electrical output | Reactor technology | Fuel basis | Verified status at 26 Sep 2026 | Actual FOAK evidence |
|---|---|---|---|---|---|
| BWRX-300 | 300 MWe net; Darlington regulatory project ~327 MWe | Natural-circulation BWR | Commercial GNF2 BWR fuel; no HALEU requirement | Licensed nuclear construction under way in Canada | Darlington Unit 1 physically under construction; operating-licence application submitted |
| Holtec SMR-300 | ~320 MWe/unit | PWR | UO₂ up to 5% U-235 | UK GDA Step 2 completed; US deployment programme developing | No operating unit; no completed FOAK; design still under development |
| AP300 | ~330 MWe | One-loop PWR derived from AP1000 | Conventional LWR fuel architecture | NRC pre-application engagement | No AP300 construction project yet |
| EAGLES-300 | Current consortium description: 300 MWe | Lead-cooled fast reactor | Advanced fast-reactor / closed-cycle-compatible fuel strategy | International pre-licensing / development | Requires LEANDREA and ALFRED demonstrators before commercial deployment targeted for 2039 |
| Natrium | 345 MWe nuclear island; storage system permits wider electrical output range | Sodium-cooled fast reactor + molten-salt energy storage | HALEU metallic fuel | US construction permit issued; nuclear construction commenced April 2026 | Kemmerer Unit 1 under construction |
| NUWARD | Up to ~400 MWe; cogeneration configuration can differ | PWR | EDF-fleet-derived fuel architecture; conventional fuel-cycle basis | Conceptual/design development; industrial partnerships | No licensed or constructing NUWARD reactor |
The table demonstrates the central procurement issue.
Output class alone says very little about deployment maturity.
Two reactors near 300 MWe can have completely different national-programme implications.
A BWRX-300 selection would leverage a design already in licensed Western construction using commercial BWR fuel.
An EAGLES-300 selection would commit Italy to a Generation-IV lead-cooled fast-reactor pathway whose own industrial roadmap requires demonstration facilities before commercial deployment.
Both may ultimately produce approximately 300 MWe.
They do not carry the same schedule, fuel, regulator or industrial risk.
5.21.3 BWRX-300 — the principal current Western construction reference in this class
The BWRX-300 is a direct-cycle boiling-water reactor developed by GE Vernova Hitachi.
The current vendor specification is:
- 300 MWe net electrical output;
- 870 MWth;
- natural circulation;
- 240 GNF2 fuel bundles;
- 60-year design life;
- nominal refuelling intervals of approximately 12–24 months. [I]
The Darlington project is regulated at approximately 327 MWe in Canadian licensing documentation. The difference should not be treated as a contradiction: vendor net-output terminology and project-specific regulatory capacity definitions do not always use exactly the same basis. [I]
The fuel choice is strategically important.
GE Vernova Hitachi states that the BWRX-300 uses existing GNF2 fuel already deployed in operating BWRs and does not require HALEU. [I]
Its present deployment status is more advanced than that of the other water-cooled reactors in this six-design comparison.
At Darlington:
- OPG selected the BWRX-300 in December 2021;
- applied for the construction licence in October 2022;
- received the construction licence in April 2025;
- CNSC removed the first construction hold point on 30 March 2026;
- OPG submitted the operating-licence application in March 2026;
- the reactor is physically under construction. [I]
The first unit is presently planned for service around 2030.
For Italy, this creates an unusually important reference class because Canadian regulators, OPG and the supply chain will generate real evidence on:
- construction schedule;
- basemat and civil execution;
- reactor-vessel installation;
- modular manufacturing;
- commissioning;
- final FOAK cost.
The principal Italian limitation is industrial rather than technological.
No primary-source evidence reviewed establishes an Italian BWRX-300 industrial consortium comparable with the EDF/NUWARD arrangement.
Italian firms could technically participate in many work packages, but vendor-approved localisation would have to be negotiated rather than assumed.
5.21.4 Holtec SMR-300 — conventional PWR basis, but still a developing FOAK programme
Holtec’s current SMR-300 is approximately:
- 320 MWe;
- 1,050 MWth;
- pressurised-water reactor;
- UO₂ fuel enriched to up to 5% U-235;
- nominal 18-month fuel cycle;
- claimed 80-year design life in the UK assessment documentation. [G]
Its evolution is relevant to any Italian procurement assessment.
The project entered the UK Generic Design Assessment process as the SMR-160. During development, Holtec increased output substantially and introduced reactor coolant pumps for normal operation. It was renamed SMR-300 in January 2024. [G]
This demonstrates genuine design development rather than merely a branding change.
The UK regulators completed GDA Step 2 in March 2026 and stated that they had identified no fundamental safety, security, safeguards or environmental-protection shortfall that would prevent eventual deployment at that level of assessment. [G]
But the qualification matters.
The UK assessment deliberately stopped after Step 2 rather than completing the full detailed Step 3 process. The Environment Agency explicitly states that additional concerns could still emerge during future detailed or site-specific assessment. [G]
Therefore Holtec should be described as:
a serious PWR-SMR design with substantial regulatory review, but not a reactor with completed FOAK operating evidence.
5.21.5 AP300 — strong technology inheritance and an unusually direct Italian manufacturing connection
Westinghouse’s AP300 is a 330 MWe-class PWR derived from AP1000 technology.
The NRC describes it as a Generation III+ one-loop PWR based on AP1000:
- components;
- technology;
- licensing basis. [I]
The significance is that AP300 is not intended as an entirely clean-sheet reactor.
Its commercial proposition relies heavily on inheritance from the AP1000, a design already operating internationally.
That reduces some categories of technology novelty.
It does not constitute AP300 FOAK evidence.
As of the September 2026 cut-off, the design remains in NRC pre-application engagement associated with a future design-certification application. [I]
No AP300 unit is under construction.
Italy nevertheless has a strategically important Westinghouse industrial asset.
In March 2026, Mangiarotti became Westinghouse Electric Italy S.p.A. Westinghouse explicitly describes the Monfalcone facility as a dedicated nuclear manufacturing hub supporting the AP1000 and AP300 global programmes. It employs approximately 300 skilled professionals and specialises in nuclear-steam-supply-system heavy equipment. [I]
This means that AP300 has a different Italian industrial linkage from BWRX-300.
The connection is not a national deployment agreement.
It is an existing vendor-owned Italian nuclear manufacturing base directly linked to that reactor family.
5.21.6 EAGLES-300 — same power class, fundamentally different programme
EAGLES-300 demonstrates why the 300 MWe label must not become the procurement category by itself.
The current 2026 Ansaldo documentation describes EAGLES-300 as:
- 300 MWe;
- lead-cooled;
- fast-spectrum;
- low-pressure;
- passive heat-removal-capable;
- compatible with a closed fuel-cycle strategy;
- high-temperature output suitable for electricity and industrial applications. [I]
A 2025 ENEA release used a 350 MWe figure for an earlier/current evolving programme description. The 2026 consortium material consistently identifies the commercial model as 300 MWe. This report therefore uses 300 MWe as the controlling cut-off figure while recording the earlier discrepancy as evidence that the design remains under development. [G/I]
The programme’s sequence is explicit:
LEANDREA → ALFRED → EAGLES-300.
LEANDREA, planned in Belgium, is intended as a technology/material/fuel demonstrator.
ALFRED in Romania is intended as a performance demonstration step.
Commercial EAGLES-300 deployment is targeted for approximately 2039, contingent on successful progress through those stages. [I]
For Italy, however, the industrial linkage is exceptionally deep.
The consortium contains:
- Ansaldo Nucleare;
- ENEA;
- RATEN;
- SCK CEN.
It has also been selected by the European Industrial Alliance on SMRs and is the first pilot of the IAEA NHSI international pre-licensing initiative for lead-cooled SMRs. [I/G]
The procurement implication is therefore clear but should remain neutral:
EAGLES-300 offers significantly greater Italian technology participation than most imported LWR-SMRs, but it belongs to a materially later technology-development and licensing pathway.
It cannot be treated as the schedule-equivalent substitute for a BWRX-300 merely because both carry “300” in the product name.
5.21.7 Natrium — the most mature advanced reactor in the comparison, but not an ordinary 345 MWe SMR
TerraPower’s Natrium plant combines:
- an 840 MWth sodium-cooled fast reactor;
- approximately 345 MWe nuclear-island electrical output;
- a separate molten-salt thermal-energy-storage system.
TerraPower states that the storage/power-conversion configuration can supply approximately 100–500+ MWe for 5.5 hours or more, with significant ramping capability. [I]
It is therefore misleading to evaluate Natrium solely as “a 345 MWe reactor.”
From an electricity-system perspective it is a:
345 MWe fast reactor + thermal energy storage + larger flexible turbine/power-conversion system.
That architecture could have particular relevance in a future Italian electricity system containing large solar volumes because heat can be stored while electrical output is shifted toward higher-value hours.
The technology has also crossed a major deployment threshold.
The US NRC approved the construction permit in March 2026, and TerraPower announced commencement of nuclear construction at Kemmerer on 23 April 2026. [I]
This gives Natrium a stronger physical deployment basis than AP300, NUWARD or EAGLES.
But its Italian deployment would require Italy to accept a much greater technology leap than with a conventional PWR/BWR.
Natrium uses:
- sodium coolant;
- fast-neutron spectrum;
- HALEU metallic fuel.
The NRC confirms the HALEU-metal-fuel basis. [I]
For Italy this would require regulatory competence in:
- sodium technology;
- sodium fire/chemical phenomena;
- fast-reactor physics;
- metallic HALEU fuel;
- advanced-reactor waste.
There is also no Italy-specific industrial consortium around Natrium comparable to NUWARD or EAGLES.
Its significance to Italian procurement is consequently twofold:
strong construction evidence
but
high technological and fuel-system discontinuity from Italy’s historic LWR experience.
5.21.8 NUWARD — strongest explicit Franco-Italian industrial architecture, but currently a design-development programme
EDF’s revised NUWARD reactor is a PWR platform rated at up to approximately 400 MWe.
EDF’s April 2026 facts-and-figures publication describes:
- pressurised-water technology;
- capacity up to 400 MWe;
- electricity and heat applications;
- a cogeneration configuration of approximately 290 MWe plus 320 MWth at the stated 50% cogeneration condition;
- use of proven technologies and an established nuclear fuel cycle;
- completion of conceptual design targeted around mid-2026;
- commercialisation ambition in the 2030s. [I]
EDF management has also stated that NUWARD is intended to use the same broad fuel architectures as the existing EDF fleet and could potentially accommodate MOX. [I]
For Italy the most significant development occurred on 25 June 2026.
Edison, EDF and NUWARD signed a declaration of intent with an unusually broad Italian industrial group including:
- Ansaldo Energia;
- Ansaldo Nucleare;
- MAIRE;
- AIN;
- AIPE;
- ATB Riva Calzoni;
- Saipem;
- SIMIC;
- Tectubi Raccordi;
- Walter Tosto;
- Webuild,
alongside major French/European nuclear participants.
The declaration aims to develop a European Generation-III SMR programme with an industrial objective of first plants operational around 2035. [I]
This is the clearest explicit Italy-specific industrial coalition among the six systems considered here.
But the maturity qualification remains decisive.
NUWARD underwent a major design reset in 2024 toward more conventional PWR building blocks.
At the 2026 cut-off:
- there is no operating NUWARD;
- there is no NUWARD under construction;
- no construction licence has been issued;
- EDF remains in design-development and licensing preparation.
EDF’s September 2026 recruitment activity for NUWARD includes dedicated roles for:
- licensing and Preliminary Safety Analysis Report preparation;
- nuclear-island integration;
- codes and standards;
- cost estimation.
That is direct evidence of an active industrial programme, but also of the fact that design and licensing work remains under way. [I]
5.21.9 Maturity comparison — the critical distinction
The six reactors can therefore be separated descriptively according to what has actually happened, rather than what vendors plan to happen.
| Technology | Design activity | Generic/reference regulatory review | Construction authorisation | Nuclear construction | Commercial operation |
|---|---|---|---|---|---|
| BWRX-300 | Yes | Yes | Yes | Yes | No |
| Natrium | Yes | Yes | Yes | Yes | No |
| Holtec SMR-300 | Yes | Substantial — UK Step 2 | Not yet for first complete commercial unit | No | No |
| AP300 | Yes | Pre-application | No | No | No |
| NUWARD | Yes | Licensing preparation / engagement | No | No | No |
| EAGLES-300 | Yes | International pre-licensing | No | No | No |
Accordingly:
None of the six designs has completed a Western FOAK operating cycle as of 26 September 2026.
The evidence is nonetheless no longer homogeneous.
BWRX-300 and Natrium have moved into actual nuclear construction.
That is qualitatively different from:
- design approval;
- generic assessment;
- pre-application review;
- international pre-licensing.
5.21.10 Fuel-chain comparison
The fuel issue creates an equally sharp division.
| Design | Fuel-system category | Existing commercial supply maturity | Italy-specific strategic implication |
|---|---|---|---|
| BWRX-300 | Existing GNF2 BWR fuel | High — commercial fuel already operating | No HALEU infrastructure required; vendor/fabricator dependence remains |
| Holtec SMR-300 | Conventional UO₂ ≤5% LEU PWR fuel | High as fuel category | Fits mature Western enrichment/fabrication infrastructure |
| AP300 | AP1000-derived conventional LWR architecture | High as fuel family | Conventional Western LWR fuel chain; Italy still imports conversion/enrichment/fabrication |
| NUWARD | EDF-fleet-derived conventional PWR architecture; possible MOX compatibility | High baseline industrial maturity | Strong French/European fuel-cycle integration |
| Natrium | HALEU metallic fuel | Developing | New fuel-cycle dependency; materially greater deployment risk |
| EAGLES-300 | Advanced fast-reactor / closed-cycle-compatible fuel | Development pathway | Fuel qualification and eventual fuel-cycle architecture become part of reactor programme |
BWRX provides the clearest example of why this matters.
GE Vernova Hitachi selected GNF2 specifically to avoid creating a new SMR fuel qualification programme; the company states explicitly that BWRX-300 does not require HALEU. [I]
Natrium sits at the opposite end of the near-term fuel spectrum.
A construction permit does not remove the fact that its HALEU supply chain is materially less mature than conventional LWR enrichment and fabrication.
5.21.11 Italian industrial linkage
| Design | Identifiable Italian linkage at cut-off | Character of linkage |
|---|---|---|
| BWRX-300 | Italian heavy nuclear manufacturers could potentially participate; no dedicated Italy deployment consortium identified | Potential localisation, vendor agreement still required |
| Holtec SMR-300 | Italian pressure equipment, civil and nuclear-component capability technically relevant; no equivalent national consortium identified | Potential localisation |
| AP300 | Westinghouse Electric Italy, Monfalcone, directly positioned to support AP300 global projects | Direct vendor-owned Italian manufacturing link |
| EAGLES-300 | Ansaldo Nucleare + ENEA are core design consortium members | Direct Italian reactor-development/IP participation |
| Natrium | No comparable Italian reactor-development consortium identified | Possible component participation, limited direct strategic linkage |
| NUWARD | Edison + Ansaldo + MAIRE + ATB + SIMIC + Tectubi + Walter Tosto + Webuild and others in June 2026 declaration | Extensive explicit Franco-Italian industrial programme |
The industrial question therefore cannot be reduced to “which reactor can Italian companies manufacture?”
Italian firms possess sufficient engineering depth to participate in several reactor supply chains.
The more important distinction is:
Does Italy participate only as a qualified supplier, as an embedded vendor manufacturing base, or as a co-developer of the reactor technology itself?
Those correspond to different degrees of industrial sovereignty.
5.21.12 Capital granularity — what “smaller project” really means
The 300–400 MWe scale can limit the amount of generation committed with each individual unit.
It does not demonstrate lower FOAK capital intensity.
Darlington is the first useful Western market test.
Its approximately 300 MWe first unit carries:
- CAD 6.1 billion direct first-unit programme cost;
- CAD 1.6 billion shared four-unit systems/infrastructure;
- CAD 7.7 billion approved first-unit/shared-infrastructure budget;
- CAD 20.9 billion current four-unit programme estimate.
These figures include categories such as interest, escalation and contingency that are often missing from generic vendor CAPEX claims. [I]
The Italian procurement framework should therefore distinguish:
| Cost concept | Required Italian disclosure |
|---|---|
| Vendor reactor price | Equipment/package cost only |
| EPC overnight cost | Construction excluding financing/escalation |
| Owner’s cost | Project-development and owner systems |
| Grid cost | Transmission/interconnection |
| Site infrastructure | Water, roads, port/logistics, earthworks |
| Interest during construction | Financing cost before revenue |
| Escalation | Inflation during delivery |
| Contingency | Cost uncertainty |
| Common multi-unit infrastructure | Shared across later modules |
| First fuel/core | Initial fuel procurement |
| Lifecycle fund | Decommissioning/waste obligations |
No reactor should be compared using vendor overnight cost against another reactor’s all-in project cost.
5.21.13 Grid consequence: 300–400 MWe offers granularity but does not make grid integration trivial
From a national-system perspective, a trip of a 300–400 MWe unit is materially smaller than the loss of a 1.6 GW-class reactor.
That can reduce the size of the single-generator contingency.
But three caveats apply.
First, multiple modules on the same site may share:
- switchyard;
- cooling;
- flood hazard;
- security systems.
Therefore site-level common-mode loss can exceed the individual module output.
Second, several former thermal/nuclear sites have existing high-voltage infrastructure, but their historical connection was designed around a different generation configuration.
Third, Italy’s future grid will itself have changed materially by the 2030s.
Consequently each design requires a project-specific Terna system study.
A 380 kV connection is evidence of favourable infrastructure.
It is not a nuclear connection permit.
5.21.14 Brownfield replacement logic
The 300–400 MWe class is particularly compatible conceptually with staged brownfield redevelopment.
A large former thermal site can potentially host:
- first module;
- common systems;
- later modules.
This can preserve optionality.
For example, a four-module 300 MWe development ultimately provides approximately 1.2 GW, but capital can be staged rather than committed to the entire capacity at once.
The Darlington programme uses this principle: first one licensed BWRX-300, with common infrastructure intended to support a possible four-reactor site. [I]
For Italy, however, reuse of former thermal sites remains conditional on Chapter 3’s:
- seismic;
- water;
- coastal/flood;
- environmental;
- population;
- territorial
screens.
5.21.15 Cogeneration and industrial loads distinguish some designs
The 300–400 MWe class is also relevant because it is sufficiently large to anchor an industrial cluster without necessarily becoming a national-scale single-unit commitment.
The designs differ significantly.
NUWARD is explicitly being developed as a multi-energy platform for:
- electricity;
- heat;
- industrial applications;
- hydrogen;
- desalination;
- carbon capture.
EDF’s published example includes a configuration producing approximately 290 MWe plus 320 MWth of heat. [I]
BWRX-300 is also marketed for:
- hot water;
- steam;
- hydrogen;
- district heat;
- direct-air-capture applications. [I]
EAGLES-300 is intended to exploit a higher-temperature lead-cooled system for:
- industrial heat;
- hydrogen;
- molecule synthesis. [I]
Natrium has a different flexibility proposition: its molten-salt storage can separate nuclear heat production from instantaneous electricity production and increase electrical output during selected periods. [I]
Therefore “300 MWe” does not imply equivalent system functionality.
5.21.16 Regulatory transferability to Italy
For Italy, licensing maturity has two components:
- how far the design has progressed elsewhere;
- how reusable that foreign regulatory work is under an Italian licensing process.
A conventional water-cooled design reviewed by an established allied regulator creates the easiest basis for regulatory reliance because:
- Italian institutions have historical LWR knowledge;
- European/Western regulators have extensive LWR experience;
- fuel and waste systems are familiar.
Fast reactors create a different regulator-development requirement.
EAGLES partly addresses this through the IAEA’s multinational pre-licensing initiative, in which Italian institutions are directly involved. [I/G]
Natrium has a major regulatory advantage of a real US NRC construction permit, but its sodium/HALEU system would still require Italy to build substantial specialised competence.
5.21.17 Procurement-readiness categories
For government planning, the six designs should not be placed in a single undifferentiated “SMR shortlist.”
They should be grouped by verified programme state, without converting those groups into an overall political ranking.
Construction-reference category
BWRX-300
Natrium
Both have passed into licensed nuclear construction.
Their technology risk is nevertheless very different.
Substantial regulatory-review category
Holtec SMR-300
It has undergone meaningful Western generic regulatory assessment but has not yet generated the same physical construction evidence.
Pre-application / design-development category
AP300
NUWARD
Both draw heavily on established PWR technology, but their specific SMR designs remain earlier in the licensing/deployment chain.
Advanced-reactor pre-commercialisation category
EAGLES-300
It has deep Italian/European technology participation and international pre-licensing, but its programme explicitly requires demonstration steps before commercial deployment.
5.21.18 Italy-specific decision-gate matrix
| Required Italian condition | BWRX-300 | Holtec SMR-300 | AP300 | NUWARD | Natrium | EAGLES-300 |
|---|---|---|---|---|---|---|
| Foreign construction evidence available now | Yes | No | No | No | Yes | No |
| Conventional LWR fuel chain | Yes | Yes | Yes | Yes | No | No |
| HALEU dependency | No | No | No | No baseline | Yes | No baseline HALEU assumption; advanced fuel programme still required |
| Direct Italian reactor-development stake | Limited | Limited | Vendor-owned Italian manufacturing asset | Extensive industrial cooperation | Limited | Core Italian participation |
| Italian regulator would review familiar LWR class | Yes, BWR | Yes, PWR | Yes, PWR | Yes, PWR | No | No |
| Full commercial FOAK operating evidence | No | No | No | No | No | No |
| Existing commercial fuel type already demonstrated | Yes | Fuel family yes | Fuel family yes | Fuel family yes | No equivalent mature HALEU metal chain | Advanced fuel qualification required |
| Current programme inherently compatible with Italian mid-2030s boundary case | Physically possible only under aggressive Italian schedule | Depends on US FOAK/licensing progress | Depends on rapid design certification and deployment reference | Depends on successful completion of design/licensing development | Construction maturity high but Italian fuel/regulatory leap substantial | Own programme targets commercialisation around 2039 |
The final row does not predict Italian completion dates.
It identifies whether the current external technology programme is structurally compatible with an Italian 2034–36 boundary-case schedule.
5.21.19 The most important procurement mistake would be treating maturity as a single number
Technology maturity has several components:
- design maturity;
- regulator maturity;
- fuel maturity;
- construction maturity;
- supply-chain maturity;
- operating maturity.
A reactor can score very differently across them.
For example:
AP300
High technological inheritance from AP1000.
Low specific AP300 construction evidence.
Natrium
High project-specific construction progress.
Lower fuel-chain maturity.
NUWARD
High established PWR institutional/fuel-cycle inheritance.
Lower project-specific licensing/construction maturity.
EAGLES
High Italian research ownership.
Low commercial operating evidence.
Therefore a single label such as:
“advanced”
or
“Gen III+”
is inadequate for procurement.
5.21.20 A government tender should require evidence at subsystem level
Before moving from technology surveillance into procurement, the State should demand comparable evidence under at least the following headings:
| Category | Required evidence |
|---|---|
| Design | Frozen/reference design maturity |
| Licensing | Reference-regulator decisions and open issues |
| Construction | FOAK physical progress and achieved milestones |
| Cost | Actual committed and forecast cost, not vendor target alone |
| Fuel | Enrichment/fabrication contract and alternatives |
| Waste | Spent-fuel and waste inventory per unit of generation |
| Site | Cooling, seismic, footprint and emergency envelope |
| Grid | Unit contingency and multi-module configuration |
| Supply chain | Identified Italian work packages |
| Digital | I&C/IP/software support arrangements |
| Operator | Training and reference-plant arrangements |
| Schedule | Reference-class rather than marketing construction date |
This would allow Italy to compare six different nuclear systems on a common evidentiary basis.
5.21.21 The 300–400 MWe band does not remove the fleet-scale challenge
The scale is attractive precisely because units can be deployed incrementally.
But the PNIEC 2050 scenarios make clear that Italy would eventually require a large fleet if nuclear is intended to provide a material national share.
At approximately 300 MWe per module:
- 8 GW corresponds to roughly 27 modules;
- 16 GW corresponds to roughly 53–54 modules.
The PNIEC’s 8 GW nuclear scenario covers about 11% of 2050 electricity demand, while the full estimated technical potential reaches approximately 16 GW / 22%. These are scenario envelopes rather than procurement commitments. [G]
Therefore the strategic attraction of this power class depends ultimately on replication.
One successful FOAK is insufficient.
The technology must become:
- serially manufacturable;
- repeatably licensable;
- financeable;
- operable at fleet scale.
5.21.22 Italy’s procurement question is therefore not “which 300 MWe reactor?”
The underlying government decision is more precise.
Italy must determine which type of 300–400 MWe system it is prepared to acquire.
Conventional imported/reference LWR system
Examples:
- BWRX-300;
- Holtec;
- AP300;
- NUWARD.
Principal attributes:
- established LWR fuel;
- familiar regulatory physics;
- lower technology novelty;
- varying degrees of foreign IP dependence.
Advanced fast-reactor system
Examples:
- Natrium;
- EAGLES.
Principal attributes:
- potentially greater fuel utilisation and higher-temperature system capability;
- more specialised fuel;
- materially different regulator competence;
- greater technology novelty.
That division is more meaningful than the common electrical rating.
5.21.23 Final assessment
The 300–400 MWe class is the most concrete scale for Italy’s initial procurement analysis because it reconciles several competing national constraints:
- generation that is large enough to matter;
- individual project size below that of a conventional gigawatt-class reactor;
- staged capacity addition;
- potential use of existing industrial/grid brownfields;
- compatibility with a substantial portion of Italy’s heavy nuclear manufacturing base.
But these benefits should not be overstated.
A 300 MWe SMR remains a major nuclear infrastructure project.
The Canadian reference already demonstrates multibillion-dollar FOAK capital exposure.
The power class does not guarantee:
- low €/kW cost;
- short construction;
- financeability;
- easy siting;
- low water use;
- high Italian content.
Most importantly, the six candidate systems in this band should not be represented as though they were sitting on a common commercial shelf.
As of 26 September 2026:
BWRX-300 and Natrium are under licensed nuclear construction.
Holtec SMR-300 has undergone substantial generic regulatory review but has not yet completed a commercial FOAK.
AP300 remains in pre-application design-certification work.
NUWARD is an active European design-development and industrial programme with unusually deep Italian participation but no construction reference.
EAGLES-300 is an Italian-led European advanced-reactor pathway whose own roadmap deliberately passes through LEANDREA and ALFRED before commercial deployment around 2039.
None has yet completed a Western FOAK operating cycle.
The correct Italian procurement principle is therefore:
Do not choose a reactor because 300–400 MWe appears to be the right size. Choose only after identifying which combination of design maturity, fuel security, regulatory reference, Italian industrial participation, site compatibility, financing and lifecycle dependency Italy is prepared to accept.
The electrical output defines the scale of the asset.
It does not define the risk of the programme.
5.21 — LOAD-BEARING SOURCE REGISTER
I1 — Canadian Nuclear Safety Commission — Darlington New Nuclear Project. BWRX-300 selected in 2021; construction application 2022; construction licence April 2025; physical construction under way; operating-licence application March 2026.
CNSC — Darlington New Nuclear Project
I2 — GE Vernova Hitachi — BWRX-300 technical data. 300 MWe net, 870 MWth, natural circulation, GNF2 fuel, 60-year design life.
GE Vernova Hitachi — BWRX-300 technology
I3 — GE Vernova Hitachi — BWRX-300 fuel strategy. Commercial GNF2 fuel and no HALEU requirement.
GE Vernova Hitachi — BWRX-300 fuel and reference technology
I4 — Ontario Power Generation — Darlington project economics. CAD 6.1bn first SMR, CAD 1.6bn common systems/services, CAD 20.9bn four-unit programme including interest, escalation and contingency.
OPG — Darlington SMR costs and deployment programme
G1 — UK nuclear/environmental regulators — Holtec SMR-300 Step 2 GDA. ~320 MWe, 1,050 MWth PWR, UO₂ fuel ≤5% enrichment, continuing design development.
UK Government — Holtec SMR-300 Step 2 assessment
G2 — UK regulators, 31 March 2026. Completion of Holtec GDA Step 2; no fundamental shortfall identified at that level of assessment.
UK Government — Holtec SMR-300 GDA completion
I5 — US Nuclear Regulatory Commission — AP300. 300 MWe-class Generation III+ one-loop PWR based on AP1000 components, technology and licensing basis; currently in pre-application engagement.
US NRC — Westinghouse AP300 regulatory status
I6 — Westinghouse — AP300 output and technology lineage.
Westinghouse — AP300 SMR
I7 — Westinghouse, 3 March 2026 — Westinghouse Electric Italy. Monfalcone nuclear manufacturing hub supporting AP1000 and AP300 projects; approximately 300 skilled employees.
Westinghouse — Westinghouse Electric Italy manufacturing hub
I8 — Ansaldo Energia — EAGLES-300. Current 2026 specification: 300 MWe commercial lead-cooled fast reactor; commercial deployment objective 2039 after demonstrators.
Ansaldo — EAGLES-300 programme
I9 — Ansaldo Energia, February 2026 — LEANDREA. LEANDREA planned by 2034, followed by ALFRED and commercial EAGLES-300 pathway.
Ansaldo — EAGLES/newcleo LEANDREA roadmap
I10 — US NRC — Natrium. 345 MWe pool-type sodium fast reactor using HALEU metallic fuel.
US NRC — Natrium reactor technology
I11 — US NRC, 4 March 2026 — Natrium construction authorisation.
US NRC — Kemmerer Natrium construction permit
I12 — TerraPower, 23 April 2026 — commencement of nuclear construction.
TerraPower — Kemmerer construction commencement
I13 — TerraPower — Natrium technical data. 840 MWth, 345 MWe nuclear island and thermal-storage-enabled electrical output flexibility.
TerraPower — Natrium technology data
I14 — EDF, 2026 Facts & Figures — NUWARD. PWR, up to 400 MWe; cogeneration configuration; conceptual-design and 2030s commercialisation programme.
EDF — NUWARD technical and programme data
I15 — Edison, 25 June 2026 — Franco-Italian NUWARD industrial declaration. Edison, EDF, NUWARD and major Italian suppliers; industrial objective of first plants around 2035.
Edison — EDF/NUWARD/Italian industrial agreement
G3 — MASE — PNIEC 2024. 2050 nuclear scenario of approximately 8 GW / 11% electricity demand and full estimated potential around 16 GW / 22%.
5.22 “Factory built” remains a hypothesis that must be demonstrated at fleet scale
The industrial premise behind many SMR business models is straightforward.
Large conventional nuclear projects are dominated by complex site construction. Each project mobilises large temporary workforces, extensive temporary facilities, high volumes of field welding and concrete, and a supply chain that must repeatedly coordinate thousands of activities under nuclear-quality requirements.
The SMR proposition is to move a materially larger share of that work into controlled industrial manufacturing environments, where components or complete modules can be produced repeatedly, tested before shipment and assembled at the reactor site using a standardised process.
In principle, this can provide important advantages:
- higher labour productivity;
- better quality control;
- greater automation;
- repeatable welding and inspection;
- reduced weather exposure;
- parallel factory and site work;
- lower rework;
- shorter on-site construction;
- faster accumulation of manufacturing experience;
- amortisation of non-recurring engineering and licensing costs across multiple units.
These mechanisms are technically credible.
They are also central to the economic proposition of SMRs because small reactors sacrifice part of the traditional nuclear economy of scale. A 300 MWe plant cannot simply divide every cost of a 1,200 MWe reactor by four. Some costs remain fixed or only partially scalable.
The OECD Nuclear Energy Agency consequently describes series construction as an imperative to the SMR economic model: standardisation, simplification, modularisation and factory fabrication must generate sufficient learning and repeatability to compensate for the diseconomies associated with smaller unit size. Crucially, the NEA also states that although these benefits have been demonstrated in industries such as shipbuilding and aircraft manufacture, they still need to be demonstrated for SMRs themselves. [S]
That distinction should be fundamental to Italian procurement policy.
Modular engineering is already real. Factory manufacture of nuclear components is already real. Serial SMR factory economics are not yet demonstrated in the Western commercial power sector.
The State should therefore distinguish five concepts that are frequently merged in political or vendor communication:
- modular design;
- factory fabrication;
- modular construction;
- serial production;
- demonstrated declining unit cost through series production.
Only the fifth establishes the economic proposition that matters for a national fleet.
5.22.1 “Modular” does not mean “the entire reactor leaves a factory complete”
The term module can describe very different things.
For one design, a module may be:
- a structural steel assembly;
- a pipe rack;
- a mechanical-services skid;
- a section of containment;
- an electrical room.
For another, it may mean:
- an integral reactor vessel containing the primary system.
For a multi-module power station such as NuScale, the term is also used for the individual reactor power module itself.
The IAEA therefore warns that a “module” varies from design to design. Factory-built modules may contain mechanical, electrical and instrumentation systems and may be assembled under controlled industrial conditions, but the extent of off-site fabrication can differ materially. [I]
This distinction prevents a misleading formulation:
SMR ≠ complete power station manufactured like a passenger car and delivered ready to operate.
Even highly modular reactors continue to require substantial site works, potentially including:
- excavation;
- foundations;
- seismic structures;
- cooling infrastructure;
- turbine island;
- switchyard;
- security;
- waste systems;
- emergency infrastructure;
- grid connection;
- commissioning.
Factory manufacture changes the balance between factory work and site work.
It does not remove the site.
5.22.2 Modular construction itself is not new to nuclear power
Another important correction is that modular construction did not originate with SMRs.
The OECD-NEA identifies recent large-reactor examples such as:
- AP1000;
- APR-1400;
- ABWR
as projects that already use modular construction approaches. [S]
The SMR thesis is more ambitious.
Because individual components and structures are smaller, developers expect that a larger fraction of the plant can eventually be transferred from the construction site into controlled factory or fabrication environments.
The NEA has estimated that modularisation/factory fabrication is already applicable to roughly 30% of nuclear construction and that significantly more ambitious strategies could theoretically increase this toward approximately 60–80%, depending on design and delivery model. This is a prospective industrial range, not evidence that an operating Western SMR fleet has already achieved it. [S]
Rolls-Royce SMR currently makes an even more ambitious vendor claim: approximately 90% of its plant is intended to be factory fabricated, tested and transported to site as modules. But as of the September 2026 cut-off, the company is still industrialising that system; its Sheffield Module Development Facility is producing and testing prototype modules, while the first UK/Czech deployment supply chain is being established. [I]
This is precisely the difference between:
factory-oriented design
and
demonstrated serial factory production.
5.22.3 The economic logic begins with the loss of economies of scale
Large reactors historically exploit an important economic effect: many fixed costs do not rise proportionately with electrical output.
A large unit may require:
- one control room;
- one security organisation;
- one licensing process;
- one containment system;
- one operating organisation,
while producing several times as much electricity as a small unit.
SMRs therefore start with a structural challenge.
The smaller reactor must offset some of this diseconomy of scale through other mechanisms.
The NEA’s economic logic can be reduced to:
smaller unit scale penalty
offset by
design simplification + standardisation + modularisation + series production + learning + potentially lower financing risk.
If the second group of effects does not materialise, the SMR may retain the cost penalty of smaller scale without capturing enough manufacturing benefit to offset it. [S]
That is why serial production is not a peripheral advantage.
It is central to the SMR economic proposition.
5.22.4 The “series effect”
The OECD-NEA separates the SMR series effect into two broad mechanisms.
First:
serial production of equipment reduces unit cost as cumulative manufacturing volume rises.
Second:
learning-by-doing improves efficiency as experience is fed back into later units.
[S]
That can occur at several levels simultaneously.
| Level | Learning mechanism |
|---|---|
| Design engineering | Fewer design changes and engineering hours on later units |
| Regulatory | Reuse of an already reviewed standard design |
| Factory | Repeated welding, machining, assembly and inspection |
| Supply chain | Stable long-term orders allow process optimisation |
| Site construction | Crews repeat the same installation sequence |
| Commissioning | Procedures are reused and improved |
| Operator | Training and maintenance standardised |
| Financing | Reduced uncertainty can lower risk premium |
This is why a genuine SMR fleet can become economically different from a sequence of unrelated one-off reactors.
5.22.5 Learning rates from aircraft and shipbuilding cannot simply be inserted into an SMR financial model
The NEA notes evidence from other serial manufacturing industries such as aircraft and shipbuilding showing learning rates in the broad 10–20% range in cited literature. [S]
But this number requires careful interpretation.
A learning rate of 10% would mean, in simplified learning-curve terminology, that each doubling of cumulative production reduces the relevant unit cost by approximately 10%.
It does not mean:
- every successive reactor costs 10% less;
- nuclear projects will automatically achieve aerospace learning rates;
- total plant CAPEX falls at the same rate as one factory-produced component.
Nuclear reactors contain cost categories with very different learning potential.
High potential for repeatability
- factory manufacturing;
- standard modules;
- welding;
- component assembly;
- repeated procurement.
Lower potential
- excavation;
- geology;
- cooling water;
- grid connection;
- site security;
- local infrastructure;
- territorial mitigation.
Potentially non-repeating
- FOAK licensing;
- country-entry costs;
- new site EIA;
- major site-specific seismic modifications.
Therefore an aircraft-industry learning curve cannot simply be applied to total nuclear CAPEX.
5.22.6 The first units may actually be more expensive because the factory model itself must be created
Factory manufacturing requires its own upfront investment.
Before serial production can begin, the programme may require:
- factory acquisition or construction;
- specialised tooling;
- jigs and fixtures;
- automated welding;
- lifting equipment;
- nuclear-certified quality systems;
- workforce training;
- prototype qualification;
- regulator inspection arrangements.
These are non-recurring costs.
If the programme ultimately builds only:
- one reactor;
- two reactors;
- three reactors,
the fixed industrial investment may be distributed over too few units to produce the claimed unit savings.
The IAEA makes this point explicitly: a full module-manufacturing environment is unlikely to exist until a sufficient order book exists because such factories require major capital investment that must be recovered across the fleet. Manufacturing practice must also be field-proven, the module configuration stabilised and operating experience accumulated. [I]
The IAEA consequently expects early SMRs to retain substantial site construction, with prototype or low-volume module manufacturing used initially to accumulate industrial experience. [I]
This is a crucial qualification to vendor factory narratives.
5.22.7 The circular commercial problem
SMRs therefore face an industrial coordination problem:
A factory needs a fleet order to become economical.
But:
utilities may want proven factory economics before committing to a fleet.
This produces the following cycle:
large order book → factory investment → repeat production → learning → lower unit cost
while investors may initially demand:
lower demonstrated unit cost → before large order book.
Breaking this cycle can require:
- government-backed fleet commitment;
- multinational deployment;
- framework orders;
- shared factories serving several countries;
- long-term supplier contracts.
The European Commission’s 2026 strategy is explicitly designed around this problem. It calls for fleet-based deployment, concentration on a limited number of promising designs, stronger European supply chains and industrial standards supporting modular manufacturing. [G]
5.22.8 The European Commission’s strategy is evidence that the fleet manufacturing system does not yet exist at mature scale
The Commission’s March 2026 SMR Strategy should not be read merely as political support for SMRs.
It is also an important diagnosis of what the European sector still lacks.
The Commission calls for:
- fleet-based industrial deployment;
- a limited number of reactor designs;
- stronger European supply chains;
- collaboration between suppliers;
- industrial standards supporting fleet deployment;
- development of modular manufacturing;
- SMR Valleys and manufacturing clusters;
- greater regulatory coordination.
[G]
If mature serial manufacturing and fleet economics already existed in Europe, many of these policy actions would be unnecessary.
The strategy is therefore implicitly acknowledging that SMR industrialisation is still in the market-creation stage.
5.22.9 The OECD-NEA is still studying how large-scale factory economics should work
The OECD-NEA created a dedicated Small Modular Reactor Economics Working Group — SMR-ECON.
Its mandate through the end of 2026 includes:
- consolidating evidence from other industries that achieved economies through serial construction;
- identifying which lessons can be applied to SMRs;
- examining cost reduction from first commercial units toward later large-scale factory-based deployment;
- informing policymakers about SMR cost economics.
[S]
This is an important evidentiary fact.
The world’s principal intergovernmental nuclear-economics institution is still explicitly drawing on comparator industries because a sufficiently mature SMR factory-production cost dataset does not yet exist.
5.22.10 No Western commercial SMR series has yet produced the required cost curve
As of 26 September 2026, the official and primary evidence reviewed for this report does not identify an OECD-country programme satisfying all of the following simultaneously:
- at least approximately ten identical commercial SMR units;
- sequential construction;
- stable design configuration;
- repeated factory manufacturing;
- comparable regulatory conditions;
- transparent unit-by-unit cost data;
- demonstrated declining real unit cost.
This formulation is deliberately narrower and more defensible than saying that no modular reactor has ever existed.
There are operating modular/small reactors internationally.
There are Western SMRs now under construction.
There are vendors building manufacturing systems.
What does not yet exist is the Western commercial fleet dataset necessary to empirically validate the complete factory-economics proposition.
5.22.11 Current evidence by programme
| Programme | What has actually been demonstrated | What remains to be demonstrated |
|---|---|---|
| BWRX-300 / Darlington | Licensed Western SMR construction; modular/open-top construction strategy; planned four-unit fleet | FOAK completion, commissioning, repeat units, factory learning, declining unit cost |
| Rolls-Royce SMR | Detailed modularisation strategy; supplier selection; prototype module facility; multiple national deployment agreements | First reactor construction, industrial throughput, factory cost curve |
| Holtec SMR-300 | Significant design/regulatory development and heavy-manufacturing capability | First commercial reactor and repeat-unit economics |
| AP300 | AP1000 technology inheritance and established Westinghouse manufacturing base | AP300 FOAK construction and serial AP300 manufacturing |
| NuScale | NRC-approved standard design | Current reference commercial construction and fleet manufacturing evidence |
| NUWARD | European industrial consortium and redesigned PWR architecture | Licensed FOAK, factory system and replicated units |
| EAGLES/newcleo | Test infrastructure and advanced-reactor development | Commercial demonstrator sequence and series manufacture |
| Natrium | Actual advanced-reactor construction | Replicated plants and series cost evidence |
The sector has therefore crossed from concept into industrial execution, but not into mature fleet economics.
5.22.12 Darlington is the most important near-term empirical test
The BWRX-300 project at Darlington is especially valuable because OPG intends to deploy four identical units at one established nuclear site.
This creates conditions favourable to observing the series effect:
- same owner;
- same site;
- same reactor technology;
- same regulator;
- same national supply chain;
- common infrastructure.
OPG states that it intends to maximise Canadian supply-chain participation, while GE Vernova Hitachi describes modular/open-top construction as a core delivery method. [I]
But as of the report cut-off, only the first reactor is in nuclear construction.
Therefore Darlington is presently:
the leading Western experiment in SMR fleet economics
rather than:
proof that the economics have already been achieved.
Italy should monitor the unit-to-unit data aggressively.
5.22.13 The data Italy should demand from Darlington and other reference fleets
For each successive reactor, Italy should seek evidence on:
| Metric | Why it matters |
|---|---|
| Engineering hours/unit | Tests design-reuse benefit |
| Site labour hours/MWe | Tests modular installation efficiency |
| Factory labour hours/module | Tests manufacturing learning |
| Major weld hours | Tests repeatability |
| Rework rate | Tests quality benefit |
| Construction duration | Tests schedule learning |
| Procurement lead times | Tests supply-chain maturity |
| Overnight cost/MWe | Tests physical-cost decline |
| Interest during construction | Tests schedule/finance benefit |
| Contingency consumed | Tests predictability |
| Commissioning duration | Tests operational learning |
| Unit availability after start-up | Tests whether rapid production compromises quality |
Without these data, claims of fleet learning remain qualitative.
5.22.14 Rolls-Royce provides the clearest European factory strategy — but it remains pre-series
Rolls-Royce SMR explicitly states that approximately 90% of the plant is intended to be manufactured or fabricated off-site and delivered as modules. [I]
In April 2026 it selected Aker Solutions as its primary module partner, describing modularisation as central to the delivery strategy. [I]
In May 2026 it selected Škoda JS and Doosan Enerbility for pre-production work on key nuclear-island components, including reactor-pressure-vessel preparation. [I]
In September 2026 it announced that Siemens Energy’s Newcastle facility would manufacture key steam-turbine components for the first three UK units. [I]
At Sheffield, however, the dedicated Module Development Facility is still described as producing working prototypes of plant modules to de-risk the programme. [I]
This is not a weakness.
It is evidence of the actual industrialisation sequence:
prototype → qualification → supplier readiness → FOAK production → repeat production → fleet learning.
Italy should expect the same sequence if it seeks domestic module manufacturing.
Serial economics disappear if every reactor is substantially redesigned.
Standardisation requires stability in:
- reactor island;
- nuclear steam supply system;
- safety systems;
- components;
- codes;
- manufacturing processes;
- interface specifications.
The NEA specifically notes that standardisation does not require every facility to be physically identical in every respect, but the global reactor architecture and key nuclear systems need sufficient commonality for meaningful replication. [S]
This creates a tension with national localisation.
Every country may seek changes for:
- local codes;
- seismic conditions;
- grid rules;
- security;
- labour practices.
Too much localisation can destroy the standardisation on which factory economics depend.
5.22.16 Site-specific engineering remains a lower bound on standardisation
Even a standard reactor cannot standardise away:
- geology;
- foundation conditions;
- flood elevation;
- cooling-water source;
- marine works;
- heavy transport route;
- grid connection;
- surrounding population.
Therefore an Italian fleet spread across:
- Trino;
- Montalto;
- Brindisi;
- Civitavecchia
could use a common reactor design while still having materially different balance-of-site costs.
This is one reason why factory savings should be applied only to the cost categories they actually affect.
5.22.17 Regulatory standardisation is as important as mechanical standardisation
A reactor manufactured identically but relicensed differently in every country does not achieve the full series effect.
Repeated regulatory changes can require:
- design changes;
- documentation changes;
- different equipment qualification;
- different procurement.
The OECD-NEA explicitly identifies regulatory harmonisation as a critical condition for the global market required to support factory fabrication. [S]
The Commission’s 2026 strategy similarly promotes:
- common regulatory work;
- fleet deployment;
- industrial standards.
[G]
For Italy this reinforces the strategic value of choosing a reactor already being deployed in multiple allied jurisdictions.
5.22.18 Factory regulatory oversight creates new problems rather than eliminating regulation
Moving nuclear construction to a factory changes the regulator’s work.
It does not reduce it to ordinary industrial inspection.
The regulator may need to oversee safety-class manufacturing:
- outside the reactor site;
- possibly outside Italy;
- possibly in several countries.
That raises questions concerning:
- regulator access;
- quality records;
- non-conformances;
- manufacturing surveillance;
- chain of custody;
- foreign regulatory reliance.
The IAEA SMR Regulators’ Forum has therefore created dedicated work on:
- manufacturability;
- supply chains;
- construction;
- commissioning;
- fleet-wide deployment;
- off-the-shelf manufacturing.
[I]
The manufacturing model creates a different regulatory problem.
It does not remove regulatory oversight.
5.22.19 Off-the-shelf manufacture creates a particularly important legal issue
Traditional nuclear procurement normally begins after:
- owner;
- site;
- licence framework
are identifiable.
A true mass-production model could eventually manufacture modules before a specific final site or licensee is assigned.
The IAEA SMR Regulators’ Forum has explicitly examined this “off-the-shelf” manufacturing concept because it raises questions about:
- responsibility for manufacturing quality;
- regulatory jurisdiction;
- design configuration;
- later acceptance by the site regulator. [I]
Italy should therefore not assume that nuclear modules can eventually be stocked like conventional turbines without regulatory consequences.
5.22.20 Factory economics require sufficient market size for one design
A factory does not benefit from the existence of fifty different SMR concepts.
It benefits from many orders for one sufficiently standardised design.
The OECD-NEA states that a sufficiently large market for a single design is required to support serial factory fabrication and suggests that only a subset of the many designs under development is likely to reach that scale. [S]
This is an important correction to an apparently positive market statistic.
A market containing:
- 60 designs;
- two orders each
can be less industrially useful than:
- three designs;
- forty orders each.
Fragmentation is therefore the enemy of the SMR factory model.
5.22.21 The Commission’s decision to focus support on fewer designs is economically rational
COM(2026)117 explicitly urges the European Industrial Alliance and Member States to focus resources on a limited number of the most promising designs.
It also encourages developers working on similar technologies to:
- collaborate;
- pool facilities;
- share manufacturing solutions where possible.
[G]
This is not merely industrial politics.
It addresses the minimum market-volume problem.
Europe cannot efficiently create:
- dozens of fuel types;
- dozens of dedicated factories;
- dozens of incompatible waste strategies
for small numbers of each reactor.
5.22.22 The Italian 8–16 GW envelope is theoretically large enough to matter — but only if standardised
The PNIEC scenario discussed elsewhere in this report uses:
- approximately 8 GW in its constrained nuclear pathway;
- approximately 16 GW as estimated technical potential.
At a nominal 300 MWe per unit, those correspond approximately to:
- 27 modules for 8 GW;
- 53–54 modules for 16 GW.
That is theoretically enough volume to create strong domestic manufacturing demand.
But only if Italy does not split that programme among many incompatible reactor families.
For illustration:
| 8 GW programme configuration | Approximate units/design | Factory implication |
|---|---|---|
| One 300 MWe design | ~27 | Strong series potential |
| Two designs equally | ~13–14 each | Still potential series |
| Four designs equally | ~6–7 each | Much weaker factory economics |
| Six designs equally | ~4–5 each | Limited domestic series effect |
This table is not a proposed fleet composition.
It illustrates why technology fragmentation directly reduces learning potential.
5.22.23 A European fleet may matter more than an Italian fleet
Italy does not necessarily need to order 30 identical reactors itself for factory economics to develop.
A more credible model may be:
France + Italy + Poland + Czechia + Sweden + Netherlands + other European customers
buying the same reactor family.
A factory can then serve a continental order book.
This is the economic logic behind the European Commission’s emphasis on fleet deployment and common standards. [G]
For Italy, the procurement question should therefore include:
How many units of this exact or substantially identical design are credibly expected across Europe before Italy’s Units 2–5 are ordered?
This is more economically relevant than the vendor’s global memorandum-of-understanding count.
5.22.24 Memoranda of understanding should not be counted as factory orders
Factory investment requires confidence in:
- binding contracts;
- financing;
- sites;
- licensing.
A vendor may announce:
- MOUs;
- framework agreements;
- site studies;
- strategic partnerships.
These demonstrate market interest.
They do not provide the same revenue certainty as:
- firm reactor orders;
- construction contracts;
- financed projects.
The Italian industrial assessment should therefore maintain an order-quality hierarchy.
| Commercial status | Weight for factory-economics assessment |
|---|---|
| General expression of interest | Very low |
| MOU / feasibility agreement | Low |
| Technology selection | Medium |
| Government-backed development contract | Medium-high |
| FID / binding EPC or reactor contract | High |
| Construction licence + financed build | Very high |
| Repeat units actually ordered | Critical evidence |
This prevents inflated “order books” from being used to justify factory-cost assumptions prematurely.
5.22.25 Factory utilisation is the critical commercial variable
A nuclear module factory with low utilisation can be economically worse than conventional construction.
The factory still carries:
- fixed labour;
- maintenance;
- capital depreciation;
- quality-assurance organisation;
- specialist tooling.
If orders arrive irregularly, those fixed costs are spread over too few units.
Therefore the relevant variable is not merely:
factory exists.
It is:
factory throughput and utilisation.
A government procurement model should ask vendors to identify:
- planned annual module capacity;
- committed orders;
- capacity already reserved;
- minimum economic throughput;
- expansion capability.
5.22.26 Production gaps can destroy the learning curve
Serial production benefits depend on continuity.
If Factory Unit 1 is built in 2031 and Unit 2 only in 2037:
- trained personnel may leave;
- tooling may be mothballed;
- suppliers may close lines;
- lessons may be lost.
The same phenomenon has been observed historically in conventional nuclear programmes when long gaps separate projects.
SMR economics therefore depend not only on number of units, but on cadence.
Italy should ask:
How many identical units per year must the industrial system produce to preserve the claimed learning curve?
5.22.27 Design change can reset the learning curve
The economic series assumes configuration stability.
If after Unit 2 the vendor changes:
- reactor vessel;
- safety systems;
- I&C;
- fuel;
- containment;
later units may no longer benefit fully from earlier manufacturing learning.
Some design improvement is normal.
But major regulatory or technological changes can effectively create a new FOAK.
The IAEA identifies configuration stability as a prerequisite before full module mass production becomes rational. [I]
5.22.28 The “FOAK–NOAK gap” must be measured, not assumed
Vendors commonly distinguish:
FOAK — First of a Kind
from
NOAK — Nth of a Kind.
The economic case often assumes that NOAK will be much cheaper.
Italy should not accept a NOAK cost merely because a vendor labels it as such.
The tender should require a reconciliation showing:
| Cost reduction source | Evidence required |
|---|---|
| Engineering reuse | Hours removed |
| Factory learning | Observed productivity |
| Supplier learning | Contracted price data |
| Reduced contingency | Reference-project evidence |
| Shorter schedule | Real previous-unit schedule |
| Lower finance cost | Financing commitments |
| Shared infrastructure | Identified physical assets |
| Licensing reuse | Regulator-approved reuse scope |
If the reduction cannot be traced to a physical or financial mechanism, it should remain an aspirational cost target.
Factory manufacture is not automatically cheaper at low production volume.
The initial units may carry:
- prototype tooling;
- low utilisation;
- high inspection;
- engineering support;
- regulatory observation;
- rework.
Only later does repeat manufacture potentially overcome these costs.
Therefore the first Italian reactor should not be financially justified using mature-factory cost assumptions unless another country has already produced the relevant series.
This is where Italy’s late-entry position could become advantageous.
5.22.30 Italy can import the learning curve
Italy does not have to be the first customer of a reactor design.
If Canada constructs:
- BWRX Unit 1;
- Unit 2;
- Unit 3;
- Unit 4
before Italy orders later units, some:
- engineering;
- supply-chain;
- manufacturing;
- regulatory
learning is imported into the Italian project.
Likewise, a European fleet could allow Italy to become the fifth or tenth unit of a standard design even if it is the first unit physically built on Italian soil.
That is one of the strongest arguments for aligning Italy’s procurement with a genuine multinational fleet rather than an isolated national design.
5.22.31 But country-specific FOAK costs remain
Even if Italy becomes the tenth global unit, the first Italian plant may still be a country FOAK.
It will carry first-time Italian costs involving:
- regulator interface;
- site licensing;
- operator qualification;
- emergency planning;
- grid rules;
- Italian construction law;
- local supply-chain qualification.
Therefore:
global NOAK ≠ automatically Italian NOAK.
The procurement model should distinguish:
- design FOAK;
- factory FOAK;
- country FOAK;
- site FOAK.
5.22.32 Four distinct learning curves should therefore be tracked
| Learning curve | What is repeated? | Can Italy import it? |
|---|---|---|
| Design learning | Reactor engineering | Yes, substantially |
| Factory learning | Module/component production | Yes, if same factories/suppliers used |
| Regulatory learning | Review of standard design | Partly, through reliance/cooperation |
| Site-construction learning | Civil/installation work | Only partly; location remains specific |
This framework is more useful than a single generic learning-rate assumption.
5.22.33 Transportability creates a physical ceiling on factory modularisation
Larger modules require transport from factory to site.
The NEA specifically identifies transportability as a constraint on modularisation. [S]
Relevant limits include:
- road axle load;
- bridge capacity;
- railway gauge;
- port draught;
- crane capacity;
- module dimensions.
This connects directly to Chapter 3.
Coastal/port sites such as:
- Civitavecchia;
- Brindisi;
- Fiume Santo
could possess an advantage for factory-built large modules.
Inland sites such as:
- Trino;
- Caorso
would require detailed heavy-haul studies.
A design whose economics depend on very large preassembled modules may therefore change the Italian site ranking.
5.22.34 Factory production shifts, rather than eliminates, quality risk
Controlled manufacturing can improve quality.
But industrial concentration can also create systemic defect risk.
If one standard factory repeatedly manufactures an incorrect:
- weld;
- material;
- digital component;
- valve;
- structural module,
the defect can propagate across the fleet.
Standardisation therefore has a dual effect:
good design repeated → rapid learning
but also potentially:
common defect repeated → fleet-wide remediation.
Configuration management and non-conformance detection consequently become more important as production scales.
5.22.35 Fleet-scale manufacturing creates supply-chain concentration risk
SMR series production can require high volumes from a relatively small number of nuclear-qualified suppliers.
Potential bottlenecks include:
- large forgings;
- specialised steels;
- reactor vessels;
- steam generators;
- qualified valves;
- nuclear I&C.
A highly efficient single-source factory can therefore become a strategic vulnerability if:
- production stops;
- quality problem occurs;
- owner becomes insolvent;
- geopolitical restrictions arise.
Italy should therefore assess both:
economies of concentration
and
resilience through second sourcing.
5.22.36 Italian industrial policy should not build a reactor-module factory before demand exists
Chapter 4 demonstrated that Italy already possesses:
- heavy fabrication;
- forgings;
- nuclear fittings;
- testing;
- EPC capability.
This does not automatically justify a dedicated complete SMR module factory.
Before supporting one, Government should require evidence of:
- selected reactor design;
- vendor manufacturing licence/IP agreement;
- binding multi-unit demand;
- export opportunity;
- expected annual throughput;
- regulator acceptance of manufacturing model;
- demonstrable competitiveness against existing vendor factories.
Otherwise Italy could create stranded industrial capacity.
5.22.37 Component factories may be rational earlier than complete reactor factories
Italy may capture substantial factory economics without manufacturing the entire reactor module domestically.
Existing specialist factories could serially produce:
- piping;
- fittings;
- forgings;
- containment structures;
- pressure components;
- casks;
- heat exchangers.
This is particularly compatible with Italy’s current industrial strengths identified in Chapter 4.
The strategic distinction is between:
SMR factory
and
SMR supply-chain factories.
The latter may have much lower demand thresholds and can serve several reactor programmes internationally.
5.22.38 Multi-design factories may reduce the stranded-asset problem
Where technically possible, factories should be capable of manufacturing components for:
- multiple nuclear designs;
- conventional reactors;
- industrial equipment.
This creates revenue diversification.
However, excessive design diversity can reduce repeatability.
Industrial policy must therefore balance:
factory flexibility
against
series standardisation.
5.22.39 Factory manufacturing also changes financing timing
Modular manufacture can shorten site construction by allowing factory work to occur in parallel with:
- excavation;
- civil structures;
- site preparation.
That can reduce financing duration.
But it can also shift cash expenditure earlier because expensive modules may need to be manufactured before site construction reaches the installation stage.
The OECD-NEA explicitly notes that modular approaches can require procurement of components earlier, increasing some upfront expenditure even while potentially reducing overall project duration. [S]
Therefore the cash-flow effect is not automatically:
factory = less capital required early.
It may instead be:
more parallel early expenditure + shorter overall financing period.
5.22.40 Factory economics and project finance are therefore linked
If modularisation reduces construction from six years to four years, interest during construction may decline substantially.
But that benefit only exists if:
- modules arrive on time;
- site work is ready;
- no regulatory hold delays installation.
A completed module sitting in storage because the foundation is late does not create the expected financing benefit.
Factory and site schedules must therefore be tightly integrated.
5.22.41 Italy should require an industrial-readiness level separate from TRL
Technology Readiness Level alone is inadequate.
A reactor may have a technically mature design while lacking:
- factory;
- qualified supply chain;
- trained workers;
- serial orders.
The IAEA itself now treats industrial preparedness as a distinct objective, including:
- codes and standards;
- modular construction;
- advanced manufacturing;
- serial component production;
- fuel-cycle supply. [I]
Italy should therefore assess at least:
| Dimension | Question |
|---|---|
| Technology readiness | Does the reactor work technically? |
| Licensing readiness | Can regulators approve it? |
| Manufacturing readiness | Can industry produce it repeatedly? |
| Supply-chain readiness | Are qualified suppliers available? |
| Fleet readiness | Is there sufficient demand for serial economics? |
A design can be high on the first dimension and low on the fifth.
5.22.42 Proposed Italian “Factory Economics Proof Test”
Before Italy attributes material NOAK savings to an SMR bid, the vendor should demonstrate the following.
Test F1 — Design stability
At least one reference design baseline sufficiently stable for repeated manufacture.
Test F2 — Qualified manufacturing route
Factories, tooling and qualified processes identified.
Test F3 — Order book
Binding orders or highly committed deployment programme sufficient to sustain industrial capacity.
Test F4 — Regulatory acceptance
Manufacturing and inspection route accepted by the relevant regulator(s).
Test F5 — Reference build
At least one module/reactor manufactured and installed.
Test F6 — Repetition
Subsequent units use substantially the same design and delivery method.
Test F7 — Observed learning
Measured improvement in:
- labour hours;
- defect/rework;
- schedule;
- cost.
Test F8 — Cost transparency
Vendor can demonstrate that lower later-unit price derives from actual learning rather than:
- reduced contingency;
- State subsidy;
- accounting scope changes.
Until F6–F8 exist, the programme should classify large NOAK cost reductions as forecast rather than demonstrated evidence.
5.22.43 Italian bid-price treatment
A government procurement evaluation should therefore distinguish three price levels.
| Price type | Treatment |
|---|---|
| FOAK firm price | Can support project financing if scope and risk allocation are clear |
| Fleet-option price | Credible only where contractual indexation and volume conditions are specified |
| Vendor NOAK target | Scenario input, not bankable cost evidence until learning has been demonstrated |
This prevents the Government from financing Unit 1 using the theoretical economics of Unit 10.
5.22.44 Sensitivity analysis should explicitly remove factory learning
Each technology bid should be modelled in at least two cases.
Case A — factory-learning case
Uses vendor-supported:
- serial manufacturing;
- schedule reduction;
- learning.
Case B — no-learning case
Assumes later reactors cost approximately the same in real terms as early units except for clearly demonstrated shared-site savings.
The fleet decision should remain understandable under both cases.
If a design becomes economically unacceptable unless extremely high learning rates occur, Government should recognise that its business case is dependent on an unproven assumption.
5.22.45 A third case should test interrupted production
A particularly useful stress case for Italy is:
Unit 1 → production gap → Unit 2.
This tests whether:
- suppliers remobilise;
- factory overhead rises;
- skills are lost.
A national programme exposed to political or siting delays should not assume uninterrupted aerospace-style production.
5.22.46 Factory economics are strongest under multinational fleet alignment
The most favourable industrial conditions are likely to exist where several countries:
- choose the same design;
- use compatible codes;
- coordinate regulatory review;
- sequence orders.
That produces:
- larger order volume;
- smoother factory utilisation;
- more supplier investment;
- broader financing confidence.
This is exactly the direction of the Commission’s fleet-based deployment strategy. [G]
For Italy, participation in a real European fleet could therefore be more important economically than owning a wholly national module factory.
5.22.47 What would constitute convincing proof by the early 2030s
The State should look for evidence such as:
- Unit 2 manufactured faster than Unit 1;
- Unit 3 manufactured faster than Unit 2;
- lower factory labour hours;
- lower rework;
- stable safety configuration;
- lower real EPC price;
- declining contingency use;
- shorter site assembly;
- repeat regulator approval without substantial redesign.
The key word is real.
Nominal euro or dollar cost can rise because of inflation even while real productivity improves.
Therefore cost learning should be measured in:
- constant currency;
- common scope;
- common financing treatment.
5.22.48 What would not prove factory economics
The following would be insufficient:
- one prototype module;
- one factory opening;
- one FOAK reactor;
- vendor claim of 30% future savings;
- multiple non-binding MOUs;
- reduced overnight cost obtained by excluding owner/grid/financing costs;
- later unit with a different design.
These may be positive signals.
They are not the completed economic proof.
5.22.49 Government evidence ladder
| Level | Evidence | Government interpretation |
|---|---|---|
| E0 | Vendor factory concept | Hypothesis |
| E1 | Prototype module successfully manufactured | Manufacturing concept demonstrated |
| E2 | FOAK production modules manufactured | Industrial route demonstrated |
| E3 | FOAK reactor assembled/commissioned | Delivery system demonstrated once |
| E4 | 2–4 substantially identical units | Early series evidence |
| E5 | 5–10 units with comparable cost/schedule data | Material learning evidence |
| E6 | Mature multi-site fleet with stable factories and declining real cost | Factory economics demonstrated |
As of September 2026, no Western commercial SMR programme has reached E5–E6.
The leading projects are moving through E1–E3.
5.22.50 Consequence for Italy’s first reactor
Italy should assume that its first reactor will retain a meaningful FOAK/country-entry premium, even if the technology has been built elsewhere.
The investment case should not depend on:
- mature factory utilisation;
- maximum vendor learning rate;
- fully optimised NOAK supply chain.
Those benefits should instead be treated as fleet upside.
This creates a more conservative and auditable distinction:
FOAK must be financeable on FOAK evidence.
Fleet must be justified by observed learning.
5.22.51 Consequence for the PNIEC 8–16 GW envelope
If Italy ultimately pursues the PNIEC-scale nuclear envelope, serial manufacturing becomes much more than a cost optimisation.
It becomes a physical delivery requirement.
Approximately 27 300-MWe modules for 8 GW cannot plausibly be delivered as twenty-seven isolated bespoke megaprojects while achieving competitive schedules.
A fleet of that scale would require:
- repeat engineering;
- repeat licensing;
- industrial throughput;
- factory production;
- continuous workforce.
At 16 GW the requirement becomes still stronger.
Therefore:
Italy does not need proven factory economics to investigate one FOAK, but it does need a credible path to factory economics before treating 8–16 GW as an executable fleet programme.
5.22.52 Procurement implication
The factory claim should become a contractual subject.
Italy should seek commitments concerning:
- production capacity;
- factory location;
- delivery slots;
- supplier continuity;
- design freeze;
- later-unit pricing methodology;
- productivity sharing;
- open-book evidence where public guarantees are used.
If taxpayers or consumers are asked to fund FOAK risk in exchange for later fleet savings, the State should have a contractual right to participate in those savings.
Otherwise:
public sector carries FOAK risk
while
vendor captures NOAK upside.
That is not an optimal risk-allocation model.
5.22.53 Industrial implication for Italy
The Italian objective should not automatically be:
“Build an Italian SMR factory.”
A more defensible hierarchy is:
- qualify the existing nuclear supply chain;
- secure repeat Italian work packages;
- identify components where Italian factories are globally competitive;
- establish dedicated serial lines when order volume justifies them;
- consider full-module manufacturing only where a stable reactor fleet provides sufficient throughput.
This uses Italy’s existing advantages in:
- forgings;
- heavy components;
- piping;
- testing;
- EPC;
- precision manufacturing.
It reduces the risk of creating a politically symbolic but commercially underutilised factory.
5.22.54 Final assessment
The factory-built SMR proposition is technically credible and potentially transformational.
It should not be dismissed merely because the complete economic proof has not yet arrived.
The underlying mechanisms are real:
- controlled manufacturing environments can improve quality;
- standardised production can generate learning;
- parallel factory/site work can shorten schedules;
- repeat design can amortise non-recurring engineering;
- smaller modules can improve transport and assembly.
The international institutions responsible for nuclear technology and economics recognise these opportunities.
But they also identify precisely the unresolved condition.
The OECD-NEA states that the factory and learning benefits demonstrated in other industries still need to be proven for SMRs. [S]
The IAEA states that full module-factory environments require sufficient order volumes, stable configurations, regulator acceptance and operating experience before mass production becomes realistic. [I]
The OECD-NEA is still operating a dedicated 2023–2026 SMR economics working group partly to determine how experience from serial-production industries can be translated into nuclear deployment. [S]
And the European Commission’s 2026 policy itself calls for:
- fleet deployment;
- concentration around fewer designs;
- European supply-chain development;
- modular-manufacturing standards.
[G]
These are not signs that the factory model has failed.
They are evidence that the model is still being industrialised.
The correct Italian government position should therefore be:
Factory manufacture is a credible engineering strategy. Serial factory economics remain a forecast until repeated units demonstrate them.
Italy should consequently distinguish four levels of assertion:
demonstrated today:
nuclear factory fabrication, component modularisation and modular construction techniques.
being demonstrated now:
Western SMR FOAK construction and prototype module-production systems.
not yet demonstrated at commercial Western fleet scale:
stable high-throughput manufacture of repeated identical SMRs with transparent learning data.
potential future value:
declining real unit cost, shorter schedules and lower financing risk from serial manufacture.
The procurement implication is straightforward:
Italy should not pay FOAK prices while assuming NOAK economics.
FOAK decisions should use conservative current evidence.
Fleet decisions should be released progressively as actual serial-production evidence appears.
That is the distinction between modular design and demonstrated modular economics.
5.22 — LOAD-BEARING SOURCE REGISTER
G1 — European Commission, COM(2026)117, 10 March 2026 — European SMR Strategy. Calls for fleet-based industrial deployment, concentration on a limited number of promising designs, competitive European supply chains and industrial standards supporting modular manufacturing.
European Commission — SMR Strategy COM(2026)117
G2 — European Commission, 10 March 2026 — strategy announcement. Defines SMRs as designs intended for factory fabrication and site assembly while setting out the still-required fleet, manufacturing, supply-chain and regulatory actions.
European Commission — Strategy to bring European SMRs online
S1 — OECD Nuclear Energy Agency, Small Modular Reactors: Challenges and Opportunities, NEA No. 7560. Establishes the economic importance of series construction, standardisation, modularisation and factory fabrication; explicitly states that benefits demonstrated in other industries remain to be demonstrated for SMRs.
OECD-NEA — Small Modular Reactors: Challenges and Opportunities
S2 — OECD-NEA — Small Modular Reactor Economics Working Group (SMR-ECON). Dedicated 2023–2026 work programme studying how economies of multiple and serial construction from comparable industries may translate into SMR deployment and future large-scale factory construction.
OECD-NEA — SMR Economics Working Group
S3 — OECD-NEA — SMR-ECON mandate. Confirms specific work on the transition from first commercial units to large-scale factory-based construction and the need to draw evidence from other serial-production industries.
OECD-NEA — SMR-ECON mandate
I1 — IAEA Nuclear Energy Series — SMR industrialisation and deployment. Explains why full module factories require sufficient order books, configuration stability, manufacturing validation and operating experience and why early units are unlikely to capture mature NOAK economics.
IAEA — SMR Industrial Deployment and Factory Manufacturing
I2 — IAEA SMR Platform — Industrial Preparedness. Serial production, modular manufacturing, codes and standards and supply-chain capability treated explicitly as SMR industrial-readiness requirements.
IAEA — SMR Industrial Preparedness
I3 — IAEA SMR Regulators’ Forum. Dedicated regulatory work on manufacturing, construction, commissioning, off-the-shelf manufacture and fleet-wide deployment.
IAEA — SMR Regulators’ Forum publications
I4 — Ontario Power Generation — Darlington SMR programme. First BWRX-300 under construction with planned four-unit fleet and Canadian supply-chain strategy.
OPG — Darlington Small Modular Reactor
I5 — GE Vernova Hitachi — Darlington BWRX-300. Modular/open-top construction strategy and projected construction model; first unit remains the reference FOAK.
GE Vernova Hitachi — BWRX-300 at Darlington
I6 — GE Vernova Hitachi — BWRX-300 construction model. Describes modular/open-top construction and 24–36 month vendor construction target.
GE Vernova Hitachi — BWRX-300 Canada
I7 — Rolls-Royce SMR, 29 April 2026 — Modularisation Delivery Strategy. Aker Solutions selected as primary module partner; fleet deployment explicitly linked to modular industrial methods.
Rolls-Royce SMR — Modularisation Delivery Strategy
I8 — Rolls-Royce SMR — manufacturing model. Vendor plan for approximately 90% factory fabrication/testing and site assembly.
Rolls-Royce SMR — Factory-built delivery model
I9 — Rolls-Royce SMR — Module Development Facility. Sheffield facility producing and testing prototype modules before fleet production.
Rolls-Royce SMR — Prototype module facility
I10 — Rolls-Royce SMR, 27 May 2026 — key nuclear-island suppliers. Škoda JS and Doosan Enerbility selected for pre-production work and manufacturing readiness.
Rolls-Royce SMR — Nuclear-island supplier programme
I11 — Rolls-Royce SMR, 3 September 2026 — turbine manufacturing. Siemens Energy Newcastle to manufacture key turbine components for first three UK units, illustrating transition from design toward actual European production planning.
Rolls-Royce SMR — UK turbine manufacturing
5.23 The key technology fork is actually fuel
The reactor market can be divided more usefully by fuel than by marketing category.
Conventional LEU fuel
Examples:
- BWRX-300;
- Holtec SMR-300;
- AP300;
- Rolls-Royce SMR;
- NUWARD;
- NuScale.
Advantages:
- mature enrichment;
- mature fabrication;
- multiple Western suppliers;
- established safeguards;
- existing spent-fuel experience.
HALEU
Examples:
- Xe-100;
- Natrium;
- several other AMRs.
Requires:
- enrichment above conventional LWR levels;
- new commercial capacity;
- additional security/safeguards handling;
- specialised fabrication.
The United States is expanding HALEU capability, but commercial-scale supply is still developing.
MOX / closed-cycle fuel
newcleo is the clearest Italian-linked example.
Requires:
- plutonium-bearing fuel fabrication;
- reprocessing/recycling strategy;
- specialised safeguards;
- more demanding handling and licensing.
This fuel distinction should be one of the principal filters in the Italian technology down-select.
5.24 HALEU is a strategic dependency, not a footnote
X-energy’s 2026 HALEU agreement with Centrus is significant because it demonstrates that advanced-reactor developers themselves treat fuel availability as a first-order project risk. [I]
A reactor can possess:
- finished design;
- construction licence;
- site;
- financing;
and still fail to operate on schedule if qualified fuel is unavailable.
Italy currently has no domestic HALEU enrichment or commercial advanced-fuel fabrication chain.
Therefore any HALEU reactor should carry an explicit fuel-security premium in national scoring.
5.25 MOX creates a different sovereignty proposition
MOX-based fast reactors are attractive partly because they promise better use of existing fissile resources and potentially support closed fuel cycles.
But this comes at the cost of greater institutional complexity.
Italy would need to determine:
- where plutonium is separated;
- where MOX is fabricated;
- who owns material;
- safeguards;
- transport;
- security;
- waste end-state.
newcleo’s separate US MOX-facility regulatory engagement illustrates that fuel manufacturing is effectively a second nuclear megaproject attached to the reactor programme. [I]
This is one reason why a 200 MWe LFR can be harder to deploy than a 300 MWe LWR.
5.26 Water-cooled SMRs have a licensing advantage in Italy
Nuclitalia explicitly began with a focus on mature water-cooled SMRs. [I]
That choice is technically rational.
Italy already has historical regulatory and industrial knowledge of:
- PWR;
- BWR;
- conventional LWR fuel;
- water chemistry;
- steam cycles;
- LWR waste.
European regulators also possess deep LWR experience.
This does not make LWR-SMRs automatically cheap.
It lowers technology novelty.
For an earliest FOAK, that difference is significant.
5.27 Lead-cooled reactors maximise Italian intellectual ownership
The opposite strategy is represented by:
- newcleo;
- EAGLES;
- ENEA;
- Ansaldo Nucleare.
Italy has genuine competence in:
- lead thermal hydraulics;
- materials;
- experimental facilities;
- reactor design;
- safety R&D.
Choosing this pathway could create greater national IP than importing a foreign PWR-SMR.
But technology sovereignty must not be confused with schedule certainty.
The lead programme requires:
- demonstrators;
- materials qualification;
- fuel qualification;
- corrosion control;
- licensing precedent.
Therefore it is better understood as a late-2030s strategic technology track.
5.28 High-temperature reactors create industrial-heat opportunities
Xe-100 and HTR-PM demonstrate a different value proposition.
Their high outlet temperatures enable:
- industrial steam;
- hydrogen;
- chemical processing;
- refinery use.
For Italy this could matter in industrial clusters where electricity is not the only energy requirement.
However, high-temperature gas reactors introduce:
- TRISO fuel;
- graphite;
- gas-circuit technology;
- different waste streams;
- different licensing assumptions.
The value case should therefore be evaluated against industrial heat, not only €/MWh electricity.
5.29 Natrium’s storage system creates a unique grid proposition
Natrium combines a 345 MWe reactor with molten-salt thermal storage capable of increasing turbine output to around 500 MWe for several hours. [I]
This separates the reactor from conventional baseload nuclear.
In a high-solar Italian system, thermal storage could allow:
- nuclear heat to remain relatively steady;
- electrical production to shift toward higher-value hours.
That is strategically interesting.
But the national programme must compare that benefit with:
- standalone battery storage;
- pumped hydro;
- conventional LWR load following.
A technologically elegant system is not automatically the lowest-system-cost solution.
5.30 Licensing passport: useful concept, dangerous slogan
Italy has discussed using foreign regulatory work to accelerate licensing.
That is sensible.
The 2026 EU SMR Strategy explicitly promotes:
- closer regulator cooperation;
- joint early reviews;
- international assessment reuse. [G]
But no regulator can simply import a foreign construction licence.
Italy still requires:
- Italian site evaluation;
- seismic analysis;
- hydrology;
- environmental assessment;
- emergency planning;
- safeguards;
- security;
- Italian legal authorisation.
The correct concept is:
regulatory reliance
not
automatic licence passport.
5.31 Italy should use foreign FOAKs as its test programme
Italy’s strategic advantage in starting later is that it can observe actual execution abroad.
The next several years should generate valuable evidence from:
Darlington
- BWRX-300 construction duration;
- civil modularisation;
- cost;
- commissioning;
- operator staffing.
Kemmerer
- sodium-reactor construction;
- HALEU supply;
- storage integration.
Long Mott
- Xe-100 licensing;
- TRISO manufacturing;
- modular HTGR construction.
Palisades
- SMR-300 licensing and construction.
Wylfa
- Rolls-Royce factory/module industrialisation.
Italy should not select a technology solely because it appears promising in 2026 if another three years of foreign construction data can materially improve the decision.
5.32 Technology selection should use a two-stage gate
Gate 1 — eliminate designs that cannot meet national requirements
Minimum tests:
- allied/vendor strategic compatibility;
- regulator-accessible reference;
- fuel security;
- site compatibility;
- commercial deployment credibility;
- waste pathway.
Gate 2 — compare surviving designs
Criteria:
- FOAK cost;
- construction evidence;
- Italian supply-chain content;
- grid flexibility;
- water consumption;
- industrial heat;
- fuel-cycle dependence;
- waste;
- schedule.
This avoids spending years comparing designs that are politically or industrially impossible to procure.
5.33 Proposed readiness screen for an earliest Italian FOAK
Category A — near-term technology-selection candidates
Not “recommended”; simply mature enough to justify full due diligence.
- BWRX-300
- Holtec SMR-300
- Rolls-Royce SMR, if 470 MWe is acceptable
- NuScale US460, if a credible FOAK project re-emerges
Category B — strategically important but requiring additional maturity before irreversible commitment
- AP300
- NUWARD
- Xe-100
Category C — advanced-reactor strategic track
- newcleo LFR-AS-200
- EAGLES-300
- Natrium
Natrium is actually more advanced in construction than many Category A designs; it is placed in the advanced track because its Italian deployment would entail a qualitatively larger fuel/licensing technology jump.
Reference-only for Italian procurement under present conditions
- ACP100;
- HTR-PM;
- KLT-40S/RITM.
They remain important benchmarking technologies.
5.34 Why BWRX-300 maturity does not automatically make it Italy’s choice
The BWRX has the strongest Western construction evidence.
That does not automatically mean it dominates on:
- local content;
- electricity price;
- financing;
- heat cogeneration;
- waste;
- vendor terms;
- Italian industrial control.
NUWARD, for example, may offer weaker technology maturity but stronger Italian industrial integration.
EAGLES may offer much later deployment but stronger national technology ownership.
Technology selection is therefore a multi-objective decision, not a maturity race.
5.35 Why NUWARD’s Italy connection does not make 2035 guaranteed
The Edison/EDF declaration is strategically significant.
But the relevant technology was still emerging from a substantial redesign.
The correct reporting language is:
industrial programme with an objective of first units around 2035
not
reactor ready to operate in Italy in 2035.
The latter would confuse an industrial ambition with a licensed construction schedule.
5.36 Why newcleo cannot be called “available now”
newcleo has:
- R&D facilities;
- regulator engagement;
- Italian industrial links;
- MOX strategy.
It does not have:
- an operating LFR-AS-200;
- a construction licence;
- an operating fuel-fabrication facility supplying that reactor.
Therefore it cannot be compared directly with a BWRX-300 under construction and described as equally “available.”
5.37 Why fusion does not belong in the 2030s SMR procurement shortlist
Fusion remains strategically important to Italy through:
- DTT;
- ENEA;
- Eni;
- ASG;
- ITER.
But it cannot credibly substitute for a fission SMR in a mid-2030s electricity programme.
The master brief expressly requires fusion to be treated as a parallel technology track rather than a pre-2040 substitute.
5.38 EU industrial policy changes the context
The European Commission adopted its SMR/AMR strategy on 10 March 2026.
It aims to enable Europe’s first SMR projects in the early 2030s and emphasises:
- fleet deployment;
- regulatory cooperation;
- European supply-chain localisation;
- fuel-cycle resilience;
- standardisation;
- “SMR Valleys”;
- strategic autonomy. [G]
The Commission estimates possible EU SMR capacity of 17–53 GW by 2050.
Italy therefore does not need to industrialise alone.
Its strongest option may be participation in a European fleet programme, because serial economics require multiple units across multiple jurisdictions.
5.39 EU industrial policy also warns against single-vendor strategic dependence
The 2026 Commission strategy explicitly recognises that some of the most advanced LWR-SMRs are of non-EU origin and calls for balanced cooperation while retaining European value and strategic autonomy. [G]
That is directly relevant to:
- BWRX-300;
- Holtec;
- AP300;
- NuScale;
- Xe-100;
- Natrium.
Italy should therefore negotiate not merely:
reactor price
but:
- localisation;
- IP access;
- maintenance rights;
- spare parts;
- fuel contracts;
- long-term software support;
- cyber access;
- European manufacturing.
COMPARATIVE TABLES — FUEL, LICENSING AND PROCUREMENT READINESS
Table 5.23-A — The three fuel architectures relevant to Italy
| Strategic variable | Conventional LEU / LWR fuel | HALEU advanced fuel | MOX / closed-cycle fuel |
|---|---|---|---|
| Typical Italian-relevant designs | BWRX-300, Holtec SMR-300, AP300, Rolls-Royce SMR, NUWARD, NuScale | Xe-100, Natrium | newcleo LFR-AS-200; potentially other fast-reactor pathways |
| Typical enrichment | Generally ≤5% U-235 for current LWR designs | >5% and <20% U-235; Xe-100 ~15.5% | Mixed uranium/plutonium oxides rather than enrichment alone defining fuel complexity |
| Commercial enrichment chain | Established | Developing | Requires plutonium-bearing fuel-cycle infrastructure |
| Commercial fabrication | Established for conventional LWR fuel | Limited/developing specialised fabrication | Specialised MOX fabrication required |
| Existing Western operating experience | Very extensive | Limited advanced-reactor deployment experience | Existing MOX experience internationally, but Italian-linked fast-reactor implementation remains developmental |
| Italy domestic enrichment capability | None | None | Not applicable in same way, but Italy also lacks a commercial domestic MOX/reprocessing chain |
| Italy domestic commercial fuel fabrication | No complete power-reactor fuel chain | No | No current commercial fast-reactor MOX production chain |
| Security/safeguards complexity | Established LWR baseline | Higher due to enrichment level and new logistics | Higher due to plutonium-bearing material |
| Regulatory familiarity | Highest | Lower | Lower / reactor- and facility-specific |
| Transport infrastructure maturity | High | Developing specialised packages/routes | Specialised nuclear-material transport |
| Spent-fuel management experience | Extensive international LWR experience | Technology-specific | Reprocessing/recycling and residual-waste strategy integral to programme |
| Fuel as potential schedule blocker | Relatively lower | High | High |
| Principal sovereignty issue | Foreign conversion, enrichment, fabrication and vendor fuel design | Foreign/new enrichment and specialist fabrication | Reprocessing, plutonium ownership, fabrication, safeguards and final waste route |
| Near-term Italian deployment compatibility | Strongest fuel-cycle compatibility | Conditional on supply-chain maturation | Conditional on establishment of an integrated fuel-cycle strategy |
The underlying report correctly identifies conventional LEU as having mature enrichment and fabrication, HALEU as requiring new commercial capacity and specialised fabrication, and MOX as carrying reprocessing, safeguards and plutonium-management complexity.
The U.S. Department of Energy continues to state explicitly in 2026 that HALEU is not yet available from domestic commercial suppliers at the scale required and that supply gaps can delay advanced-reactor deployment.
Table 5.23-B — Fuel architecture by reactor design
| Reactor | Technology | Electrical scale | Fuel family | Commercial fuel maturity | Fuel-specific Italian issue |
|---|---|---|---|---|---|
| BWRX-300 | BWR | ~300–327 MWe | Conventional BWR LEU | High | Imported/vendor-controlled GNF2 supply chain, but no HALEU dependency |
| Holtec SMR-300 | PWR | ~320 MWe | UO₂ LEU ≤5% | High as fuel category | Conventional Western enrichment/fabrication dependence |
| AP300 | PWR | ~330 MWe | AP1000-derived conventional LWR fuel | High as fuel category | Foreign fuel/vendor dependence rather than new fuel technology |
| Rolls-Royce SMR | PWR | 470 MWe | UO₂, max ~4.95% U-235 | High | Conventional fuel chain; reactor scale above Italy’s common ~300 MWe political shorthand |
| NUWARD | PWR | Up to ~400 MWe | Conventional EDF/PWR fuel architecture | High baseline maturity | Strong European fuel-cycle compatibility; detailed final design still developing |
| NuScale US460 | Integral PWR | 77 MWe/module; ~462 MWe station | Conventional LWR fuel family | High as fuel category | Commercial project deployment rather than fuel is the larger unresolved issue |
| Xe-100 | HTGR | 80 MWe/module | TRISO using ~15.5% HALEU | Developing | HALEU enrichment + TRISO fabrication become critical-path infrastructure |
| Natrium | Sodium fast reactor | 345 MWe + storage | HALEU metallic fuel | Developing | Advanced fuel availability is a first-order schedule dependency |
| newcleo LFR-AS-200 | Lead fast reactor | 200 MWe | MOX | Developmental for this deployment chain | Requires MOX fabrication, safeguards, transport and recycling/reprocessing strategy |
| EAGLES-300 | Lead fast reactor | ~300 MWe | Advanced fast-reactor fuel pathway | Developmental | Fuel qualification is tied to demonstrator and reactor-development sequence |
| ACP100 | Integral PWR | ~125 MWe | Conventional LEU | Established fuel family | Chinese vendor/fuel dependency and European strategic compatibility |
| HTR-PM | HTGR | ~200 MWe system | TRISO | Operating Chinese reference | Chinese fuel/vendor ecosystem not readily transferable to Italy |
| KLT-40S / RITM family | Compact PWR | ~35–60 MWe/module class | Russian reactor fuel | Operational / deployment experience exists | Russian vendor/fuel dependence makes Italian procurement strategically problematic |
GE Vernova Hitachi states that the BWRX-300 uses the already commercial GNF2 fuel and does not require HALEU.
UK documentation confirms Holtec’s use of uranium-dioxide fuel enriched up to 5% and Rolls-Royce’s use of standard UO₂ fuel enriched to a maximum of 4.95%.
X-energy states that Xe-100 fuel uses HALEU enriched to approximately 15.5% U-235, with Centrus supplying enrichment services and TRISO-X performing fuel fabrication.
The NRC confirms that newcleo’s LFR-AS-200 is designed to use MOX fuel and that a separate MOX fuel-fabrication facility is itself in pre-application regulatory engagement.
FUEL SECURITY AND SOVEREIGNTY
Table 5.24-A — Fuel security risk chain
| Stage | Conventional LEU LWR | HALEU reactor | MOX/closed-cycle reactor |
|---|---|---|---|
| Uranium mining | Diversified global market possible | Same initial uranium requirement | May partly rely on recovered fissile material depending on strategy |
| Conversion | Mature but concentrated industrial market | Required before enrichment | Depends on chosen upstream/recycling architecture |
| Enrichment | Mature ≤5% market | Specialised >5% enrichment required | Not the sole defining fuel step |
| Deconversion | Mature | Additional HALEU-specific capability needed | Different process chain |
| Fuel fabrication | Mature PWR/BWR fabrication | Specialised TRISO or metallic fabrication | Specialised MOX fabrication |
| Security burden | Established | Higher | Higher |
| Safeguards burden | Established | Increased material-accounting/security requirements | Plutonium safeguards central |
| Transport | Mature | Additional packages/licensing | Specialised plutonium-bearing transport |
| Italian domestic availability | No complete domestic chain | None | None |
| Principal schedule exposure | International procurement | Supply-chain creation itself | Fuel-cycle facility development itself |
Government interpretation
LEU dependency is a procurement-security problem.
HALEU dependency can become a technology-deployment problem.
MOX dependency can become a separate national infrastructure programme.
This is why the uploaded report correctly states that a reactor can possess a completed design, licence, site and financing but still fail to operate if qualified fuel is unavailable.
| HALEU issue | Current evidence | Italian implication |
|---|---|---|
| Commercial availability | US DOE still identifies insufficient commercial supply | Do not treat fuel as an ordinary procurement commodity |
| Public intervention | US HALEU Availability Program actively allocates material | Advanced-reactor deployment remains partly dependent on state intervention |
| Enrichment | New capacity being financed/expanded | Long lead time |
| Deconversion | Separate specialised infrastructure needed | Additional supply-chain gate |
| Transport | Dedicated transport solutions under development | Licensing/logistics risk |
| Fabrication | Reactor-specific; e.g. TRISO-X for Xe-100 | Supplier concentration |
| Inventory strategy | Initial projects may rely on allocated material | Fleet replication harder than first demonstration |
| European situation | EU capability still needs development | Italian project cannot assume domestic/EU self-sufficiency |
US DOE states directly that HALEU is not currently available from domestic commercial suppliers at adequate scale and that this can delay advanced reactors.
Text schematic — HALEU dependency
URANIUM
│
▼
CONVERSION
│
▼
HALEU ENRICHMENT (>5%, <20%)
│
├── if capacity unavailable ─────────► PROJECT DELAY
│
▼
DECONVERSION
│
▼
SPECIALISED FUEL FABRICATION
(TRISO / metallic fuel / other)
│
├── qualification delay ─────────────► COMMISSIONING DELAY
│
▼
TRANSPORT + SAFEGUARDS
│
▼
FUEL LOAD
│
▼
FIRST CRITICALITY
KEY POINT:
A completed reactor does not become generating capacity until the entire fuel chain is complete.
MOX AND CLOSED-CYCLE IMPLICATIONS
Table 5.25-A — MOX sovereignty opportunity versus programme complexity
| Dimension | Potential strategic benefit | Additional requirement / exposure |
|---|---|---|
| Fissile-resource utilisation | Reuse of plutonium/recovered material | Reprocessing infrastructure or foreign service |
| Fuel sovereignty | Potentially greater long-term control | Italy currently lacks a commercial domestic MOX chain |
| Waste strategy | Can alter spent-fuel inventory and composition | Does not eliminate geological disposal |
| Fuel fabrication | High-value industrial capability | Separate nuclear facility and licence |
| Safeguards | Manageable under Euratom/IAEA | Substantially more demanding than standard LEU fuel |
| Security | Controlled plutonium-bearing material | Higher physical-protection requirements |
| Transport | Technically established internationally | Specialised routes, packages and authorisations |
| Cost | Potential lifecycle/resource advantages | Significant additional capital infrastructure |
| Schedule | Supports advanced-reactor strategy | Can become critical path to reactor deployment |
| Italian IP | High potential with LFR development | Requires long-duration R&D and licensing |
The report’s original section correctly identifies MOX as a different sovereignty proposition, not merely another fuel option.
Text schematic — MOX closes some loops but adds infrastructure
SPENT / RECOVERABLE MATERIAL
│
▼
REPROCESSING
│
┌────┴─────┐
│ │
▼ ▼
RECOVERED RESIDUAL
U/Pu WASTE
│ │
▼ └──────────────► CONDITIONING
MOX FABRICATION │
│ ▼
▼ GEOLOGICAL END-STATE
FAST REACTOR
│
▼
NEW SPENT FUEL
│
└────────► further recycle OR final disposal
IMPORTANT:
Closed cycle ≠ zero waste.
Closed cycle = more fuel-cycle infrastructure + different final waste.
LICENSING BURDEN
Table 5.26-A — Reactor physics familiarity versus Italian licensing burden
| Technology family | Italian historical experience | European regulatory experience | New Italian specialist capability required | Relative licensing novelty |
|---|---|---|---|---|
| PWR SMR | Strong historical/research familiarity | Very extensive | SMR-specific passive systems and design features | Lower |
| BWR SMR | Historic Italian BWR experience | Extensive | BWRX-specific safety architecture | Lower–moderate |
| HTGR | Limited Italian power-reactor experience | More limited | TRISO, graphite, helium, HTGR accident phenomenology | Higher |
| Sodium fast reactor | R&D knowledge, no commercial domestic operation | Specialist | Sodium chemistry, fast spectrum, metallic HALEU | High |
| Lead fast reactor | Strong Italian R&D positioning | Emerging | Lead chemistry, fast spectrum, materials, advanced fuel | High but with significant domestic knowledge base |
| Fusion | Strong Italian R&D/industrial involvement | R&D framework | Entirely different licensing/commercial framework | Not relevant to near-term fission licensing |
Nuclitalia explicitly began its evaluation with a focus on mature water-cooled SMRs, supporting the conclusion that technology familiarity is relevant to Italy’s near-term pathway.
The supplied report also distinguishes Italy’s existing LWR familiarity from the development requirements of lead-cooled systems.
TECHNOLOGY SOVEREIGNTY VERSUS DEPLOYMENT SPEED
Table 5.27-A — Strategic trade-off
| Pathway | Technology maturity | Fuel maturity | Italian IP position | Italian industrial participation | Likely regulator learning burden | Schedule character |
|---|---|---|---|---|---|---|
| Foreign Western LWR-SMR | Higher | Higher | Lower | Potentially high | Lower | Earlier |
| Franco-Italian NUWARD pathway | Medium / developing | High fuel-family maturity | Medium | High | Moderate | Mid-2030s ambition, not guaranteed |
| Italian-linked LFR | Lower commercial maturity | Developing | High | Very high | High | Later |
| HALEU HTGR | Medium regulatory momentum | Developing | Low currently | Low currently | High | Dependent on fuel-chain maturation |
| Natrium-type fast reactor | High project maturity for an AMR | Developing HALEU | Low Italian ownership | Limited direct link | High | Reference project ahead of Italy, but Italian adaptation complex |
Strategic interpretation
MORE DEPLOYMENT MATURITY
◄────────────────────────────────────────────►
Western LWR SMR Italian-led LFR
│ │
│ │
Lower Italian reactor IP Higher Italian reactor IP
Mature fuel chain More complex fuel chain
Lower licensing novelty Higher licensing novelty
Earlier possible FOAK Later credible commercial path
This is the core trade described in the source: Italian lead-reactor capability increases potential intellectual ownership but must not be confused with near-term schedule certainty.
HIGH-TEMPERATURE REACTORS
Table 5.28-A — HTGR value proposition for Italy
| Attribute | Xe-100 / HTGR implication |
|---|---|
| Electrical production | Modular electricity generation |
| Process temperature | Higher than standard LWR steam conditions |
| Industrial steam | Strong potential |
| Hydrogen | Potentially attractive |
| Refining / chemical heat | Stronger direct application than conventional LWR |
| Fuel | HALEU-based TRISO |
| Fuel-chain maturity | Developing |
| Coolant | Helium |
| Moderator/core material | Graphite |
| Waste | Includes graphite/TRISO-specific waste streams |
| Italian industrial integration | Currently limited compared with NUWARD/LFR |
| Best Italian use case | Industrial cluster where high-temperature heat has genuine contracted value |
| Principal programme risk | Fuel plus regulatory novelty |
X-energy’s current fuel agreement identifies approximately 15.5% HALEU as feedstock for TRISO-X and explicitly connects the Xe-100’s high temperatures with process-heat applications.
The original report correctly states that HTGRs should be assessed against their industrial-heat value rather than electricity €/MWh alone.
NATRIUM — GRID FLEXIBILITY
Table 5.29-A — Natrium system proposition
| Element | Conventional nuclear interpretation | Natrium-specific characteristic |
|---|---|---|
| Reactor thermal output | Continuous nuclear heat | Continuous sodium fast-reactor heat |
| Normal electrical output | Closely linked to reactor thermal output | ~345 MWe nuclear system |
| Energy storage | External battery/storage normally required | Integrated molten-salt thermal storage |
| Peak electrical output | Limited by reactor/turbine plant | Can raise output toward ~500 MWe for several hours |
| Solar-system interaction | Load following / external storage | Nuclear heat can remain steadier while electricity output shifts |
| Fuel | Conventional LEU possible in LWRs | HALEU metallic fuel |
| Main benefit | Firm generation | Firm generation + intraday power shifting |
| Main new risk | — | Sodium system + HALEU + thermal-storage integration |
The supplied text correctly identifies Natrium’s integrated storage as a genuinely different grid proposition, but also notes that it must be compared against batteries, pumped hydro and LWR load following rather than assumed to be the lowest-cost flexibility solution.
REGULATORY RELIANCE
Table 5.30-A — What a foreign licence can and cannot do for Italy
| Foreign regulatory evidence can potentially help Italy with | Foreign regulatory evidence cannot replace |
|---|---|
| Generic reactor design review | Italian legal authorisation |
| Safety analysis review | Italian site safety case |
| Component qualification | Site-specific seismic assessment |
| Accident methodology | Hydrology/flood analysis |
| Digital I&C evidence | Italian cyber/security approval |
| Manufacturing evidence | Italian inspection authority |
| Fuel qualification evidence | Italian/Euratom safeguards obligations |
| Source-term methods | Italian emergency-planning process |
| Codes and standards | Italian EIA/VIA |
| Operating-reference evidence | Italian operating licence |
Text schematic — correct “licence passport” interpretation
FOREIGN REFERENCE REGULATOR
│
│ safety/design evidence
▼
ITALIAN REGULATOR
│
├── REUSE where justified
├── VERIFY national differences
├── ADD site-specific review
└── RETAIN sovereign decision
│
▼
ITALIAN LICENSING DECISION
NOT:
FOREIGN LICENCE ─────────► AUTOMATIC ITALIAN LICENCE
The underlying section explicitly distinguishes regulatory reliance from an automatic licence passport.
The European Commission’s 2026 strategy supports joint early reviews and regulatory cooperation, but it does not create automatic mutual licensing.
FOREIGN FOAK OBSERVATORY
Table 5.31-A — What Italy should learn before committing
| Foreign programme | Technology | Evidence Italy should extract | Italian decision affected |
|---|---|---|---|
| Darlington | BWRX-300 | Real construction duration; actual cost; modular civil execution; operating-licence review; commissioning; availability | Water-cooled SMR maturity |
| Kemmerer | Natrium | Sodium-reactor construction; HALEU availability; thermal-storage integration; commissioning | Fast-reactor/HALEU feasibility |
| Long Mott | Xe-100 | NRC licensing; TRISO fuel factory; modular HTGR execution; industrial heat integration | HTGR viability |
| Palisades/Pioneer | Holtec SMR-300 | Construction permit; cost; PWR modularisation; first build performance | Holtec maturity |
| Wylfa | Rolls-Royce SMR | UK licensing; module factories; supply-chain serialisation; construction | European factory-production evidence |
| NUWARD lead programme | PWR SMR | Design stability; licensing milestones; European industrial participation | Franco-Italian pathway |
| LEANDREA / ALFRED | Lead fast reactor | Materials/fuel qualification; regulator learning; lead-system operation | EAGLES/newcleo strategic track |
The source text already identifies Darlington, Kemmerer, Long Mott, Palisades and Wylfa as Italy’s effective foreign test programme.
TWO-STAGE TECHNOLOGY SELECTION
Table 5.32-A — Gate 1: elimination screen
This gate answers:
Is the technology eligible for serious Italian procurement work at all?
| Gate 1 test | Required evidence | Failure consequence |
|---|---|---|
| Strategic compatibility | Vendor/jurisdiction compatible with Italian/EU security policy | Remove from near-term procurement |
| Reference regulator | Regulator accessible and review evidence available | Hold / remove |
| Fuel security | Commercial or credible contracted fuel pathway | Remove until solved |
| Site compatibility | Design envelope compatible with realistic Italian site family | Remove for that site |
| Cooling compatibility | Feasible water/dry/hybrid cooling configuration | Remove for affected site |
| Waste pathway | Waste/spent fuel technically manageable under Italian architecture | Hold / remove |
| Commercial credibility | Real project, regulator engagement and financing trajectory | Keep as R&D only if absent |
| Vendor disclosure | Sufficient design and lifecycle data | No Italian licensing |
| Security/cyber | Supportable long-term vendor model | Hold / reject |
| EU/Euratom compatibility | No fundamental legal/geopolitical incompatibility | Remove |
The original material identifies strategic compatibility, regulator reference, fuel security, site compatibility, commercial credibility and waste pathway as the first-stage tests.
Table 5.32-B — Gate 2: comparison of surviving technologies
This gate answers:
Which surviving system best fits the specific Italian programme being considered?
| Comparison dimension | Required unit |
|---|---|
| FOAK all-in capital requirement | €bn / defined scope |
| Overnight cost | €/kW |
| Financing requirement | Cost of capital / support mechanism |
| Construction evidence | Actual milestones completed |
| Commercial first-power evidence | Operating units / commissioning status |
| Italian qualified industrial content | % of defined procurement value |
| Italian strategic content | Reactor/fuel/IP/system ownership |
| Grid flexibility | Ramp/load follow/storage capability |
| Water withdrawal | m³/MWh |
| Water consumption | m³/MWh |
| Process heat | MWth + temperature |
| Fuel dependency | Supplier count / jurisdictions |
| Waste | kg or m³/TWh by class |
| Spent fuel | mass/TWh + heat characteristics |
| Operator-training burden | Years / specialist disciplines |
| Regulatory review burden | Reference evidence available |
| Earliest credible Italian operation | Scenario band, not vendor promise |
The original report correctly identifies cost, construction evidence, Italian content, grid flexibility, water, industrial heat, fuel-cycle dependence, waste and schedule as Gate 2 criteria.
READINESS SCREEN
Table 5.33-A — Italian technology-monitoring portfolio
| Portfolio | Designs | What the category means |
|---|---|---|
| Near-term full due-diligence candidates | BWRX-300; Holtec SMR-300; Rolls-Royce SMR if output acceptable; NuScale if credible FOAK re-emerges | Sufficient maturity to justify detailed Italian technical/economic review |
| Strategically important — further maturity required | AP300; NUWARD; Xe-100 | Serious technologies, but further licensing/deployment evidence needed before irreversible commitment |
| Advanced-reactor strategic track | newcleo LFR-AS-200; EAGLES-300; Natrium | Important strategic technologies; Italian deployment entails materially greater technology/fuel/licensing novelty |
| International reference / benchmark | ACP100; HTR-PM; KLT-40S/RITM | Valuable operating/construction evidence but weak fit with present Italian strategic procurement conditions |
This classification follows the supplied report’s own readiness logic.
Important: Natrium’s placement in the advanced track does not imply low construction maturity; it reflects the larger Italian technology and fuel-system transition required. The supplied text makes this distinction explicitly.
MULTI-OBJECTIVE COMPARISON
Table 5.34-A — Why maturity alone cannot decide Italy’s technology choice
| Design / family | Construction evidence | Italian industrial integration | Fuel simplicity | Italian technology ownership | Principal unresolved issue |
|---|---|---|---|---|---|
| BWRX-300 | Strongest Western SMR construction evidence | Medium / requires vendor localisation agreement | High | Low–medium | Commercial/FOAK cost and localisation terms |
| Holtec SMR-300 | Developing | Medium | High | Low | First commercial construction |
| AP300 | No AP300 FOAK yet | Medium-high because of Westinghouse Electric Italy | High | Low | Specific AP300 licensing/construction evidence |
| NUWARD | No FOAK yet | Very high | High | Medium through European partnership | Design/licensing maturity |
| Xe-100 | Advanced regulatory programme | Low currently | Low due to HALEU/TRISO | Low | Fuel supply + first construction |
| Natrium | Actual construction | Low Italian-specific link | Low due to HALEU | Low | HALEU + sodium/advanced licensing |
| newcleo LFR | Pre-commercial | Very high | Complex MOX | High | Fuel-cycle and demonstrator sequence |
| EAGLES-300 | Pre-commercial | Maximum Italian institutional participation | Advanced fuel pathway | High | Demonstrators + licensing precedent |
Strategic interpretation
ITALIAN INDUSTRIAL / TECHNOLOGY CONTROL
HIGH
▲
│
EAGLES / newcleo│
│
NUWARD │
│
LOW DEPLOYMENT ────────────────────┼──────────────── HIGH DEPLOYMENT
MATURITY │ MATURITY
│ BWRX-300
│
│ Natrium*
│
▼
LOW
ITALIAN TECHNOLOGY CONTROL
* Natrium has strong construction maturity,
but weak Italian ownership and high fuel/licensing novelty.
This text schematic is intentionally qualitative and should not be converted into numeric coordinates without a separate scoring methodology.
The source material itself states that BWRX maturity does not automatically dominate local content, financing, cogeneration, waste or industrial control, and contrasts it with NUWARD and EAGLES.
DESIGN-SPECIFIC “DO NOT OVERSTATE” TABLE
Table 5.34-B — Statements that government documents should avoid
| Design | Incorrect / overstated formulation | Defensible formulation |
|---|---|---|
| BWRX-300 | “Italy should choose BWRX because it is the most mature.” | BWRX currently has the strongest Western SMR construction evidence, but technology choice also depends on industrial, economic, site and fuel criteria. |
| NUWARD | “NUWARD will operate in Italy in 2035.” | The Franco-Italian industrial programme has an objective of first plants around 2035; no Italian licensed construction schedule exists. |
| newcleo | “newcleo is an available Italian reactor.” | newcleo has substantial Italian R&D and industrial integration but no operating LFR-AS-200, construction licence or operational supporting commercial MOX chain. |
| EAGLES | “EAGLES is ready because Ansaldo/ENEA are Italian.” | Italian participation is strong, while the commercial technology remains dependent on demonstrator and licensing milestones. |
| Natrium | “Natrium is commercially mature because construction has started.” | Natrium has crossed into construction, but first operation, HALEU supply and serial performance remain unproven. |
| Xe-100 | “Xe-100 fuel is commercially routine.” | Xe-100 requires ~15.5% HALEU and specialised TRISO fabrication, both of which are still being industrialised. |
| Fusion | “Fusion can replace the SMR decision.” | Fusion is an important parallel Italian R&D/industrial track but cannot presently substitute for a mid-2030s fission deployment strategy. |
The supplied source explicitly warns against treating NUWARD’s 2035 ambition as a licensed Italian schedule and against describing newcleo as available today.
EU INDUSTRIAL CONTEXT
Table 5.38-A — EU 2026 SMR strategy and Italian implications
| EU action | Why the EU is doing it | Italian implication |
|---|---|---|
| Fleet deployment | Individual national one-offs weaken economics | Italy should favour designs with credible multi-country order books |
| Regulatory cooperation | Repeated national reviews increase delay | ISIN should reuse foreign assessments where justified |
| European supply-chain localisation | Avoid excessive foreign dependence | Use Italy’s heavy nuclear manufacturing base |
| Fuel-cycle resilience | Fuel can become critical-path dependency | Fuel security must be scored at procurement stage |
| Standardisation | Necessary for modular/factory economics | Avoid excessive Italian design modifications |
| SMR Valleys | Concentrate industry and skills | Potential opportunity for Italian manufacturing clusters |
| Strategic autonomy | Avoid replacing Russian gas dependence with new technology dependency | Contract IP, software, fuel and maintenance access |
| European IP protection | Preserve value generated inside Europe | Particularly relevant to EAGLES/NUWARD and Italian suppliers |
| Regulatory sandboxes / joint reviews | Accelerate early learning | Italy can reduce country-FOAK regulatory burden |
The Commission’s March 2026 strategy explicitly calls for fleet-based deployment, regulatory cooperation, European supply chains, fuel-cycle services, manufacturing clusters, IP protection and avoidance of new strategic dependencies.
The underlying report already identifies these exact elements and notes possible EU SMR deployment of 17–53 GW by 2050.
IMPORTED TECHNOLOGY DEPENDENCE
Table 5.39-A — What Italy must negotiate beyond reactor price
| Contract area | Risk if omitted | Required Italian protection |
|---|---|---|
| Reactor IP | Permanent inability to make modifications independently | Defined licence and engineering access |
| Manufacturing localisation | Domestic industry limited to low-value work | Component-by-component localisation plan |
| Fuel | Single-source dependency | Long-term diversified supply strategy |
| Spare parts | Vendor monopoly | Strategic spares and alternative qualification |
| Software | Long-duration digital lock-in | Lifecycle support, patching and access provisions |
| Cyber support | Foreign dependency in critical systems | Controlled remote access and sovereign oversight |
| Maintenance | Vendor dependency | Italian workforce transfer and certification |
| Engineering changes | Cost/schedule exposure | Defined change-control rights |
| Decommissioning data | Future lifecycle dependency | Full technical records and configuration data |
| Training | Permanent foreign operator reliance | Structured knowledge transfer |
| Export rights | Limits Italian supply-chain growth | Defined European/global manufacturing rights |
Core procurement principle
DO NOT NEGOTIATE ONLY:
REACTOR PRICE
│
▼
€ / PROJECT
NEGOTIATE THE FULL LIFECYCLE:
DESIGN/IP
│
LICENSING DATA
│
LOCALISATION
│
FUEL
│
SOFTWARE / CYBER
│
SPARES
│
MAINTENANCE
│
TRAINING
│
WASTE / DECOMMISSIONING DATA
│
▼
60–80 YEAR SOVEREIGN DEPENDENCY PROFILE
The uploaded source explicitly identifies localisation, IP access, maintenance rights, spare parts, fuel, software, cyber and European manufacturing as the strategic issues that must accompany reactor-price negotiations.
MASTER DECISION SCHEMATIC — ITALIAN TECHNOLOGY DOWN-SELECT
This is the text diagram I would recommend converting later into a government infographic.
┌───────────────────────────────────────────────────────────────┐
│ GLOBAL REACTOR UNIVERSE │
└──────────────────────────────┬────────────────────────────────┘
│
▼
┌─────────────────────────┐
│ GATE 1 — ELIGIBILITY │
└─────────────────────────┘
│
┌───────────────────┼────────────────────┐
│ │ │
▼ ▼ ▼
FUEL SECURE? REFERENCE STRATEGICALLY
REGULATOR? COMPATIBLE?
│ │ │
└───────────────────┼────────────────────┘
│
▼
SITE COMPATIBLE?
│
▼
WASTE PATHWAY?
│
▼
COMMERCIAL DEPLOYMENT CREDIBLE?
│
▼
┌──────────────────────────────┐
│ SURVIVING TECHNOLOGIES │
└──────────────┬───────────────┘
│
▼
┌─────────────────────────┐
│ GATE 2 — COMPARISON │
└─────────────────────────┘
│
┌─────────────┬──────────┼───────────┬─────────────┐
▼ ▼ ▼ ▼ ▼
FOAK COST CONSTRUCTION ITALIAN FUEL / SITE /
EVIDENCE CONTENT WASTE WATER
│ │ │ │ │
└─────────────┴──────────┼───────────┴─────────────┘
│
▼
GRID FLEXIBILITY
│
▼
INDUSTRIAL HEAT
│
▼
LICENSING BURDEN
│
▼
SCHEDULE
│
▼
┌────────────────────────────────┐
│ ITALIAN LEAD DESIGN + BACKUP │
└────────────────────────────────┘
MASTER FUEL DECISION SCHEMATIC
REACTOR SHORTLIST
│
┌────────────────────┼──────────────────────┐
│ │ │
▼ ▼ ▼
CONVENTIONAL HALEU MOX /
LEU CLOSED CYCLE
│ │ │
▼ ▼ ▼
Mature Western fuel New enrichment + Reprocessing /
infrastructure fabrication chain recycling chain
│ │ │
▼ ▼ ▼
Lower near-term fuel Higher deployment Higher institutional
technology novelty risk complexity
│ │ │
▼ ▼ ▼
PWR/BWR SMR pathway Xe-100 / Natrium newcleo / fast-reactor
│ │ sovereignty pathway
└────────────────────┼──────────────────────┘
│
▼
ITALIAN STRATEGIC CHOICE
│
┌───────────────────────┼────────────────────────┐
▼ ▼ ▼
EARLIER FOAK ADVANCED TECHNOLOGY GREATER ITALIAN
COMPATIBILITY CAPABILITY FUEL-CYCLE ROLE
MASTER GOVERNMENT PROCUREMENT TABLE
Table 5.39-B — Evidence required before irreversible Italian commitment
| Decision item | Minimum acceptable evidence | If absent |
|---|---|---|
| Reactor design | Stable reference baseline | Remain in technology-monitoring phase |
| Foreign regulation | Substantive safety-review evidence | Do not begin full Italian licensing |
| Reference project | Construction or credible near-construction programme | Apply higher FOAK contingency |
| Fuel | Contractible complete fuel chain | No irreversible project commitment |
| HALEU | Enrichment + deconversion + fabrication path | Hold advanced-reactor deployment |
| MOX | Reprocessing/material source + fabrication + safeguards route | Treat fuel cycle as separate megaproject |
| Italian site | Survives seismic, water, grid, environmental screen | No project |
| Waste | Quantified lifecycle disposition path | No final investment decision |
| Industrial content | Named, qualified work packages | Do not publish unsupported localisation percentages |
| Regulator | Staffing and reference-review access | Do not accept full licensing programme |
| Finance | Bankable risk allocation | No FID |
| Vendor IP | Contracted lifecycle access | Reassess strategic dependency |
| Cyber/software | Long-term support and controlled access | No final digital architecture approval |
| Operator | Training/reference programme | No commissioning/fuel-load path |
| Foreign FOAK evidence | Current monitored dataset | Re-baseline as evidence changes |
Final analytical synthesis
The technology problem can be compressed into one government decision chain:
FUEL
↓
determines part of the
↓
SUPPLY-CHAIN DEPENDENCE
↓
which affects
↓
LICENSING + SECURITY + WASTE COMPLEXITY
↓
which affects
↓
DEPLOYMENT DATE + FINANCING RISK
↓
which must be balanced against
↓
ITALIAN INDUSTRIAL / TECHNOLOGY SOVEREIGNTY
For Italy, the major strategic families therefore remain:
| Strategic family | Principal benefit | Principal cost |
|---|---|---|
| Conventional Western LWR-SMR | Earlier deployment compatibility and mature fuel infrastructure | Greater foreign reactor/fuel/IP dependence |
| HALEU advanced reactor | Advanced performance / industrial heat / flexibility potential | Fuel chain remains an explicit strategic bottleneck |
| Italian-linked lead fast reactor | Greater Italian technology ownership | Later schedule, demonstrators and complex fuel-cycle development |
| Foreign non-Western reference reactors | Useful operating evidence | Limited present procurement compatibility because of strategic/vendor dependence |
| Fusion | High long-term Italian scientific/industrial value | Not a substitute for 2030s fission procurement |
The central government conclusion should therefore be expressed as:
Fuel is not an auxiliary procurement item. It is one of the principal determinants of reactor deployability, strategic autonomy, regulatory burden, waste architecture and commercial schedule.
That is why the Italian down-select should begin by asking:
“What complete reactor-and-fuel system is Italy prepared to depend on for the next 60–80 years?”
rather than:
“Which reactor has the most attractive nameplate output?”
5.40 The first-unit date should be expressed as confidence bands, not vendor promises
| Design | Public first-unit target/reference | Report confidence |
|---|---|---|
| ACP100 | 2026 target; pre-commissioning at cut-off | HIGH that project is late-stage; commercial date not yet confirmed |
| BWRX-300 | Darlington end-2030 | MEDIUM-HIGH |
| Holtec SMR-300 | early 2030s | MEDIUM-LOW |
| Xe-100 | US demonstration late-2020s/early-2030s programme | MEDIUM-LOW |
| Natrium | current construction; operation subject to future licence/fuel | MEDIUM |
| Rolls-Royce | 2030s Wylfa | MEDIUM |
| NUWARD | 2030s / industrial 2035 objective | LOW-MEDIUM |
| AP300 | early/mid-2030s vendor ambition | LOW-MEDIUM |
| newcleo LFR-AS-200 | early 2030s vendor ambition | LOW |
| EAGLES-300 | 2039 commercial target | MEDIUM-LOW |
| NuScale US460 | no current reference construction date | LOW for schedule |
These confidence terms are analytical, not predictions.
5.41 Italian industrial-content matrix
| Design | Immediate Italian industrial linkage | Potential local-content depth |
|---|---|---|
| NUWARD | Very high — explicit 2026 Italian consortium | High |
| EAGLES-300 | Very high — Ansaldo + ENEA core partners | Very high if programme succeeds |
| newcleo LFR-AS-200 | Very high Italian R&D/engineering | High but technology-dependent |
| AP300 | Westinghouse Electric Italy asset | Medium-high |
| BWRX-300 | No dedicated Italian agreement identified | Medium-high technically |
| Holtec SMR-300 | No major formal Italian programme identified | Medium |
| Rolls-Royce SMR | European supply-chain opportunity | Medium |
| NuScale | Historical Ansaldo technical work | Medium |
| Xe-100 | Minimal current Italian link | Low-medium |
| Natrium | Minimal current Italian reactor-programme link | Low-medium |
Potential local content does not equal current contractual content.
5.42 Fuel-security matrix
| Design | Fuel category | Italian/EU supply risk |
|---|---|---|
| BWRX-300 | Conventional LEU BWR fuel | Low-medium |
| Holtec SMR-300 | Conventional LEU PWR | Low-medium |
| AP300 | Conventional LEU PWR | Low-medium |
| Rolls-Royce | Conventional LEU PWR | Low-medium |
| NUWARD | Conventional EDF-compatible PWR fuel | Low-medium |
| NuScale | Conventional LEU | Low-medium |
| Xe-100 | HALEU TRISO | High |
| Natrium | HALEU metal | High |
| newcleo | MOX fast-reactor fuel | High / infrastructure-dependent |
| EAGLES | Advanced fast-reactor fuel | High until qualification chain established |
“Low-medium” does not mean fuel sovereignty.
Italy has no domestic complete commercial fuel chain.
It means the international Western supply chain already exists at commercial scale.
5.43 Waste consequences cannot be reduced to “SMRs produce less waste”
Smaller reactors generally produce less total waste per unit because they produce less electricity.
That does not demonstrate lower waste per MWh.
Advanced reactors can create different:
- spent-fuel composition;
- activation products;
- graphite waste;
- metallic/sodium-contaminated waste;
- lead-management issues.
Therefore waste comparison must be technology-specific.
Chapter 6 performs that analysis.
5.44 Cooling and site implications differ materially
LWR-SMRs
Require substantial low-temperature heat rejection.
Relevant to:
- Trino;
- Caorso;
- coastal brownfields.
HTGR
Higher-temperature operation can improve industrial-heat utilisation but still requires ultimate heat rejection.
Sodium fast reactor
Natrium separates reactor and power cycle through intermediate systems and storage.
Lead fast reactor
High boiling temperature and low primary pressure simplify some accident phenomena but introduce heavy liquid-metal materials/chemistry issues.
Technology selection therefore changes the Chapter 3 site ranking.
The site and reactor should be selected iteratively.
5.45 Operator-training implications
A BWRX-300 requires Italy to rebuild BWR competence.
A Holtec/AP300/NUWARD/Rolls-Royce/NuScale selection requires PWR competence.
An LFR requires a largely new operational culture around:
- liquid metal;
- chemistry;
- heat-transfer systems;
- fast-neutron physics.
An HTGR requires:
- TRISO;
- helium systems;
- graphite-core expertise.
This should enter the technology score because operator training begins years before commissioning.
5.46 Vendor lock-in must be scored explicitly
A reactor programme creates decades of dependency on:
- fuel;
- proprietary engineering;
- software;
- replacement components;
- licence-holder knowledge;
- maintenance.
The cheapest FOAK vendor can therefore become the most expensive lifecycle relationship.
The national tender should require disclosure of:
- IP access;
- digital source-code rights;
- localisation rights;
- spare-part rights;
- fuel-supplier alternatives;
- long-term technical-support terms.
5.47 A credible Italian down-select should not contain twenty technologies
A sovereign technology screen can be broad.
A procurement process cannot.
By the time the first Italian FOAK enters formal pre-licensing, Italy should have reduced the field to approximately:
- 2–3 near-term water-cooled designs;
- 1 advanced-reactor strategic track.
Anything larger would disperse:
- regulator resources;
- engineering;
- site studies;
- vendor negotiations;
- industrial qualification.
5.48 Near-term LWR shortlist structure — not a ranking
The plausible water-cooled families for full Italian due diligence are:
BWR route
BWRX-300
Key advantage: construction evidence.
US PWR route
Holtec SMR-300 / AP300 / NuScale
Different balances between regulatory maturity and project maturity.
European PWR route
NUWARD / Rolls-Royce SMR
Different balances between Italian industrial integration and design maturity.
The State should not pick a winner before receiving comparable:
- design;
- CAPEX;
- fuel;
- localisation;
- waste;
- schedule evidence.
5.49 Advanced-reactor track
Italy has three advanced technology families worth maintaining in active analysis:
Lead fast
- newcleo;
- EAGLES.
Sodium fast
- Natrium as international benchmark.
HTGR
- Xe-100 as industrial-heat benchmark.
This captures most of the strategic learning without attempting to license every global concept.
5.50 Procurement kill-switches
A design should not proceed to Italian FOAK commitment if any of the following remain unresolved:
- no credible reference regulator;
- no fuel-supply path;
- no spent-fuel/waste route;
- no financing model;
- vendor refuses meaningful European/Italian localisation;
- no site can meet cooling/hazard requirements;
- safety design changes remain too extensive;
- FOAK reference slips materially without explanation;
- regulator cannot staff the design review;
- operator training cannot meet commissioning schedule.
These criteria are more useful than marketing labels such as “Gen III+” or “Gen IV.”
5.51 Implication for the 2034–2036 earliest Italian scenario
For Italy to produce first fission electricity by 2034–36, several things must simultaneously occur.
The design would need to be:
- essentially mature by 2027–28;
- reference-licensed abroad;
- supported by an active FOAK;
- conventional enough for accelerated Italian regulatory reliance;
- fuel-secure;
- selected early.
This is difficult to reconcile with a reactor that has not yet reached substantive licensing.
Therefore the earliest schedule structurally favours:
a mature Western LWR-SMR reference design.
It does not structurally favour a Gen-IV first-of-a-kind.
That is a schedule conclusion, not a technology recommendation.
5.52 Implication for the 2037–2040 central scenario
A 2037–40 central programme provides more room for:
- BWRX construction learning;
- Holtec development;
- AP300 certification;
- NUWARD design maturity;
- Wylfa progress;
- Xe-100 construction experience.
It may also allow limited advanced-reactor demonstrations to inform a second-wave decision.
This is why the Chapter 9 central programme band is materially more credible than assuming 2033–34.
5.53 Implication beyond 2040
After 2040, the technology landscape could be substantially different.
By then Italy may have evidence from:
- multiple BWRX units;
- Wylfa;
- Holtec;
- Natrium;
- Xe-100;
- LEANDREA;
- ALFRED;
- possibly EAGLES/newcleo.
At that point, the strategic case for advanced reactors could be much stronger than it is today.
The mistake would be to force a 2040 technology thesis into a 2027 procurement decision.
5.54 Overall technology assessment
The global SMR sector has entered a new phase.
It is no longer accurate to say that all SMRs are paper reactors.
It is equally inaccurate to say that SMR technology has already demonstrated mass-produced, low-cost fleet economics.
As of 26 September 2026:
- Russia has commercial floating SMR operation;
- China has commercial HTR-PM operation and ACP100 approaching operation;
- Canada is physically constructing BWRX-300;
- the United States is constructing Natrium and reviewing Xe-100/Holtec deployment projects;
- the UK has committed to Rolls-Royce SMRs at Wylfa;
- France has redesigned NUWARD around more mature PWR building blocks;
- Italy is deeply embedded in two lead-reactor programmes but neither is commercially deployable today.
The practical Italian choice is therefore not between “old nuclear” and “new nuclear.”
It is between different quantities of technological novelty.
Lowest novelty
Conventional LEU water-cooled SMRs:
- BWRX-300;
- Holtec SMR-300;
- AP300;
- NUWARD;
- Rolls-Royce;
- NuScale.
Intermediate novelty
High-temperature gas:
- Xe-100.
High novelty
Fast reactors:
- Natrium;
- newcleo;
- EAGLES.
Higher novelty may provide:
- higher temperatures;
- improved fuel utilisation;
- different waste strategies;
- greater technological sovereignty.
It also produces:
- harder licensing;
- harder fuel supply;
- lower operating evidence;
- greater FOAK risk.
The most important conclusion is therefore methodological:
Italy should not select a reactor on nameplate capacity or generation label. It should select a complete nuclear system consisting of reactor + fuel + regulator reference + supply chain + waste route + site + operator + financing.
A 300 MWe reactor without secure fuel is not a viable technology.
A 200 MWe Italian-led advanced reactor without an operating demonstrator is not equivalent to a 300 MWe Canadian FOAK already under construction.
A 470 MWe reactor does not become unsuitable merely because political speeches use the number “300 MW.”
And a design approval does not equal a completed power station.
For the first Italian programme, technology maturity should be measured by the weakest part of the deployment chain, not the strongest vendor claim.
CHAPTER 5 — LOAD-BEARING SOURCE REGISTER
Global operating and deployment status
I1 — IAEA, 2025 report to the General Conference. Akademik Lomonosov commercial since 2020; HTR-PM commercial since December 2023; global SMR development status.
IAEA — Nuclear technology and SMR deployment status
I2 — IAEA SMR Platform. Operating designs and SMR operations.
IAEA — SMR Platform Booklet
I3 — IAEA Advanced Reactor Information System. Global SMR design and deployment database.
IAEA — ARIS
BWRX-300
I4 — Ontario Power Generation — Darlington SMR project. Construction status, Licence to Construct and 2026 operating-licence application.
OPG — Darlington Small Modular Reactor
I5 — CNSC — Darlington New Nuclear Project licence-to-operate protocol. 327 MWe regulatory project value; construction licence issued April 2025.
CNSC — Darlington BWRX-300 licensing
I6 — GE Vernova Hitachi — BWRX-300 technology description. 300 MWe, 870 MWth, natural circulation, GNF2 fuel.
GE Vernova Hitachi — BWRX-300 technology
I7 — GE Vernova Hitachi — BWRX-300 fuel and proven-technology strategy.
GE Vernova — BWRX-300 proven technology
I8 — US NRC — BWRX-300 pre-application record.
US NRC — BWRX-300
Holtec SMR-300
G1 — UK regulators, March 2026 — Holtec SMR-300 GDA Step 2.
UK Government — Holtec SMR-300 GDA Step 2
G2 — UK regulators — Holtec SMR-300 detailed assessment. Includes PWR architecture and uranium enrichment up to 5%.
UK Government — Holtec SMR-300 Fundamental Assessment
I9 — US NRC — Pioneer Units 1 and 2 application.
US NRC — Palisades SMR-300 Pioneer Units
I10 — Holtec, March 2026 — Palisades SMR deployment programme.
Holtec — Pioneer 1 and 2 development
Westinghouse AP300
I11 — US NRC — AP300 pre-application programme.
US NRC — Westinghouse AP300
I12 — Westinghouse — AP300 product documentation.
Westinghouse — AP300 SMR
NUWARD
I13 — EDF 2025 Facts & Figures, published April 2026. Redesigned NUWARD PWR, up to 400 MWe, conceptual-design and commercialisation schedule.
EDF — 2025 Facts & Figures / NUWARD
I14 — EDF Universal Registration Document 2025. NUWARD redesign based on proven technological building blocks.
EDF — Universal Registration Document 2025
I15 — Edison, 25 June 2026. EDF/NUWARD/Edison/Italian nuclear industry declaration of intent.
Edison — European SMR development agreement
Rolls-Royce SMR
G3 — UK Government — Rolls-Royce SMR GDA status. 470 MWe PWR; GDA Step 3.
UK Government — New reactor design assessments
G4 — UK nuclear-justification application — Rolls-Royce SMR fuel. UO₂, maximum enrichment 4.95%.
UK Government — Rolls-Royce SMR application
I16 — Rolls-Royce SMR, 13 April 2026 — Wylfa contract.
Rolls-Royce SMR — Three-unit Wylfa programme
I17 — Rolls-Royce SMR, 27 May 2026 — nuclear-island supply chain.
Rolls-Royce SMR — Nuclear-island supplier agreements
NuScale
I18 — US NRC — US460 Standard Design Approval. Six 77 MWe modules, 462 MWe total.
US NRC — NuScale US460
I19 — US NRC, 29 May 2025 — US460 approval announcement.
US NRC — NuScale US460 design approval
I20 — US NRC — terminated Carbon Free Power Project.
US NRC — CFPP termination
Xe-100
I21 — US NRC — Long Mott Xe-100 construction-permit review.
US NRC — Long Mott Xe-100
I22 — US NRC — September 2026 mandatory hearing.
US NRC — Long Mott mandatory hearing
I23 — X-energy/Centrus, 6 August 2026 — HALEU supply agreement. Xe-100 fuel enrichment approximately 15.5%.
X-energy — HALEU fuel agreement
Natrium
I24 — US NRC, March 2026 — Natrium construction permit.
US NRC — Natrium construction approval
I25 — US NRC — Natrium design and fuel. 345 MWe sodium fast reactor using HALEU metal fuel.
US NRC — Natrium reactor
I26 — TerraPower, April 2026 — start of nuclear construction.
TerraPower — Kemmerer construction begins
G5 — UK regulators, June 2026 — Natrium enters GDA.
UK Government — Natrium Generic Design Assessment
newcleo and EAGLES
I27 — US NRC — newcleo LFR-AS-200. 480 MWth, 200 MWe, lead-cooled fast reactor, MOX fuel.
US NRC — newcleo LFR-AS-200
I28 — US NRC — newcleo MOX fuel-fabrication pre-application.
US NRC — newcleo MOX facility regulatory engagement
G6 — ENEA, 19 February 2026 — EAGLES/newcleo LEANDREA programme.
ENEA — EAGLES and newcleo cooperation
I29 — Ansaldo Nucleare — EAGLES-300 commercial roadmap. 300 MWe lead-cooled fast reactor, commercial target 2039.
Ansaldo Energia — EAGLES-300 roadmap
I30 — Ansaldo Nucleare/IAEA NHSI — EAGLES international pre-licensing.
Ansaldo Energia — EAGLES international pre-licensing project
China, Korea, Russia and Argentina
I31 — IAEA / CNNC material — ACP100/Linglong One. Construction and commissioning programme.
IAEA — ACP100 project material
S1 — World Nuclear News, September 2026 — ACP100 pre-commissioning status.
World Nuclear News — Changjiang and Linglong One update
I32 — IAEA — HTR-PM commercial-operation evidence.
IAEA — HTR-PM development
I33 — KAERI — SMART100. 110 MWe upgraded Korean integral PWR.
KAERI — SMART100
I34 — IAEA — Russian KLT-40S/RITM SMR programme.
IAEA — Marine-based SMRs
G7 — Argentina Nuclear Regulatory Authority / National Safety Report 2025. CAREM25 prototype under construction.
Argentina — National Nuclear Safety Report
European policy
G8 — European Commission, 10 March 2026 — EU SMR Strategy. First European projects targeted for early 2030s; fleet deployment, supply-chain localisation, regulatory cooperation and strategic autonomy.
European Commission — EU SMR Strategy
G9 — European Commission — Small Modular Reactors policy portal.
European Commission — Small Modular Reactors
G10 — European Commission, COM(2026)117. Detailed SMR/AMR strategy, including non-EU technology, European supply chain and regulatory cooperation.
European Commission — Future development and deployment of SMRs in Europe
END OF CHAPTER 5
CHAPTER 6 — FUEL CYCLE, RADIOACTIVE WASTE, AND THE MISSING NATIONAL REPOSITORY
6.1 Executive finding
Radioactive waste is not a secondary issue to be addressed after Italy chooses a reactor. It is one of the principal programme-enabling conditions for any credible return to nuclear generation.
Italy enters the prospective new-build programme carrying three different liabilities:
- the radioactive waste, spent fuel and nuclear materials inherited from the previous Italian nuclear programme;
- conditioned residues that must return from foreign reprocessing in France and the United Kingdom;
- the future spent fuel, operational waste and decommissioning waste that would be generated by a new fleet.
The country still has no operating National Repository. The proposed repository is a surface facility intended principally for definitive disposal of very-low- and low-level waste and for temporary, not final, storage of higher-activity material. Sogin’s current design envelope is approximately 98,000 m³: around 84,000 m³ of VLLW/LLW for final disposal and around 14,000 m³ of intermediate- and high-level waste for temporary storage. Approximately 60% of the anticipated inventory comes from nuclear operation and decommissioning and 40% from medicine, industry and research.
That repository does not solve the entire Italian back end.
High-level waste, long-lived intermediate-level waste and spent fuel requiring direct disposal need an eventual deep geological disposal route. The IAEA’s ARTEMIS review records that Italy’s 2019 National Programme did not contain a developed geological-disposal plan. A draft 2023 update introduces a dual strategy — maintaining both a possible national repository solution and a possible regional/international solution — but had not been formally approved when reviewed. The ARTEMIS team explicitly recommended that both paths continue in parallel until Italy makes a decision.
Consequently, the central back-end deficiency is not simply:
“Italy has not yet built the National Repository.”
It is broader:
Italy has not yet implemented the surface repository, has not yet returned all foreign reprocessing residues, has not completed legacy decommissioning, and has not established a final geological disposal solution for its long-lived high-activity material.
That distinction matters directly to new build.
Italy historically generated approximately 1,864 tonnes of irradiated fuel from Caorso, Garigliano, Latina and Trino, measured by heavy-metal mass before irradiation. Approximately 99% has been transferred abroad for reprocessing. Around 913 tonnes were handled under earlier ENEL-era contracts; roughly 951 tonnes fall under later arrangements involving France’s ORANO and the United Kingdom’s NDA. About 938 tonnes of the latter amount had already been transferred through 125 shipments, while approximately 13 tonnes associated with the Trino/Garigliano programme remained to be removed from Italy.
Sending fuel abroad did not export Italy’s ultimate liability.
The reprocessing contracts require conditioned residues to return.
France currently holds approximately:
- 15.4 m³ of vitrified high-level residues;
- 47.6 m³ of compacted metallic residues.
In the United Kingdom, a substitution agreement concluded in 2017 replaced larger volumes of low- and intermediate-level reprocessing waste with a smaller radiologically equivalent amount of vitrified high-level waste; the estimated UK inventory is now approximately 20 m³.
These obligations are not theoretical. On 24 September 2026, two days before this report’s cut-off, Sogin awarded Germany’s GNS a contract worth approximately €32 million for five CASTOR HAW28M casks specifically for the return programme for reprocessing residues from La Hague and Sellafield. Each cask is approximately five metres high, 2.5 metres in diameter and weighs about 115 tonnes.
The fiscal exposure is also substantial. An official answer to the Chamber of Deputies on 12 February 2025 reported that Sogin had spent €1.3942 billion since 1999 on reprocessing, transport, management and storage of fuel in France and the United Kingdom. Current foreign management and storage contracts were stated to cost around €5 million per year. The same parliamentary answer clarified that a separate €235.5 million figure appearing in a Court of Auditors table represented future contractual commitments rather than an annual expenditure figure.
For new build, the financial principle is different from the current legacy regime. Since 2023, costs of the historic Italian nuclear programme are funded through the State Budget rather than directly through electricity-user charges, while ARERA continues to determine allowable nuclear costs using economic-efficiency criteria.
The 2026 nuclear delegation instead requires the future framework to impose adequate financial guarantees at the expense of the authorised operator, including potentially one or more dedicated funds covering the lifecycle, decommissioning, radioactive waste and spent-fuel management. The final levy, fund design and allocation between reactor operator, repository, geological disposal and State have not yet been legislated.
The State should therefore reject one of the most persistent claims in the political discussion: that SMRs “solve the waste problem.”
They do not.
Water-cooled SMRs may use well-established LWR fuel and produce familiar waste streams, which can simplify the back end. Other designs introduce HALEU/TRISO fuel, graphite, metallic fast-reactor fuel, sodium systems, lead systems or MOX fuel-cycle requirements. The IAEA itself states that SMRs may generate waste streams different from conventional reactors and that present international operational experience with their waste, spent fuel and decommissioning remains limited.
The correct principle is therefore:
SMR does not mean waste-free, repository-free or geological-disposal-free. Waste consequences must be assessed reactor by reactor and fuel cycle by fuel cycle.
This chapter implements the full waste-cycle analysis required by the programme mandate.
6.2 “Radioactive waste” is not one material
The term scorie nucleari is politically common but technically inadequate.
Italian law distinguishes several waste categories because radioactivity level, radionuclide half-life, heat generation and disposal requirements differ materially.
The current classification derives from the Interministerial Decree of 7 August 2015.
Italian radioactive-waste categories
| Category | Principal characteristics | Typical management route |
|---|---|---|
| VSLW — Very Short Lived Waste | Radionuclides predominantly with half-life below 100 days; can decay to clearance levels within approximately five years | Decay storage followed by conventional management when regulatory clearance is achieved |
| VLLW — Very Low Level Waste | Activity generally ≤100 Bq/g, with alpha contribution ≤10 Bq/g under the current classification | Surface or near-surface engineered disposal where clearance is not reached |
| LLW — Low Level Waste | Short-lived radionuclides ≤5 MBq/g; Ni-59/Ni-63 ≤40 kBq/g; long-lived radionuclides ≤400 Bq/g | Engineered surface/near-surface disposal |
| ILW — Intermediate Level Waste | Above LLW concentration thresholds but without significant heat-generation requirement | Some limited ILW can satisfy surface-disposal radioprotection criteria; long-lived/incompatible ILW requires geological disposal |
| HLW — High Level Waste | Very high activity, significant heat generation and/or high concentrations of long-lived radionuclides | Deep geological disposal |
| Spent nuclear fuel | Irradiated reactor fuel; may be treated as material for reprocessing/reuse or destined to direct disposal | Interim wet/dry storage → reprocessing or deep geological disposal |
This classification has direct infrastructure consequences.
A repository designed for LLW is not automatically suitable for HLW.
An interim store is not a disposal facility.
A transport cask is not a geological repository.
A vitrified residue package is not “disposed” merely because it has been conditioned into a stable waste form.
This distinction is especially important when comparing Italy’s historic programme with a future fleet.
Spent fuel is fuel removed from a reactor after irradiation.
It can follow two broad pathways.
Open fuel cycle
Reactor → spent-fuel pool → dry storage → geological disposal.
In this model, the spent fuel ultimately becomes the waste form requiring geological isolation.
Reprocessing / closed or partially closed fuel cycle
Reactor → cooling → reprocessing → recovery of uranium/plutonium → fabrication/reuse where applicable → conditioned high-level reprocessing residues → geological disposal.
Reprocessing therefore changes the composition and physical form of the final waste.
It does not make the disposal requirement disappear.
Sogin itself explains that reprocessing separates uranium and plutonium from fission products and other residues and that the conditioned residues must ultimately return to Italy.
For government accounting, the correct lifecycle equation is therefore:
spent fuel management ≠ spent fuel disappearance
and
reprocessing ≠ final disposal.
6.4 Italy’s inherited irradiated-fuel inventory
The four commercial Italian power stations generated approximately 1,864 tonnes of irradiated fuel measured as pre-irradiation heavy-metal mass.
| Former NPP | Approximate irradiated-fuel inventory |
|---|---|
| Latina | 1,425.5 t |
| Caorso | 190.4 t |
| Trino | 137 t |
| Garigliano | 111 t |
| Total | ~1,864 t |
Latina dominates the historic total because of the Magnox reactor’s fuel characteristics and long operating history.
The quantity expressed in tonnes should not be compared directly with the much smaller cubic-metre volume of conditioned high-level residues.
The physical volume changes radically during:
- dismantling of fuel assemblies;
- dissolution;
- separation;
- compaction;
- vitrification.
The radiological significance does not disappear simply because the conditioned waste occupies less space.
6.5 Approximately 99% has left Italy for reprocessing — but that does not close the liability
Sogin reports that approximately 99% of the irradiated fuel from the four former power stations has been shipped abroad.
The principal destinations were:
- Eurochemic in Belgium;
- Sellafield in the United Kingdom;
- La Hague in France.
The historic quantities divide broadly into two contractual generations.
Earlier contracts
Approximately 913 tonnes were reprocessed under contracts concluded before Sogin inherited the programme.
The recovered nuclear materials from those contracts have been disposed of or transferred according to the relevant arrangements.
Sogin-era/current contractual programme
Approximately 951 tonnes are associated with the subsequent ORANO/NDA arrangements.
Approximately 938 tonnes had been transferred abroad through around 125 transports.
The transfers included roughly:
- 716 tonnes principally associated with Sellafield;
- 190 tonnes from Caorso to La Hague;
- additional Trino/Avogadro material to La Hague.
Approximately 13 tonnes of fuel associated with Trino and Garigliano remained to complete the programme.
This remaining quantity is small relative to the original inventory but strategically important because completion of fuel removal is a prerequisite for closing several legacy-site decommissioning sequences.
6.6 ITREC’s Elk River fuel is a different legacy problem
The remaining fuel-cycle legacy is not limited to the four former commercial stations.
The ITREC facility at Rotondella contains 64 Elk River fuel elements, together with associated material from the historic research programme.
Rather than shipping this material through the same conventional foreign reprocessing pathway, Sogin’s current programme provides for dry storage in specialised casks, pending eventual transfer to the National Repository’s interim-storage function.
On 25 June 2026, Sogin began the operations required to re-encapsulate the 64 elements and move them into two dry-storage casks already present at ITREC.
The significance is important:
Italy will retain spent-fuel-type material requiring long-term management even after the commercial power-reactor fuel export programme is completed.
Therefore “all Italian spent fuel has been reprocessed abroad” would be factually incorrect.
6.7 Foreign reprocessing: what Italy actually bought
Foreign reprocessing provided Italy with several benefits.
It:
- removed irradiated fuel from ageing domestic storage pools;
- separated reusable uranium and plutonium;
- converted highly active liquid residues into more stable conditioned forms;
- reduced the volume of material requiring return;
- allowed decommissioning to advance at sites that otherwise would retain fuel.
But Italy purchased treatment and interim foreign management, not permanent disposal.
The final high-activity liability remained Italian.
This distinction is embedded both in contractual return obligations and in EU radioactive-waste law.
6.8 French residue inventory
Under the current arrangements with ORANO, Sogin reports that France holds:
| Material | Approximate volume |
|---|---|
| Vitrified high-level residues | 15.4 m³ |
| Compacted metallic residues | 47.6 m³ |
The vitrified material is stored in facilities with forced ventilation to remove decay heat.
The compacted metallic residues are held in dedicated interim-storage facilities.
These are highly conditioned volumes.
They should not be compared directly with the original hundreds of tonnes of fuel to imply that the radioactivity has been reduced by the same percentage as the volume.
Vitrification concentrates and immobilises radioactive material in a durable matrix.
Its purpose is safe handling, storage, transport and eventual disposal.
6.9 United Kingdom residue inventory and the substitution agreement
The UK programme followed an important different pathway.
The original reprocessing activities generated several categories of residues.
On instruction from the Italian Government, Sogin negotiated a substitution/minimisation arrangement with the UK’s Nuclear Decommissioning Authority.
The agreement was concluded on 17 July 2017.
Instead of returning a larger volume of low- and intermediate-level residues, the UK returns a smaller volume of radiologically equivalent vitrified high-level waste.
The resulting UK inventory is estimated at approximately 20 m³ of vitrified HLW.
The arrangement has obvious logistical benefits:
- lower physical return volume;
- fewer packages;
- fewer transports;
- simpler destorage operations.
But the substitution should not be mischaracterised as waste elimination.
The radiological liability has been concentrated into fewer high-activity packages.
6.10 The residue-return obligation is active
One of the strongest pieces of evidence in the entire chapter was generated only two days before the report cut-off.
On 24 September 2026, Sogin announced the award of a contract to Germany’s GNS for five CASTOR HAW28M high-activity waste casks.
Contract value:
approximately €32 million.
Each cask is approximately:
- 5 m high;
- 2.5 m diameter;
- 115 t mass.
Sogin states explicitly that the procurement forms part of the programme for returning residues produced by reprocessing Italian fuel at La Hague and Sellafield.
This procurement has strategic significance.
The return obligation is not an abstract item buried in historic treaties.
Italy is buying the physical equipment needed to execute it.
6.11 The missed 2025 return horizon
The Italy–France Lucca Intergovernmental Agreement of 24 November 2006 originally established a sequence culminating in a 31 December 2025 deadline for completion of the return to Italy of waste generated by French reprocessing. Parliamentary records repeatedly document that deadline.
That deadline could not be implemented as originally envisaged because Italy did not have the intended National Repository/interim high-level storage infrastructure available.
A July 2026 Senate committee record states that the Government had renewed the arrangement with France and that the French storage period could extend as far as 2040. The same claim was repeated in material annexed to the Senate’s 23 September 2026 proceedings.
This report treats that 2040 horizon with an important evidentiary qualification:
it is documented in the parliamentary record, but the underlying revised bilateral instrument was not independently located in the primary government treaty documentation used for this chapter.
Therefore:
- the existence of a revised/delayed French return arrangement is well supported by the parliamentary record;
- 2040 should not be treated as an unconditional contractual deadline unless the underlying agreement is produced and reviewed.
That is the appropriate government-grade evidentiary standard.
6.12 Foreign storage already carries measurable fiscal costs
The official parliamentary response of 12 February 2025 is unusually useful because it distinguishes several figures often confused in public discussion.
Sogin reported:
approximately €5 million per year for then-current management and foreign storage contracts.
It also reported cumulative expenditure since 1999 of:
€1,394.2 million
for:
- reprocessing;
- transport;
- management;
- storage
of fuel in France and the United Kingdom.
The same official response explains that a figure of €235.5 million appearing in a Court of Auditors table did not represent a current annual bill. It represented future contractual commitments already undertaken.
This distinction is important because several different costs coexist:
- historic reprocessing cost;
- fuel transport;
- residue conditioning;
- foreign storage;
- future return transport;
- return casks;
- Italian interim storage;
- eventual geological disposal.
No single number captures the complete back-end liability.
6.13 Delay has a recurring-cost mechanism
Every year in which the intended Italian storage infrastructure is unavailable can generate additional:
- foreign storage charges;
- contract-management costs;
- cask and transport rescheduling;
- security and regulatory costs;
- project-management expenditure.
This does not mean that every year of National Repository delay costs exactly €5 million.
The €5 million figure concerns particular foreign management/storage contracts at a stated point in time.
But the direction of the fiscal effect is clear:
repository delay does not freeze the liability; it tends to transfer part of the liability into continuing interim-management expenditure.
That is why waste infrastructure should be treated as a national capital programme rather than only as an environmental obligation.
6.14 The National Repository: what it actually is
The planned Deposito Nazionale e Parco Tecnologico — DNPT is a surface facility.
Its principal functions are:
Definitive disposal
Approximately 84,000 m³ of:
- VLLW;
- LLW.
Temporary storage
Approximately 14,000 m³ of:
- ILW;
- HLW;
- other material awaiting a future final route.
Total current planning envelope:
approximately 98,000 m³.
The infrastructure is also intended to accommodate waste produced for approximately 40 years after it becomes operational, including continuing medical, industrial and research waste.
This planning horizon is important.
The current design was developed around Italy’s legacy programme and continuing non-power uses.
It cannot automatically be assumed to contain enough capacity for an 8–16 GW new-build reactor fleet extending into the second half of the century.
That inventory must be recalculated.
6.15 The National Repository is not a deep geological repository
This point should appear explicitly in every government briefing.
The National Repository is intended to provide:
final disposal for suitable lower-activity waste
plus
interim storage for higher-activity and long-lived materials.
It is not the final disposal facility for all Italian nuclear waste.
Sogin itself states that intermediate- and high-level material temporarily stored at the National Repository must subsequently be transferred to deep geological disposal.
The IAEA ARTEMIS review reaches the same conclusion at national-policy level.
Therefore the phrase:
“Once the National Repository is built, Italy’s nuclear waste problem is solved”
is technically false.
A more accurate statement is:
The National Repository would solve the centralised near-surface-disposal requirement for lower-activity waste and provide a national interim-storage solution for higher-activity material while Italy develops a geological disposal route.
6.16 Current repository volume: 98,000 m³ is not the same as today’s inventory
The 98,000 m³ figure is a forecast design envelope.
It combines:
- waste already existing;
- additional waste expected from continuing decommissioning;
- waste generated by medicine, industry and research;
- future waste expected over the repository planning horizon.
It should not be described as 98,000 m³ of waste already sitting in temporary stores today.
The most recent category-by-category Sogin inventory fully verified in the evidence used for this chapter is the 31 December 2024 inventory.
Sogin reported approximately 15,892 m³ of radioactive waste within its managed inventory, comprising both conditioned final packages and material still requiring treatment/conditioning. The reported composition was approximately:
| Category | Sogin inventory at 31 Dec 2024 |
|---|---|
| VSLW | ~10 m³ |
| VLLW | ~10,079 m³ |
| LLW | ~3,526 m³ |
| ILW | ~2,250 m³ |
| HLW recorded at Sogin sites | 0 m³ |
| Total | ~15,892 m³ |
Of the total, approximately:
- 4,473 m³ were reported as conditioned/final products;
- 11,419 m³ still required treatment or conditioning.
[G]
The reported zero HLW in this particular physical inventory does not mean Italy has no HLW liability.
The principal conditioned high-level reprocessing residues remain physically abroad.
That is precisely why the foreign-return programme matters.
6.17 Volume will increase as decommissioning progresses
Radioactive-waste volume is not static.
Dismantling a reactor or fuel-cycle facility creates new material streams.
Some become:
- radioactive waste;
- conventional waste following clearance;
- recyclable metal after radiological release.
Sogin’s management system therefore distinguishes:
waste already conditioned
from
waste requiring treatment/conditioning
and from
future material expected during dismantling.
Sogin is using its AIGOR information system specifically to maintain lifecycle estimates of future final volumes and associated radioactivity.
This is why today’s stored volume is not an adequate measure of the repository requirement.
6.18 Existing Sogin nuclear sites
Sogin’s present physical management perimeter includes the former commercial nuclear programme and major research/fuel-cycle facilities.
Former commercial power stations
- Trino
- Caorso
- Latina
- Garigliano
Fuel-cycle / research installations
- EUREX — Saluggia
- FN — Bosco Marengo
- IPU and OPEC — Casaccia
- ITREC — Rotondella
Additional responsibilities
- Ispra-1 research reactor;
- waste from decommissioning of the RTS-1 Galileo Galilei naval research reactor at CISAM;
- repatriation of special fissile nuclear material from the EURACOS converter at the University of Pavia.
This is a geographically distributed interim-storage architecture.
Until the National Repository exists, waste remains distributed across multiple sites that were never intended to function as Italy’s permanent national disposal system.
6.19 Temporary site stores are necessary but are not the desired national end-state
Sogin stores conditioned and unconditioned waste safely in authorised interim facilities at its sites.
Examples include:
- approximately 2,484 m³ at Latina as of 31 December 2024;
- approximately 1,665 m³ at Trino;
- approximately 2,710 m³ at EUREX Saluggia.
This distributed-storage model allows decommissioning work to continue.
But it has structural disadvantages:
- multiple security perimeters;
- multiple ageing facilities;
- duplicated monitoring;
- continued radiological constraints on sites;
- inability to achieve complete site release;
- continuing maintenance cost.
Sogin defines the final green-field condition as the point at which radioactive waste has been removed and temporary stores can themselves be dismantled.
The National Repository is therefore not merely another storage facility.
It is the infrastructure that allows several decommissioning sites eventually to cease being nuclear sites.
6.20 Decommissioning is 47.7% complete — but the repository remains a system dependency
Sogin’s approved 2025 financial statements report that the overall national decommissioning programme had reached 47.7% completion at 31 December 2025.
That measure includes:
- dismantling;
- irradiated-fuel management;
- safe-maintenance activities.
Sogin management repeated the 47.7–48% range in April and June 2026.
This is significantly more informative than the lower percentages sometimes quoted for physical dismantling alone.
But it also demonstrates the central system dependency:
decommissioning can progress without the National Repository,
complete site release generally cannot.
Waste packages can be processed and conditioned, but they still require an ultimate authorised destination.
6.21 CNAI: 51 candidate areas, not 51 selected sites
On 13 December 2023, MASE published the proposed Carta Nazionale delle Aree Idonee — CNAI after receiving ISIN’s technical opinion.
The list contains 51 areas.
Their distribution is:
| Territory | Number of CNAI areas |
|---|---|
| Basilicata | 10 |
| Basilicata/Puglia cross-border areas | 4 |
| Lazio — all in Viterbo province | 21 |
| Piemonte — Alessandria province | 5 |
| Puglia | 1 |
| Sardinia | 8 |
| Sicily | 2 |
| Total | 51 |
The concentration in Viterbo province is politically significant:
21 of the 51 areas — more than 40% of the entire proposed national list — lie in that single province.
But CNAI inclusion means:
technically identified as potentially/suitably examinable under the applied criteria.
It does not mean:
repository site approved.
6.22 No municipality volunteered
The post-2023 legal process permitted non-binding self-nominations from territorial authorities and, where relevant, military sites.
The deadline expired on 12 March 2024.
Sogin states explicitly:
no self-nominations were registered.
That is one of the most important political facts in the current waste programme.
The voluntary mechanism did not generate a willing host.
The process therefore moved to the next statutory branch:
Strategic Environmental Assessment of the CNAI proposal.
This does not make the repository legally impossible.
It materially increases the importance of negotiation, compensation and territorial legitimacy.
6.23 The CNAI process remains active in September 2026
The Strategic Environmental Assessment process is not ceremonial.
After SEA:
- Sogin updates the CNAI proposal;
- the relative suitability ranking is updated;
- ISIN gives its opinion;
- MASE, in agreement with the Ministry of Infrastructure and Transport, approves the CNAI;
- a negotiation phase follows with Regions and local authorities;
- expressions of interest are collected;
- the eventual host site must emerge through the statutory process.
Therefore Italy still has a repository siting process, not a repository site.
6.24 Viterbo/Tuscia opposition remains technically organised
Territorial opposition is no longer limited to political declarations.
On 22 September 2026, the Province of Viterbo convened both its Provincial Council and Assembly of Mayors specifically to consider integrative observations to the CNAI proposal within the SEA process, based on work by a group of experts commissioned by the Province.
This is significant for two reasons.
First, the territory containing 21 candidate areas has organised a technical-administrative challenge rather than relying solely on political refusal.
Second, because the intervention occurs inside the SEA process, it becomes part of the formal administrative record.
The State therefore cannot reasonably plan repository siting on the assumption that the large Viterbo candidate pool automatically implies higher probability of local acceptance.
6.25 Repository target: 2039 is an operator objective, not a licensed completion date
During testimony to the Senate Environment Committee on 30 June 2026, Sogin CEO Gian Luca Artizzu confirmed 2039 as the company’s target for realisation of the National Repository.
Sogin stated that it was attempting to parallelise project activities so that delays in the SEA process might be partially absorbed.
The date should be classified as:
operator programme objective
not:
statutory completion deadline
and not:
licensed construction schedule.
At the cut-off:
- final CNAI not approved;
- site not selected;
- detailed site characterisation not completed;
- authorisation not granted;
- construction not started.
A 2039 target is therefore dependent on the successful completion of all of those stages.
6.26 ARERA’s 2026 intervention demonstrates that waste-project finance is actively audited
In 2026 ARERA temporarily suspended advances relating to National Repository activities pending completion of required planning documentation.
On 7 August 2026, Sogin announced that ARERA Resolution 317/2026 had restored the previously suspended advances after the documentation had been completed.
This episode matters because it demonstrates that repository finance is not an unconstrained transfer to Sogin.
ARERA continues to scrutinise:
- planning;
- efficiency;
- eligible cost;
- documentation.
The same discipline should be carried into any new-build decommissioning and waste fund.
6.27 The missing geological repository is the larger long-term gap
Italy’s surface repository debate receives most public attention because it is the immediate site-selection controversy.
The long-term technical issue is deeper.
The IAEA ARTEMIS review records the Italian policy as:
- near-surface disposal for VLLW/LLW;
- centralised interim storage for ILW/HLW/spent fuel;
- geological disposal as the eventual solution for long-lived material.
But the final geological route has not yet been selected.
The 2019 National Programme did not contain a sufficiently developed geological-disposal plan.
The draft 2023 programme considers:
national geological disposal
and
regional/international geological disposal.
The IAEA review recommended maintaining progress on both options until a decision is made.
This means Italy currently has:
a planned interim destination
but not yet
an implemented final destination
for the most demanding material.
6.28 Interim storage for 50–100 years is not equivalent to disposal
The ARTEMIS review describes Italy’s policy for consolidated interim storage of ILW, HLW and spent fuel as extending up to 50 years, potentially expandable toward 100 years.
That may be entirely safe when correctly designed and regulated.
But it remains storage.
Storage assumes:
- continuing institutional control;
- maintenance;
- surveillance;
- security;
- retrievability;
- eventual removal.
Geological disposal is designed to transition to long-term passive safety after closure.
The difference is therefore not semantic.
It is a difference in the intergenerational control requirement.
6.29 An international geological repository cannot be assumed to appear
The possibility of a regional or international geological repository has strategic attraction for a country with a relatively small legacy HLW inventory.
It could:
- share capital cost;
- share scientific infrastructure;
- reduce duplication;
- provide economies of scale.
But Italy should not design its domestic programme on the assumption that another state will eventually accept its long-lived waste.
A regional repository would require:
- host-state political consent;
- compatible domestic legislation;
- bilateral/multilateral treaty;
- Euratom compliance;
- transport arrangements;
- liability allocation;
- safeguards;
- host-community acceptance.
Until such an agreement exists, national capability must remain the fall-back planning case.
That is consistent with the ARTEMIS recommendation to pursue both pathways concurrently.
6.30 EU law prevents Italy from treating foreign processing as an escape from responsibility
Council Directive 2011/70/Euratom requires national programmes to cover spent fuel and radioactive waste from generation through disposal and requires adequate financial resources to be available when required.
Article 9 specifically requires Member States to ensure financial resources are available, taking due account of the responsibility of the generators.
The Directive also embodies the principle that the originating Member State retains responsibility for its spent fuel and radioactive waste even where material is exported for treatment or reprocessing, subject to the Directive’s rules on disposal agreements.
Italy’s historical experience demonstrates the practical meaning.
The fuel went abroad.
The liability returned.
6.31 The new 2026 framework explicitly adopts lifecycle responsibility
The enabling legislation is stronger on this issue than a narrow construction statute would be.
Article 2 explicitly requires future regulation covering:
- temporary storage of radioactive waste;
- temporary storage of spent fuel;
- final disposal of radioactive waste;
- final disposal of spent fuel where it is not reprocessable, recyclable or reusable;
- fuel fabrication;
- reprocessing;
- decommissioning.
Article 3 requires adequate financial guarantees at the operator’s expense, potentially through one or more funds, covering the entire lifecycle and the costs associated with:
- plant deactivation;
- radioactive-waste management;
- spent-fuel management;
- final dismantling.
This is the correct legislative principle.
What remains missing is the financial engineering.
6.32 Legacy liabilities and new-build liabilities must be kept financially separate
Italy currently has a legacy problem generated by the old national programme.
Since 2023, those historic nuclear costs are paid directly through the State Budget, rather than the previous electricity-system charge, while ARERA retains responsibility for determining recognised nuclear costs under economic-efficiency criteria.
A new reactor programme should not silently add its future waste and decommissioning liabilities to this historical taxpayer-funded pool.
The distinction should be explicit.
Legacy programme
Origin:
historic ENEL/ENEA/state nuclear programme.
Current payer:
State Budget / taxpayers, under the post-2023 financing arrangement.
New-build programme
Origin:
future commercial reactor operators.
Intended payer under 2026 delegation:
licensed operators through lifecycle financial guarantees/funds.
Mixing the two would destroy price transparency.
6.33 New-build electricity prices must include the back end
Any future Italian nuclear LCOE, CfD or strike-price calculation should include at least:
- interim spent-fuel storage;
- transport;
- waste characterisation;
- waste treatment;
- conditioning;
- repository contribution;
- geological-disposal provision;
- decommissioning contribution;
- regulator cost where charged to operator;
- long-term fund administration.
If these costs are omitted and later transferred to the State, the electricity price will be artificially low.
This is why the future financial guarantee must be collected during generation, not only after closure.
6.34 Recommended new-build funding architecture
The final decree has not yet established a specific mechanism.
A defensible model should nevertheless contain at least four segregated components.
Fund A — decommissioning
Covers:
- defuelling;
- dismantling;
- decontamination;
- demolition;
- site release.
Fund B — operational radioactive waste
Covers:
- LLW/VLLW conditioning;
- transport;
- National Repository disposal charges.
Fund C — spent fuel / HLW
Covers:
- wet storage;
- dry casks;
- transport;
- reprocessing if selected;
- interim storage;
- geological disposal.
Fund D — extraordinary lifecycle contingency
Covers:
- premature closure;
- major decommissioning cost increase;
- regulatory changes that require additional waste treatment.
The funds should be:
- legally segregated;
- inaccessible to ordinary corporate creditors;
- independently audited;
- updated periodically using revised cost estimates;
- protected from operator insolvency.
[U]
6.35 A per-MWh levy alone may be insufficient
A simple waste levy collected per unit of electricity can work for predictable fleet operation.
But it performs poorly if:
- reactor closes prematurely;
- construction is abandoned after nuclear material enters site;
- operator becomes insolvent;
- future disposal costs rise dramatically.
Therefore a robust system may require a combination of:
- upfront financial guarantee;
- accumulating lifecycle fund;
- periodic actuarial/top-up requirements;
- operator balance-sheet/security requirements.
The correct financial design is a funding sufficiency test, not merely a nominal levy.
6.36 New-build repository capacity must be re-baselined
The current National Repository planning figure of approximately 98,000 m³ was not developed as a final waste envelope for a new 8–16 GW nuclear fleet operating through the second half of the century.
Therefore the moment a credible fleet pathway enters the National Programme, Sogin/MASE/ISIN should produce a separate forecast for:
- additional VLLW;
- additional LLW;
- additional ILW;
- additional spent fuel;
- additional HLW if reprocessing is used;
- decommissioning waste.
The design question is not merely:
Can the current repository accept the first SMR’s waste?
It is:
Does the Italian repository and geological-disposal architecture have capacity for the entire lifetime inventory generated by the full plausible fleet?
6.37 The first reactor should not consume legacy repository capacity without transparent allocation
The National Repository has been justified politically and financially principally as the solution to:
- legacy nuclear waste;
- medical waste;
- industrial waste;
- research waste.
A new fleet introduces a new generator class.
If new reactors use the same facility, there must be an explicit capacity allocation and charging mechanism.
Otherwise the programme risks:
- crowding out non-energy waste;
- consuming capacity paid for by legacy taxpayers;
- requiring an early expansion that was not included in original siting consultation.
This is both a financial and territorial issue.
Host-community consent for a repository sized around ~98,000 m³ cannot automatically be interpreted as consent for unlimited additional waste from a future multi-GW fleet.
6.38 SMR waste myth: smaller reactor does not mean proportionately smaller waste burden
An SMR normally produces less total waste per reactor unit than a much larger reactor if all other factors are similar.
That statement is almost trivial because the reactor produces less electricity.
The relevant national metric is instead:
- waste per MWh;
- heat load per MWh;
- long-lived inventory per MWh;
- number of disposal packages;
- spent-fuel volume;
- decommissioning waste;
- required repository footprint.
The IAEA notes that SMRs may generate a diverse range of waste streams and explicitly states that international information and operating experience on SMR waste, spent fuel and decommissioning remain limited.
Therefore the government should reject both simplistic claims:
“SMRs create no waste problem.”
and
“all SMRs inherently create more waste than large reactors.”
Neither is a defensible universal statement.
6.39 Water-cooled SMRs: familiar back end, not zero back end
For designs such as:
- BWRX-300;
- Holtec SMR-300;
- AP300;
- NUWARD;
- Rolls-Royce SMR;
- NuScale,
the waste system is broadly analogous to today’s LWR fleet.
The IAEA states that land-based water-cooled SMRs generally expect spent-fuel and radioactive-waste management approaches similar to advanced water-cooled reactors.
Likely waste streams include:
- spent UO₂ fuel assemblies;
- ion-exchange resins;
- filters;
- contaminated metals;
- activated structural material;
- operational clothing/tools;
- decommissioning concrete/steel.
This familiarity is a major licensing advantage.
It is not a disposal exemption.
A new LWR-SMR fleet still requires:
spent-fuel storage + geological disposal or reprocessing + LLW/ILW disposal.
6.40 Higher burnup changes waste characteristics
Many modern reactors seek:
- higher fuel burnup;
- longer cycles;
- greater fuel utilisation.
This can reduce the number of fuel assemblies handled for a given electricity output.
But spent-fuel characteristics can also change:
- decay heat;
- isotopic composition;
- neutron source;
- long-lived radionuclide inventory;
- storage duration before transport/disposal.
Therefore “fewer assemblies” cannot be translated directly into “simpler geological disposal.”
Repository design is governed by thermal and radiological constraints as well as physical volume.
6.41 Xe-100 and other HTGRs: TRISO solves one problem and creates another waste form
TRISO fuel has important safety advantages.
Its multilayer ceramic particle structure retains fission products effectively at very high temperature.
But high-temperature gas reactors also introduce substantial graphitic material.
Future back-end planning must therefore account for:
- irradiated graphite;
- TRISO fuel compacts/pebbles;
- activated core structures;
- potentially different conditioning requirements.
This is a materially different waste-management system from a conventional PWR.
Italy currently has no commercial-scale national disposal experience for a fleet of TRISO/graphite reactors.
That does not make Xe-100 unmanageable.
It means its waste-system development must form part of technology selection rather than being postponed until operation.
6.42 Natrium: advanced fuel plus sodium-system decommissioning
Natrium would introduce:
- HALEU metallic fuel;
- sodium coolant;
- fast-spectrum activation environment;
- molten-salt thermal storage.
The waste-management challenge includes not only spent fuel but eventual:
- sodium treatment;
- contaminated system components;
- activated structural materials.
Sodium itself need not automatically become final radioactive waste; it can potentially be treated, stabilised or managed through specialised processes.
But Italy does not currently operate a commercial sodium fast-reactor waste infrastructure.
The learning burden is therefore substantially greater than for a water-cooled SMR.
6.43 Lead-cooled reactors: lead is not “the waste problem,” but it creates a distinct lifecycle system
newcleo and EAGLES use liquid lead.
Their back-end considerations include:
- activation products;
- corrosion products;
- contamination of lead;
- purification;
- reuse/recycling of coolant where practicable;
- treatment of contaminated lead-system components.
Again, it would be technically inaccurate to assume that hundreds or thousands of tonnes of lead automatically become disposable radioactive waste.
A well-designed system should seek:
- decontamination;
- recycling;
- reuse.
But the lifecycle infrastructure and regulatory acceptance of those strategies still require demonstration.
6.44 MOX changes the question from waste volume to fuel-cycle complexity
newcleo’s LFR-AS-200 is linked to a MOX/closed-fuel-cycle strategy.
Reprocessing and MOX can recover fissile material that would otherwise remain in spent fuel.
This can improve resource utilisation.
It can also alter long-lived inventories.
But the system requires additional nuclear installations:
- reprocessing;
- plutonium-bearing material handling;
- MOX fabrication;
- safeguards;
- high-security transport.
The US NRC’s separate engagement with newcleo on a MOX fuel-fabrication facility illustrates this directly.
The correct comparison is therefore not:
MOX = less waste.
It is:
MOX = a different fuel cycle with additional facilities, recovered materials and residual wastes.
A geological-disposal requirement remains.
6.45 Reprocessing does not eliminate geological disposal
This principle can be stated categorically.
Reprocessing can:
- recover uranium/plutonium;
- reduce physical spent-fuel volume;
- place fission products into durable vitrified matrices;
- alter final waste composition.
It does not reduce final waste to zero.
Italy’s own history proves the point.
After decades of reprocessing abroad, Italy still expects the return of high-level vitrified residues and still needs a final geological disposal route.
Therefore any future claim that a closed fuel cycle allows Italy to avoid geological disposal should be rejected unless supported by a fully demonstrated waste technology capable of eliminating all long-lived disposal streams.
No such commercial system exists for the Italian programme today.
6.46 Waste-informed reactor selection
Every technology bidder should be required to submit a standardised Italian Waste and Decommissioning Dossier.
It should contain:
| Required data | Purpose |
|---|---|
| Operational VLLW/LLW per TWh | National Repository capacity |
| ILW per TWh | Interim/geological requirement |
| Spent fuel assemblies or mass per TWh | Storage/disposal planning |
| Decay heat | Repository spacing and storage |
| Long-lived isotope inventory | Geological-disposal case |
| Fuel enrichment | Fuel-cycle/security assessment |
| Fuel form | Handling/storage requirements |
| Dry-cask design availability | Interim-storage maturity |
| Reprocessing compatibility | Closed-cycle option |
| Decommissioning waste estimate | Lifecycle funding |
| Unique coolant/material waste | Technology-specific treatment |
| Existing regulator-approved disposal path | Technology maturity |
Without this data, a reactor should not receive a high sustainability score merely because its electrical output is small.
6.47 Waste standardisation should be a procurement requirement
Waste management should enter the Italian reactor-selection process before technology selection, not after construction contracts have been signed.
The conventional procurement sequence—select the reactor, define the operating model and only later determine how its waste will be conditioned, packaged, stored, transported and ultimately disposed of—would expose Italy to avoidable long-duration costs and infrastructure fragmentation.
For a new Italian fleet, waste architecture should therefore become a formal Gate 1 and Gate 2 procurement criterion.
The objective should not be to force every waste stream produced by every reactor into an identical physical container. That would be technically unrealistic. Different waste classes, radionuclide inventories, thermal outputs, physical forms and fissile characteristics necessarily require different treatment and packaging solutions.
The strategic objective should instead be:
maximum feasible standardisation of waste forms, package families, transport interfaces, handling equipment, storage systems, documentation, inspection procedures and repository acceptance envelopes across the national reactor fleet.
That distinction is important.
A standardised national waste architecture does not mean:
ONE CONTAINER
FOR
EVERY WASTE TYPE
It means:
MINIMUM NUMBER OF
QUALIFIED PACKAGE FAMILIES
+
MINIMUM NUMBER OF
TRANSPORT SYSTEMS
+
COMMON HANDLING INTERFACES
+
COMMON CHARACTERISATION RULES
+
COMMON DIGITAL RECORDS
+
COMMON STORAGE ENVELOPES
+
DEFINED DISPOSAL ACCEPTANCE CRITERIA
The procurement system should consequently favour reactor designs for which a large proportion of operational and decommissioning waste can be managed using already established or readily standardisable waste-management techniques.
Where technically possible, preference should be given to systems compatible with:
- established waste containers;
- established shielding concepts;
- recognised conditioning processes;
- existing or readily licensable transport-package families;
- standard lifting and handling interfaces;
- standard waste-characterisation systems;
- common storage-rack or storage-building geometries;
- established non-destructive examination techniques;
- repository-compatible package dimensions;
- common waste-identification and tracking systems;
- common inspection and surveillance procedures;
- established retrieval techniques;
- common fire-protection and radiological-monitoring arrangements;
- standardised decommissioning-waste pathways.
This principle is consistent with the broader international requirement that waste management be considered as an integrated chain rather than as disconnected operations. The Euratom radioactive-waste framework requires Member States to account for the interdependencies between all stages of spent-fuel and radioactive-waste generation and management, while IAEA guidance requires final waste products to be developed with subsequent processing, storage, transport and disposal requirements in mind.
Standardisation begins with waste acceptance criteria
The first level of standardisation is not the steel container itself.
It is the waste acceptance envelope.
For each important waste stream, the Italian programme should define permissible ranges for variables including:
| Acceptance variable | Why it matters |
|---|---|
| Radionuclide inventory | Determines radiological classification, shielding and disposal compatibility |
| Total activity | Influences package category, handling and repository acceptance |
| Surface dose rate | Determines handling, shielding and transport requirements |
| Decay heat | Determines storage configuration and thermal limits |
| Fissile content | Determines criticality controls and safeguards requirements |
| Waste form | Influences mechanical and chemical stability |
| Free liquids | May be restricted by storage/disposal criteria |
| Gas generation | Can affect container pressure and long-term integrity |
| Chemical composition | Can influence corrosion and repository compatibility |
| Organic content | May influence degradation and gas generation |
| Complexing agents | Can affect radionuclide mobility |
| Package mass | Determines crane, transport and storage-system requirements |
| Package dimensions | Determines transport, storage and repository-interface compatibility |
| Structural resistance | Relevant to stacking, handling and long-duration storage |
| Fire behaviour | Relevant to facility safety case |
| External contamination | Relevant to handling and transport |
| Identification | Required for lifetime inventory control |
| Traceability | Required from generation through final disposition |
The IAEA specifically treats waste-package specifications as a mechanism for demonstrating compatibility with processing, storage and disposal requirements, and requires consideration of the radiological, physical, chemical and mechanical properties of the complete waste package.
This has direct procurement implications.
A vendor should therefore not be permitted simply to state:
“The reactor produces manageable radioactive waste.”
It should be required to provide a waste-by-waste compatibility matrix.
Table 6.47-A — Waste-standardisation information required from every reactor vendor
| Required disclosure | Minimum evidence |
|---|---|
| Operational solid waste streams | Annual quantity by waste type |
| Activated components | Material, activity and expected dimensions |
| Resins / filters | Volume, activity and conditioning method |
| Concentrates / liquids | Treatment and solidification route |
| Contaminated equipment | Expected volume and disposition route |
| Spent control components | Activity and package concept |
| Reactor-internal replacement components | Handling, segmentation and storage concept |
| Decommissioning waste | Indicative lifecycle inventory |
| Spent fuel | Assembly geometry, mass, burn-up, heat and radionuclide inventory |
| Special waste | Graphite, sodium, lead, TRISO, contaminated salts or other technology-specific material |
| Waste package | Proposed container family |
| Conditioning | Cementation, compaction, vitrification, encapsulation or alternative |
| Storage | Required environmental conditions |
| Inspection | Required package-surveillance method |
| Transport | Proposed package or transport system |
| Disposal | Anticipated acceptance route |
| Repackaging | Whether repackaging may be required before disposal |
| Long-term records | Data required to accompany each package |
Every unique package creates an infrastructure tail
A reactor vendor can make a waste solution appear inexpensive when considering the package only at the point of generation.
That approach is misleading.
A unique package can create additional requirements throughout the entire back end:
UNIQUE WASTE FORM
↓
UNIQUE CONDITIONING PROCESS
↓
UNIQUE CONTAINER
↓
PACKAGE QUALIFICATION
↓
HANDLING EQUIPMENT
↓
STORAGE QUALIFICATION
↓
SURVEILLANCE PROGRAMME
↓
TRANSPORT PACKAGE / CERTIFICATION
↓
REPOSITORY ACCEPTANCE ANALYSIS
↓
POSSIBLE FUTURE REPACKAGING
Each additional package type can consequently generate costs across:
- engineering;
- safety demonstration;
- regulator review;
- materials qualification;
- manufacturing;
- inspection;
- quality assurance;
- transport licensing;
- lifting systems;
- storage buildings;
- maintenance tooling;
- operator training;
- emergency procedures;
- repository-interface analysis;
- record keeping;
- eventual repackaging.
Transport provides a particularly clear example.
Under IAEA transport requirements, package approval is tied to the package design, authorised radioactive contents, applicable regulations, modes of transport and other defined characteristics. A new waste or spent-fuel configuration therefore cannot simply be assumed to fit automatically into an existing transport certificate.
The procurement question is consequently not:
“Can this waste theoretically be transported?”
Almost all credible reactor programmes can eventually develop a transport solution.
The more important question is:
“Can this waste use a transport architecture that Italy and Europe already know how to license, manufacture, operate and maintain?”
Those are very different standards.
Reactor diversity can multiply back-end complexity
The argument becomes especially important if Italy considers a technologically heterogeneous first fleet.
Consider a hypothetical portfolio combining:
- one BWR;
- one PWR;
- one HTGR;
- one sodium fast reactor;
- one lead fast reactor.
From an electricity-system perspective this might appear diversified.
From a waste-management perspective it could create five partly independent technological ecosystems.
The programme could have to manage:
LWR SPENT FUEL
+
TRISO / GRAPHITE MATERIAL
+
METALLIC FAST-REACTOR FUEL
+
SODIUM-CONTAMINATED COMPONENTS
+
LEAD-CONTAMINATED COMPONENTS
+
MOX / PLUTONIUM-BEARING MATERIAL
The issue is not that these waste streams are technically impossible to manage.
The issue is institutional multiplication.
Different technologies can require different:
- waste-treatment facilities;
- characterisation methodologies;
- conditioning processes;
- storage conditions;
- shielding arrangements;
- transport systems;
- safeguards procedures;
- package types;
- regulator expertise;
- operator training;
- eventual disposal demonstrations.
This creates a potentially severe diseconomy of technological diversity.
The first Italian nuclear fleet should therefore distinguish between:
generation diversification
and
infrastructure fragmentation.
They are not equivalent.
A country may gain limited resilience by operating several reactor technologies while simultaneously losing economies of scale across:
- fuel procurement;
- spare parts;
- operator training;
- maintenance;
- licensing;
- waste treatment;
- waste packages;
- spent-fuel storage;
- transport;
- repository interfaces.
Table 6.47-B — Back-end implications of excessive reactor diversity
| Fleet architecture | Possible benefit | Back-end consequence |
|---|---|---|
| Single reactor family | Maximum standardisation | Concentrated vendor/technology dependence |
| Two closely related LWR families | Some vendor diversification | Relatively manageable waste diversity |
| Multiple PWR/BWR SMRs | Moderate technological diversity | Still largely common LWR waste architecture |
| LWR + HTGR | Adds industrial-heat capability | Adds graphite/TRISO-specific waste questions |
| LWR + sodium fast reactor | Adds flexibility/advanced technology | Adds metallic fuel and sodium-system waste |
| LWR + lead fast reactor | Adds Italian advanced-reactor sovereignty | Adds lead-system and advanced-fuel-cycle requirements |
| LWR + HTGR + SFR + LFR | Maximum technological diversification | Potentially very high institutional and waste-system fragmentation |
Standardisation should therefore enter the tender specification
Italy should require every reactor bid to include a Waste Architecture Standardisation Statement.
At minimum it should identify:
- which waste packages already possess recognised operating experience;
- which packages would require Italian-specific qualification;
- which package geometries are compatible with the intended national surface repository and storage infrastructure;
- which waste streams would require dedicated new facilities;
- which waste streams require specialised transport systems;
- whether spent-fuel dry-storage systems already exist for the proposed fuel;
- whether those storage systems can later support transportation;
- whether repository acceptance would require repackaging;
- whether technology-specific waste creates a separate national R&D programme;
- the expected number of distinct waste-package families across the full plant lifecycle;
- the expected cost of qualification, storage, transportation and eventual disposal;
- responsibility for any future redesign required because a waste package fails national disposal acceptance criteria.
Italian procurement rule
The correct procurement objective should therefore be:
minimise the number of unique radioactive-waste interfaces created by the national fleet without compromising safety or forcing technically inappropriate waste into unsuitable packages.
This would make waste standardisation a source of national economic efficiency rather than merely a downstream environmental requirement.
It would also create an important strategic constraint on fleet composition.
A first Italian fleet composed of many unrelated reactor technologies may appear to diversify vendor risk.
But if every technology creates its own:
FUEL
+
WASTE
+
CASK
+
STORAGE
+
TRANSPORT
+
SAFEGUARDS
+
DISPOSAL
ecosystem, diversification at reactor level could produce concentration of complexity at state level.
That trade-off should be quantified before procurement.
For this reason, waste-package compatibility should become a formal scoring category in the Italian technology down-select.
Not because waste should determine reactor choice alone.
But because reactor choice determines the national waste system for generations.
6.48 The National Repository should not become a substitute for reactor-site waste planning
The existence of a future National Repository must not be used to justify minimal waste-management capability at new reactor sites.
This would repeat one of the most persistent errors in nuclear back-end planning: designing operating facilities around the assumption that the next facility in the waste chain will become available precisely when required.
The correct principle is the opposite.
Every nuclear installation should remain capable of managing the waste it generates safely even when the next downstream facility is unavailable for substantially longer than planned.
This is consistent with the fundamental European principle that responsibility for radioactive waste does not disappear when a future disposal route has been identified. Under Directive 2011/70/Euratom, the licence holder retains prime responsibility for the safety of spent-fuel and radioactive-waste management under regulatory supervision, and national programmes must cover the entire chain from generation to disposal.
The present Italian Deposito Nazionale should also be described precisely.
Its currently defined role is not that of a geological repository for spent nuclear fuel.
It is intended to provide:
- final disposal for very-low- and low-activity radioactive waste; and
- temporary storage for intermediate- and high-activity material pending its subsequent long-term destination.
Sogin’s published inventory methodology explicitly distinguishes material intended for disposal at the National Repository from intermediate/high-activity material intended for temporary storage there.
That distinction becomes fundamental if Italy builds a new fleet.
A new reactor site would still require its own complete predisposal-management system.
6.48.1 Reactor-site capability begins at the point of generation
Waste does not appear at the site boundary already packaged for a national repository.
It is generated throughout plant operation.
A reactor licence must therefore cover the complete internal sequence:
WASTE GENERATED
↓
SEGREGATION
↓
RADIOLOGICAL CHARACTERISATION
↓
PHYSICAL / CHEMICAL CHARACTERISATION
↓
PRE-TREATMENT
↓
TREATMENT
↓
CONDITIONING
↓
PACKAGE CERTIFICATION
↓
TEMPORARY STORAGE
↓
INSPECTION / MONITORING
↓
TRANSPORT PREPARATION
↓
OFF-SITE TRANSFER
Each step requires:
- buildings;
- systems;
- qualified equipment;
- procedures;
- trained personnel;
- radiological controls;
- fire protection;
- criticality controls where relevant;
- lifting equipment;
- package-tracking systems;
- quality assurance;
- security measures;
- regulatory authorisation.
The National Repository removes none of these requirements.
It merely provides a potential destination for material that has already been safely characterised, conditioned, packaged and certified.
6.48.2 The reactor operator should remain responsible for package quality
The waste generator should not be allowed to transfer an unresolved waste problem downstream.
Before any package leaves the reactor site, the operator should be capable of demonstrating that the package satisfies the applicable acceptance criteria for:
- handling;
- storage;
- transport;
- and the intended downstream facility.
IAEA guidance specifically requires quality control of conditioned waste packages, including package specifications, testing, record keeping and verification that packages remain compatible with the anticipated disposal option.
Italy should consequently prohibit a procurement model in which:
REACTOR VENDOR
↓
GENERATES NON-STANDARD WASTE
↓
LEAVES FUTURE PACKAGING SOLUTION
TO THE STATE
Instead:
REACTOR PROCUREMENT
↓
DEFINES COMPLETE WASTE STREAM
↓
DEFINES CONDITIONING
↓
DEFINES PACKAGE
↓
DEMONSTRATES STORAGE
↓
DEMONSTRATES TRANSPORT
↓
DEMONSTRATES DISPOSITION PATH
6.48.3 Site storage must be a resilience function
On-site radioactive-waste storage should not be sized only against the expected annual waste-production rate multiplied by the expected national transport schedule.
That would effectively create a just-in-time waste chain.
A nuclear waste system should instead tolerate disruption.
Potential interruptions include:
- National Repository commissioning delay;
- temporary Repository shutdown;
- repository maintenance;
- regulatory suspension;
- transport accident elsewhere in the system;
- transport-package unavailability;
- rail or road disruption;
- industrial action;
- severe weather;
- natural hazard;
- security event;
- failure of a waste package to meet acceptance criteria;
- political or legal interruption;
- downstream storage saturation;
- change to waste acceptance requirements;
- discovery of package degradation;
- loss of a transport route;
- delay in construction of the geological repository.
The site safety case should therefore include defined waste-export interruption scenarios.
Table 6.48-A — Minimum reactor-site waste resilience to be demonstrated at FOAK licensing
| Function | FOAK requirement |
|---|---|
| Waste segregation | Physically separate incompatible waste streams |
| Characterisation | Identify radionuclide, chemical and physical properties |
| Treatment | Reduce or stabilise waste where required |
| Conditioning | Produce a stable waste form |
| Packaging | Meet storage/transport/downstream criteria |
| Package inspection | Permit surveillance throughout storage period |
| Temporary LLW storage | Accommodate disruption in repository transfers |
| ILW storage | Permit safe longer-duration storage where necessary |
| Spent-fuel pool | Accommodate discharged fuel with required safety margin |
| Dry-storage interface | Provide credible transition route where required |
| Damaged fuel | Provide dedicated management capability |
| Non-conforming package | Provide quarantine/remediation capability |
| Transport staging | Allow safe loading and dispatch |
| Records | Maintain package identity for entire lifecycle |
| Emergency arrangements | Address credible waste/storage events |
| Expansion capability | Permit additional storage where national schedule slips |
The IAEA’s nuclear-power-plant design requirements explicitly state that on-site radioactive-waste management and storage capacity must be provided for a period consistent with availability of the relevant disposal option. They also require plant design to facilitate waste handling, packaging and transport.
For Italy, “consistent with availability” should not be interpreted using the most optimistic repository schedule.
It should use a conservative scenario.
6.48.4 The FOAK should prove independence from repository punctuality
The first Italian new-build reactor would carry a particularly high institutional risk because the new reactor programme and national back-end programme would be developing simultaneously.
The FOAK should therefore be required to demonstrate that safe operation does not depend on:
- annual waste exports beginning on a fixed date;
- immediate National Repository availability;
- geological disposal becoming available according to a single central schedule;
- uninterrupted access to transport casks;
- continuous acceptance of every waste package by the downstream facility.
The safety case should include a credible repository-unavailable case.
For example:
NORMAL CASE
Reactor → treatment → storage → National Repository
STRESS CASE
Reactor → treatment → storage
↓
REPOSITORY DELAY
↓
EXTENDED ON-SITE STORAGE
↓
INSPECTION + AGEING MANAGEMENT
↓
EVENTUAL OFF-SITE TRANSFER
The exact duration should be determined by safety analysis, national policy and economic optimisation rather than by an arbitrary number.
But the principle should be mandatory:
repository delay must not become reactor emergency.
6.48.5 The same principle applies to spent fuel
Spent fuel creates an even stronger version of the problem.
The reactor site requires capability for:
- safe unloading;
- pool cooling;
- subcritical storage;
- shielding;
- inspection;
- damaged-fuel management;
- identification and safeguards;
- eventual transfer to dry storage where applicable;
- preparation for transport;
- retrieval.
IAEA guidance notes that spent fuel may need storage for periods ranging from months to several decades, and that uncertainty in the duration of storage must be considered in storage design. The fundamental storage safety functions include containment, criticality safety, heat removal, radiation shielding and retrievability.
Consequently, a reactor licence cannot logically rely on the proposition:
“Spent fuel will have left the site by then.”
That is a planning assumption.
It is not a safety function.
6.48.6 Italy’s existing experience already demonstrates the importance of interim storage
Italy’s legacy nuclear programme itself provides practical evidence of this problem.
Sogin continues to construct, reconstruct and upgrade interim waste-storage facilities at legacy nuclear sites while awaiting future transfer to the National Repository.
At Trino, for example, Sogin completed the civil reconstruction of a temporary radioactive-waste storage building in January 2026 specifically to accommodate existing and future decommissioning waste pending eventual transfer to the National Repository once it becomes available.
This is a critical policy lesson.
Temporary infrastructure can become necessary for much longer than originally expected.
New reactors should therefore be designed from the beginning to avoid emergency retrofits decades later.
Government requirement
The FOAK procurement specification should state:
The availability of the National Repository or any future geological disposal facility shall not be credited as an immediate safety function necessary for continued safe management of waste or spent fuel at the reactor site.
The operator should instead demonstrate sufficient:
capacity + equipment + monitoring + retrievability + expansion options
to manage credible downstream delays.
The National Repository should reduce national storage fragmentation.
It should not be used to conceal inadequate storage design at the reactor site.
6.49 Spent-fuel pool capacity should not be designed around optimistic repository dates
Spent-fuel pool capacity is one of the areas where an optimistic national waste schedule can silently migrate into reactor design.
Italy should prevent that from happening.
Spent-fuel pools are designed primarily to provide:
- cooling;
- shielding;
- subcriticality;
- fuel handling;
- temporary storage after discharge.
They should not become indefinite substitutes for a national spent-fuel strategy.
But neither should they be sized on the assumption that fuel will leave the site on a precise timetable that government cannot guarantee decades in advance.
The correct design principle is:
The plant must maintain sufficient spent-fuel management margin even if the downstream national programme is delayed.
IAEA design requirements already require irradiated-fuel storage systems to accommodate, with appropriate margin, the fuel removed according to the expected core-management strategy and the amount of fuel contained in a full reactor core. The design must also facilitate eventual removal and preparation for off-site transport.
6.49.1 Why repository dates are structurally uncertain
A spent-fuel strategy spans institutions whose schedules are not controlled by the reactor operator.
The chain can include:
REACTOR OPERATION
↓
SPENT-FUEL DISCHARGE
↓
POOL COOLING
↓
DRY STORAGE
↓
TRANSPORT
↓
CENTRAL INTERIM STORAGE
↓
REPROCESSING
OR
GEOLOGICAL DISPOSAL
Every arrow may depend on:
- another licence;
- another facility;
- another operator;
- another regulatory decision;
- another technology;
- another public consultation;
- another transport route;
- another government financing decision.
The probability that every stage follows the earliest published schedule for sixty years is therefore not an appropriate engineering basis.
6.49.2 Pool design should preserve operational flexibility
A pool that becomes saturated can affect reactor operations.
If sufficient storage positions are unavailable, the operator may lose flexibility to:
- unload a full core;
- carry out major maintenance;
- remove defective fuel;
- manage abnormal fuel conditions;
- conduct refuelling according to the planned schedule.
Pool capacity therefore has value beyond storing routine annual discharges.
An Italian design review should explicitly examine:
- normal refuelling inventory;
- reserve capacity;
- full-core offload capability;
- damaged-fuel locations;
- inspection positions;
- margin for delayed fuel export;
- timing of dry-storage commissioning;
- ability to expand dry-storage capacity;
- handling and transfer capability between pool and dry-storage systems;
- long-term implications of higher burn-up or changed fuel management.
Table 6.49-A — Spent-fuel planning scenarios required for Italian licensing
| Scenario | Question to be demonstrated |
|---|---|
| Base case | Can normal refuelling proceed throughout the operating cycle? |
| Full-core offload | Can the complete reactor core be safely unloaded if required? |
| Export delayed 5 years | Is adequate pool/dry-storage capacity available? |
| Export delayed 10 years | Does operation remain possible without emergency construction? |
| Central storage unavailable | Can fuel remain safely at the site? |
| Dry-storage commissioning delayed | Is sufficient pool margin retained? |
| Transport cask unavailable | Can accumulated fuel remain safely stored? |
| Repository programme delayed decades | Is there a technically credible long-duration storage strategy? |
| Damaged fuel discovered | Is dedicated storage/handling capability available? |
| Plant lifetime extended | Can the spent-fuel system accommodate the additional inventory? |
| Early plant shutdown | Can the entire final-core and residual inventory be managed? |
The point is not that every event will occur.
The point is that storage capacity is cheap to plan when the plant is being designed and potentially difficult and expensive to recover after the site has become constrained.
6.49.3 Pool storage and dry storage should form one integrated system
The procurement comparison should not evaluate the pool separately from dry storage.
For technologies where dry storage is technically appropriate, the complete chain should be demonstrated:
CORE
↓
SPENT-FUEL POOL
↓
COOLING PERIOD
↓
TRANSFER
↓
DRY-STORAGE SYSTEM
↓
LONG-TERM MONITORING
↓
RETRIEVAL
↓
TRANSPORT
↓
REPROCESSING OR DISPOSAL
The dry-storage system should itself be assessed for:
- fuel compatibility;
- burn-up limits;
- decay-heat limits;
- criticality control;
- shielding;
- confinement;
- seismic performance;
- flooding;
- extreme temperature;
- ageing;
- corrosion;
- inspectability;
- retrievability;
- replacement/repackaging;
- transport compatibility.
The IAEA expressly identifies retrievability as a fundamental spent-fuel storage safety function.
That becomes especially important if storage lasts longer than initially planned.
A spent-fuel container that can safely remain stationary for decades but cannot subsequently be inspected, retrieved, repackaged or transported would create a major downstream liability.
6.49.4 Dual-purpose systems deserve particular scrutiny
Where technically and legally appropriate, Italy should examine systems in which the same canister or compatible package architecture can support more than one stage of the fuel-management chain.
For example:
REACTOR LOADING
↓
SEALED CANISTER
↓
DRY STORAGE
↓
TRANSPORT OVERPACK
↓
CENTRAL STORAGE / FUTURE FACILITY
This can potentially reduce:
- fuel handling;
- occupational exposure;
- package transitions;
- repackaging operations;
- interface complexity.
But procurement should not assume that a “dual-purpose” storage/transport system will automatically be acceptable for final geological disposal.
Storage, transport and disposal have different safety cases and different regulatory requirements.
The government should therefore distinguish carefully between:
storage-compatible
transport-compatible
and
disposal-compatible.
These are three separate statements.
6.49.5 Pool expansion should not become the default answer
If repository or dry-storage programmes are delayed, the simplest short-term response can appear to be increasing pool density.
That should not become an automatic strategy.
Higher-density pool storage can increase dependence on:
- neutron absorbers;
- geometry control;
- cooling;
- water inventory;
- structural performance;
- operating procedures.
The optimal pool loading therefore belongs within the safety case, not within a political desire to postpone the next spent-fuel investment.
Italy should establish the planned transition to dry storage—or another defined long-duration solution—before the pool approaches operational saturation.
6.49.6 Every vendor should provide a full 60–80-year spent-fuel inventory
FOAK procurement should require a year-by-year fuel inventory model showing:
- initial core;
- annual reload requirements;
- annual spent-fuel discharges;
- pool inventory;
- decay heat;
- dry-storage transfers;
- dry-storage inventory;
- expected transport campaigns;
- residual inventory at plant closure.
Text schematic — the required fuel inventory model
YEAR 0
INITIAL CORE
│
▼
YEARS 1–60+
RELOADS
│
▼
ANNUAL DISCHARGES
│
▼
POOL INVENTORY
│
├──── EXPECTED TRANSFER ───► DRY STORAGE
│
└──── DELAY CASE ──────────► ADDITIONAL POOL OCCUPANCY
│
▼
CAPACITY MARGIN?
YES / NO
The model should be stress-tested against multiple national back-end schedules.
It should not contain one repository opening date followed by the assumption that all later fuel disappears according to plan.
6.49.7 Italy’s historical experience argues directly against just-in-time assumptions
The present Italian waste programme demonstrates that nuclear back-end schedules can extend for many years beyond the point at which waste was originally generated.
That history does not prove that a future repository must necessarily be delayed.
It demonstrates something more useful for engineering:
the possibility of long delay is credible.
Therefore, the new programme should be designed so that a delay changes financing and logistics—not nuclear safety.
The hierarchy should be:
SPENT-FUEL POOL
↓
PLANNED DRY STORAGE
↓
OPTIONAL CENTRAL STORAGE
↓
REPROCESSING OR GEOLOGICAL DISPOSAL
not:
SPENT-FUEL POOL
↓
ASSUMED REPOSITORY DATE
↓
DATE SLIPS
↓
EMERGENCY STORAGE PROJECT
Procurement implication
No reactor should pass final Italian procurement due diligence without a complete answer to the question:
“Where is every fuel assembly expected to be, and in what licensed storage system, under the base case and under material national-back-end delays throughout the entire plant life?”
If that question cannot be answered, the reactor proposal does not yet contain a complete fuel-cycle plan.
6.50 Geological-disposal research should begin before the FOAK produces spent fuel
The geological-disposal programme is the longest-duration infrastructure component of a renewed Italian nuclear strategy.
It should therefore begin among the earliest, not the latest, programme workstreams.
The apparent paradox is important.
A first Italian reactor entering operation in the late 2030s would not require immediate geological disposal of freshly discharged fuel.
Spent fuel would normally remain in cooling pools for a period before becoming eligible for subsequent management, potentially including dry storage, reprocessing or future disposal depending on national policy.
That creates an apparent buffer of time.
It should not be confused with an absence of urgency.
Geological disposal is not a facility that can be commissioned quickly once spent-fuel stores begin approaching capacity.
IAEA guidance is explicit that development of a geological disposal facility can take decades and should proceed through a stepwise process in which the safety case, site information, design and regulatory decisions mature iteratively.
International progress has followed precisely that pattern. The IAEA’s 2024 geological-disposal roadmap was developed after decades of national research programmes and describes a pathway beginning with policy and early research before moving through siting, licensing, construction, operation and closure.
Italy should therefore separate two questions:
When will the first spent fuel require geological disposal?
and:
When must the national geological-disposal programme begin?
The answer to the second should be much earlier.
6.50.1 Geological disposal is a programme, not a construction project
The physical repository is only one component.
Before excavation of a final facility, Italy would need to develop or confirm:
- national spent-fuel policy;
- waste classification;
- reference inventory;
- direct-disposal versus reprocessing assumptions;
- waste-form requirements;
- geological screening methodology;
- regulatory criteria;
- institutional responsibilities;
- funding architecture;
- technical research programmes;
- geological datasets;
- hydrogeological models;
- engineered-barrier concepts;
- container materials;
- corrosion models;
- radionuclide-transport models;
- thermal models;
- criticality analysis;
- safeguards concepts;
- security arrangements;
- environmental baseline data;
- underground research capability;
- public-participation arrangements;
- host-community process;
- site investigation;
- safety assessment;
- safety case;
- licensing;
- construction planning;
- waste-acceptance criteria;
- operational plans;
- closure concept;
- post-closure knowledge and records.
This sequence cannot credibly begin when the first dry-storage facility is close to saturation.
Table 6.50-A — Indicative geological-disposal development chain
| Programme stage | Principal activity |
|---|---|
| National policy | Define long-term spent-fuel/waste strategy |
| Institutional architecture | Define implementer, regulator and government responsibilities |
| Inventory definition | Determine reference waste/spent-fuel quantities and characteristics |
| Concept studies | Evaluate geological and engineered-barrier options |
| National screening | Identify potentially suitable geological environments |
| R&D programme | Materials, hydrogeology, geochemistry, thermal and radionuclide transport |
| Preliminary site investigation | Obtain site-specific geological data |
| Candidate-site selection | Narrow potential locations |
| Underground research | Test geological and engineered assumptions |
| Detailed characterisation | Establish site-specific parameters |
| Preliminary safety case | Test feasibility and major uncertainties |
| Site confirmation | Establish repository suitability |
| Licence application | Submit construction safety case |
| Construction | Develop underground facility |
| Commissioning | Demonstrate systems and procedures |
| Waste emplacement | Begin operation |
| Monitoring | Verify assumptions during operation |
| Closure | Emplace seals/barriers and terminate operations |
| Post-closure | Long-term passive safety |
The IAEA’s geological-disposal guidance describes site development as progressing through conceptual planning, regional screening, detailed site investigation and site confirmation, supported by progressively deeper geological, hydrogeological and environmental evidence.
6.50.2 Italy should not confuse the National Repository with the geological repository
This distinction must remain explicit throughout the nuclear strategy.
The present National Repository project primarily addresses Italy’s existing radioactive-waste inventory and future low-level waste.
It does not by itself constitute the final geological disposal solution for a future large inventory of spent nuclear fuel or high-level waste.
Sogin’s current project architecture envisages final disposal at the National Repository for very-low- and low-level waste, while intermediate/high-activity materials are to be stored there temporarily pending their ultimate destination.
A renewed nuclear programme would therefore require Italy to answer a second-order question that is not solved simply by completing the current National Repository:
What is the final disposition strategy for the spent fuel and high-level waste generated by the new programme?
Possible strategic pathways could include:
ONCE-THROUGH CYCLE
Spent fuel
↓
Storage
↓
Geological disposal
or:
REPROCESSING / RECYCLE
Spent fuel
↓
Reprocessing
↓
Recovered material ───► new fuel
↓
High-level residual waste
↓
Geological disposal
Both eventually require a long-term solution for material that cannot be indefinitely recycled or stored.
Reprocessing therefore changes the disposal inventory.
It does not eliminate geological-disposal policy.
6.50.3 Reactor procurement and repository R&D must communicate from the beginning
Repository design depends on the waste.
Waste depends on the reactor and fuel cycle.
The two programmes therefore cannot proceed independently.
For example, repository requirements can change according to:
- fuel assembly geometry;
- uranium enrichment;
- burn-up;
- plutonium content;
- minor-actinide content;
- cladding material;
- fuel matrix;
- decay heat;
- cooling time;
- canister loading;
- reprocessing strategy;
- waste-form chemistry;
- package material;
- safeguards requirements.
This creates a direct information flow:
REACTOR CHOICE
↓
FUEL CHOICE
↓
BURN-UP / INVENTORY
↓
SPENT-FUEL CHARACTERISTICS
↓
DECAY HEAT + RADIONUCLIDES
↓
CANISTER LOADING
↓
REPOSITORY SPACING
↓
REPOSITORY SIZE
↓
COST + SITE REQUIREMENTS
Consequently, the reactor shortlist should already provide the geological-disposal programme with bounding inventory data.
6.50.4 Advanced reactors may change, not eliminate, geological questions
New reactor vendors frequently discuss:
- higher fuel utilisation;
- recycling;
- lower waste volumes;
- reduction of long-lived isotopes;
- closed fuel cycles.
These characteristics may be strategically important.
But they should be evaluated with precise physical metrics.
Italy should require comparisons of:
- spent-fuel mass/TWh;
- conditioned waste volume/TWh;
- total activity/TWh;
- long-lived activity;
- decay heat at defined times;
- fissile inventory;
- radiotoxicity profile;
- package count;
- repository footprint;
- required isolation period;
- reprocessing waste;
- secondary waste.
“Less waste” is not an adequate government metric.
A technology can produce lower waste mass while generating material with different:
- heat;
- activity;
- chemistry;
- safeguards;
- packaging;
- repository requirements.
The geological programme therefore needs technology-specific inventory data early enough to avoid designing a repository around the wrong waste assumptions.
6.50.5 Underground research should begin while design options remain open
A national programme does not necessarily have to build an immediate full-scale underground laboratory.
But Italy should develop access to underground-research capability well before repository licensing.
This could involve:
- participation in European underground research facilities;
- bilateral research programmes;
- domestic geological test facilities;
- borehole programmes;
- laboratory experiments;
- modelling programmes;
- materials-corrosion studies;
- engineered-barrier testing.
The IAEA maintains an international Underground Research Facilities Network precisely because such facilities provide practical evidence and knowledge necessary for geological-disposal programme development.
Italy can therefore use the early phase to purchase knowledge before making irreversible siting decisions.
6.50.6 Early geological research preserves strategic options
Beginning early does not mean choosing the final site early.
The distinction is essential.
Early work can examine multiple geological environments and multiple waste-management strategies.
The programme can remain reversible while knowledge accumulates.
A possible sequence is:
2020s / EARLY 2030s
NATIONAL POLICY
+
INVENTORY MODELLING
+
REGULATORY FRAMEWORK
+
GENERIC R&D
+
EUROPEAN COLLABORATION
↓
EARLY / MID-2030s
REGIONAL GEOLOGICAL SCREENING
+
BOREHOLES
+
HOST-COMMUNITY FRAMEWORK
↓
LATER 2030s / 2040s
CANDIDATE-SITE INVESTIGATION
+
UNDERGROUND RESEARCH
+
SITE-SPECIFIC SAFETY CASE
↓
SUBSEQUENT PHASE
SITE CONFIRMATION
+
LICENSING
+
CONSTRUCTION
This is an illustrative sequencing logic, not an asserted Italian schedule.
The important principle is that work begins before the waste creates schedule pressure.
6.50.7 The geological programme should be protected from reactor-cycle political volatility
One of the most dangerous institutional models would be:
NEW NUCLEAR GOVERNMENT
↓
REACTOR PROGRAMME STARTS
↓
GEOLOGICAL RESEARCH STARTS
NEXT GOVERNMENT
↓
REACTOR DEBATE CHANGES
↓
GEOLOGICAL PROGRAMME STOPS
LATER GOVERNMENT
↓
BACK-END PROBLEM REMAINS
↓
PROGRAMME RESTARTS FROM WEAK BASE
Waste obligations survive changes in electricity policy.
The geological-disposal programme should therefore be constructed as a long-duration national scientific and safety institution, not merely as an accessory to one reactor procurement cycle.
Directive 2011/70/Euratom requires national programmes to include research, development and demonstration activities needed to implement spent-fuel and radioactive-waste solutions, together with milestones, timeframes, costs, responsibilities and financing.
This provides a strong institutional basis for separating long-term waste research from short-term political cycles.
6.50.8 Funding should start with the first generation of nuclear revenue
A new nuclear programme should establish the financing mechanism for final disposal before commercial operation.
The principle should be:
ELECTRICITY GENERATED TODAY
↓
WASTE LIABILITY CREATED TODAY
↓
FUNDING CONTRIBUTION TODAY
↓
RESOURCES AVAILABLE WHEN REQUIRED
not:
ELECTRICITY GENERATED TODAY
↓
WASTE LIABILITY
↓
FUTURE GOVERNMENT PAYS
The Euratom framework requires adequate financial resources for spent-fuel and radioactive-waste management and applies the principle that the costs should be borne by those who generated the material.
The Italian financing architecture should therefore identify before FOAK operation:
- contribution methodology;
- ring-fenced fund structure;
- responsible institution;
- investment policy;
- inflation assumptions;
- liability methodology;
- periodic cost reassessment;
- treatment of cost overruns;
- plant-closure contingencies;
- responsibilities if the operator becomes insolvent.
6.50.9 The programme should maintain optionality between direct disposal and recycling without avoiding the end-state question
Italy does not necessarily need to freeze every future fuel-cycle decision before the first reactor is ordered.
Future advances could alter the economic attractiveness of:
- reprocessing;
- plutonium recycling;
- fast reactors;
- partitioning;
- transmutation.
But optionality cannot become an excuse for indefinite deferral.
The geological programme can design around bounding waste envelopes.
For example:
SCENARIO A
DIRECT DISPOSAL OF SPENT FUEL
SCENARIO B
PARTIAL REPROCESSING
SCENARIO C
CLOSED-CYCLE / FAST-REACTOR STRATEGY
↓
COMMON QUESTION:
WHAT MATERIAL STILL REQUIRES
FINAL ISOLATION?
This permits technological flexibility while maintaining a credible end-state.
6.50.10 The FOAK decision should trigger the geological programme, not precede it by decades
The strongest version of the policy principle is therefore:
Italy should not authorise a new reactor fleet while leaving geological disposal as an undefined problem for a later generation of government.
This does not mean a geological repository must be operating before the FOAK.
That would be unnecessary.
It means that before significant new spent-fuel liabilities are created, Italy should already possess:
- a defined long-term policy;
- an institutional owner;
- a regulator;
- an inventory model;
- a financing mechanism;
- an R&D programme;
- a geological-screening programme;
- international research partnerships;
- an indicative siting process;
- a public-engagement framework;
- a safety-case development roadmap.
Table 6.50-B — Minimum geological-disposal programme maturity at key reactor milestones
| Nuclear programme milestone | Required back-end maturity |
|---|---|
| Technology shortlist | Bounding fuel/waste inventories established |
| Reactor down-select | Long-term fuel-cycle options compared |
| Site selection | Waste transport and storage interfaces considered |
| FOAK licensing begins | Geological-disposal institutional programme active |
| FID | Financing mechanism established |
| First construction | R&D and geological screening underway |
| First fuel load | Long-term inventory incorporated into national programme |
| First spent-fuel discharge | Storage pathway fully operational |
| Transition to dry storage | Disposal/reprocessing route undergoing substantive development |
| Fleet expansion | Repository capacity model updated for full fleet |
Master schematic — the correct temporal relationship
WRONG MODEL
FOAK CONSTRUCTION
↓
FOAK OPERATION
↓
SPENT FUEL ACCUMULATES
↓
DRY STORAGE EXPANDS
↓
STORAGE PRESSURE
↓
START GEOLOGICAL PROGRAMME
CORRECT MODEL
REACTOR POLICY
│
├────────► GEOLOGICAL R&D
│
├────────► INVENTORY MODELLING
│
├────────► REGULATORY FRAMEWORK
│
├────────► FINANCING SYSTEM
│
└────────► GEOLOGICAL SCREENING
↓
FOAK SELECTION
│
├────────► TECHNOLOGY-SPECIFIC WASTE DATA
│
└────────► SAFETY-CASE DEVELOPMENT
↓
CONSTRUCTION
│
└────────► SITE / R&D PROGRAMME CONTINUES
↓
FIRST CRITICALITY
↓
SPENT-FUEL PRODUCTION
↓
POOL / DRY STORAGE
↓
MATURE GEOLOGICAL-DISPOSAL PROGRAMME
↓
FINAL DISPOSITION
Final government conclusion — §§6.47–6.50
These four issues form one connected national infrastructure problem.
Waste standardisation determines how many different:
- packages;
- facilities;
- licences;
- transport systems;
- handling systems;
- surveillance systems;
Italy must maintain.
On-site waste planning determines whether each reactor can continue managing its own liabilities when national infrastructure is delayed.
Spent-fuel storage determines whether reactor operation remains resilient when the downstream fuel-cycle schedule changes.
Geological-disposal preparation determines whether temporary storage remains genuinely temporary rather than becoming a permanent policy substitute.
The complete chain is therefore:
REACTOR TECHNOLOGY
↓
WASTE CHARACTERISTICS
↓
STANDARDISATION
↓
ON-SITE MANAGEMENT
↓
POOL STORAGE
↓
DRY / INTERIM STORAGE
↓
TRANSPORT
↓
NATIONAL STORAGE / TREATMENT
↓
GEOLOGICAL DISPOSAL
Failure at any downstream stage eventually propagates upstream.
That creates the central procurement principle:
Italy should select reactors not only according to how efficiently they produce electricity, but also according to how coherently their wastes can be incorporated into a national system that must remain safe, licensable, transportable, retrievable, financeable and ultimately disposable for periods extending far beyond the operating life of the reactor itself.
The implication for the first national fleet is significant.
A large number of unrelated reactor technologies may reduce dependence on a single vendor.
But it can simultaneously multiply:
fuel systems + waste streams + package families + storage systems + transport certifications + regulator specialisms + geological-disposal interfaces.
For the first fleet, technological diversity should therefore be constrained by a second requirement:
back-end commonality.
Italy should favour technologies that maximise electricity-system and industrial value without creating unnecessary parallel waste-management infrastructures.
The long-term strategic objective should be simple:
no reactor should be procured whose complete waste pathway cannot be described before construction begins.
6.51 The 2050 taxonomy condition makes geological planning economically relevant now
As addressed in Chapter 1, the EU sustainable-finance taxonomy attaches waste-management conditions to qualifying nuclear investments, including a detailed plan for a high-level waste disposal facility intended to be operational by 2050 under the applicable technical screening framework.
Therefore Italy’s geological-disposal programme is not merely a problem for the second half of the century.
It can influence:
- taxonomy eligibility;
- investor due diligence;
- financing cost;
- State-aid design;
- credibility of the “sustainable nuclear” definition.
A new-build programme launched before Italy has a credible geological roadmap risks placing financing ambitions ahead of the waste architecture required to support them.
6.52 The repository is also necessary for medicine and industry
Approximately 40% of the projected repository volume is expected to derive from:
- nuclear medicine;
- industry;
- scientific research.
This matters politically.
The National Repository cannot accurately be presented as infrastructure required only because of a possible return to nuclear power.
Italy requires a national radioactive-waste solution even if no new reactor is ever built.
Conversely, a new reactor fleet expands a national infrastructure requirement that already exists.
This distinction should be central to public information.
6.53 Legacy waste exists independently of the 2026 political decision
The existing liabilities were created decades ago.
Whether Italy:
- builds 20 SMRs;
- builds one FOAK;
- or builds no new reactor,
it still must manage:
- Trino;
- Caorso;
- Latina;
- Garigliano;
- EUREX;
- ITREC;
- Casaccia;
- Bosco Marengo;
- Ispra-1;
- returned reprocessing residues;
- ongoing medical/industrial/research waste.
The repository debate should therefore not be allowed to become analytically dependent on the new-build debate.
Italy already requires the infrastructure.
6.54 The political linkage nevertheless cannot be ignored
Legally separate does not mean politically separate.
Public opposition to new reactors will be strengthened if the State has not resolved the waste programme inherited from the previous one.
A citizen can reasonably ask:
Why should a territory accept new radioactive-material production when the State has not yet built the repository promised for the previous programme?
This is a social-licence problem even where there is no statutory requirement that the National Repository be operating before a reactor construction licence can be considered.
Therefore the repository is not necessarily a formal legal precondition to every new-build step.
It is a major programme credibility gate.
6.55 Current legacy financing: the taxpayer now carries the historic programme
ARERA’s 2025 regulatory decision confirms that from 2023, nuclear legacy costs ceased to be financed directly through electricity-user charges and became charges borne directly by the State Budget.
ARERA retained its cost-recognition and efficiency-control responsibilities.
This fiscalisation changed who sees the cost.
It did not make the cost disappear.
Legacy expenditure now competes within public finances with:
- healthcare;
- infrastructure;
- defence;
- education;
- other energy programmes.
The State should therefore publish lifecycle nuclear liabilities in a form that prevents repository and decommissioning costs from becoming invisible inside general expenditure.
6.56 New build must not reproduce the same intergenerational transfer
The purpose of the 2026 operator-guarantee provisions should be to prevent future generations from inheriting another unfunded decommissioning programme.
A new reactor owner should accumulate sufficient resources while the plant is generating revenue.
The fundamental rule should be:
The generation that receives the electricity should finance the waste and decommissioning liabilities created by producing it.
That is economically consistent with Article 9 of Directive 2011/70/Euratom, which requires adequate financial resources while taking account of generator responsibility.
6.57 Operator insolvency must be planned for
A reactor may operate for 60–80 years.
Its corporate owner may not.
Therefore a decommissioning fund cannot merely be an accounting provision on the operator’s balance sheet.
It should remain available if the company:
- restructures;
- is acquired;
- enters insolvency;
- ceases trading.
Possible protections include:
- segregated statutory funds;
- external trustees;
- government-supervised investment rules;
- periodic adequacy tests;
- mandatory top-ups.
[U]
The final decrees must resolve this before licensing.
6.58 Premature shutdown is the principal funding stress test
A fund calibrated on 60 years of generation can be underfunded if a plant closes after:
- 10 years;
- 20 years;
- construction but before full commercial operation.
The funding architecture therefore needs an early-life guarantee.
Otherwise the State becomes de facto insurer of last resort.
A proper stress test should model:
- normal 60-year operation;
- 40-year closure;
- 20-year closure;
- closure immediately after major nuclear commissioning;
- operator insolvency.
6.59 Geological-disposal costs must be booked before a geological repository exists
A common accounting error would be to postpone geological-disposal provisions until a site is selected.
That would understate the economic cost of electricity generated before selection.
The correct approach is to collect money against an estimated future liability, with periodic revisions as the programme develops.
This is standard intergenerational financial logic.
Uncertainty about repository cost is an argument for periodic recalculation.
It is not an argument for zero provision.
6.60 Who should pay for what
A defensible allocation would separate the liabilities as follows.
| Liability | Principal payer |
|---|---|
| Historic reactor decommissioning | Existing State legacy framework |
| Historic fuel/reprocessing residues | Existing State/Sogin legacy framework |
| Current medical/industrial/research waste | Generators under applicable charging arrangements + national infrastructure mechanisms |
| New reactor operational waste | New reactor operator |
| New spent-fuel interim storage | New reactor operator |
| New reactor decommissioning | New reactor operator |
| Incremental National Repository capacity required by new build | New reactor operators |
| Incremental geological-disposal capacity from new build | New reactor operators |
| Regulator controls attributable to new build | Operators where legislation so provides |
| Policy development / sovereign institutional functions | State |
[U]
The State may choose to subsidise parts of these costs for energy-policy reasons.
If it does, that support should be recorded explicitly rather than hidden in waste accounting.
6.61 Repository charging should reflect radiological burden, not only cubic metres
A pure €/m³ waste charge would be simple but potentially distortive.
One cubic metre of VLLW is not economically equivalent to one cubic metre of vitrified HLW.
A fair tariff system should consider some combination of:
- volume;
- activity;
- heat output;
- package type;
- long-lived isotope inventory;
- required storage duration;
- handling complexity;
- final disposal route.
[U]
This is particularly important if the repository ultimately accepts waste from multiple reactor technologies.
6.62 The Italian programme requires one consolidated radioactive-material account
The State should be able to answer, annually:
- how much waste exists;
- where it is;
- what category it is;
- whether it is conditioned;
- who owns it;
- who pays for it;
- what its final destination is;
- what capacity remains in each store.
Sogin’s AIGOR system is an important component of that architecture, but the future national system must also integrate:
- non-Sogin generators;
- new operators;
- spent fuel;
- imported/returned residues;
- eventual geological-disposal packages.
A national nuclear programme without a single lifecycle material account would be fiscally and operationally incomplete.
Before the State permits an irreversible new reactor commitment, the waste programme should satisfy at least the following minimum conditions.
Gate W1 — National Repository
A legally credible path exists with:
- final CNAI process;
- selected host pathway;
- schedule;
- financing.
The repository need not necessarily already be operating, but an indefinite undefined siting process is insufficient.
Gate W2 — Returned residues
Italy has a licensed plan for:
- French residues;
- UK residues;
- transport casks;
- interim storage.
Gate W3 — Geological disposal
A formally approved programme exists identifying:
- national pathway;
- international pathway;
- decision deadlines;
- R&D;
- funding.
Gate W4 — New reactor waste dossier
Selected reactor vendor provides lifecycle inventory.
Gate W5 — Spent fuel strategy
Government decides whether baseline policy is:
- direct disposal;
- reprocessing;
- or a formally maintained dual option.
Gate W6 — Operator funding
Segregated funding/guarantee structure is legally operational.
Gate W7 — Repository capacity
Incremental new-build waste capacity is accounted for separately from legacy capacity.
Failure on these gates need not automatically prohibit all preparatory engineering.
It should prohibit an irreversible State-backed FOAK financing decision.
6.64 Waste should enter the technology tender as a scored criterion
A future reactor tender should not score only:
- CAPEX;
- schedule;
- electrical efficiency;
- Italian content.
It should also score:
- spent-fuel quantity;
- heat load;
- dry-storage maturity;
- existing licensed casks;
- waste package standardisation;
- final-disposal compatibility;
- unusual materials;
- decommissioning evidence;
- vendor willingness to guarantee waste data.
A slightly more expensive reactor with a mature European back end may be cheaper over 100 years than a lower-CAPEX reactor requiring a new fuel and disposal infrastructure.
6.65 “Waste minimisation” must not become a substitute for “waste disposition”
The 2015 Italian classification principles require waste generation to be kept as low as reasonably practicable.
That is appropriate.
Operators should pursue:
- decontamination;
- material clearance;
- recycling;
- volume reduction;
- segregation.
But volume reduction is only one objective.
A highly concentrated long-lived waste package may occupy little space but require geological isolation for thousands of years.
Therefore the lifecycle KPI should include:
- volume;
- activity;
- heat;
- lifetime;
- final disposition.
6.66 Reprocessing strategy for a new fleet should not be inherited automatically from the old fleet
Italy’s historic programme adopted foreign reprocessing partly to remove fuel from legacy sites and support decommissioning.
That does not prove reprocessing is automatically the optimal strategy for future SMRs.
A new programme should compare:
Once-through cycle
Advantages:
- fewer fuel-cycle facilities;
- simpler safeguards;
- commercially mature for LWRs.
Disadvantages:
- full spent-fuel inventory requires geological disposal.
Foreign reprocessing
Advantages:
- recovery of reusable materials;
- conditioned waste returns;
- potentially lower physical volume.
Disadvantages:
- cost;
- foreign dependency;
- transport;
- residues still return;
- geological disposal still needed.
Domestic closed cycle
Advantages:
- greater fuel-cycle sovereignty;
- potential resource utilisation.
Disadvantages:
- requires reprocessing/fabrication facilities;
- plutonium safeguards/security;
- very high capital/regulatory complexity.
No option is waste-free.
6.67 Domestic reprocessing would be a second national nuclear programme
The 2026 delegation legally opens the possibility of fuel fabrication and reprocessing facilities in Italy.
That should not be treated as a minor ancillary industry.
A domestic reprocessing/MOX programme would require:
- separate sites;
- separate environmental assessment;
- nuclear-security systems;
- safeguards;
- liquid and solid waste systems;
- plutonium-accountancy infrastructure;
- specialist workforce;
- additional decommissioning funds.
It would effectively be a second major nuclear infrastructure programme alongside reactor deployment.
For the first LWR-SMR fleet, Italy should therefore not assume domestic reprocessing unless a separate national cost-benefit and security decision supports it.
6.68 Repository and fuel policy should be technology-neutral but not technology-blind
The law’s technology-neutrality principle does not mean every reactor imposes the same waste requirement.
A national waste policy should accommodate multiple technology families where reasonable.
But procurement should recognise that:
- LEU LWR fuel;
- HALEU TRISO;
- metallic HALEU;
- MOX fast-reactor fuel
are not interchangeable from a back-end perspective.
Technology neutrality should therefore mean:
same decision principles
not
identical waste assumptions.
6.69 A fleet strategy reduces back-end complexity
If Italy deploys:
- BWRX;
- NUWARD;
- Xe-100;
- newcleo;
- Natrium
simultaneously, it creates five different back-end systems.
If Italy standardises around one or two technologies, it can standardise:
- fuel;
- casks;
- handling;
- waste packages;
- operator training;
- repository interfaces.
That is another reason why the first fleet should have limited technological diversity.
6.70 Decommissioning must be designed into the plant
IAEA SMR work increasingly emphasises design for decommissioning.
A reactor designed for modular replacement and easy component access may reduce:
- worker dose;
- dismantling time;
- secondary waste.
Italy should require vendors to demonstrate:
- removable shielding;
- segmentation strategy;
- material inventory;
- remote handling;
- contamination control;
- final-site release strategy.
Waste management begins at reactor design.
It should not begin 60 years later.
6.71 Waste liabilities belong in the State balance-sheet risk register even when privately funded
Even where a private operator is legally responsible, the State remains exposed if:
- operator fails;
- disposal facility is delayed;
- fund is inadequate;
- public safety requires intervention.
Therefore MEF should maintain a separate contingent nuclear liability register identifying:
- operator funds;
- guarantee shortfalls;
- repository commitments;
- geological-disposal estimates;
- State backstop exposure.
This does not mean the State should provision the entire private liability as public debt.
It means the risk should be visible.
6.72 The current programme already demonstrates the cost of schedule mismatch
Italy’s historic timeline contains a simple structural mismatch:
fuel reprocessing progressed faster than national disposal infrastructure.
The result is:
- waste conditioned abroad;
- return obligation delayed;
- continuing foreign storage costs;
- new cask procurement;
- ongoing intergovernmental negotiation.
A new fleet should not repeat that sequencing error.
The final waste destination need not physically exist before first fuel loading.
But the pathway, funding and milestones should.
6.73 Overall assessment
Italy’s radioactive-waste problem is manageable.
It is not solved.
The country possesses:
- an experienced state decommissioning company;
- waste-treatment capability;
- internationally benchmarked regulatory practices;
- a mature concept for a surface National Repository;
- an identified 51-area siting pool;
- an active SEA process;
- defined foreign-reprocessing inventories;
- physical procurement under way for the return of high-level residues.
Those are substantial assets.
The unresolved issues are equally substantial.
Italy does not yet possess:
- an operating National Repository;
- a selected repository site;
- an authorised construction programme for that repository;
- a final geological disposal site;
- a fully approved updated national geological-disposal strategy;
- completed return of French and UK high-level residues;
- completed removal/management of all legacy spent fuel;
- a defined new-build waste levy or decommissioning-fund formula.
The historic programme generated approximately 1,864 tonnes of spent fuel.
Sending approximately 99% abroad for reprocessing reduced domestic interim fuel inventories and supported decommissioning, but it did not transfer final responsibility.
Conditioned residues are returning.
The €32 million cask contract awarded on 24 September 2026 is physical evidence of that reality.
The National Repository is therefore indispensable — but it is only one part of the answer.
Its roughly 84,000 m³ lower-activity disposal capacity plus 14,000 m³ higher-activity temporary-storage capacity provides the missing national centralisation step.
It does not provide the final geological isolation required for Italy’s most long-lived material.
That is the more important intergenerational gap.
For a new reactor fleet, the State must apply a stricter rule than it inherited from the twentieth century:
No reactor technology should be considered fully deployable unless its fuel, spent fuel, operational waste, decommissioning waste, interim storage, final disposal and funding pathway are all identified before the investment becomes irreversible.
That standard does not require Italy to solve every geological engineering detail before selecting an SMR.
It does require the waste system to be treated as part of the reactor system.
The programme should therefore proceed on five principles:
First, complete the legacy cycle.
The National Repository is required independently of new build and should remain a priority state infrastructure project.
Second, return and secure the foreign residues.
The France/UK programme should be reported transparently as a continuing Italian liability.
Third, develop geological disposal now.
Interim storage should buy time, not become the permanent strategy by default.
Fourth, ring-fence new-build liabilities from legacy taxpayers.
Future operators must finance their own decommissioning, waste and spent-fuel obligations through protected lifecycle funds.
Fifth, select technology with its back end attached.
An SMR cannot be assessed solely as a reactor island. Fuel cycle and waste architecture are part of the procurement.
The most consequential conclusion is therefore institutional rather than radiological:
Italy cannot credibly inaugurate a second nuclear era while continuing to treat disposal infrastructure as a problem that belongs to the end of the first one.
The two programmes now overlap.
How Italy resolves that overlap will determine not only repository policy, but the legal, fiscal and political credibility of the entire new-build programme.
CHAPTER 6 — LOAD-BEARING SOURCE REGISTER
Italian radioactive-waste classification
G1 — Interministerial Decree, 7 August 2015 — Classification of radioactive waste. Establishes the Italian VSLW/VLLW/LLW/ILW/HLW classification and disposal principles.
Official Gazette — Decree of 7 August 2015
G2 — MASE — official text of the 7 August 2015 radioactive-waste classification.
MASE — Radioactive-waste classification decree
Legacy irradiated fuel and foreign reprocessing
G3 — Sogin — Nuclear Fuel Management. Principal official source for the ~1,864 t historic reactor-fuel inventory, 99% foreign reprocessing, ~938 t transfers under current contracts, remaining ~13 t, and the return of conditioned residues.
Sogin — Nuclear fuel management
G4 — Sogin — French and UK reprocessing residues. France: 15.4 m³ vitrified HLW and 47.6 m³ compacted metallic residues; United Kingdom: approximately 20 m³ vitrified HLW following substitution agreement.
G5 — Sogin, 25 June 2026 — ITREC dry storage. Re-encapsulation of 64 Elk River fuel elements into two dry-storage casks pending National Repository availability.
G6 — Sogin, 24 September 2026 — CASTOR HAW28M procurement. Five casks from GNS; approximately €32 million; part of the France/UK reprocessing-residue return programme.
L1 — Chamber of Deputies, 12 February 2025 — answer to Question 5-03541. Official distinction between foreign storage/management costs and historic reprocessing/transport expenditure; approximately €5m/year current storage/management contracts and €1.3942bn cumulative Sogin expenditure since 1999.
L2 — Senate parliamentary record — Lucca Agreement milestones. Records the original 31 December 2025 return deadline.
L3 — Senate, July 2026 — parliamentary record on revised French storage arrangement. Records the assertion that the revised arrangement may extend storage in France to 2040; treated in this report as parliamentary evidence pending review of the underlying bilateral instrument.
Sogin and the legacy nuclear inventory
G7 — Sogin Group, 2024 Sustainability Report. Detailed radioactive-waste inventory and conditioning status at 31 December 2024.
G8 — Sogin Group, 2025 Financial Statements, approved August 2026. National decommissioning programme at 47.7% completion at 31 December 2025.
G9 — Sogin — corporate mission and current nuclear sites. Four former commercial stations, fuel-cycle facilities, Ispra-1, CISAM/RTS-1 and EURACOS responsibilities.
G10 — Sogin — Waste Management. Characterisation, treatment, conditioning, storage, National Repository transfer and green-field sequence.
National Repository and CNAI
G11 — Sogin — National Repository and Technology Park. Surface repository architecture; ~84,000 m³ VLLW/LLW final disposal, ~14,000 m³ ILW/HLW interim storage; ~98,000 m³ total; 60/40 nuclear versus medical/industrial/research split.
G12 — Sogin — Repository siting procedure. Confirms absence of self-nominations, continuation through SEA, CNAI update, ISIN opinion and subsequent negotiation process.
G13 — MASE — official proposed CNAI list. Full 51-area list, including 21 Viterbo areas.
G14 — Province of Viterbo, September 2026. Formal consideration of expert-supported integrative observations to CNAI within the SEA procedure.
G15 — Sogin, 30 June/1 July 2026 — Senate hearing. Confirms 47.7% decommissioning progress and 2039 National Repository objective.
G16 — Sogin / ARERA, 7 August 2026. Restoration of National Repository advances after completion of requested planning documentation.
Geological disposal and international review
I1 — IAEA ARTEMIS Review of Italy. Near-surface disposal for VLLW/LLW; consolidated interim storage for ILW/HLW/spent fuel; missing final geological pathway; draft 2023 dual national/international approach.
I2 — IAEA SMR Platform Annual Report 2025. Limited current information/experience on SMR waste, spent fuel and decommissioning; diverse waste streams expected.
I3 — IAEA SMR Platform — Waste Management. Waste-informed design and lifecycle approach for SMRs.
I4 — IAEA — Advances in SMR Development. Water-cooled SMRs generally use back-end approaches similar to advanced water reactors; HLW/spent fuel declared as waste requires deep geological disposal.
EU and Italian financial responsibility
L4 — Council Directive 2011/70/Euratom. National programmes, generator responsibility, adequate financial resources, transparency and full spent-fuel/waste management chain.
L5 — Senate DDL 1924, Article 3(o). Adequate lifecycle financial guarantees, with costs borne by licensed operators, including possible dedicated funds for decommissioning, radioactive waste and spent fuel.
L6 — Senate DDL 1924, Articles 2–3. Future regulation of fuel fabrication, reprocessing, waste/spent-fuel storage, disposal and decommissioning.
G17 — ARERA Resolution 261/2025/R/eel. From 2023 legacy nuclear costs are borne directly by the State Budget; ARERA retains cost-recognition and efficiency oversight.
END OF CHAPTER 6
CHAPTER 7 — SYSTEM, ENVIRONMENTAL, SEISMIC AND SECURITY IMPACTS
7.1 Executive finding
A new Italian nuclear fleet would not operate as an isolated source of baseload electricity. It would enter an electricity system undergoing simultaneous structural change: rapid renewable penetration, retirement pressure on ageing thermal generation, storage deployment, expansion of electricity demand through heat pumps and industrial electrification, increasing data-centre connection requests, reinforcement of north–south transmission corridors, new HVDC links and growing exposure to climate-driven variability.
The system value of nuclear must therefore be assessed through more than annual terawatt-hours or levelised cost.
A reactor can contribute:
- dispatchable low-carbon generation;
- dependable capacity;
- synchronous inertia where connected through a conventional synchronous turbine-generator;
- voltage and reactive-power support;
- reduced dependence on weather-correlated generation;
- potentially industrial heat;
- electricity for hydrogen production;
- high-load-factor supply for data centres and other continuous loads.
But a nuclear fleet does not eliminate the requirement for:
- storage;
- transmission reinforcement;
- interconnectors;
- demand response;
- renewable balancing;
- operating reserve;
- black-start resources;
- grid-forming capability;
- extreme-weather resilience.
Those requirements change in quantity and character rather than disappear.
Terna’s 2025 National Resource Adequacy Assessment is particularly relevant. Its 2030–2035 scenarios do not yet include a new Italian nuclear fleet, but they demonstrate the future system problem into which nuclear would enter. Terna applies an adequacy standard of three Loss-of-Load-Expectation hours per year and uses climate-sensitive probabilistic modelling. Under a scenario in which all economically unviable thermal capacity retires, Terna estimates more than 150 LOLE hours in 2030 and more than 200 hours in 2035, even after accounting for storage secured through MACSE. It also links deterioration in adequacy between 2030 and 2035 partly to higher peak demand from electrification, heat pumps and data centres and finds continued strong dependence on climatic conditions in a high-renewables system. [G]
This evidence does not prove that nuclear is the unique solution to the Italian adequacy problem. It establishes that the future system requires substantial quantities of dependable capacity, flexibility and network capability. Nuclear is one candidate contributor to that requirement.
Climate is simultaneously a grid issue and a reactor-site issue. ISPRA recorded significant deterioration in Italian water availability during 2025 and severe water stress in parts of the Po system in summer 2026, while European climate monitoring recorded exceptional heat and dryness across parts of Western and Southern Europe. The OECD Nuclear Energy Agency has separately documented that heatwaves, drought, low river levels and high cooling-water temperatures can constrain nuclear output unless plants are designed and operated for those conditions. [G][S]
Consequently, reactor capacity should not be modelled as climatically invariant.
A nominal 300 MWe reactor does not automatically contribute 300 MW of dependable system capacity during every stress event. The relevant value depends on:
- forced-outage probability;
- planned refuelling;
- cooling-water availability;
- ambient temperature;
- grid connection;
- common-mode site risks;
- whether several modules can fail simultaneously.
For safety, the legal threshold is equally demanding. Italy’s implementation of the Euratom nuclear-safety regime requires new nuclear installations to be designed, sited, constructed, operated and decommissioned so as to prevent accidents and mitigate their consequences, specifically avoiding early radioactive releases for which off-site protective action could not be implemented in time and large releases requiring protective measures unlimited in space or time. Italian law also requires defence in depth and explicit consideration of extreme natural and unintentional human-induced hazards. [L]
This requirement applies irrespective of reactor size.
An SMR may have:
- a smaller radioactive inventory per module;
- lower decay heat;
- passive safety;
- underground structures;
- smaller accident source terms for particular scenarios.
None of those characteristics creates a statutory assumption that emergency planning disappears.
Emergency-planning zones must be justified from the actual design, source term, site, accident analysis and off-site dose consequences. International regulatory work recognises that SMRs may justify smaller emergency-planning arrangements in some cases; it does not support a universal zero-EPZ rule.
Italy already possesses a national radiological/nuclear emergency system, but its present national plan was developed principally around accidents at foreign nuclear power plants and other radiological events affecting Italy. A domestic generating reactor would require a separate site-specific external emergency plan under Legislative Decree 101/2020. Italian law requires such a plan for nuclear installations, assigns the Prefect a central planning role with Region, municipalities, health services, ARPA/APPA, fire services, law enforcement and the operator, and prohibits new installations requiring such planning from beginning activity before the emergency plans have been approved. The plan must be reviewed at least every three years and exercised periodically. [L]
Security adds another independent licensing layer.
The future plant must integrate:
- physical protection;
- sabotage prevention;
- insider-threat protection;
- material control;
- cyber security;
- supply-chain security;
- emergency response.
Italy is party to the amended Convention on the Physical Protection of Nuclear Material and maintains national rules governing physical protection of nuclear facilities and material. Digitalisation also brings the plant inside the broader NIS2 cybersecurity architecture while leaving nuclear-specific computer-security requirements fully applicable.
Finally, Italy’s present civil nuclear-liability regime is not unlimited. Following implementation of the amended Paris and Brussels nuclear-liability conventions, the general Italian operator-liability amount is €700 million per nuclear incident, with supplementary public and international compensation under the Brussels regime taking the guaranteed compensation architecture to at least approximately €1.5 billion. Lower statutory amounts can apply to specified lower-risk installations and transport. [L/G]
A return to active commercial nuclear generation therefore creates a policy question that Italy did not have to confront while operating only decommissioning and research facilities: whether the existing statutory liability and insurance architecture remains appropriate for a new reactor fleet or should be amended before the first licence.
The central conclusion is that the environmental and security case for an Italian SMR cannot be reduced to the proposition that “new reactors are smaller and safer.”
The relevant state question is:
Can the selected reactor maintain dependable system value, adequate cooling, defence in depth, secure operation, emergency preparedness and insurable lifecycle responsibility under the actual Italian grid, climate, seismic, hydrogeological and security environment for sixty or more years?
That is the standard applied below.
7.2 The Italian electricity system problem is adequacy, flexibility and network geography — not merely annual energy
Italy’s electricity transition increasingly separates energy sufficiency from capacity adequacy.
A power system may generate enough annual renewable electricity while still experience critical hours in which:
- solar production is unavailable;
- wind output is low;
- storage is depleted;
- imports are constrained;
- conventional units are unavailable;
- demand peaks.
Terna measures this through probabilistic adequacy indicators rather than annual generation balances.
Its 2025 assessment shows that the highest risks of unserved energy in future scenarios concentrate particularly in:
- evening hours;
- winter periods;
- some summer peak-demand periods.
It also identifies storage as necessary to cover high evening residual load when thermal capacity declines. [G]
This is the context in which nuclear capacity has potential value.
Nuclear generation is not weather-correlated in the same manner as photovoltaic or wind production.
It can therefore reduce the volume of residual demand that must be served by:
- storage;
- gas;
- imports;
- demand response.
But the correct comparison is system-wide.
A reactor should be evaluated against alternative portfolios that could provide equivalent reliability through combinations of:
- renewables;
- storage;
- interconnection;
- demand response;
- dispatchable generation;
- CCS;
- firm low-carbon imports.
That analysis belongs partly in Chapter 10, but the physical-system requirement is already clear here.
7.3 Capacity credit is not the reactor’s nameplate output
A recurring analytical error is to count every megawatt of nuclear nameplate capacity as one megawatt of guaranteed adequacy capacity.
The correct concept is effective capacity value.
A nuclear unit can fail to be available during a system stress period because of:
- scheduled outage;
- unplanned outage;
- fuel-cycle issue;
- cooling restriction;
- transmission outage;
- external natural hazard.
Therefore the future Italian adequacy model must calculate nuclear contribution probabilistically.
As of September 2026, Terna has no empirical Italian new-reactor performance history from which to assign such a capacity credit.
A domestic fleet model should therefore use:
- international reference-unit forced-outage data;
- reactor-specific refuelling assumptions;
- climate-sensitive derating;
- common-cause site modelling;
- conservative FOAK availability assumptions.
[U]
The State should not allow a procurement model to assume 90–95% annual capacity factor and then translate the same percentage directly into adequacy capacity without hourly probabilistic modelling.
The two metrics answer different questions.
One systems argument in favour of SMRs is physically valid.
If a 1,200 MWe single unit trips, the grid immediately loses approximately 1,200 MWe.
If the same site output is composed of independently operating 300 MWe modules, the trip of one module could reduce the instantaneous loss to approximately 300 MWe.
All else equal, that can reduce:
- reserve requirement associated with the largest infeed loss;
- frequency excursion after a single-unit trip.
But this advantage should not be overstated.
Several modules located on the same site can share:
- switchyard;
- cooling-water system;
- external grid;
- access roads;
- flood hazard;
- seismic hazard;
- security perimeter;
- certain auxiliary systems.
A site-wide flood, grid fault, fire, cyber event or other common-cause condition could therefore affect more than one unit.
IAEA siting requirements specifically require multi-unit and common-cause external hazards to be considered rather than treating each module as statistically independent. [S]
The system benefit should consequently be calculated from the real common-mode architecture of the selected design.
7.5 Nuclear and renewables are complementary at system level, but economically they can compete hour by hour
The IEA and OECD-NEA both recognise that dispatchable nuclear generation can complement variable renewable generation by supplying firm low-carbon energy and system services.
But complementarity should not be confused with constant market compatibility.
A future Italian system may experience periods with:
- high solar production;
- high wind production;
- low daytime wholesale prices;
- limited export capability.
A nuclear plant continuing at full output during such hours may experience:
- low market revenue;
- negative-price exposure;
- renewable curtailment elsewhere;
- pressure to reduce output.
Therefore the commercial model must address whether the reactor will:
- operate almost continuously and rely on a long-term revenue contract;
- load-follow;
- divert electricity into hydrogen or other flexible loads;
- provide thermal energy;
- co-locate with high-load-factor demand;
- combine several of these options.
The answer affects both economics and reactor design.
7.6 Load following is possible for modern reactors, but it is not free flexibility
Modern PWR and BWR fleets can vary output.
Several prospective SMRs explicitly advertise load-following capability.
But flexibility has consequences.
Repeated power manoeuvring can affect:
- fuel management;
- control systems;
- thermal cycling;
- maintenance;
- component fatigue;
- capacity factor;
- revenue.
The system comparison should therefore not assume that nuclear can absorb every renewable fluctuation with no cost.
Short-duration balancing may be better provided by:
- batteries;
- hydro;
- demand response;
- interconnectors.
Nuclear’s strongest system role may instead be to reduce the volume of residual load that those resources must manage.
[U]
7.7 Synchronous inertia: useful, real, but not unique to nuclear
A conventional nuclear steam-cycle unit generally connects to the grid through a large synchronous turbine-generator.
The rotating mass can provide physical inertia, which slows the initial rate of frequency change after a major imbalance.
As inverter-connected solar, wind and batteries increase, conventional synchronous inertia can decline.
Nuclear generation can therefore contribute:
- rotational inertia;
- fault current;
- reactive-power support;
- voltage control.
But this should not be converted into the claim that nuclear is required to maintain system stability.
Terna is already deploying alternative technology.
Its Italian “G for Grid Forming” project demonstrated grid-forming battery capability specifically intended to strengthen system stability as inverter-based renewable generation rises. [G]
Other solutions include:
- grid-forming inverters;
- synchronous condensers;
- batteries;
- hydro generators;
- advanced wind-converter controls.
Nuclear therefore provides one source of system strength rather than the only source.
7.8 A nuclear fleet does not eliminate storage
A nuclear programme can reduce the amount of storage needed in some scenarios by providing energy during:
- nights;
- winter;
- low-wind periods.
But it cannot eliminate the storage requirement created by high solar penetration.
Terna’s adequacy work shows substantial value from storage in future evening residual-load periods. [G]
Storage additionally supplies services that a nuclear station may not provide as efficiently:
- millisecond frequency response;
- intraday solar shifting;
- congestion relief;
- local voltage services.
The correct policy question is therefore:
How does nuclear change the optimal storage portfolio?
not:
Does nuclear make storage unnecessary?
7.9 Interconnectors remain strategically important
Italy is deeply interconnected with:
- France;
- Switzerland;
- Austria;
- Slovenia;
- other markets through additional routes and planned infrastructure.
A domestic nuclear fleet could reduce some import dependence.
It would not make interconnection economically or operationally obsolete.
Interconnectors provide:
- emergency support;
- reserve sharing;
- price arbitrage;
- renewable balancing;
- export opportunity during low domestic demand;
- access to geographically diversified generation.
A large Italian nuclear build that simultaneously reduced interconnection flexibility would weaken rather than strengthen resilience.
7.10 Grid reinforcement remains necessary even with nuclear
The introduction of nuclear generation would not eliminate the need for reinforcement of the Italian transmission system.
It would change part of the reason for that reinforcement.
Italy’s electricity network is already undergoing a major structural transformation driven by the rapid increase in renewable generation, storage, electrification, new interconnectors, large industrial consumers and geographically concentrated new loads such as data centres. Terna’s 2025 Development Plan provides for more than €23 billion of transmission investment during 2025–2034. It assumes more than 65 GW of additional renewable capacity by 2030 compared with 2023, with approximately 43 GW of renewable capacity expected to require integration into the high-voltage network over the ten-year planning horizon. The same programme develops large AC and HVDC corridors intended to increase transmission capacity between Italian market zones and reinforce internal grid resilience.
A future nuclear programme would enter this evolving network.
It would not enter the Italian power system as if the transmission network were frozen in its present configuration.
This distinction is fundamental.
New nuclear generation would provide programmable, high-load-factor production, but it would also create new concentrated injection points, potentially ranging from a few hundred megawatts for an individual SMR to considerably larger aggregate injections for multi-unit sites.
The transmission question is therefore not:
“Is there already a 380 kV line near the site?”
The correct question is:
“Can the future transmission system safely absorb the proposed reactor output at that specific node, under normal and credible contingency conditions, after taking into account all other generation, storage, consumption and network projects expected to exist when the reactor enters operation?”
That is a materially more demanding test.
7.10.1 Existing transmission infrastructure is an advantage, not evidence of connection capacity
The existence of high- or extra-high-voltage infrastructure near a candidate site can materially reduce connection difficulty.
It can provide:
- existing transmission corridors;
- substations;
- rights-of-way;
- established grid interfaces;
- existing easements;
- road access;
- industrial land;
- switchyard locations;
- existing knowledge of local electrical conditions;
- potentially reusable infrastructure from retired generating stations.
But none of these characteristics demonstrates that the network possesses sufficient future headroom for nuclear generation.
An existing 380 kV node may already be constrained by:
- generation connected elsewhere on the corridor;
- future renewable projects;
- storage projects;
- demand connections;
- planned HVDC converters;
- reactive-power requirements;
- short-circuit limits;
- planned line outages;
- maintenance conditions;
- stability constraints;
- congestion between market zones.
Terna’s Grid Code explicitly treats network security through contingency analysis, including N-1 security, and identifies the loss of lines, transformers and generating units among the single contingencies that must be considered. It also imposes requirements concerning voltage regulation, reactive power and system stability.
Consequently:
EXISTING 380 kV INFRASTRUCTURE
│
▼
REDUCES CONNECTION UNCERTAINTY
│
▼
BUT DOES NOT EQUAL
│
▼
AVAILABLE CONNECTION CAPACITY
│
▼
AND DOES NOT EQUAL
│
▼
CONNECTION AUTHORISATION
7.10.2 The Chapter 3 sites possess important transmission context, but each still requires a new Terna study
The sites previously identified in Chapter 3—including Montalto, Trino, Latina, Caorso, Civitavecchia and Brindisi—have important existing high-voltage transmission characteristics.
Direct Terna evidence confirms substantial extra-high-voltage infrastructure in several of these areas.
Montalto is an established 380 kV node. Terna’s planned Milano–Montalto Hypergrid project includes a 2,000 MW VSC-HVDC connection terminating near the Montalto 380 kV node, itself demonstrating both the strategic strength of the location and the fact that its future electrical architecture is changing.
Trino is connected to the 380 kV transmission architecture through the Trino–Lacchiarella corridor.
Caorso is associated with the 380 kV network through the La Casella–Caorso system and subsequent network rationalisation.
Brindisi is embedded in a substantial 380 kV network including Brindisi–Bari Ovest, Brindisi–Taranto Nord, Brindisi–Brindisi Nord and connections associated with Brindisi Sud.
Latina already sits within major extra-high-voltage infrastructure and the Italian HVDC system; it is also included in long-term Hypergrid development concepts.
The Civitavecchia/Torrevaldaliga area likewise belongs to the important Tyrrhenian transmission corridor identified in Terna network documentation.
But these findings demonstrate only that these areas deserve detailed electrical investigation.
They do not demonstrate that a 300, 470, 600 or 1,000+ MW nuclear development could be connected without significant additional works.
Table 7.10-A — Correct interpretation of legacy high-voltage infrastructure
| Candidate area | Verified transmission advantage | What remains unproven |
|---|---|---|
| Montalto | Established 380 kV node; future 2 GW Milano–Montalto VSC-HVDC architecture | Available nuclear injection capacity after Hypergrid development |
| Trino | Existing 380 kV Trino–Lacchiarella infrastructure | Future node capacity, local stability and connection works |
| Latina | Major HV/HVDC network history and future Hypergrid relevance | Capacity available for nuclear after future network reconfiguration |
| Caorso | Existing 380 kV network architecture | Actual capacity for new generation and required substation works |
| Civitavecchia / Torrevaldaliga | Historically important Tyrrhenian generation/transmission node | Future post-thermal-generation network configuration and nuclear connection capacity |
| Brindisi | Dense 380 kV transmission structure | Future congestion, generation queue, short-circuit and stability limits |
The procurement rule must therefore be:
legacy electrical infrastructure can increase a site’s attractiveness, but only a Terna system study can establish connection feasibility.
7.10.3 Thermal transmission capacity is only the first test
The simplest grid question is whether the lines connected to a node can carry the additional current.
That is necessary.
It is not sufficient.
The thermal capability of:
- conductors;
- transformers;
- busbars;
- switchgear;
- cables;
- breakers;
must remain within allowable limits under normal and contingency conditions.
A reactor may therefore be compatible with the network under the intact N condition but incompatible following the loss of one critical transmission circuit.
For example:
NORMAL CONDITION
NUCLEAR PLANT
│
├──────── LINE A
│
└──────── LINE B
POWER DIVIDED BETWEEN TWO PATHS
↓
THERMAL LIMITS OK
N-1 CONDITION
LINE A LOST
│
▼
LINE B RECEIVES LARGER FLOW
│
▼
THERMAL LIMIT EXCEEDED?
│
YES ─────► CONNECTION / NETWORK REINFORCEMENT REQUIRED
A credible connection study must therefore examine not merely the nominal output of the reactor but power flows throughout the affected regional network.
7.10.4 N-1 analysis becomes particularly important for large multi-unit sites
Terna’s N-1 security framework includes the loss of a generating unit and major network components among the relevant single contingencies.
For nuclear, the analysis must go further than simply asking whether one reactor module can trip.
A multi-module site can contain common infrastructure such as:
- generator transformers;
- switchyards;
- busbars;
- common transmission corridors;
- cooling-water systems;
- shared turbine systems in some architectures;
- common protection systems;
- auxiliary-power connections.
The relevant grid contingency could therefore be greater than the capacity of one nominal module.
For example:
4 × 300 MWe SITE
│
├── Unit 1 = 300 MWe
├── Unit 2 = 300 MWe
├── Unit 3 = 300 MWe
└── Unit 4 = 300 MWe
THE GRID STUDY MUST NOT AUTOMATICALLY ASSUME:
Largest credible loss = 300 MW
IT MUST ASK:
Can one common failure disconnect:
600 MW?
900 MW?
1,200 MW?
This is the largest credible loss-of-infeed question.
It directly affects:
- frequency response;
- reserve requirements;
- network protection;
- system inertia requirements;
- automatic control;
- dispatching;
- market arrangements.
7.10.5 Voltage stability must be evaluated separately from active-power transport
A transmission line can remain below its thermal current limit and the surrounding system can still encounter voltage problems.
Large generating units exchange reactive power with the grid.
The reactor-generator system must therefore be analysed for:
- reactive capability;
- voltage-control range;
- generator excitation limits;
- transformer tap ranges;
- voltage response following contingencies;
- switching conditions;
- high-voltage conditions at low system demand;
- low-voltage conditions following major disturbances.
Terna’s Grid Code explicitly contains voltage-stability and reactive-power requirements for generators and connected users.
The relevant design question is therefore:
Can the nuclear unit maintain acceptable active and reactive operation across the full range of network conditions expected during its lifetime?
This becomes especially important because the Italian system of the 2030s and 2040s will contain considerably more converter-connected renewable generation, storage and HVDC equipment than the system for which many existing nuclear-era sites were originally connected.
7.10.6 Short-circuit capability can become a limiting condition
Connecting a large synchronous generator changes fault levels.
It can increase the prospective short-circuit current seen by:
- busbars;
- circuit breakers;
- transformers;
- substations.
This can require:
- breaker replacement;
- busbar modification;
- substation reconfiguration;
- current-limiting solutions;
- alternative connection topology.
Terna connection requirements expressly consider short-circuit currents as a design parameter for connected equipment.
This creates an important paradox.
A site with an electrically strong network is advantageous for:
- voltage support;
- system strength;
- reliable evacuation of generation.
But the same strong network plus a large synchronous generator can increase short-circuit levels.
Therefore:
STRONG GRID
│
├── ADVANTAGE: voltage / stability / evacuation
│
└── POSSIBLE ISSUE: higher fault level
The correct answer can only come from a site-specific study.
7.10.7 Transient stability must be demonstrated
A nuclear generator cannot be treated simply as a constant source of megawatts.
Following a severe network fault, the generator rotor accelerates relative to the grid.
Protection clears the fault.
The question is whether the machine then returns to stable synchronous operation.
Terna’s Grid Code explicitly recognises transient-stability limits and establishes protection-clearing requirements partly to preserve transmission-system stability.
Relevant studies should therefore include:
- three-phase faults;
- single-line faults;
- delayed clearing;
- line trips;
- transformer loss;
- generator trips;
- busbar contingencies;
- severe voltage disturbances;
- interaction with power-system stabilisers;
- interaction with HVDC controls.
This becomes a reactor-design issue as well as a transmission issue because:
- turbine-generator characteristics;
- generator inertia;
- excitation control;
- governor response;
- plant-protection logic;
all affect the result.
7.10.8 Loss-of-infeed must be assessed as a system event
A 300 MW reactor trip and a 1,200 MW multi-unit trip do not produce the same frequency disturbance.
The study should therefore quantify:
- largest credible instantaneous loss;
- resulting rate of change of frequency;
- frequency nadir;
- primary-response requirement;
- secondary reserve requirement;
- available storage response;
- interconnector response;
- demand response;
- restoration trajectory.
SMR modularity could provide an advantage if individual modules are electrically independent because the failure of one module produces a smaller disturbance than the failure of a large conventional unit.
But this advantage exists only if common-mode failures do not trip several modules simultaneously.
Therefore the government should evaluate:
module size
and
common-mode site outage size
as separate variables.
7.10.9 Interaction with HVDC systems must become a specific Italian study category
Italy is developing a transmission architecture in which HVDC plays a much larger role.
Examples include:
- Tyrrhenian Link;
- Adriatic Link;
- Milano–Montalto;
- Elmed;
- SA.CO.I.3;
- future Hypergrid corridors.
Terna’s Development Plan is explicitly building a network in which AC and HVDC infrastructure interact to increase transfer capability between market zones.
This is particularly relevant to candidate sites such as Montalto and Latina.
A nuclear connection study should therefore examine:
- converter control interaction;
- reactive-power behaviour;
- voltage control;
- power-flow redistribution following HVDC outage;
- frequency-support capability;
- fault behaviour;
- oscillatory interaction;
- converter-blocking events;
- simultaneous nuclear/HVDC contingencies where credible.
The existence of HVDC does not make nuclear integration problematic by definition.
It means that the future network topology differs significantly from the historical grid on which the old nuclear facilities operated.
7.10.10 The connection queue must be modelled at the future commissioning date
The most important mistake would be to perform the grid study using only today’s connected assets.
Terna is simultaneously processing very large queues for:
- renewable generation;
- storage;
- data centres;
- conventional consumption users.
At the end of January 2026, Terna reported more than 300 GW of renewable-generation connection requests, in addition to almost 80 GW of data-centre connection requests. These figures are applications rather than a forecast of actual capacity, but they demonstrate the magnitude of competing claims on future network infrastructure.
A nuclear connection study should therefore use several future network scenarios.
Table 7.10-B — Minimum scenarios for nuclear grid-connection assessment
| Scenario | Required test |
|---|---|
| Current network | Establish existing electrical baseline |
| Committed 2030 network | Include authorised/under-construction Terna reinforcement |
| Expected reactor commissioning network | Include projects likely to exist when reactor starts |
| High-renewable case | Test large simultaneous RES output |
| Low-demand/high-RES case | Test overgeneration and high-voltage conditions |
| High-demand case | Test data-centre/electrification load |
| HVDC outage case | Test redistribution of power flows |
| Nuclear-trip case | Assess loss-of-infeed |
| Line N-1 case | Assess thermal/voltage/security limits |
| Transformer N-1 case | Assess local evacuation capacity |
| Common-mode multi-unit trip | Assess frequency-security impact |
| Planned-maintenance case | Verify connection remains operable with equipment unavailable |
7.10.11 Off-site power requirements also make the transmission network part of nuclear safety
The grid is not relevant only because the reactor exports electricity into it.
The reactor also depends on the grid.
IAEA guidance identifies the transmission system as part of the preferred power supply for a nuclear plant and states that off-site electrical power is an important element of defence in depth. The IAEA recommends adequate off-site supply capability and normally physically independent external power supplies, with detailed arrangements depending on reactor design and safety analysis.
A future Italian nuclear grid study must consequently assess two directions of power flow:
NORMAL OPERATION
REACTOR
│
▼
ELECTRICITY EXPORTED TO GRID
SHUTDOWN / START-UP / DISTURBANCE
GRID
│
▼
OFF-SITE POWER SUPPLIED TO REACTOR
Even reactors with advanced passive safety features require a rigorously defined electrical architecture.
Emergency systems can manage loss of off-site power.
They do not make a reliable external grid irrelevant.
7.10.12 Nuclear should therefore become an input into Terna planning before reactor procurement is complete
Grid planning and reactor selection should not occur sequentially.
The inefficient sequence would be:
SELECT REACTOR
↓
SELECT SITE
↓
APPLY FOR CONNECTION
↓
DISCOVER LARGE NETWORK REINFORCEMENT
↓
COST + DELAY
The correct sequence is:
TECHNOLOGY ENVELOPE
+
CANDIDATE SITE FAMILY
+
EXPECTED UNIT SIZE
↓
EARLY TERNA STUDY
↓
NETWORK CONSTRAINTS
↓
SITE / REACTOR REFINEMENT
↓
DETAILED CONNECTION STUDY
↓
FINAL PROCUREMENT
Table 7.10-C — Nuclear-specific grid data required before site down-select
| Variable | Required evidence |
|---|---|
| Net unit output | MWe |
| Maximum site output | MWe |
| Minimum stable output | MWe |
| Ramp capability | MW/min |
| Generator MVA | Design value |
| Reactive capability | P-Q capability diagram |
| Generator inertia | Machine-specific value |
| Fault-current contribution | Generator/system study |
| Transformer configuration | Main + auxiliary + reserve |
| Startup load | MW/Mvar |
| Shutdown load | MW/Mvar |
| Largest individual trip | MW |
| Largest common-mode site trip | MW |
| Planned refuelling configuration | Grid-import requirement |
| Off-site power architecture | Number and independence of supplies |
| Blackout coping assumptions | Safety-case value |
| Grid support capability | Frequency, voltage, reactive power |
| Island operation | If claimed, formally demonstrated |
| HVDC interaction | Where relevant |
| Harmonics/control interaction | Where relevant |
| Connection reinforcement | Lines/substations/transformers required |
| Expected connection date | Integrated with reactor schedule |
The strategic conclusion is therefore direct:
Nuclear generation can reduce dependence on weather-dependent electricity production, but it cannot reduce the transmission system to a secondary consideration. A nuclear programme requires a strong grid twice: once to evacuate power and again to provide reliable off-site electrical supply to the plant.
The 380 kV infrastructure surrounding several candidate Italian sites is consequently a significant strategic asset.
It is not a connection licence.
7.11 Data centres are an important emerging load — but the connection queue must not be misread
Data-centre electricity demand has become material to Italian transmission planning.
The scale of the change is now directly visible in Terna’s connection data.
Terna reported approximately 30 GW of data-centre connection requests at the end of 2024. By 28 February 2025 the figure had increased to 39.62 GW. By 30 June 2025, applications exceeded 50 GW. At the end of 2025 there were 411 requests representing 69.05 GW. At the end of January 2026, Terna recorded 449 connection requests representing 78.79 GW.
That acceleration is strategically important.
But the 78.79 GW figure must not be interpreted as a load forecast.
7.11.1 What 78.79 GW means
It means that project developers had submitted connection requests whose requested capacities totalled 78.79 GW.
It does not mean that Italy had:
- 78.79 GW of operating data centres;
- 78.79 GW of data centres under construction;
- 78.79 GW of financed projects;
- 78.79 GW of permitted projects;
- 78.79 GW of contracted IT demand;
- 78.79 GW of electricity consumption;
- a Terna forecast showing 78.79 GW of future realised load.
The evidentiary distinction must remain explicit:
CONNECTION REQUEST
≠
PERMITTED PROJECT
≠
FINANCED PROJECT
≠
CONSTRUCTED PROJECT
≠
ENERGISED PROJECT
≠
ACTUAL ELECTRICITY DEMAND
7.11.2 Connection queues contain strategic optionality
Developers may submit connection applications before all other investment decisions have been completed.
This is rational.
Electricity access can be one of the scarcest resources for a large data-centre development.
A developer may therefore seek to reserve or investigate grid access while:
- evaluating several sites;
- negotiating land;
- negotiating customers;
- comparing jurisdictions;
- obtaining environmental permits;
- seeking financing;
- waiting for semiconductor/server procurement;
- assessing water/cooling infrastructure.
Several potential locations can consequently represent alternatives for the same underlying investment.
This produces the possibility of overlapping requests.
A queue can therefore be very large while the final realised load is much smaller.
7.11.3 But the queue is not meaningless
The opposite error would be to dismiss the queue because not every project will materialise.
That would also be wrong.
The evidentiary value of the data is strong.
It demonstrates that:
an unprecedented number of developers are testing the availability of very large, continuous electricity loads on the Italian transmission system.
Terna itself concludes that new infrastructure or reinforcement of existing network elements will be necessary to connect data centres.
The relevant policy conclusion is therefore not:
“Italy will need 78.79 GW for data centres.”
It is:
“Data centres have become a first-order variable in Italian network planning, but realised demand must be filtered from the much larger connection queue.”
7.11.4 The geographical distribution also matters
Terna has repeatedly identified northern Italy, particularly Lombardy, as the principal concentration area for data-centre connection demand.
The 2025 Development Plan noted that the requests were concentrated mainly in northern Italy and especially Lombardy. Earlier Terna analysis showed Milan as the dominant node within the Lombardy data-centre market.
This creates a geographical issue for nuclear/data-centre analysis.
A nuclear site with abundant grid infrastructure but located far from the principal data-centre cluster may still contribute electricity to the national system.
But it does not automatically create a physically local nuclear-data-centre ecosystem.
The analysis must distinguish:
national electricity supply
from
local co-location.
7.11.5 Data-centre demand should be assigned maturity classes
For system planning, Italy should not treat every connection request as equally probable.
A structured maturity system would be more useful.
Table 7.11-A — Proposed maturity classification for data-centre grid demand
| Class | Evidence | Treatment in planning |
|---|---|---|
| DC-0 — enquiry | Preliminary interest only | Do not treat as committed demand |
| DC-1 — formal connection request | Grid application submitted | Queue evidence |
| DC-2 — grid solution defined | Connection solution accepted/advanced | Medium evidence |
| DC-3 — site controlled | Land/right secured | Increased credibility |
| DC-4 — permitting advanced | Environmental/local authorisations progressing | Higher credibility |
| DC-5 — financing/customer commitment | Capital and anchor customers substantially established | Strong demand signal |
| DC-6 — construction | Physical project under construction | Very strong demand signal |
| DC-7 — energisation scheduled | Grid works and facility commissioning aligned | Near-certain load |
| DC-8 — operating | Metered consumption | Actual demand |
The exact classification would need to be designed with Terna and relevant authorities.
The principle is what matters:
queue megawatts should be probability-adjusted before they become energy-policy assumptions.
7.11.6 The relevant number is ultimately energy as well as power
A connection request is measured in MW.
System planning must also consider MWh/TWh.
Two 500 MW customers can have radically different annual electricity consumption if their utilisation profiles differ.
A serious data-centre forecast therefore requires assumptions for:
- IT load;
- cooling load;
- auxiliary load;
- power usage effectiveness;
- utilisation;
- redundancy architecture;
- maintenance;
- load growth;
- demand response;
- on-site generation/storage.
Large data centres are particularly relevant because they can produce sustained electricity demand throughout much of the year.
Terna has described data centres as high-energy-demand users and noted that their rapid development is connected to cloud computing and, increasingly, artificial-intelligence applications.
7.11.7 Grid planning faces a difficult asymmetry
If Terna assumes too little data-centre demand:
UNDER-BUILD GRID
↓
CONNECTION DELAYS
↓
INVESTMENT CONSTRAINT
If Terna assumes that the entire queue materialises:
OVER-BUILD GRID
↓
UNDERUTILISED INFRASTRUCTURE
↓
SYSTEM COST
The correct policy response is therefore:
- maturity filtering;
- milestone requirements;
- transparent queue management;
- connection deposits/commitments where appropriate;
- coordinated geographic planning;
- anticipatory investment where justified.
7.11.8 Data centres should be incorporated into nuclear site scenarios—but not counted as guaranteed customers
When assessing a prospective reactor site, three load cases should be examined:
LOW DATA-CENTRE REALISATION
MEDIUM DATA-CENTRE REALISATION
HIGH DATA-CENTRE REALISATION
The business case should not assume that a particular connection request will become a reactor customer unless:
- the data-centre project exists;
- location is known;
- schedule is credible;
- power requirements are contracted;
- the commercial relationship is binding.
Otherwise the data-centre load remains a system scenario, not project revenue.
7.12 Nuclear and data centres can be technically compatible
Nuclear generation and data-centre demand possess several characteristics that can make them technically and commercially compatible.
The European Commission’s March 2026 SMR Strategy explicitly identifies data centres as an emerging high-demand user class to which SMRs could provide stable electricity. The same strategy also identifies district heat, industrial heat, chemical applications and hydrogen among possible non-electric or combined applications.
The compatibility is real.
It should not be oversimplified.
7.12.1 Why the load profile can be attractive
Large data centres generally value:
- very high availability;
- predictable electricity supply;
- high annual energy availability;
- long-duration price certainty;
- low-carbon electricity;
- electrical quality;
- contractual reliability.
Nuclear plants are designed for high annual availability and substantial continuous output.
This creates an apparent natural pairing:
NUCLEAR
HIGH-CAPACITY-FACTOR GENERATION
│
▼
LARGE CONTINUOUS LOAD
│
▼
DATA CENTRE
The pairing can be particularly attractive where a data-centre operator seeks a long-term low-carbon electricity contract.
7.12.2 Commercial compatibility is different from electrical co-location
There are at least four distinct nuclear-data-centre models.
Table 7.12-A — Nuclear/data-centre supply architectures
| Model | Physical arrangement | Commercial relationship |
|---|---|---|
| Grid PPA | Reactor and data centre located anywhere within relevant market system | Financial/contractual energy purchase |
| Local grid supply | Reactor and data centre connected to same regional network | Grid remains between facilities |
| Direct-wire / private-network arrangement | Dedicated electrical connection in addition to or alongside grid | Stronger physical relationship |
| Integrated energy campus | Reactor, data centre and possibly industrial loads co-located | Deepest infrastructure integration |
These models should never be treated as equivalent.
A PPA can link a data centre in Lombardy to nuclear generation elsewhere without the data centre being physically attached to the reactor.
A direct-wire project raises entirely different questions concerning:
- electrical protection;
- regulatory status;
- network charges;
- backup supply;
- island operation;
- grid-code obligations;
- ownership of electrical infrastructure.
7.12.3 “Behind the meter” does not mean “without a grid”
This distinction is particularly important.
A data centre located beside a nuclear reactor could receive a large part of its normal electricity from that plant.
But the data centre may still require:
- alternative network feeds;
- uninterruptible power supplies;
- batteries;
- emergency generators or alternative emergency supplies;
- redundant switchgear;
- independent electrical paths.
Likewise, the nuclear plant itself requires a defined off-site electrical supply architecture.
IAEA nuclear safety guidance states that the transmission network contributes to defence in depth and recommends adequate off-site electrical power capable of serving plant requirements; depending on the reactor safety case, multiple physically independent external supplies may be required.
Therefore:
NUCLEAR REACTOR ───────► DATA CENTRE
│ │
│ │
▼ ▼
TRANSMISSION GRID ◄──────── REDUNDANT SUPPLY
│
▼
NUCLEAR OFF-SITE POWER
The correct conclusion is:
co-location can reduce transmission exposure for normal energy delivery, but it does not automatically eliminate external-grid requirements for either installation.
7.12.4 Island operation would require a separate technical case
One of the most misleading simplifications would be:
“If the data centre is next to the reactor, the pair can simply disconnect from the grid and continue operating.”
That is not automatically true.
Stable electrical islanding requires control of:
- frequency;
- voltage;
- reactive power;
- active-power balance;
- load rejection;
- turbine response;
- generator protection;
- data-centre UPS interaction;
- re-synchronisation;
- emergency conditions.
Suppose:
REACTOR OUTPUT = 300 MW
DATA-CENTRE LOAD = 250 MW
GRID EXPORT = 50 MW
If the grid connection suddenly disappears, the reactor-data-centre island must immediately absorb the imbalance and stabilise.
Now consider:
REACTOR OUTPUT = 300 MW
DATA-CENTRE LOAD = 200 MW
GRID EXPORT = 100 MW
A sudden grid separation creates an instantaneous 100 MW excess generation inside the island.
Conversely:
REACTOR TRIPS
DATA CENTRE STILL REQUIRES 200 MW
The data centre immediately requires alternative supply.
These are protection and control problems.
They are not solved by geographical proximity.
7.12.5 Nuclear outages must be incorporated into the data-centre architecture
Nuclear plants do not operate without interruption indefinitely.
They require:
- refuelling outages;
- planned maintenance;
- inspection;
- equipment replacement;
- unplanned outages.
A data centre requiring continuous power therefore cannot base its reliability architecture on the assumption that the reactor never stops.
Possible arrangements include:
NORMAL:
NUCLEAR → DATA CENTRE
REACTOR OUTAGE:
GRID → DATA CENTRE
GRID DISTURBANCE:
UPS / BATTERY → CRITICAL IT LOAD
+
BACKUP POWER
NUCLEAR + GRID DISTURBANCE:
SITE EMERGENCY ARCHITECTURE
A nuclear-data-centre project should therefore specify separately:
- energy source;
- capacity backup;
- ride-through capability;
- emergency supply.
7.12.6 A data centre is not automatically a perfect flat load
Although large data centres often have high utilisation, their actual demand can vary according to:
- IT workload;
- server utilisation;
- cooling conditions;
- hardware deployment;
- maintenance;
- customer demand;
- computational scheduling.
Future AI facilities may also develop greater controllable demand.
This creates a potentially useful flexibility opportunity.
Certain computing loads could theoretically be scheduled toward periods of:
- high nuclear availability;
- renewable surplus;
- low grid demand.
But this should be treated as a potential operational feature, not assumed in the base case until a data-centre operator has contractually and technically demonstrated controllable load.
7.12.7 Co-location can reduce some grid flows but may increase local concentration risk
A very large nuclear/data-centre campus could combine:
- hundreds of MW of generation;
- hundreds of MW of load;
- major switchyards;
- fibre infrastructure;
- cooling infrastructure;
- possibly hydrogen or storage systems.
This can produce economies of infrastructure.
It can also create common-mode exposure.
Potential common events include:
- flooding;
- earthquake;
- extreme weather;
- industrial fire;
- major grid-substation failure;
- cyber incident;
- access disruption;
- cooling-water interruption.
Co-location should therefore be evaluated through:
economic integration
and
common-cause risk
simultaneously.
7.12.8 Nuclear safety boundaries must remain independent
A data centre should not become a system on which nuclear safety depends unless it has been formally classified, designed and licensed for that role.
Similarly, the nuclear reactor should not become the sole reliability mechanism for a data centre.
The interfaces should be designed so that:
DATA-CENTRE FAILURE
≠
NUCLEAR SAFETY FAILURE
and:
NUCLEAR TRIP
≠
UNCONTROLLED DATA-CENTRE FAILURE
7.12.9 Commercial structure matters as much as technical compatibility
A nuclear plant can operate for many decades.
A data-centre technology cycle is much shorter.
Servers may be replaced within years.
A data-centre company may:
- expand;
- contract;
- relocate workload;
- change technology;
- change customer mix.
An electricity contract must therefore address the mismatch between:
60+ year nuclear asset
and
shorter digital-commercial cycle.
The reactor project should not become financially dependent on one data-centre customer unless credit, replacement-load and termination risks have been carefully allocated.
Table 7.12-B — Nuclear/data-centre due-diligence matrix
| Dimension | Required question |
|---|---|
| Load | Is demand real, financed and contracted? |
| Location | Are reactor and load actually co-located? |
| Grid | What independent connection remains required? |
| Reliability | What occurs during reactor outage? |
| Reactor trip | How is data-centre load transferred? |
| Grid loss | Can facilities ride through independently? |
| Islanding | Is it technically demonstrated? |
| Backup | What duration and technology? |
| PPA | Physical or financial? |
| Carbon accounting | What contractual framework applies? |
| Cyber | Are control networks physically/logically separated? |
| Security | Do shared infrastructures create vulnerabilities? |
| Cooling | Do facilities compete for water? |
| Heat | Can data-centre waste heat be productively used? |
| Schedule | Which asset must be operational first? |
| Credit | Who carries demand-risk over reactor life? |
Core conclusion
The proposition:
“SMRs could power data centres”
is technically credible and is explicitly recognised in the European Commission’s 2026 strategy.
The proposition:
“Therefore an SMR/data-centre campus does not need the transmission grid”
is not.
7.13 Timing matters: nuclear cannot solve Italy’s immediate data-centre queue
The strongest constraint on using nuclear generation to address Italy’s current data-centre connection problem is not theoretical compatibility.
It is time.
Data-centre developers are seeking connections today.
New Italian nuclear generation is not available today.
The distinction must remain absolute in system planning.
7.13.1 Italy’s official nuclear pathway is post-2030
The Italian PNIEC treats possible deployment of new small modular fission reactors as a medium-term, post-2030 option, subject to technological maturity and safety.
As of 2026, Nuclitalia is undertaking a feasibility and technology-selection process, focused initially on mature water-cooled SMRs; it is not constructing an Italian nuclear power station.
ISIN’s participation in NUWARD’s Joint Early Review is currently as an observer, and ISIN explicitly states that Italy does not yet possess a regulatory framework enabling an authorisation process for power reactors.
ISIN has separately referred to SMRs and advanced reactors being considered in the Italian energy mix in the 2035–2045 timeframe.
The conclusion is therefore robust even without assigning a speculative FOAK date:
No current Italian nuclear programme can produce electricity in time to solve 2026–2030 data-centre connection constraints.
7.13.2 The two problems operate on different clocks
DATA-CENTRE CLOCK
2026
│
├── SITE
├── GRID APPLICATION
├── PERMITTING
├── CONSTRUCTION
└── ENERGISATION
↓
LATE 2020s / EARLY 2030s
ITALIAN NUCLEAR CLOCK
2026
│
├── POLICY / LAW
├── TECHNOLOGY ASSESSMENT
├── REGULATORY FRAMEWORK
├── SITE SELECTION
├── LICENSING
├── FID
├── CONSTRUCTION
├── COMMISSIONING
└── FIRST POWER
↓
POST-2030
Trying to make the second solve the immediate bottleneck in the first would distort both programmes.
7.13.3 Near-term connection management requires near-term solutions
For the 2026–2030 horizon, Italy’s data-centre strategy therefore depends on tools that can actually operate within that horizon.
These include:
- network reinforcement;
- new substations;
- anticipatory grid investment where justified;
- connection-queue reform;
- stronger maturity requirements;
- geographical redistribution of projects;
- storage;
- demand flexibility;
- energy efficiency;
- on-site generation where legally and technically appropriate;
- faster permitting of electrical infrastructure.
Terna’s existing Development Plan already identifies data-centre growth as a driver of new network infrastructure.
Nuclear belongs to a different planning horizon.
7.13.4 Nuclear may become relevant to the structural post-2035 load system
The fact that nuclear cannot solve the current queue does not mean data centres are irrelevant to nuclear planning.
If substantial data-centre demand survives the present connection queue and becomes permanent electricity consumption, the Italian load curve of the late 2030s could look materially different from today’s.
That creates a legitimate long-term planning question:
Could future programmable nuclear generation serve part of the structural load created by digital infrastructure?
The answer can only be conditional.
It depends on:
- realised data-centre demand;
- location;
- reactor location;
- reactor schedule;
- grid topology;
- transmission investment;
- nuclear cost;
- competing electricity sources;
- PPA structure;
- carbon requirements;
- data-centre customer longevity.
7.13.5 The correct planning sequence is therefore chronological
2026–2030
─────────
MANAGE CURRENT CONNECTION QUEUE
+
BUILD GRID
+
FILTER REAL FROM SPECULATIVE DEMAND
2030–2035
─────────
OBSERVE ACTUAL DATA-CENTRE LOAD
+
FINALISE NUCLEAR SITE/TECHNOLOGY
+
COORDINATE TRANSMISSION PLANNING
2035–2045
─────────
POTENTIAL NEW NUCLEAR
+
MATURE DATA-CENTRE CLUSTERS
+
STORAGE
+
RENEWABLES
+
HVDC
+
INDUSTRIAL ELECTRIFICATION
The dates represent planning horizons, not reactor commissioning promises.
7.13.6 A data-centre connection should not be delayed on the assumption that nuclear will arrive later
A particularly damaging policy outcome would be:
DATA CENTRE NEEDS POWER IN 2028
↓
GRID REINFORCEMENT NOT BUILT
↓
ASSUMPTION:
“NUCLEAR WILL SOLVE THIS LATER”
↓
DATA CENTRE CANNOT CONNECT
↓
NUCLEAR STILL NOT AVAILABLE
Nuclear and grid reinforcement are complements.
They should not be presented as substitutes.
7.13.7 Nor should an SMR be justified using speculative future data-centre demand
The reverse mistake is equally important.
Suppose a reactor business case requires:
400 MW REACTOR
↓
350 MW DATA-CENTRE OFFTAKE
If the supposed data-centre customer exists only as a connection request, the revenue case is not bankable.
Before data-centre demand is credited to a nuclear FID, Italy should require:
- identified customer;
- site control;
- credible permitting;
- financing;
- contracted load;
- start date;
- minimum demand;
- contract tenor;
- credit quality;
- termination provisions.
7.13.8 Nuclear and digital infrastructure should nevertheless be planned together now
The apparent contradiction is resolved by distinguishing:
construction timing
from
planning timing.
Nuclear cannot provide power to the immediate queue.
But the government should already incorporate digital-load scenarios into:
- reactor siting;
- Terna development plans;
- industrial-zone planning;
- transmission corridors;
- water planning;
- heat-reuse strategies;
- storage planning.
This avoids a future situation in which:
NUCLEAR BUILT HERE
│
DATA CENTRES DEVELOPED THERE
│
▼
MAJOR NEW TRANSMISSION REQUIRED
when earlier integrated planning might have reduced infrastructure requirements.
Table 7.13-A — Correct use of data-centre evidence by nuclear decision stage
| Nuclear stage | Use of data-centre evidence |
|---|---|
| 2026 feasibility | Scenario variable only |
| Technology shortlist | Consider compatibility with large continuous loads |
| Candidate-site screen | Map mature digital clusters |
| Grid studies | Include high/medium/low data-centre scenarios |
| FID | Credit only contracted demand |
| Construction | Coordinate actual network reinforcements |
| Operation | Optimise dispatch/contracting with realised load |
Government conclusion
The distinction should therefore remain explicit throughout the report:
Data centres are an immediate transmission-planning problem and a potential long-term nuclear customer class. They are not evidence that nuclear can solve Italy’s current connection queue.
7.14 Industrial heat could increase reactor system value
The economic and decarbonisation value of a nuclear reactor need not be limited to the electricity sent through the generator.
A reactor first produces heat.
Electricity is one possible final product of that heat.
Part of the thermal output can, in principle, be redirected toward non-electric applications.
These can include:
- district heating;
- industrial steam;
- desalination;
- hydrogen;
- synthetic fuels;
- chemical processes;
- combined heat and power.
The European Commission’s 2026 SMR Strategy expressly identifies applications ranging from district heating and industrial heat to chemical industries and hydrogen production.
The IAEA likewise identifies nuclear cogeneration as a potentially important application for SMRs and notes that different reactor technologies provide materially different temperature levels.
7.14.1 Electricity-only efficiency does not capture total useful energy
A conventional nuclear power plant converts only part of reactor thermal energy into electricity.
The remainder is rejected through the condenser.
Simplified:
REACTOR HEAT
│
▼
STEAM CYCLE
│
├────────► ELECTRICITY
│
└────────► REJECTED HEAT
Cogeneration changes the architecture:
REACTOR HEAT
│
├────────► ELECTRICITY
│
├────────► INDUSTRIAL STEAM
│
├────────► DISTRICT HEAT
│
├────────► DESALINATION
│
└────────► HYDROGEN / CHEMICAL PROCESS
The relevant economic metric can therefore become:
value of total useful energy output
rather than simply:
€/MWh electricity.
7.14.2 But useful heat has value only when a customer exists
A reactor capable of producing industrial steam does not automatically create industrial-heat revenue.
A heat business requires:
- a customer;
- correct temperature;
- correct pressure;
- correct heat quantity;
- sufficiently high annual utilisation;
- acceptable distance;
- compatible operating schedule;
- heat-delivery infrastructure;
- contractual offtake.
The decisive variable is not theoretical thermal output.
It is:
bankable thermal demand at a physically usable distance from the reactor.
7.14.3 Heat cannot be transported like electricity
Electricity can be transmitted over hundreds of kilometres through the grid.
Steam and hot water suffer:
- thermal losses;
- pressure losses;
- pumping requirements;
- pipeline capital cost;
- rights-of-way;
- insulation requirements.
The IAEA notes that heat is relatively difficult and expensive to transport and gives an indicative district-heating range of approximately 10–15 km for hot-water/steam applications in one SMR assessment.
There is no universal maximum industrial-steam distance.
Economics depend on:
- steam pressure;
- temperature;
- pipe diameter;
- load;
- terrain;
- utilisation;
- return condensate;
- value of displaced fuel.
But the strategic conclusion is robust:
industrial heat is fundamentally local.
This makes heat integration a site-selection problem, not merely a reactor-design feature.
7.14.4 Site selection should therefore map thermal demand
Every candidate nuclear site should be surrounded by a defined industrial-heat study radius.
Within that radius Italy should identify:
- industrial facilities;
- annual heat demand;
- peak heat demand;
- temperature requirement;
- steam pressure;
- operating hours;
- existing boilers;
- existing fuels;
- emissions;
- expected plant lifetime;
- future electrification plans.
An industrial cluster should then be represented as a thermal load map.
5 km
┌────────────────┐
│ HIGH-VALUE │
│ HEAT USERS │
│ NPP │
└────────────────┘
15 km
┌──────────────────────┐
│ DISTRICT / INDUSTRIAL│
│ HEAT OPPORTUNITIES │
└──────────────────────┘
FARTHER
ELECTRICITY / HYDROGEN
GENERALLY BECOME MORE
TRANSPORTABLE PRODUCTS
The distances are schematic rather than universal project limits.
7.14.5 Italy has several relevant classes of industrial heat demand
Potential Italian applications include:
- chemicals;
- refining;
- petrochemicals;
- steel;
- ceramics;
- food processing;
- paper;
- district heating;
- desalination;
- hydrogen.
The important point is that these sectors require different heat grades.
A food-processing facility requiring steam at relatively modest temperature and a high-temperature metallurgical process do not represent the same reactor market.
Table 7.14-A — Heat-grade concept for reactor siting
| Heat class | Illustrative application | Reactor relevance |
|---|---|---|
| Low temperature | District heating, hot water | LWR highly relevant |
| Low–medium | Desalination, some food/process heat | LWR / SMR relevant |
| Medium steam | Chemicals, industrial utilities | Design-specific |
| High temperature | Higher-temperature chemical/refining processes | Advanced reactors increasingly advantageous |
| Very high temperature | Some future hydrogen/process routes | HTGR/VHTR-type systems more relevant |
This table is deliberately qualitative.
Actual industrial procurement must use the customer’s required temperature, pressure and mass flow, not generic sector labels.
7.14.6 Steam extraction carries an electricity opportunity cost
If thermal energy is extracted from a steam cycle before it has completed expansion through the turbine, electrical output can decrease.
Therefore:
MORE HEAT SOLD
│
▼
POTENTIALLY LESS
ELECTRICITY GENERATED
The correct economic comparison is not:
“Heat is additional free output.”
It is:
VALUE OF HEAT
+
REMAINING ELECTRICITY VALUE
-
COGENERATION CAPEX
-
HEAT NETWORK COST
-
LOST ELECTRICITY REVENUE
=
COGENERATION VALUE
This needs hourly or seasonal modelling.
7.14.7 Industrial demand and reactor demand must be matched dynamically
An industrial plant may:
- shut down;
- reduce production;
- undergo maintenance;
- change product;
- close permanently.
The reactor may simultaneously need to continue operating.
Therefore a heat-integrated nuclear station should retain alternative energy paths.
For example:
NORMAL INDUSTRIAL DEMAND
REACTOR → STEAM CUSTOMER
CUSTOMER REDUCES DEMAND
REACTOR → TURBINE / CONDENSER
REACTOR OUTAGE
BACKUP BOILER / GRID / STORAGE → CUSTOMER
This leads to a critical commercial principle:
an industrial customer cannot normally be allowed to make nuclear safety or reactor operability dependent on continuous acceptance of heat.
7.14.8 Intermediate heat systems may be required
Direct coupling of the nuclear primary circuit to an industrial chemical process would generally be unattractive from a safety/interface perspective.
Depending on reactor design, heat can instead be transferred through:
- secondary coolant;
- intermediate heat exchanger;
- steam transformer;
- tertiary circuit.
The NUWARD cogeneration work presented through the IAEA explicitly notes that industrial integration requires design-specific hazard analysis, plot-plan integration and additional equipment such as steam transformers.
The separation concept can be represented as:
NUCLEAR PRIMARY SYSTEM
│
▼
NUCLEAR SECONDARY / INTERMEDIATE SYSTEM
│
▼
ISOLATION HEAT EXCHANGER
│
▼
INDUSTRIAL STEAM NETWORK
│
▼
CUSTOMER
The objective is to prevent industrial disturbances from propagating into nuclear safety systems and to minimise radiological interface concerns.
7.14.9 Desalination is particularly site-dependent
Nuclear desalination can use:
- electricity for reverse osmosis;
- heat for thermal desalination;
- combined electricity and heat.
This can be particularly relevant to coastal locations.
But it requires:
- seawater intake;
- brine management;
- water permits;
- pipelines;
- product-water demand.
Consequently:
“reactor capable of desalination” is not equivalent to “desalination is economically justified at this site.”
7.14.10 Hydrogen introduces several different nuclear pathways
Nuclear energy can support hydrogen through at least two principal pathways.
Electric electrolysis:
NUCLEAR
↓
ELECTRICITY
↓
ELECTROLYSER
↓
HYDROGEN
This pathway can technically be used with any reactor capable of producing electricity.
High-temperature electrolysis / thermally assisted production:
ADVANCED REACTOR
↓
ELECTRICITY + HIGH-TEMPERATURE STEAM
↓
HIGH-TEMPERATURE ELECTROLYSIS
↓
HYDROGEN
Higher-temperature reactors may improve the second architecture because part of the energy input is supplied as heat rather than electricity.
The IAEA identifies high-temperature reactor families as particularly relevant to industrial process heat and hydrogen applications.
7.14.11 Hydrogen can partly solve the heat-distance problem—but adds conversion cost
Heat is difficult to transport over long distances.
Hydrogen is more transportable.
Therefore:
NUCLEAR SITE
↓
HEAT + ELECTRICITY
↓
HYDROGEN
↓
PIPELINE / STORAGE / INDUSTRY
can potentially serve customers farther from the reactor.
But this introduces:
- electrolyser capital cost;
- conversion losses;
- compression;
- storage;
- pipeline;
- safety systems;
- hydrogen-market risk.
Thus hydrogen does not eliminate siting economics.
It changes them.
7.14.12 Industrial heat could materially change the relative attractiveness of sites
Consider two hypothetical nuclear sites.
Site A
Excellent grid
No nearby industrial heat user
Site B
Excellent grid
+
large chemical/refining cluster 5 km away
+
long-term steam demand
For an electricity-only reactor, Site A and Site B may appear similar.
For a cogeneration-capable reactor, Site B could offer:
- electricity revenue;
- steam revenue;
- industrial decarbonisation value;
- reduced industrial gas consumption;
- potentially stronger local economic integration.
Therefore the site-selection algorithm should include:
recoverable useful thermal demand within an economically realistic radius.
Table 7.14-B — Industrial-heat data required for each candidate nuclear site
| Variable | Required measurement |
|---|---|
| Customer | Named facility |
| Distance | km from reactor thermal interface |
| Annual heat demand | GWhth/year |
| Peak demand | MWth |
| Minimum demand | MWth |
| Temperature | °C |
| Steam pressure | bar |
| Load factor | % |
| Current fuel | Gas/oil/electricity/etc. |
| Current emissions | tCO₂/year |
| Existing boiler capacity | MWth |
| Backup requirement | MWth |
| Contract life | Years |
| Customer asset life | Years |
| Heat-network CAPEX | € |
| Heat losses | % |
| Reactor electric penalty | MWe |
| Revenue | €/MWhth |
| Avoided fuel | Physical + financial value |
Without this information, industrial heat should remain an option value, not reactor-project revenue.
7.14.13 Heat integration can create a stronger industrial cluster but also stronger mutual dependency
Deep integration can create:
NUCLEAR
│
├── POWER
├── STEAM
├── HYDROGEN
└── WATER
↓
INDUSTRIAL CLUSTER
This can improve economics.
But it creates interdependence.
The industrial cluster depends on reactor availability.
The reactor business model depends on industrial offtake.
The solution is not to avoid integration.
It is to design:
- backup systems;
- alternative heat sinks;
- contractual flexibility;
- multiple customers where possible;
- modular heat networks.
7.14.14 Heat should become part of site valuation, not a justification added afterward
The wrong sequence would be:
SELECT REACTOR
↓
SELECT SITE
↓
THEN SEARCH FOR HEAT CUSTOMER
The stronger sequence is:
MAP NATIONAL HEAT DEMAND
+
MAP GRID
+
MAP WATER
+
MAP SITES
↓
IDENTIFY NUCLEAR-INDUSTRIAL CLUSTERS
↓
MATCH REACTOR TEMPERATURE
↓
PROCUREMENT
Government conclusion
Industrial heat can increase the total system value of nuclear power.
But only if the thermal demand is:
real + nearby + technically compatible + durable + contractible.
Industrial heat should therefore become a quantitative site-selection variable, not a generic benefit listed in reactor brochures.
7.15 LWR heat and advanced-reactor heat are not interchangeable
The term “nuclear heat” can conceal major differences between reactor technologies.
A megawatt of thermal power at 120°C does not have the same industrial usefulness as a megawatt of thermal power at 550°C or 750°C.
Temperature determines the quality, or exergy, of heat.
Higher-temperature heat can serve processes unavailable to lower-temperature systems.
Therefore reactor comparisons must distinguish:
QUANTITY OF HEAT
FROM
QUALITY / TEMPERATURE OF HEAT
7.15.1 Light-water reactors occupy the lower-temperature end of the nuclear cogeneration spectrum
Conventional LWRs and water-cooled SMRs operate at temperatures well suited to:
- district heating;
- desalination;
- low- and medium-temperature steam;
- many conventional cogeneration applications;
- electricity production for electrolysis.
The IAEA concludes that currently available LWRs are particularly suitable for district heating and desalination because of their lower working-temperature range.
This is not a weakness.
Low- and medium-temperature industrial heat represents a substantial energy market.
LWR technology also brings important advantages in:
- operating experience;
- fuel maturity;
- regulatory familiarity;
- established materials;
- conventional steam-cycle engineering.
The strategic issue is simply that LWR heat should not be credited for processes whose temperature requirements exceed what the reactor can economically provide.
7.15.2 High-temperature reactor families substantially expand the process-heat envelope
IAEA analysis identifies indicative operating-temperature ranges including approximately:
- LFR: ~550°C;
- MSR: ~800°C;
- GFR: ~850°C;
- VHTR: approximately 750–950°C.
These higher-temperature systems can potentially serve a broader set of process-heat and hydrogen-production applications.
The significance is substantial.
At higher temperatures, nuclear energy can potentially displace fossil combustion in processes that cannot be efficiently served by low-temperature steam alone.
7.15.3 Xe-100 demonstrates the difference clearly
X-energy describes the Xe-100 as having:
- 200 MWth thermal output;
- 80 MWe electrical output;
- 750°C reactor outlet temperature;
- approximately 565°C steam temperature.
The design is explicitly promoted for electricity and industrial-grade steam applications.
This places it in a fundamentally different industrial-heat category from conventional water-cooled SMRs.
Simplified comparison
WATER-COOLED SMR
│
▼
LOW / MEDIUM TEMPERATURE HEAT
│
├── DISTRICT HEAT
├── DESALINATION
├── PROCESS STEAM
└── ELECTRICITY → H₂
HTGR / HIGH-TEMPERATURE SYSTEM
│
▼
HIGHER-TEMPERATURE HEAT
│
├── ALL OF THE ABOVE
├── HIGHER-GRADE PROCESS STEAM
├── CHEMICAL PROCESSES
├── HIGH-TEMPERATURE H₂
└── SYNTHETIC-FUEL PATHWAYS
7.15.4 But thermal capability and deployment readiness move on different axes
This is the key government distinction.
A reactor can offer superior process temperature while simultaneously presenting greater deployment uncertainty.
Table 7.15-A — Heat capability versus deployment variables
| Technology family | Industrial heat grade | Fuel maturity | Regulatory familiarity | Commercial deployment evidence |
|---|---|---|---|---|
| Conventional LWR SMR | Low–medium | High | High | Highest among current SMR families |
| HTGR / Xe-100 type | High | HALEU/TRISO still industrialising | Lower | First commercial deployments pending |
| Sodium fast reactor | Higher-temperature potential | HALEU/advanced fuel | Lower | Major reference project advancing |
| Lead fast reactor | Higher-temperature potential | Advanced/MOX pathway | Lower | Demonstrator/commercial pathway still developing |
| MSR / other advanced concepts | Potentially high | Technology-specific | Low | Generally earlier commercial stage |
The table intentionally does not reduce the technologies to one score.
The axes are independent.
7.15.5 Italy should therefore reject a one-dimensional reactor ranking
If the policy objective is:
earliest technically credible electricity deployment
a mature water-cooled SMR may have important advantages.
If the objective is:
deep decarbonisation of a high-temperature industrial cluster
a high-temperature advanced reactor may possess a stronger ultimate energy proposition.
The wrong conclusion would be:
HIGHER HEAT TEMPERATURE
=
BETTER REACTOR
The equally wrong conclusion would be:
MORE MATURE LWR
=
BEST SOLUTION FOR EVERY INDUSTRIAL PROCESS
The correct comparison is multi-objective.
7.15.6 The temperature of the reactor is not necessarily the temperature delivered to the customer
The complete heat-transfer chain matters.
For example:
REACTOR OUTLET
750°C
↓
INTERMEDIATE HEAT EXCHANGER
↓
SECONDARY CIRCUIT
↓
STEAM GENERATOR
↓
PIPELINE
↓
CUSTOMER
565°C OR LOWER
Temperature is lost across heat exchangers and transport.
Therefore procurement should require vendors to state:
- reactor coolant outlet temperature;
- secondary-side temperature;
- process-steam temperature;
- process-steam pressure;
- heat available at customer battery limit;
- distance assumption;
- heat-delivery loss;
- resulting electrical-output penalty.
A brochure quoting reactor outlet temperature alone is insufficient.
7.15.7 Industrial heat must be valued at the customer interface
For comparison purposes, Italy should introduce a standard metric:
Guaranteed Useful Heat at Delivery Point
expressed as:
MWth
+
TEMPERATURE
+
PRESSURE
+
ANNUAL AVAILABILITY
+
DELIVERY DISTANCE
For example:
200 MWth
at
450°C
40 bar
90% contractual availability
5 km from reactor
is analytically meaningful.
Simply stating:
“The reactor produces high-temperature heat”
is not.
7.15.8 LWR process heat may still dominate economically where the customer does not need high temperature
High-grade heat has greater potential usefulness.
But supplying 700°C capability to a customer that needs 150°C steam does not necessarily create economic value.
It may instead introduce:
- greater reactor complexity;
- novel fuel;
- higher licensing burden;
- lower supply-chain maturity.
Therefore the correct matching principle is:
CUSTOMER NEED = 150°C
A 150–250°C SOLUTION MAY BE SUFFICIENT
HIGHER TEMPERATURE
DOES NOT AUTOMATICALLY CREATE
ADDITIONAL CUSTOMER VALUE
This is why industrial-demand mapping must precede reactor heat ranking.
7.15.9 High-temperature capability should receive value only where there is a high-temperature offtaker
The procurement matrix should distinguish:
potential capability
from
monetisable capability.
Table 7.15-B — Proposed heat-value scoring logic
| Condition | Treatment |
|---|---|
| Reactor has no useful-heat capability | Zero cogeneration value |
| Reactor can deliver heat but no customer exists | Option value only |
| Customer exists but temperature mismatch | Low value |
| Customer exists and temperature matches | Significant value |
| Multiple nearby customers | Higher resilience/value |
| Customer has long-term contract | Bankable value |
| Customer requires novel heat interface | Apply technology contingency |
| Heat supply reduces electricity materially | Deduct opportunity cost |
| Backup system required | Include backup CAPEX/OPEX |
| Heat network requires major corridor | Include infrastructure cost |
7.15.10 Advanced heat also introduces additional nuclear-industrial interface questions
High-temperature integration can involve:
- intermediate loops;
- specialised heat exchangers;
- advanced materials;
- chemical compatibility;
- high-temperature valves;
- thermal cycling;
- hydrogen safety;
- industrial pressure systems.
A high reactor outlet temperature is therefore not purely an advantage.
It creates engineering obligations.
For sodium- or lead-cooled systems, the industrial heat interface must also maintain appropriate separation between the nuclear coolant and industrial process.
The complete system becomes:
REACTOR
↓
PRIMARY COOLANT
↓
INTERMEDIATE HEAT TRANSPORT
↓
PROCESS HEAT EXCHANGER
↓
INDUSTRIAL SYSTEM
Each interface requires:
- safety analysis;
- materials qualification;
- inspection;
- isolation;
- leak detection;
- pressure control.
7.15.11 Cogeneration should not be allowed to weaken the reactor safety case
The industrial facility may experience:
- sudden steam-demand loss;
- pipe rupture;
- chemical accident;
- fire;
- loss of power;
- shutdown.
The nuclear plant must tolerate these events without compromising safety.
The design must therefore address:
- isolation valves;
- pressure transients;
- heat-sink alternatives;
- separation distances;
- external hazards;
- industrial accidents;
- common utility failures.
The industrial system should be treated as a potential external interface hazard, not merely an energy customer.
7.15.12 The national programme therefore needs two different readiness scores
Every reactor considered for industrial cogeneration should receive at least two independent assessments:
A. Deployment Readiness
Based on:
- design maturity;
- licensing;
- reference project;
- construction;
- fuel;
- supply chain;
- financing.
B. Industrial Energy Capability
Based on:
- maximum useful temperature;
- steam conditions;
- heat quantity;
- hydrogen capability;
- desalination capability;
- flexibility;
- customer integration.
The two assessments should never be merged before decision-makers see them separately.
Text schematic — why two axes are necessary
HIGH INDUSTRIAL-HEAT CAPABILITY
▲
│
HTGR │ ADVANCED FAST
│ REACTORS
│
│
LOW DEPLOYMENT ─────────────┼──────────── HIGH DEPLOYMENT
READINESS │ READINESS
│
│ LWR / WATER-COOLED
│ SMR
│
▼
LOWER-TEMPERATURE HEAT
This diagram is qualitative.
It should not be converted into numerical technology scores without a defined methodology.
7.15.13 The optimum reactor may therefore differ by Italian site
A site dominated by:
- electricity demand;
- strong transmission;
- no major nearby heat consumers;
may favour one technology profile.
A site adjacent to:
- chemical plants;
- refineries;
- hydrogen production;
- continuous high-temperature demand;
may justify another.
Therefore Italy should avoid selecting one reactor solely at national level and then assuming it has equal value at every candidate location.
The better formulation is:
technology × site × customer × grid × fuel × schedule
Master comparison — §§7.10–7.15
ITALIAN ENERGY SYSTEM
│
┌───────────────────────┼──────────────────────┐
│ │ │
▼ ▼ ▼
GRID DATA CENTRES INDUSTRIAL HEAT
│ │ │
│ │ │
▼ ▼ ▼
NETWORK CAPACITY LARGE NEW LOAD LOCAL HEAT DEMAND
│ │ │
▼ ▼ ▼
N-1 / STABILITY CONNECTION QUEUE TEMP./PRESSURE
│ │ │
▼ ▼ ▼
HVDC / VOLTAGE REAL OR SPECULATIVE? DISTANCE
│ │ │
▼ ▼ ▼
NUCLEAR SITE LONG-TERM CUSTOMER REACTOR MATCH
│ │ │
└───────────────────────┼──────────────────────┘
│
▼
TECHNOLOGY SELECTION
│
┌────────────────────┴───────────────────┐
▼ ▼
DEPLOYMENT READINESS SYSTEM VALUE
• licence • electricity
• fuel • reliability
• FOAK • data-centre load
• construction • industrial heat
• regulator • hydrogen
│ • desalination
└────────────────────┬───────────────────┘
│
▼
ITALIAN INVESTMENT DECISION
Final government conclusion — §§7.10–7.15
The grid, data-centre and industrial-heat questions should not be analysed as separate appendices to reactor technology.
They are part of the reactor decision itself.
A future nuclear station is simultaneously:
- a very large generation connection;
- a user of off-site electricity;
- a potential source of firm electricity for new digital loads;
- a potential producer of industrial heat;
- a possible anchor for hydrogen or desalination;
- a new source of contingency risk that Terna must integrate into the national system.
The first implication is that existing 380 kV infrastructure is valuable but insufficient evidence. Montalto, Trino, Latina, Caorso, Civitavecchia and Brindisi may possess attractive transmission characteristics, but each requires a new system study using the network topology expected at reactor commissioning—not historical maps alone.
The second implication is that Italy should not confuse 78.79 GW of January 2026 data-centre connection requests with 78.79 GW of future consumption. The figure is nevertheless strategically important because it demonstrates unprecedented developer interest in very large electricity loads.
The third implication is chronological. Nuclear cannot solve the immediate 2026–2030 data-centre connection problem. Italian nuclear planning is still in feasibility, regulatory and technology-assessment stages, while the PNIEC places possible new-fission deployment after 2030.
The fourth implication is that data centres could nevertheless become an important structural nuclear customer class in the 2035–2045 electricity system if the present connection pipeline converts into real, durable demand.
The fifth implication is that industrial heat can materially change reactor economics, but only where thermal demand physically exists near the site.
And the sixth is that LWR heat and advanced-reactor heat cannot be scored as the same product. Water-cooled reactors possess stronger present deployment familiarity but lower process-temperature capability; high-temperature and fast-reactor systems can offer a broader industrial-heat envelope while introducing greater fuel, licensing and technology novelty.
The appropriate government procurement principle is therefore:
Italy should not ask simply how many megawatts a reactor can generate. It should ask where those megawatts and megawatts-thermal enter the Italian energy system, what network reinforcement they require, what credible long-term loads they serve, what industrial fuels they can displace, and whether the additional system value is sufficient to compensate for the reactor’s fuel, licensing, construction and technology risk.
The complete decision chain is:
REACTOR
↓
SITE
↓
GRID CONNECTION
↓
SYSTEM SECURITY
↓
ELECTRICITY MARKET
│
├────────► ORDINARY GRID LOAD
│
├────────► DATA CENTRES
│
├────────► ELECTROLYSIS
│
└────────► OTHER ELECTRIFICATION
│
▼
THERMAL OUTPUT
│
├────────► DISTRICT HEATING
│
├────────► INDUSTRIAL STEAM
│
├────────► DESALINATION
│
└────────► HIGH-TEMPERATURE PROCESS HEAT
│
▼
TOTAL SYSTEM VALUE
│
▼
BALANCED AGAINST
│
├── FUEL RISK
├── LICENSING RISK
├── FOAK RISK
├── GRID CAPEX
├── SITE RISK
└── SCHEDULE RISK
That is the level at which the Italian nuclear programme should evaluate grid integration, digital demand and industrial cogeneration.
7.16 Hydrogen does not automatically make poor reactor economics disappear
A nuclear reactor can produce low-carbon hydrogen through:
- conventional electrolysis using electricity;
- potentially higher-efficiency high-temperature electrolysis where suitable steam is available.
Hydrogen can provide a flexible off-take during low electricity-price periods.
But the economic case depends on:
- electrolyser CAPEX;
- operating hours;
- hydrogen market;
- pipeline/storage infrastructure;
- electricity opportunity cost;
- industrial demand.
A government model should therefore not assume that excess nuclear electricity can always be monetised as hydrogen at attractive prices.
Hydrogen is an option, not a guaranteed balancing revenue stream.
7.17 Industrial co-location creates additional external hazards
Locating a reactor beside:
- chemical production;
- hydrogen storage;
- refinery infrastructure;
- major data centres;
- industrial gas facilities
can improve energy integration.
It can also introduce:
- explosion hazards;
- toxic releases;
- fires;
- pipelines;
- transport accidents.
IAEA site-evaluation requirements require such human-induced external hazards to enter the nuclear safety case.
Cogeneration therefore creates both system value and safety-interface obligations.
7.18 Water is a lifetime design constraint
Water availability cannot be assessed using the climate of the 1960s when Italy’s historic nuclear stations were designed.
A new reactor commissioned around 2040 could operate until approximately:
- 2100;
- potentially later if life extension is granted.
Its water system must therefore survive climate conditions substantially different from those under which the old plants operated.
ISPRA reported renewable Italian water resources of approximately 128 billion m³ in 2025, more than 7% below the long-term average and approximately 19% below 2024. [G]
The summer of 2026 further demonstrated that major northern water systems remain exposed to persistent heat, low precipitation and declining reservoir levels.
The implication is direct:
historic availability of river cooling water is not evidence of future cooling-water security.
7.19 Mediterranean heat is also a thermal-efficiency problem
Every thermal power plant operates across a temperature difference.
As the temperature of the heat sink rises:
- condenser efficiency falls;
- turbine output can fall;
- discharge-water temperature constraints can tighten.
This is true of:
- nuclear;
- gas;
- coal;
- concentrating solar thermal.
The OECD-NEA documents cases in which:
- high river temperature;
- low river level;
- heatwaves;
- drought
have reduced nuclear generation or required adaptation. [S]
For Italy, a future “dependable capacity” calculation must therefore include potential summer derating where the cooling concept is climate-sensitive.
7.20 Once-through cooling: highest withdrawal, strong heat-sink dependence
A conventional once-through cooling system withdraws large quantities of:
- river water;
- lake water;
- seawater.
Most is returned, but at higher temperature.
Advantages:
- high thermal efficiency;
- comparatively simple heat rejection.
Challenges:
- very large water withdrawal;
- thermal discharge;
- fish/biota impacts;
- intake blockage;
- high dependence on water level and temperature.
For inland Italy, prolonged drought could make once-through freshwater cooling particularly difficult to justify.
For coastal locations, seawater removes most freshwater competition but not thermal/ecological constraints.
7.21 Wet recirculating towers: lower withdrawal, higher consumptive use
Cooling towers recirculate water.
Compared with once-through systems they typically reduce withdrawal substantially.
But they lose water through:
- evaporation;
- blowdown.
This makes them potentially attractive where river withdrawal is constrained but still dependent on a reliable replenishment supply.
During:
- heatwaves;
- drought;
- water-use restrictions,
their evaporative demand can become politically and environmentally important.
7.22 Dry cooling: a real drought-resilience option, not a free solution
Dry cooling rejects heat principally to air rather than evaporating large amounts of water.
It can sharply reduce water dependency.
That gives it particular relevance for:
- Po basin locations;
- inland industrial brownfields;
- water-stressed Mediterranean locations.
But dry cooling creates trade-offs.
These can include:
- larger heat-exchanger structures;
- larger land footprint;
- higher capital cost;
- higher auxiliary power use;
- reduced thermal efficiency;
- greater performance penalty during the hottest ambient temperatures.
IAEA technical work on nuclear cooling systems recognises these trade-offs. [I/S]
The paradox is important:
dry cooling protects against drought but can perform worst precisely during the hottest heatwave conditions.
Technology and site must therefore be evaluated together.
7.23 Dry cooling does not eliminate the nuclear ultimate heat sink
A frequent misunderstanding is that a dry-cooled reactor has no water-related safety issue.
The power-cycle condenser and the safety ultimate heat sink are different engineering functions.
Depending on the reactor design, decay heat after shutdown may be rejected through:
- water;
- air;
- passive evaporation;
- combinations of systems.
IAEA site requirements explicitly require the availability and characteristics of the ultimate heat sink to be evaluated, including:
- air temperature;
- humidity;
- water temperature;
- water level;
- sustainable flow.
The safety case must therefore demonstrate heat removal during extreme conditions even where normal plant operation uses little cooling water.
7.24 Coastal cooling exchanges drought risk for marine and coastal risk
A coastal site can avoid competition for scarce inland freshwater.
That is a substantial advantage.
But the site acquires other hazards:
- tsunami;
- storm surge;
- wave action;
- sea-level rise;
- coastal erosion;
- marine heatwaves;
- salt corrosion;
- biological fouling;
- marine environmental constraints.
Chapter 3 identified these issues for:
- Montalto;
- Latina;
- Civitavecchia;
- Brindisi;
- Fiume Santo;
- Garigliano.
The correct conclusion is not “coastal is safer.”
It is:
coastal and inland sites carry different heat-sink risks.
7.25 Environmental impacts during normal operation remain material
Even without an accident, a nuclear plant can affect the environment through:
- cooling-water abstraction;
- thermal discharge;
- chemical treatment of cooling systems;
- land occupation;
- transmission corridors;
- construction excavation;
- noise;
- marine or freshwater ecology;
- routine controlled radioactive discharges within licensed limits.
These impacts are subject to environmental assessment and operating permits.
A low-carbon electricity source is not environmentally impact-free.
The appropriate comparison is against the environmental footprint of competing electricity systems over their full lifecycle.
7.26 Seismic safety cannot be reduced to Italy’s municipal seismic-zone map
The national civil seismic classification is useful for preliminary screening.
It is not the nuclear design basis.
A reactor project requires site-specific analysis of:
- ground-motion hazard;
- capable faults;
- liquefaction;
- surface rupture;
- settlement;
- slope instability;
- earthquake-induced flood;
- interaction with nearby infrastructure.
IAEA SSR-1 requires nuclear site hazards to be identified and evaluated over the installation lifetime and requires combinations of hazards to be considered where relevant.
Therefore a statement such as:
“this municipality is only seismic zone 3”
cannot establish nuclear suitability.
7.27 Probabilistic seismic hazard assessment must be reactor-specific and site-specific
The relevant nuclear output from geological investigation is not a political label.
It is a quantitative hazard curve supporting design of:
- safety-related structures;
- systems;
- components;
- seismic isolation where used;
- equipment qualification.
The future Italian regulator will need to determine:
- acceptable methodology;
- return periods;
- uncertainty treatment;
- ground-motion spectra;
- capable-fault criteria.
Legacy seismic studies at Trino, Latina, Caorso or Garigliano cannot simply be inherited from their historical plants.
The safety case must be rebuilt using current science.
7.28 Hydrogeology is part of safety, not merely environmental permitting
Groundwater and surface-water conditions influence:
- foundation stability;
- flooding;
- liquefaction;
- contaminant transport;
- construction;
- underground reactor structures;
- waste stores.
For an SMR using deep or partially underground construction, groundwater can become more rather than less important.
The safety dossier therefore must integrate:
- geology;
- hydrology;
- civil design;
- radiological consequence analysis.
7.29 Climate hazards must be treated as changing hazards
IAEA siting doctrine requires characteristics that can change during plant life to be reassessed.
For a reactor potentially operating into the next century, the relevant external-hazard baseline must consider plausible evolution in:
- extreme heat;
- drought;
- intense rainfall;
- river flood;
- sea level;
- storm surge;
- wildfire;
- water demand.
A “100-year flood” derived mechanically from a historical stationary climate dataset is not automatically an adequate future design basis.
The statistical assumptions themselves may need climate-adjusted evaluation.
I have verified these sections against primary regulatory and institutional sources only for the core safety propositions: IAEA safety standards and Fukushima lessons, the in-force Euratom nuclear-safety framework, Italy’s current Legislative Decree 101/2020 and Civil Protection framework, INGV, ISPRA, Terna, and NRC material on mechanistic source terms and advanced-reactor emergency planning. I have preserved the numbering exactly 7.30–7.32 and expanded the sections as direct replacements.
7.30 Compound hazards matter more than isolated hazards
The external-hazard analysis for a future Italian nuclear programme should not be constructed as a catalogue in which earthquake, flood, tsunami, extreme heat, drought, wildfire and loss of external infrastructure are assessed independently and then assumed to remain independent in reality.
For nuclear safety, the more demanding question is:
What can happen when one hazard causes another, several hazards have a common physical cause, or one extreme event simultaneously disables several different layers of defence?
This distinction is now embedded in international nuclear-safety doctrine.
IAEA Safety Standard SSR-1 requires site evaluation to consider not only the frequency and severity of natural and human-induced external events but also potential combinations of those events. It states explicitly that external events can occur simultaneously or within short timeframes, and that their interrelationships and causality must be evaluated. For sites containing more than one nuclear installation, credible combinations capable of affecting multiple installations must also be considered, together with the combined effects on people and the environment.
That requirement is directly relevant to Italy.
A future Italian nuclear safety case should therefore not consist of:
EARTHQUAKE → PASS
FLOOD → PASS
HEATWAVE → PASS
WILDFIRE → PASS
LOSS OF GRID → PASS
TSUNAMI → PASS
and conclude that the site is therefore safe.
It must also establish:
EARTHQUAKE
+
LOSS OF GRID
+
DAMAGED ACCESS
+
MULTIPLE UNIT CHALLENGE
→ ?
EARTHQUAKE
+
TSUNAMI / COASTAL FLOODING
→ ?
EXTREME RAINFALL
+
RIVER FLOOD
+
DRAINAGE FAILURE
+
ACCESS IMPAIRMENT
→ ?
HEATWAVE
+
DROUGHT
+
LOW RIVER FLOW
+
HIGH COOLING-WATER TEMPERATURE
+
PEAK GRID DEMAND
→ ?
WILDFIRE
+
SMOKE
+
TRANSMISSION-LINE OUTAGE
+
ROAD RESTRICTION
→ ?
The difference is fundamental.
A nuclear plant does not fail merely because one calculated physical parameter exceeds another.
Severe accidents can develop when several assumptions that were treated as independent cease to be independent at the same time.
7.30.1 Compound hazards must be divided into different causal categories
The term “combined hazards” can itself conceal several different phenomena.
Italy should distinguish at least five categories.
Table 7.30-A — Compound-hazard taxonomy for nuclear safety
| Category | Definition | Illustrative nuclear example |
|---|---|---|
| Causally linked hazards | One physical event produces a second hazard | Offshore earthquake → tsunami |
| Consequential hazards | Initial hazard damages infrastructure and creates another challenge | Earthquake → grid failure → loss of off-site power |
| Common-cause hazards | One event simultaneously affects several safety systems | Flood inundates multiple electrical rooms |
| Coincident hazards | Different hazards occur close enough in time to interact | Heatwave + drought + low river flow |
| Cascading infrastructure hazards | External event damages systems outside the nuclear site required for response | Wildfire → transmission outage + road closure + telecom disruption |
| Multi-unit hazards | Same event challenges more than one reactor or radioactive inventory | Flood affects six SMR modules simultaneously |
| Multi-installation hazards | Hazard affects reactor, spent-fuel systems, waste facilities or neighbouring nuclear installations | Earthquake affects reactor modules + spent-fuel store |
| Long-duration compound stress | Persistent environmental condition progressively removes safety margin | Drought + high water temperature + prolonged grid stress |
These categories must not be treated as interchangeable.
For example, the probability of a tsunami following a major submarine earthquake is not obtained by multiplying two independent probabilities.
The events are physically linked.
Similarly:
PROBABILITY OF EARTHQUAKE
×
PROBABILITY OF GRID LOSS
would be inappropriate if the earthquake itself can damage transmission infrastructure and cause the loss of grid connection.
The dependency must be modelled.
7.30.2 Fukushima demonstrated the danger of treating defence layers as independent when one hazard can defeat several simultaneously
The Fukushima Daiichi accident is the central modern reference for this principle.
The IAEA’s post-Fukushima lessons state explicitly that natural-hazard assessments must consider combinations occurring simultaneously or sequentially, their combined effects, and their ability to affect multiple reactor units. The IAEA further concluded that the tsunami flooding simultaneously challenged several levels of defence in depth and produced common-cause failures.
The important lesson is broader than:
“A tsunami can be dangerous.”
The deeper lesson is:
One external event can remove several apparently independent safety provisions at the same time.
A simplified representation is:
EARTHQUAKE
│
├────────► REACTOR TRIP
│
├────────► OFF-SITE GRID DAMAGE
│
└────────► TSUNAMI
│
▼
FLOODING
│
┌─────────┼─────────┐
▼ ▼ ▼
GENERATORS SWITCHGEAR ACCESS
│ │ │
└─────────┼─────────┘
▼
COMMON-CAUSE LOSS
│
▼
LOSS OF COOLING
The significance for a new Italian programme is not that Italy should copy Fukushima’s reactor design assumptions.
Modern reactor technologies can differ substantially.
The significance is methodological:
a safety function cannot be counted as genuinely independent if the same external event can disable it together with the function it is intended to back up.
7.30.3 Italian law already incorporates the post-Fukushima defence-in-depth principle
This is not merely international best practice.
It has already entered the Italian nuclear-safety framework.
Article 78 of Legislative Decree 101/2020 establishes the nuclear-safety objective that nuclear installations must be designed, sited, constructed, commissioned, operated and decommissioned to prevent accidents, mitigate their consequences and avoid both:
- early radioactive releases for which insufficient time would exist to implement necessary off-site emergency measures; and
- large radioactive releases requiring protective measures that could not be limited in space or time.
Article 79 then requires defence in depth, where applicable, specifically to minimise the impact of extreme external hazards of natural or unintended human origin, as well as to control design-basis accidents and severe conditions.
This language directly implements the post-Fukushima amendments contained in Directive 2014/87/Euratom. The Directive similarly requires the minimisation of extreme external natural and unintended man-made hazards, and requires on-site emergency arrangements to address accidents and severe accidents that can simultaneously involve or affect several units.
The legal test for a future Italian reactor is therefore not merely:
Can the plant withstand its design earthquake?
It is broader:
Can the defence-in-depth architecture remain effective when credible external hazards and their correlated consequences challenge several systems, several units or several levels of defence simultaneously?
7.30.4 Earthquake + loss of off-site power is a fundamental combined scenario
An earthquake need not directly damage the reactor’s safety-class structures in order to create a severe plant challenge.
It can damage:
- transmission lines;
- substations;
- transformers;
- regional distribution systems;
- telecommunications;
- roads;
- water systems;
- fuel-delivery infrastructure.
A site can consequently experience:
SEISMIC EVENT
│
├────────► REACTOR AUTOMATIC SHUTDOWN
│
├────────► TRANSMISSION FAULT
│
├────────► SUBSTATION DAMAGE
│
└────────► REGIONAL INFRASTRUCTURE DAMAGE
│
▼
LOSS OF OFF-SITE POWER
This creates a different safety condition from an isolated grid failure.
A conventional loss-of-grid scenario may assume that:
- roads remain accessible;
- communications remain available;
- neighbouring substations remain intact;
- external support can reach the plant;
- regional emergency services are functioning normally.
An earthquake-induced loss of grid may invalidate all of those assumptions simultaneously.
For this reason, the safety case should separately model:
ordinary LOOP — loss of off-site power
and
hazard-induced LOOP — loss of off-site power occurring as one consequence of a wider regional event.
The latter is potentially much more severe.
7.30.5 Earthquake + tsunami must be evaluated for every coastal candidate site where the hazard is physically credible
Italy should not assume that tsunami risk is an exclusively Pacific phenomenon.
The Italian Civil Protection Department states that all Mediterranean coasts are potentially exposed to tsunami hazard and that several dozen tsunamis have been documented along Italian coasts during the past thousand years. The historically most affected areas include eastern Sicily, Calabria, Puglia and the Aeolian Islands, although smaller events have also been recorded along Ligurian, Tyrrhenian and Adriatic coasts. Italian coasts can also be affected by tsunamis generated elsewhere in the Mediterranean.
INGV’s Italian Tsunami Hazard Model 2025 — ITHM25 now provides probabilistic earthquake-generated tsunami hazard curves for the entire Italian coastline at 1,085 points, spaced on average approximately 5 km apart, and provides multiple statistical measures and return-period representations.
That national evidence establishes that tsunami hazard deserves systematic screening.
It does not establish that every Italian coastal nuclear candidate site has the same tsunami hazard.
That must be determined site by site.
The nuclear analysis should examine:
- earthquake source;
- tsunami-generation mechanism;
- arrival time;
- wave height;
- run-up;
- inundation depth;
- flow velocity;
- debris;
- hydrodynamic loading;
- erosion;
- scour;
- sediment transport;
- drainage reversal;
- repeated waves;
- simultaneous tide;
- storm conditions where physically credible;
- accessibility after inundation.
The critical design question is not simply:
“Is the reactor building above calculated tsunami height?”
It is:
Which safety functions, access routes, power connections, water intakes, discharge structures, emergency centres and support systems remain operable throughout the complete event?
7.30.6 Flood hazard itself can be compound
River flooding, pluvial flooding, coastal flooding and groundwater rise cannot automatically be treated as independent phenomena.
IAEA meteorological and hydrological guidance states that a nuclear design-basis flood can result from simultaneous severe events, none of which individually represents the limiting event. The guidance therefore requires examination of interdependence between flood-generating phenomena.
A site can experience combinations such as:
INTENSE RAINFALL
│
├────────► LOCAL SURFACE RUNOFF
│
├────────► DRAINAGE SATURATION
│
└────────► RIVER LEVEL RISE
│
▼
RIVER FLOOD
│
+ HIGH GROUNDWATER
│
▼
COMPOUND INUNDATION
or, for a coastal location:
HEAVY RAIN
+
HIGH RIVER FLOW
+
STORM SURGE
+
HIGH SEA LEVEL
↓
REDUCED DRAINAGE TO SEA
↓
GREATER INLAND FLOODING
Italy’s national exposure to flooding is substantial. ISPRA’s current national indicators identify 6.8 million residents, approximately 11.5% of the population, in areas associated with the medium hydraulic-hazard scenario; more than 1.5 million buildings fall within that scenario. ISPRA also reports that 94.5% of Italian municipalities are exposed to one or more landslide, flood, avalanche or coastal-erosion hazards.
These national statistics do not determine the suitability of a nuclear site.
They demonstrate why a nuclear site cannot rely on generic national averages.
7.30.7 Flood + access-road impairment must be treated as a nuclear-safety scenario, not only a civil-engineering inconvenience
Physical access becomes particularly important during severe external events.
Emergency response may require:
- additional personnel;
- mobile generators;
- pumps;
- hoses;
- fuel;
- monitoring equipment;
- fire-fighting capability;
- radiological teams;
- replacement parts;
- communications equipment.
A plant may therefore be physically intact while its accident-management capability is degraded because the surrounding region is inaccessible.
The correct model is:
FLOOD
│
├────────► SITE WATER CHALLENGE
│
├────────► SUBSTATION DAMAGE
│
├────────► ROAD INUNDATION
│
├────────► BRIDGE CLOSURE
│
└────────► TELECOM FAILURE
│
▼
EXTERNAL SUPPORT DELAY
The IAEA’s Fukushima lessons specifically require accident management to account for disrupted regional infrastructure, including communications, transportation and utilities.
Consequently, an Italian nuclear emergency plan should demonstrate access under:
- normal conditions;
- primary-road loss;
- secondary-road loss;
- bridge failure;
- flood isolation;
- debris blockage;
- evacuation traffic;
- radiological exclusion conditions.
Alternative access should be considered where required, potentially including independent road routes or other practicable logistics solutions.
7.30.8 Heatwave + drought + peak electricity demand is a specifically important Italian systems scenario
Extreme heat can affect several parts of the reactor and power system simultaneously.
Potential consequences include:
- warmer cooling water;
- reduced cooling efficiency;
- reduced condenser performance;
- thermal derating;
- higher cooling-water demand;
- increased river or reservoir stress;
- increased electricity demand from air conditioning;
- increased transmission loading;
- greater stress on conventional generation;
- greater wildfire probability under suitable dry conditions.
The combination matters much more than a heatwave considered alone.
Italian evidence already demonstrates the relationship between high temperatures and electricity-system stress.
Terna reported that in July 2026, exceptionally high temperatures contributed to an all-time July electricity-demand record of 32.5 TWh. National demand reached approximately 58 GW on 15 July 2026, while the month’s average temperature was 1.2°C above July 2025 and almost 2°C above the ten-year average.
Italy has simultaneously experienced important water-stress asymmetry. ISPRA reports that 2024 was the hottest year in the Italian historical series, with national mean temperature 1.33°C above the 1991–2020 reference, while annual precipitation was 38% above average in the North but 18% below average in the South and major islands, where water-severity conditions progressively worsened.
Again, these observations do not demonstrate that a particular reactor will lose cooling during a future heatwave.
They demonstrate why the licensing case must assess the joint envelope:
HIGH AIR TEMPERATURE
+
HIGH COOLING-WATER TEMPERATURE
+
LOW WATER AVAILABILITY
+
HIGH ELECTRICITY DEMAND
+
POSSIBLE GRID STRESS
rather than treating each condition independently.
7.30.9 The cooling system must therefore be tested against compound climate envelopes
For each candidate site, the applicant should establish:
- maximum design air temperature;
- maximum wet-bulb temperature;
- maximum cooling-water temperature;
- minimum river flow;
- minimum reservoir level;
- seawater-temperature envelope;
- drought duration;
- sediment/debris loading;
- biological fouling conditions;
- simultaneous power-system demand.
The analysis should then answer:
- Can the reactor remain at full output?
- If not, what derating occurs?
- If shutdown is required, can residual heat still be removed?
- Does the ultimate heat sink remain available?
- Can all modules reject decay heat simultaneously?
- Does the cooling system depend on external electrical power?
- What occurs if extreme heat coincides with loss of off-site power?
- Is emergency water inventory sufficient for the required coping time?
- Are passive systems still passive under the limiting atmospheric and water conditions?
- Are environmental discharge-temperature constraints respected?
This last point should not be overlooked.
A plant may remain technically capable of operation but still face output restrictions because environmental discharge limits become controlling.
7.30.10 Wildfire + transmission-line loss deserves explicit treatment
Wildfire should not be assessed only as the probability that flame reaches the reactor perimeter.
The larger system hazard can include:
- smoke;
- airborne ash;
- firebrand transport;
- damage to external substations;
- line trips;
- transmission de-rating;
- blocked roads;
- impaired visibility;
- emergency-service diversion;
- telecommunications disruption;
- evacuation demands outside the site.
Italy’s wildfire exposure is material. ISPRA reported approximately 1,600 large fires between 1 January and 15 September 2025, affecting nearly 890 km² nationally; 16 regions had been affected by that date.
For a nuclear site, the relevant sequence may therefore be:
WILDFIRE
│
├────────► TRANSMISSION CORRIDOR AFFECTED
│ │
│ ▼
│ OFF-SITE POWER LOSS
│
├────────► ACCESS ROAD CLOSURE
│
├────────► SMOKE / ASH
│
└────────► REGIONAL EMERGENCY RESPONSE DEMAND
│
▼
REDUCED EXTERNAL SUPPORT
Vegetation management around the site does not by itself eliminate this wider regional scenario.
7.30.11 Human-induced hazards can also compound with natural events
Italian and EU law refer not only to natural hazards but to unintended human-induced external hazards.
Depending on site context, these can include:
- industrial explosions;
- toxic-gas releases;
- major fires;
- pipeline rupture;
- transport accidents;
- dam failure;
- hazardous-material releases;
- aircraft hazards;
- nearby infrastructure failure.
A nuclear site situated in or close to a major industrial zone therefore requires an integrated external-hazard map.
For example:
EARTHQUAKE
↓
NEARBY CHEMICAL INSTALLATION DAMAGED
↓
TOXIC RELEASE
↓
CONTROL-ROOM HABITABILITY CHALLENGE
or:
FLOOD
↓
INDUSTRIAL TANK FAILURE
↓
CHEMICAL CONTAMINATION OF SITE WATER
The applicant should not dismiss such sequences merely because the initial event originated outside the nuclear installation.
7.30.12 Multi-module SMRs make common-cause analysis more—not less—important
SMR modularity can provide genuine redundancy.
If six modules are physically and functionally independent, loss of one module need not imply loss of the other five.
But that advantage must be demonstrated.
A multi-module site can share:
- switchyards;
- cooling-water systems;
- ultimate heat sinks;
- control rooms;
- electrical distribution;
- emergency centres;
- access roads;
- fire-water systems;
- service buildings;
- radioactive-waste systems;
- fuel-handling facilities;
- security infrastructure;
- communications;
- operators.
An external hazard may therefore bypass nominal reactor modularity.
The key licensing question is:
What is actually independent at site level?
Table 7.30-B — Independence test for a multi-module Italian SMR site
| Shared function | Question requiring demonstration |
|---|---|
| Grid connection | Can one substation failure disconnect all modules? |
| Ultimate heat sink | Is capacity sufficient for simultaneous accident conditions? |
| Emergency power | Are systems truly module-independent? |
| Battery systems | Can one flooding/fire event disable several? |
| Control room | Is there a common habitability vulnerability? |
| Instrumentation | Are sensors/power/communications common? |
| Access | Can responders reach all modules after hazard? |
| Mobile equipment | Is equipment quantity sufficient for concurrent accidents? |
| Water inventory | Can several modules require it simultaneously? |
| Operators | Can staffing manage multiple severe accidents? |
| Emergency centre | Does one hazard disable the common facility? |
| Spent-fuel facilities | Are they independently protected? |
IAEA guidance explicitly requires multi-installation site evaluations to consider credible external-hazard combinations affecting multiple installations and to assess combined consequences.
7.30.13 The ultimate heat sink must be evaluated on a site-wide basis
The heat-rejection problem is especially important.
Following shutdown, each reactor continues to produce decay heat.
Spent fuel may also require cooling.
If a multi-module site uses a common river, reservoir, seawater intake or other ultimate heat sink, the safety case must demonstrate performance under the limiting common hazard.
The relevant question is therefore not:
“Can one module cool itself?”
It is:
“Can the complete site remove decay heat under the credible common-cause condition?”
The site case should include, where technically applicable:
ALL REACTORS SCRAM
+
ALL RECENTLY OPERATED CORES PRODUCE DECAY HEAT
+
SPENT-FUEL HEAT REMAINS
+
OFF-SITE POWER LOST
+
LIMITING ENVIRONMENTAL CONDITION
This is the correct system boundary.
7.30.14 Emergency resources must also be sized for simultaneous demand
A site may possess:
- two mobile pumps;
- two portable generators;
- one emergency response centre;
- one fire brigade;
- one specialist radiological team.
Those resources may be adequate for an accident affecting one module.
They may be inadequate for six simultaneous challenges.
Fukushima demonstrated why emergency provisions must account for concurrent multi-unit accidents rather than simply assuming that resources can be moved from an unaffected unit. The IAEA specifically concluded that accident-management guidance, training and emergency arrangements need to account for accidents involving several units simultaneously and spent-fuel facilities, potentially while regional infrastructure is disrupted.
Therefore:
RESOURCE ADEQUACY
≠
RESOURCE EXISTS
Instead:
RESOURCE ADEQUACY
=
NUMBER AVAILABLE
×
ABILITY TO DEPLOY
×
SURVIVABILITY
×
MISSION TIME
×
SIMULTANEOUS DEMAND
7.30.15 Compound hazards require deterministic and probabilistic analysis together
No single analytical technique is sufficient.
A future Italian licensing case should combine:
Deterministic analysis
to determine whether structures, systems and components can withstand prescribed hazard combinations;
and
probabilistic analysis
to evaluate:
- frequency;
- uncertainty;
- correlated initiating events;
- common-cause failures;
- multi-unit sequences;
- risk significance.
SSR-1 explicitly provides for deterministic and/or probabilistic methodologies depending on the hazard and available data and requires uncertainty analysis.
A robust programme should therefore include:
HAZARD IDENTIFICATION
↓
CAUSAL SCREENING
↓
DEPENDENCY ANALYSIS
↓
PROBABILISTIC HAZARD CURVES
↓
DETERMINISTIC DESIGN ENVELOPE
↓
PLANT RESPONSE
↓
MULTI-UNIT RESPONSE
↓
CLIFF-EDGE ANALYSIS
↓
RESIDUAL RISK
7.30.16 “Cliff-edge effects” are particularly important
A cliff edge exists when a relatively small increase in hazard severity produces a disproportionately large change in consequence.
For example:
FLOOD 4.8 m
→ safety equipment dry
FLOOD 5.0 m
→ safety equipment dry
FLOOD 5.2 m
→ barrier overtopped
FLOOD 5.3 m
→ multiple electrical systems flooded
The difference between 5.0 m and 5.3 m is small physically.
The difference in plant consequence can be enormous.
Therefore Italy should require explicit identification of:
- flood overtopping thresholds;
- battery depletion times;
- passive cooling mission times;
- minimum water inventories;
- maximum ambient temperatures;
- intake blockage limits;
- structural margins;
- switchyard fault thresholds.
A design should be valued not merely for meeting a design point but for possessing graceful degradation and margin beyond it.
7.30.17 Hazard evolution over 60–80 years must be considered
A nuclear station may operate for sixty years or longer and then remain a nuclear site during decommissioning and spent-fuel management.
Hazards are not necessarily stationary over that period.
SSR-1 specifically requires evaluation of potential changes in external hazards and site characteristics over time.
For Italy this is particularly relevant to:
- extreme heat;
- precipitation intensity;
- drought;
- sea level;
- coastal processes;
- wildfire conditions;
- hydrology.
The correct site parameter is therefore not simply:
historical maximum
but:
design value supported by current hazard science, uncertainty analysis and credible evolution over the relevant facility lifetime.
7.30.18 Emergency planning must assume that the natural disaster may still be occurring
The reactor accident cannot be planned as if it occurs on an otherwise normal day.
A compound-hazard emergency may involve:
- damaged roads;
- hospital overload;
- regional evacuations unrelated to the reactor;
- communications failure;
- electricity outage;
- damaged drinking-water systems;
- extreme heat or cold;
- unavailable emergency personnel.
The IAEA’s Fukushima lessons specifically state that emergency preparedness should account for severe reactor-core or spent-fuel damage involving several units at the same time as a natural disaster, with associated disruption of local infrastructure.
Therefore Italy should conduct exercises involving scenarios such as:
MAJOR FLOOD
+
LOSS OF GRID
+
TWO REACTOR MODULES IN ACCIDENT CONDITION
+
ROAD ACCESS LOST
+
CELLULAR COMMUNICATION DEGRADED
rather than testing only:
REACTOR ACCIDENT
+
ALL CIVIL INFRASTRUCTURE AVAILABLE
7.30.19 Minimum compound-hazard matrix required before an Italian FOAK licence
Table 7.30-C — Mandatory combined-hazard categories
| Primary event | Required correlated/consequential analysis |
|---|---|
| Earthquake | Grid loss; fire; dam failure; tsunami where applicable; access loss |
| Tsunami | Coastal flooding; debris; grid loss; intake damage; multi-unit impact |
| River flood | Heavy rain; drainage failure; groundwater rise; access loss |
| Extreme rainfall | Flash flood; landslide; drainage overload; road loss |
| Heatwave | High cooling-water temperature; peak load; equipment temperature |
| Drought | Low river flow; reduced reservoir level; wildfire |
| Wildfire | Transmission loss; road closure; smoke; external support impairment |
| Extreme wind | Grid loss; airborne debris; access disruption |
| Industrial accident | Toxic gas; fire/explosion; control-room habitability |
| Loss of grid | Evaluate whether initiating hazard also impairs emergency support |
| External infrastructure failure | Multiple simultaneously unavailable services |
The table should be a screening minimum, not a declaration that every combination is relevant to every site.
Combinations may be screened out only through a documented technical basis.
7.30.20 Government procurement implication
Every reactor vendor considered for Italy should provide a Compound External Hazard and Multi-Unit Safety Case identifying:
- all external hazards considered;
- screening criteria;
- causal relationships;
- credible combinations;
- site dependencies;
- shared systems;
- common-cause vulnerabilities;
- multi-unit sequences;
- spent-fuel involvement;
- accident-management resource demand;
- coping time;
- infrastructure assumptions;
- uncertainty;
- cliff-edge margins.
A statement such as:
“The plant is designed against earthquakes, floods and extreme weather”
is not sufficient.
Italy should require evidence showing:
how the plant behaves when those events are not independent.
Core conclusion — 7.30
The central safety lesson is therefore:
The most consequential external event may not be the most severe individual hazard. It may be the combination that simultaneously removes several independent safety assumptions.
For Italy, compound-hazard analysis should become a mandatory element of:
site selection → reactor selection → design certification → emergency planning → periodic safety review.
The relevant safety chain is:
EXTERNAL HAZARD
↓
SECONDARY / CORRELATED HAZARD
↓
MULTIPLE SYSTEM CHALLENGE
↓
COMMON-CAUSE FAILURE?
↓
MULTI-UNIT EFFECT?
↓
ACCIDENT MANAGEMENT
↓
SOURCE TERM
↓
OFF-SITE CONSEQUENCE
This leads directly to the next question.
7.31 The accident source term is the correct measure for off-site consequence planning
A reactor’s nominal electrical power, physical size or technology label does not determine its radiological consequence in an accident.
The relevant starting point for off-site radiological consequence analysis is the accident source term.
The NRC defines source term as the magnitude and mixture of radionuclides released from the fuel, the fractions of the fuel fission-product inventory involved, their physical and chemical form, and the timing of release. For advanced designs, the NRC expects applicants to establish reactor-specific source terms rather than assuming that generic LWR source terms automatically apply.
For emergency planning, however, one additional precision is essential:
The source term is the principal radiological input into the consequence calculation; it is not, by itself, the complete off-site consequence.
The complete chain is:
RADIOACTIVE INVENTORY
↓
ACCIDENT SEQUENCE
↓
FUEL RELEASE
↓
TRANSPORT THROUGH REACTOR SYSTEM
↓
RETENTION / DEPOSITION
↓
CONTAINMENT / CONFINEMENT
↓
FILTRATION / MITIGATION
↓
ENVIRONMENTAL SOURCE TERM
↓
ATMOSPHERIC / AQUATIC DISPERSION
↓
DEPOSITION
↓
HUMAN EXPOSURE PATHWAYS
↓
DOSE
↓
PROTECTIVE ACTIONS
The emergency-planning consequence therefore depends on both:
what leaves the facility
and
what subsequently happens to it in the environment.
7.31.1 The word “source term” must always specify the boundary
Different technical documents can use the term at different physical boundaries.
The safety analysis should therefore distinguish:
- core or fuel inventory — radionuclides existing in the fuel;
- fuel release — material escaping damaged fuel;
- primary-system source term — material transported beyond the fuel into the coolant/system;
- containment/confinement source term — material entering the final radiological barrier;
- environmental source term — material actually released beyond the plant boundary systems into the environment.
For off-site emergency planning, the environmentally released source term is the decisive input.
Confusing these quantities can produce enormous analytical errors.
For example:
100 units of radionuclide inventory
↓
10 released from fuel
↓
4 reach containment atmosphere
↓
3 deposited / retained
↓
0.5 passes final release pathway
↓
ENVIRONMENTAL SOURCE TERM = 0.5
The numbers above are schematic only.
The principle is the important point:
core inventory is not equal to environmental release.
7.31.2 A complete source term has several dimensions
It cannot be represented adequately by a single number such as “X kilograms of radioactivity”.
Table 7.31-A — Minimum components of an accident source term
| Variable | Why it matters |
|---|---|
| Radionuclide identity | Different nuclides create different dose pathways |
| Activity released | Determines source strength |
| Release fraction | Links accident release to total inventory |
| Release start time | Determines available emergency-response time |
| Release duration | Affects plume behaviour and protective actions |
| Release rate | Determines time-dependent concentration |
| Physical form | Gas, vapour, aerosol, particulate behaviour differs |
| Chemical form | Influences volatility, retention and biological behaviour |
| Aerosol size distribution | Influences deposition and respiratory behaviour |
| Release location | Determines atmospheric dispersion |
| Release elevation | Influences plume transport |
| Thermal/energy characteristics | Can influence initial plume rise |
| Multiple release phases | Accidents may not have one continuous release |
| Uncertainty | Consequence calculations must reflect modelling uncertainty |
This is why statements such as:
- “the reactor is only 300 MW”;
- “the core is underground”;
- “the design is passive”;
- “the reactor is Generation IV”;
- “the reactor uses TRISO”;
cannot replace source-term analysis.
Those characteristics may influence the source term.
They are not themselves the source term.
7.31.3 Core inventory is the first physical determinant
The maximum potential radioactive inventory depends on the reactor and fuel system.
Relevant variables include:
- reactor thermal power;
- operating history;
- fuel mass;
- fuel composition;
- fissile material;
- enrichment;
- burn-up;
- neutron spectrum;
- radionuclide generation;
- refuelling strategy;
- time since shutdown.
A smaller reactor module can contain a smaller fission-product inventory than a much larger reactor under otherwise comparable assumptions.
That is a legitimate potential safety advantage.
But inventory alone does not determine release.
The question becomes:
HOW MUCH RADIOACTIVITY EXISTS?
↓
WHAT FRACTION LEAVES THE FUEL?
↓
WHAT FRACTION ESCAPES EACH BARRIER?
↓
WHAT FRACTION REACHES THE ENVIRONMENT?
7.31.4 Fuel behaviour can fundamentally alter the source term
Fuel form matters because an accident first has to mobilise radionuclides from the fuel.
Different reactor concepts can use substantially different fuels, including:
- conventional UO₂ LWR fuel;
- TRISO particle fuel;
- metallic fast-reactor fuel;
- MOX;
- other advanced fuel forms.
Each requires technology-specific evidence for:
- temperature response;
- cladding/coating behaviour;
- fission-product retention;
- oxidation;
- mechanical failure;
- chemical interactions;
- release kinetics.
The regulator should therefore reject both of the following shortcuts:
ADVANCED FUEL
=
ZERO RELEASE
and:
ALL NUCLEAR FUELS
=
SAME SOURCE TERM
Neither is technically defensible.
7.31.5 Mechanistic source terms are particularly important for advanced reactors
For non-LWRs, NRC policy has long supported mechanistic source-term analysis where reactor and fuel performance are sufficiently understood.
The NRC describes a mechanistic source term as an analysis based on:
- cladding damage;
- fuel damage;
- core damage;
- transport through the coolant system;
- transport through intermediate volumes and barriers;
- mitigation systems;
- ultimate movement into the environment.
It requires sufficient experimental and analytical evidence to model reactor/fuel performance and fission-product transport through all relevant barriers. It also requires accident scenarios that bound severe accidents and design-dependent uncertainty.
That methodology is exactly what Italy should require from advanced-reactor vendors.
The question should be:
“Show the physical sequence by which each important radionuclide can move from the fuel to the environment.”
7.31.6 The containment or confinement concept is as important as the core
A smaller core does not automatically produce a smaller environmental source term if the final confinement system performs poorly.
Conversely, a larger core can have lower calculated environmental release for a particular accident if radionuclide retention is substantially more effective.
The complete comparison is therefore:
CORE INVENTORY
×
FUEL RELEASE FRACTION
×
SYSTEM TRANSPORT
×
CONTAINMENT ESCAPE
=
ENVIRONMENTAL SOURCE TERM
This is conceptual rather than a literal universal multiplication formula.
The actual analysis is time-dependent and nuclide-specific.
Important retention mechanisms can include:
- fuel retention;
- coolant retention;
- plate-out;
- aerosol deposition;
- gravitational settling;
- pool scrubbing;
- filtration;
- containment spray;
- leak-tight barriers;
- isolation;
- filtered venting where applicable.
7.31.7 “Functional containment” must be judged by radiological performance, not terminology
Some advanced non-LWR concepts may not use a conventional large LWR pressure containment in the same form.
Instead they may rely on a functional containment consisting of several barriers and retention mechanisms whose combined performance limits radioactive release.
The NRC explicitly recognises approved functional-containment approaches for non-LWRs, while still requiring the applicant to demonstrate the resulting radiological source term and public-health consequences.
Italy should therefore avoid a semantic procurement rule such as:
“A reactor is safe only if it possesses conventional containment.”
The better rule is:
The complete barrier system must quantitatively demonstrate acceptable source-term attenuation under the relevant accident spectrum.
7.31.8 Timing can be as important as total release
Consider two hypothetical releases containing the same total radioactivity.
Scenario A
RELEASE BEGINS:
20 minutes after initiating event
Scenario B
RELEASE BEGINS:
24 hours after initiating event
The integrated activity might be identical.
Emergency-planning implications are not.
The longer delay can provide additional time for:
- diagnosis;
- notification;
- protective-action decisions;
- sheltering;
- iodine prophylaxis where applicable;
- evacuation if justified;
- deployment of monitoring teams.
This connects directly to the Italian and Euratom safety objective of avoiding early releases for which insufficient time exists to implement off-site emergency measures.
For this reason, Italy should require reporting not only of:
“maximum release”
but also:
time to release.
7.31.9 Release duration and phases also matter
A severe accident can produce:
- an early pulse;
- a prolonged low-rate release;
- several separate release periods;
- a later release caused by containment degradation.
Emergency planning must therefore use time-dependent source terms.
For each sequence the applicant should provide, as technically applicable:
T0 accident initiation
T1 fuel damage begins
T2 first release from fuel
T3 material reaches confinement
T4 environmental release begins
T5 peak release rate
T6 major release ends
T7 residual release continues
The source-term calculation should also identify uncertainty around each stage.
7.31.10 The radionuclide mixture matters because exposure pathways differ
Different radionuclides behave differently environmentally and biologically.
Emergency-planning calculations therefore cannot replace nuclide-specific analysis with one total activity value.
Important categories can include:
- noble gases;
- iodine isotopes;
- caesium isotopes;
- tellurium;
- strontium;
- actinides;
- other fission products.
Their importance differs according to:
- volatility;
- aerosol behaviour;
- half-life;
- deposition;
- uptake;
- organ dose;
- food-chain behaviour.
Consequently:
1 Bq OF RADIONUCLIDE A
≠
1 Bq OF RADIONUCLIDE B
for consequence purposes.
7.31.11 Physical and chemical form are not secondary details
Iodine, for example, can exist in different chemical forms with different filtration and environmental behaviour.
Aerosol particle size influences:
- deposition in containment;
- filtration;
- atmospheric deposition;
- respiratory deposition.
The NRC therefore incorporates physical and chemical form explicitly into its source-term definition.
A government reactor-comparison table should consequently never compare two designs solely using:
total activity released.
It should require the actual source-term vector.
7.31.12 The source term must then be converted into consequence
Once the environmental source term has been established, off-site consequence analysis requires additional modelling.
Table 7.31-B — Source term versus off-site consequence
| Stage | Principal variables |
|---|---|
| Plant source term | Nuclides, activity, timing, form, release duration |
| Atmospheric transport | Wind speed/direction, stability, mixing height |
| Dispersion | Plume dilution |
| Deposition | Dry/wet deposition |
| Terrain | Local flow and dispersion effects |
| Precipitation | Can materially alter deposition |
| Population distribution | Location of receptors |
| Exposure pathways | Cloud, groundshine, inhalation, ingestion |
| Protective actions | Shelter, evacuation, iodine, food restrictions |
| Time | Short-term and longer-term consequences |
This explains why source term is the correct radiological input but not the complete consequence measure.
7.31.13 Italian law already requires consequence-based emergency analysis
Italy’s current legal framework is highly relevant.
Under Article 174 of Legislative Decree 101/2020, applicants for covered authorised practices must carry out prior evaluations of the spatial and temporal distribution of radioactive material that could be dispersed or released and of potential exposures in radiological emergencies.
Article 178 requires the nuclear licence holder to provide ISIN with a technical report for external emergency planning describing:
- reasonably conceivable nuclear accidents;
- resulting hazardous environmental conditions;
- expected geographic location;
- evolution over time;
- resulting exposures to the public, workers and emergency personnel.
It further requires scenarios to be distinguished according to whether consequences are expected to remain within provincial/interprovincial scope or may require protective measures over a wider territory.
That is effectively a consequence-based planning requirement.
The implication for future new build is clear:
Italy’s emergency plan cannot be established from reactor nameplate output. It requires an accident-specific radiological consequence case.
7.31.14 Italy should require more than one source term
There is no single physically meaningful “source term of the reactor” valid for all accidents.
Different accident sequences can create different releases.
A future licensing case should therefore contain a set of source terms covering relevant event categories.
Potential categories include:
- design-basis accidents;
- design-extension conditions;
- severe accidents;
- loss of coolant where applicable;
- loss of heat sink;
- station blackout;
- reactivity events where applicable;
- fuel-handling events;
- spent-fuel events;
- containment bypass where physically credible;
- external-hazard-induced accidents;
- multi-unit sequences.
For advanced designs, technology-specific events must also be considered.
7.31.15 Source-term analysis must include bypass pathways
A strong containment cannot attenuate a release that bypasses it.
The safety analysis should therefore identify every credible path by which radioactive material could reach the environment without experiencing the assumed retention barriers.
Potential pathways can include, depending on design:
- penetrations;
- interfacing systems;
- ventilation;
- pressure-relief pathways;
- containment isolation failure;
- auxiliary systems;
- heat-transfer systems.
The correct source-term model is not:
FUEL
↓
CONTAINMENT
↓
ENVIRONMENT
unless the design proves that this is the only relevant route.
It must instead be:
FUEL
│
├──────── PATH A ──► RETENTION ──► ENVIRONMENT
│
├──────── PATH B ──► RETENTION ──► ENVIRONMENT
│
└──────── BYPASS? ────────────────► ENVIRONMENT
7.31.16 Severe-accident mitigation must receive quantitative credit only when demonstrated
A reactor may contain systems intended to:
- retain molten material;
- remove heat passively;
- depressurise;
- filter releases;
- scrub aerosols;
- isolate confinement;
- maintain subcriticality.
Italy should not credit these features merely because the vendor lists them.
For each claimed reduction in source term the safety case should demonstrate:
- initiating conditions;
- system availability;
- mission time;
- environmental qualification;
- power requirement;
- water requirement;
- operator action requirement;
- common-cause vulnerability;
- failure mode.
This distinction is critical for passive systems.
7.31.17 “Passive” describes an operating principle, not a radiological consequence
Passive safety can reduce reliance on:
- pumps;
- external power;
- immediate operator actions.
This can materially improve accident response.
But the word “passive” does not quantify:
- radionuclide inventory;
- containment leakage;
- fuel retention;
- source-term magnitude;
- release timing.
Therefore:
PASSIVE
≠
ZERO RELEASE
Rather:
PASSIVE FEATURE
↓
MAY REDUCE ACCIDENT PROGRESSION
↓
MAY REDUCE FUEL DAMAGE
↓
MAY REDUCE SOURCE TERM
↓
MUST BE DEMONSTRATED
7.31.18 “Generation IV” is even less useful for emergency planning
Generation labels classify broad technological ambitions or reactor families.
They are not radiological release calculations.
Two reactors described as advanced or Generation IV can differ in:
- coolant;
- fuel;
- power;
- barriers;
- accident phenomenology;
- radionuclide retention;
- module count.
The Italian emergency-planning authority should therefore never accept:
“Generation IV safety”
as a substitute for:
design-specific source term + dispersion calculation + dose assessment.
7.31.19 Underground siting is similarly not a source-term number
Underground reactor structures can potentially improve protection against some external events.
But underground construction can create different design questions concerning:
- groundwater;
- flooding;
- drainage;
- access;
- ventilation;
- emergency egress;
- penetrations;
- long-term structural waterproofing.
Whether the design produces a lower environmental source term must therefore be demonstrated through the accident model.
The correct reasoning is:
UNDERGROUND LOCATION
↓
CHANGES HAZARD / BARRIER PERFORMANCE
↓
CHANGES ACCIDENT SEQUENCE
↓
MAY CHANGE SOURCE TERM
not:
UNDERGROUND
=
LOW SOURCE TERM
7.31.20 Meteorology must be treated separately from reactor safety performance
The same source term released under two meteorological conditions can generate substantially different off-site consequences.
Relevant variables include:
- wind direction;
- wind speed;
- atmospheric stability;
- precipitation;
- mixing height.
This distinction matters for reactor comparisons.
A site-specific dose result cannot be copied automatically from one country to another even if the reactor design is identical.
Italy would need:
- Italian site meteorology;
- Italian topography;
- population distributions;
- agricultural pathways;
- emergency arrangements.
7.31.21 Source term should inform emergency-planning geography rather than geography being fixed first
The analytically correct sequence is:
ACCIDENT SPECTRUM
↓
SOURCE TERMS
↓
DISPERSION / DOSE
↓
PROTECTIVE-ACTION NEED
↓
EMERGENCY-PLANNING REQUIREMENTS
not:
ASSUME SMALL EPZ
↓
SELECT ACCIDENTS THAT FIT IT
This principle is increasingly recognised internationally for advanced reactors.
In 2023 the US NRC introduced an alternative emergency-preparedness framework for SMRs and other new technologies that is explicitly performance-based, technology-inclusive, risk-informed and consequence-oriented, including a scalable approach to the plume exposure emergency-planning zone.
That foreign framework is not Italian law.
Its evidentiary significance is important:
even a regulator willing to reduce emergency-planning distances for advanced reactors requires a consequence-based demonstration rather than simply accepting the SMR label.
7.31.22 Procurement should therefore require an Accident Source-Term Dossier
Before Italy accepts any reactor into final procurement comparison, the vendor should disclose a regulator-reviewable source-term dossier containing at least:
Table 7.31-C — Minimum Italian source-term evidence package
| Evidence | Requirement |
|---|---|
| Core radionuclide inventory | By important radionuclide/group |
| Fuel qualification | Experimental/operational basis |
| Accident spectrum | Design-specific |
| Fuel damage threshold | Defined and justified |
| Release models | Mechanistic where appropriate |
| Primary-system retention | Quantified |
| Confinement/containment | Leakage/retention behaviour |
| Filtration | Performance under accident conditions |
| Release pathways | Complete |
| Bypass pathways | Explicitly assessed |
| Release start time | Sequence-specific |
| Release duration | Sequence-specific |
| Chemical form | Defined |
| Aerosol characteristics | Where relevant |
| Environmental source term | Time-dependent |
| Multi-unit source term | Required for multi-module sites |
| Spent-fuel source term | Required |
| External-hazard cases | Required |
| Uncertainty | Quantified/characterised |
| Code validation | Demonstrated |
| Regulator review status | Clearly identified |
7.31.23 Government comparison should report radiological performance in physically meaningful units
Technology comparison should include, for each bounding or representative event:
- activity released by radionuclide/group;
- release fraction;
- release start time;
- duration;
- projected dose at defined receptor distances;
- protective-action threshold implications;
- sensitivity to meteorology;
- multi-module effects.
A statement such as:
“This reactor has one tenth the emergency consequence”
should not appear without defining:
- accident;
- release;
- metric;
- distance;
- meteorology;
- dose pathway.
7.31.24 The most important safety distinction is early release versus large release
The Euratom and Italian legal objective correctly distinguishes two particularly important undesirable outcomes:
early release
where there is insufficient time to implement off-site emergency measures;
and
large release
where protective measures cannot be limited geographically or temporally.
This creates two separate evaluation questions.
Question A — time
HOW LONG BETWEEN
ACCIDENT INITIATION
AND
SIGNIFICANT OFF-SITE RELEASE?
Question B — magnitude
HOW LARGE CAN
THE ENVIRONMENTAL RELEASE
BECOME?
A reactor could perform well on one dimension and less strongly on another.
Italy should evaluate both.
Core conclusion — 7.31
The correct statement is therefore:
The source term is the physically meaningful starting measure for radiological emergency planning, but off-site consequence requires the complete chain from reactor inventory through environmental release, atmospheric or aquatic transport, human exposure and protective action.
The reactor’s power rating is not enough.
Its marketing category is not enough.
Its use of passive systems is not enough.
Its generation label is not enough.
The required sequence is:
DESIGN
↓
ACCIDENT
↓
SOURCE TERM
↓
DISPERSION
↓
DOSE
↓
PROTECTIVE ACTION
This framework is especially important when comparing SMRs.
7.32 SMRs can reduce source term — but only design-specific evidence counts
Some small modular reactors can plausibly produce lower accident source terms and smaller off-site consequences than large conventional reactors.
That potential should be recognised.
It should not be assumed.
The safety proposition must be demonstrated design by design, accident by accident and site by site.
The US NRC’s 2023 SMR and advanced-reactor emergency-preparedness rule explicitly recognises potential benefits from smaller reactor size, passive systems, slower accident progression and potentially smaller or slower fission-product releases. But the same framework is performance-based and consequence-oriented precisely because those benefits have to be demonstrated rather than inferred from the acronym “SMR”.
Italy should adopt the same evidentiary discipline irrespective of the precise regulatory framework eventually chosen.
7.32.1 Smaller fuel inventory can be a real advantage
If two otherwise comparable reactor cores differ substantially in thermal power and fuel inventory, the smaller module can contain a smaller quantity of accumulated fission products.
This reduces the maximum inventory available for release from that individual module.
Conceptually:
LARGE CORE
████████████████████
RADIONUCLIDE INVENTORY
SMALL CORE
██████
RADIONUCLIDE INVENTORY
If all other release fractions were identical, a smaller inventory would tend to support a smaller module source term.
But “all other factors identical” cannot simply be assumed.
Fuel type, burn-up, barrier performance and accident sequence also matter.
7.32.2 Lower decay heat can increase coping time
After reactor shutdown, radioactive decay continues generating heat.
Smaller cores generally produce less absolute decay heat than much larger cores with comparable recent operating histories.
Depending on design, this can make passive heat removal easier and increase the time before critical temperatures are reached.
This can create an important safety chain:
LOWER ABSOLUTE DECAY HEAT
↓
SLOWER TEMPERATURE RISE
↓
LONGER COPING TIME
↓
MORE TIME FOR PASSIVE HEAT REMOVAL
↓
MORE TIME FOR OPERATOR / EMERGENCY ACTION
↓
LOWER PROBABILITY OF FUEL DAMAGE
↓
POTENTIALLY SMALLER SOURCE TERM
Every arrow must nevertheless be demonstrated.
7.32.3 Passive heat removal can reduce dependence on active systems
Several SMR designs use increased reliance on:
- natural circulation;
- gravity;
- conduction;
- convection;
- stored water;
- passive heat exchangers.
These features can reduce dependence on:
- AC power;
- pumps;
- active valves;
- immediate operator actions.
That can be particularly important in compound scenarios such as:
EARTHQUAKE
+
LOSS OF OFF-SITE POWER
+
DELAYED EXTERNAL ACCESS
However, passive systems still possess boundary conditions.
They can depend on:
- sufficient coolant inventory;
- valve position;
- heat-transfer surfaces;
- air pathways;
- water inventories;
- structural integrity;
- environmental temperature;
- mission time.
Therefore Italy should ask:
Passive for how long, under what external conditions, with which failure assumptions?
7.32.4 “Infinite coping time” or similarly absolute claims should receive exceptional scrutiny
A reactor can potentially achieve very long periods without operator action.
But procurement documents should avoid accepting qualitative phrases without a defined accident state.
A defensible statement requires:
- accident sequence;
- initial conditions;
- heat sink;
- ambient temperature;
- module state;
- fuel condition;
- water inventory;
- time endpoint.
For example:
NO OPERATOR ACTION FOR X HOURS
UNDER ACCIDENT Y
WITH INITIAL CONDITION Z
is testable.
“Walk-away safe” is not a quantitative licensing metric.
7.32.5 Integral reactor designs can eliminate some large piping accidents
Some SMR designs place major primary-system components within a common reactor vessel.
Depending on design, this can:
- shorten external large-diameter primary piping;
- reduce certain large-break loss-of-coolant possibilities;
- simplify the primary system.
This can change the accident spectrum.
But it does not eliminate all accident sequences.
The proper conclusion is:
integral architecture can remove or reduce particular initiating events; the remaining event spectrum must still be analysed.
7.32.6 Underground structures can protect against some external hazards
Some SMRs locate the reactor vessel or major safety structures partly or substantially below grade.
Potential benefits can include increased protection against certain:
- external impacts;
- extreme winds;
- projectiles;
- some malicious or accidental external events.
However, below-grade location can increase importance of:
- groundwater;
- waterproofing;
- drainage;
- flood ingress;
- below-grade penetrations;
- emergency access.
Therefore “underground” should be recorded as a design feature whose net safety contribution is accident-specific, not as an automatic source-term reduction.
7.32.7 Simplified systems can reduce failure opportunities
A design with fewer:
- active pumps;
- valves;
- large piping systems;
- support systems;
can potentially have fewer failure modes.
This can increase reliability and reduce some accident sequences.
But simplification must be measured at the complete plant level.
A reactor with a simple primary system but extensive shared support infrastructure can still possess substantial site-level complexity.
7.32.8 Smaller module does not equal smaller site
This is the most important correction to simplistic SMR safety comparisons.
Consider:
ONE 1,200 MWe REACTOR
versus:
SIX 200 MWe MODULES
The individual module is much smaller.
The site is not necessarily smaller in:
- total thermal power;
- total fuel inventory;
- total radioactive inventory;
- spent-fuel generation;
- number of accident sources.
Therefore:
MODULE SOURCE TERM
≠
SITE SOURCE TERM
7.32.9 The relevant radiological inventory is the entire site inventory
A multi-module site may contain radioactive material in:
- operating reactor cores;
- shut-down reactor cores;
- recently unloaded fuel;
- spent-fuel pools;
- dry-storage systems;
- fresh fuel;
- radioactive-waste systems;
- activated components.
Emergency planning should identify each material-at-risk inventory.
Table 7.32-A — Site radiological inventory that Italy should require
| Inventory | Required assessment |
|---|---|
| Operating Module 1 | Accident source term |
| Operating Module 2 | Accident source term |
| All remaining operating modules | Accident source term |
| Shutdown/refuelling module | Shutdown accident states |
| Spent-fuel pool | Heat, inventory, credible releases |
| Dry spent-fuel storage | Site-specific accident case |
| Fuel handling | Handling accident |
| Waste systems | Relevant radioactive inventory |
| Shared radioactive systems | Common-cause pathways |
The site total should not simply be calculated by adding every inventory as if all releases occur simultaneously.
That would generally be physically unrealistic.
Instead, the safety analysis should identify credible correlated combinations capable of affecting more than one inventory.
7.32.10 The critical variable is simultaneous module involvement
Suppose a six-module plant has a severe accident frequency per module that is very low.
The site question is still:
Can one initiating event challenge all six modules simultaneously?
Examples could include:
- earthquake;
- flood;
- common heat-sink failure;
- grid loss;
- common electrical failure;
- common fire;
- shared-control-system failure;
- human/organisational common cause.
The IAEA site standard specifically requires credible combinations affecting multiple installations on the same site to be considered, and the Euratom framework requires emergency arrangements for accidents simultaneously affecting several units.
7.32.11 A multi-module accident does not necessarily mean six identical core releases
The opposite simplification should also be avoided.
If an external event challenges six modules, it does not necessarily follow that all six experience identical severe core damage.
Module independence and passive systems may prevent accident escalation.
The correct analysis must determine:
COMMON INITIATING EVENT
↓
MODULE 1 RESPONSE
MODULE 2 RESPONSE
MODULE 3 RESPONSE
MODULE 4 RESPONSE
MODULE 5 RESPONSE
MODULE 6 RESPONSE
↓
WHICH MODULES REACH FUEL DAMAGE?
↓
WHICH RELEASE?
↓
WHEN?
↓
COMBINED ENVIRONMENTAL SOURCE TERM
This should be calculated, not assumed either optimistically or pessimistically.
Potential shared systems vary by design but may include:
- electrical switchyard;
- ultimate heat sink;
- service-water system;
- control facilities;
- emergency-response centre;
- water inventories;
- fuel-handling equipment;
- HVAC support;
- radioactive-waste systems;
- site drainage;
- physical access.
Every shared system creates two competing effects.
It can reduce cost and simplify operations.
It can also create a common-cause pathway.
| Shared feature | Economic advantage | Safety question |
|---|---|---|
| One switchyard | Lower infrastructure cost | Can one fault disconnect entire site? |
| Common heat sink | Efficient infrastructure | Can one event remove cooling for all modules? |
| Common control room | Staffing efficiency | Can one hazard disable all control capability? |
| Common emergency centre | Lower duplication | Is it survivable in site-wide event? |
| Shared water inventory | Lower CAPEX | Is inventory sufficient for concurrent demand? |
| Shared waste building | Efficiency | Can accident propagate between modules/functions? |
| Shared access road | Simpler site | What if road is lost? |
7.32.13 Physical separation between modules should be treated as a measurable safety attribute
Module separation can reduce propagation from:
- internal fire;
- flooding;
- explosions;
- pipe rupture;
- turbine events.
But the analysis should specify:
- physical distance;
- fire barriers;
- flood barriers;
- electrical separation;
- cable routing;
- ventilation separation;
- drainage separation.
The statement:
“modules are independent”
requires an engineering definition.
7.32.14 Common control rooms require human-factors analysis for concurrent events
A multi-module station can reduce staffing by controlling several reactors from a common control room.
That may be economically important.
But severe accident analysis must consider whether operators can successfully manage:
MODULE 1 — emergency
MODULE 2 — emergency
MODULE 3 — abnormal condition
MODULE 4 — stable
MODULE 5 — shutdown
MODULE 6 — loss of instrumentation
simultaneously.
The issue is not merely operator numbers.
It includes:
- alarm load;
- information prioritisation;
- interface design;
- task allocation;
- automation;
- decision support;
- communications.
Fukushima demonstrated the operational complexity of simultaneous multi-unit emergencies.
7.32.15 Spent fuel cannot be excluded from the comparison
Even if an SMR produces an extremely small reactor-core source term, its site will accumulate spent fuel unless the fuel is continuously removed elsewhere.
The IAEA’s Fukushima lessons specifically identify severe damage involving either reactor-core fuel or spent fuel on site as relevant to emergency preparedness.
Italy should therefore require the emergency consequence analysis to answer:
- where spent fuel is stored;
- how much is stored;
- decay heat;
- cooling requirement;
- water inventory where applicable;
- passive makeup capability;
- seismic qualification;
- flood protection;
- monitoring;
- common-cause relationship to reactor modules.
7.32.16 A multi-module site can accumulate spent fuel differently from a single large reactor
Modular fleets may involve staggered refuelling schedules.
This can have operational advantages.
It can also mean that:
- one module is operating;
- another is being refuelled;
- another has recently discharged fuel;
- several years of spent fuel are present in a common storage area.
The bounding radiological site condition may therefore occur during a particular refuelling configuration rather than at maximum electrical output.
The safety case should search systematically for that condition.
7.32.17 Accident source term and emergency-planning zone are linked—but not identical
A smaller demonstrated source term may support smaller off-site emergency-planning requirements.
The US NRC’s current alternative framework explicitly allows a scalable plume-exposure emergency-planning zone for qualifying SMRs and other technologies based on a consequence-oriented safety demonstration.
This is significant evidence that smaller emergency-planning footprints are technically plausible for some advanced designs.
But the correct statement is:
some advanced reactors may justify smaller emergency-planning zones.
Not:
SMRs have small emergency-planning zones.
The latter is a categorical claim unsupported without the specific design and site analysis.
7.32.18 Italy should not copy foreign EPZ distances mechanically
US emergency-planning regulation reflects:
- US law;
- US dose criteria;
- US regulatory philosophy;
- US emergency institutions.
Italy operates under:
- Italian legislation;
- Euratom requirements;
- ISIN regulation;
- Civil Protection arrangements;
- Italian demographic and geographic conditions.
Foreign source-term and emergency-planning evaluations can therefore provide evidence.
They cannot substitute automatically for the Italian decision.
7.32.19 The correct Italian question is whether off-site protective actions remain necessary
Under Italy’s current Article 178 framework, emergency planning must be derived from reasonably conceivable nuclear accident conditions, their geographic and temporal evolution, and resulting exposure levels.
Therefore a future advanced reactor seeking reduced off-site emergency requirements should demonstrate quantitatively that the relevant accident spectrum produces consequences consistent with that claim.
The burden of proof should remain on the applicant.
7.32.20 Source-term reduction claims should be decomposed into causal evidence
A vendor may claim:
“90% lower potential release.”
Italy should require the claim to be decomposed.
Table 7.32-C — Evidence required behind an SMR source-term reduction claim
| Claimed advantage | Evidence required |
|---|---|
| Smaller core | Actual radionuclide inventory |
| Lower decay heat | Time-dependent decay-heat calculation |
| Passive cooling | Validated thermal-hydraulic analysis |
| Longer coping time | Accident-specific hours/days |
| Better fuel retention | Fuel qualification/testing |
| Integral vessel | Accident-spectrum effect |
| Underground siting | External-hazard assessment |
| Strong containment | Leak/retention analysis |
| Functional containment | Complete barrier performance |
| Reduced operator action | Human-factors/automation analysis |
| Smaller release | Mechanistic source term |
| Smaller EPZ | Site-specific consequence analysis |
| Multi-module independence | Common-cause assessment |
| Low site consequence | Combined reactor + spent-fuel assessment |
7.32.21 Fuel qualification is especially important for advanced reactors
Advanced reactor safety cases can rely heavily on claimed fuel performance.
If the fuel is credited as an important radionuclide-retention barrier, its performance must be demonstrated across the temperatures, irradiation conditions and accident environments for which credit is taken.
The NRC’s mechanistic source-term policy explicitly requires sufficient research, development and testing evidence to establish confidence in reactor and fuel performance before mechanistic source-term credit is taken.
This is particularly important for first-of-a-kind systems.
A computer model cannot compensate for missing physical qualification of the barrier on which the model depends.
7.32.22 TRISO provides a good example of why the methodology matters
TRISO-based high-temperature reactors are designed around fuel particles that incorporate several coating layers intended to retain fission products.
That architecture can potentially shift substantial containment functionality toward the fuel itself.
This is important.
But the correct licensing question remains:
How does qualified fuel actually perform over the complete accident temperature and irradiation envelope?
The source-term model then has to propagate:
FISSION-PRODUCT INVENTORY
↓
TRISO PARTICLE PERFORMANCE
↓
FAILED PARTICLE FRACTION
↓
GRAPHITE / PRIMARY-CIRCUIT TRANSPORT
↓
CONFINEMENT RETENTION
↓
ENVIRONMENTAL RELEASE
The NRC’s current X-energy regulatory interaction specifically includes both a Mechanistic Source Term Approach topical report and a Plume Exposure Pathway Emergency Planning Zone Sizing Methodology, illustrating that fuel claims, source-term analysis and emergency planning remain separate evidence steps.
7.32.23 Fast reactors require their own source-term phenomenology
Sodium-, lead- and other fast-reactor systems cannot simply inherit LWR source-term assumptions.
Their accident phenomenology can differ because of:
- coolant;
- fuel form;
- operating temperature;
- containment concept;
- chemical behaviour;
- radionuclide transport.
The NRC explicitly expects non-LWR applicants to establish technology- and design-specific mechanistic source terms rather than applying generic LWR source terms indiscriminately.
This is particularly important for Italy because the strategic technology portfolio discussed elsewhere in this report includes both water-cooled and advanced fast-reactor pathways.
7.32.24 A low-probability multi-module release can still dominate emergency planning
Emergency planning is not based only on the most likely event.
The safety analysis must identify relevant severe accident sequences and determine which are appropriate for planning.
A rare site-wide common-cause event could potentially produce a larger consequence than a more frequent single-module event.
Therefore:
MOST LIKELY ACCIDENT
≠
AUTOMATICALLY
EMERGENCY-PLANNING BOUNDING ACCIDENT
The relationship between probability and consequence must be made explicit.
7.32.25 Site layout can change the combined source term
For multi-module installations, physical arrangement matters.
Potential variables include:
- distance between modules;
- common building versus separate buildings;
- shared versus separate containment;
- shared ventilation;
- prevailing wind;
- spacing from spent-fuel facilities;
- emergency access;
- common flood elevation.
A site using the same reactor technology can therefore have a different site-level risk architecture depending on layout.
7.32.26 The site should be evaluated as one radiological system
This produces the correct hierarchy:
MODULE SAFETY CASE
↓
MULTI-MODULE SAFETY CASE
↓
SPENT-FUEL SAFETY CASE
↓
OTHER RADIOLOGICAL INVENTORIES
↓
COMMON EXTERNAL HAZARDS
↓
COMPLETE SITE SOURCE TERM
↓
OFF-SITE CONSEQUENCE
Italy should not permit the modules to be licensed analytically as if the neighbouring modules do not exist.
7.32.27 A six-module station should therefore demonstrate at least four source-term classes
At minimum:
Case 1 — Single-module accident
1 MODULE AFFECTED
5 MODULES SAFE
Tests the intrinsic module safety case.
Case 2 — Single initiating event, multiple modules challenged
COMMON HAZARD
↓
SEVERAL MODULES ABNORMAL
↓
ONE OR MORE RELEASES
Tests common-cause resilience.
Case 3 — Reactor + spent-fuel challenge
COMMON HAZARD
↓
REACTOR ACCIDENT
+
SPENT-FUEL FACILITY CHALLENGE
Tests total site radiological architecture.
Case 4 — Site-wide external hazard with infrastructure disruption
MULTI-UNIT ACCIDENT
+
LOSS OF GRID
+
ACCESS IMPAIRMENT
+
COMMUNICATION DEGRADATION
Tests emergency-management realism.
Additional cases may be required by design.
7.32.28 The accident-management resource model must match the multi-module source-term model
If the source-term calculation assumes successful deployment of:
- portable pumps;
- generators;
- water connections;
- operator actions;
the emergency plan must demonstrate that those resources are available simultaneously for every module credited with needing them.
For example:
6 MODULES
EACH REQUIRES 1 MOBILE PUMP
SITE OWNS 2 MOBILE PUMPS
cannot support an accident analysis that implicitly assumes six pumps.
The source-term analysis and emergency-resource inventory must therefore be cross-checked.
7.32.29 Module staggering can improve some site risks but complicate others
Modular construction may allow units to enter service sequentially.
This can reduce initial radiological inventory during early operation.
It can also create a site containing simultaneously:
- operating reactors;
- reactors under construction;
- commissioning units;
- spent-fuel operations.
That mixed state should be analysed.
Construction activities can introduce:
- cranes;
- excavation;
- fire loads;
- temporary electrical systems;
- traffic;
- workforce concentration.
The FOAK safety case should therefore address the transition from:
1 MODULE OPERATING
to:
2 MODULES OPERATING
+
MODULE 3 COMMISSIONING
+
MODULES 4–6 UNDER CONSTRUCTION
where the programme uses phased buildout.
7.32.30 “Fleet safety” and “site safety” are different questions
An Italian fleet may eventually contain ten SMR stations.
Each station may contain several modules.
Three different risk levels therefore exist:
MODULE LEVEL
↓
SITE LEVEL
↓
NATIONAL FLEET LEVEL
Module-level source-term reduction does not automatically resolve:
- concentration of several modules at one site;
- spent-fuel accumulation;
- emergency-service capacity;
- national response to simultaneous natural disasters.
This distinction is particularly relevant if Italy reuses several coastal or former thermal-generation sites.
7.32.31 Reduced source term can have substantial economic value
If demonstrated, lower off-site consequences can produce benefits beyond safety.
Potential implications can include:
- reduced emergency-planning burden;
- more flexible siting;
- potentially smaller land-use constraints;
- simpler emergency logistics;
- improved industrial co-location possibilities.
But these economic benefits should enter project valuation only after the regulator accepts the radiological basis.
The sequence must remain:
SAFETY EVIDENCE
↓
REGULATORY ACCEPTANCE
↓
EMERGENCY-PLANNING REQUIREMENT
↓
ECONOMIC VALUE
not:
ECONOMIC DESIRE FOR SMALL EPZ
↓
ASSUME LOW SOURCE TERM
7.32.32 Italy should establish a standardised Site Radiological Consequence Case for every reactor candidate
The most useful procurement requirement would be a standard evidence package allowing meaningful comparison across technologies.
Table 7.32-D — Proposed Site Radiological Consequence Case
| Required element | Minimum content |
|---|---|
| Individual-module inventory | Radionuclide inventory |
| Total operating-site inventory | All modules |
| Spent-fuel inventory | Time-dependent |
| Accident sequences | Technology-specific |
| External-hazard sequences | Site-specific |
| Single-module source term | Time-dependent |
| Multi-module source term | Credible common-cause cases |
| Spent-fuel source term | Relevant cases |
| Release timing | Hours/minutes after initiation |
| Release duration | Defined |
| Chemical/physical form | Defined |
| Containment/confinement credit | Quantified |
| Passive-system credit | Validated |
| Common-system failures | Included |
| Off-site dispersion | Italian site meteorology |
| Public dose | Defined receptors |
| Protective-action requirements | Derived |
| Uncertainty | Explicit |
| Foreign regulator status | Documented |
| Experimental basis | Documented |
| Remaining open items | Identified before FID |
7.32.33 Government documents should use disciplined language
Table 7.32-E — Statements to avoid
| Overstated statement | Defensible replacement |
|---|---|
| “SMRs have a smaller emergency zone.” | Some SMR designs may justify reduced emergency-planning requirements if design- and site-specific consequence analysis demonstrates sufficiently low releases. |
| “Small reactors cannot have large accidents.” | Smaller modules can reduce radioactive inventory per module, but accident consequences remain design-, site- and sequence-specific. |
| “Passive reactors cannot melt down.” | Passive features may substantially reduce accident progression, but credited performance must be demonstrated for the applicable accident envelope. |
| “Underground SMRs cannot release radiation.” | Below-grade siting can protect against some hazards but does not eliminate the need for source-term analysis. |
| “TRISO eliminates the source term.” | Qualified TRISO fuel can provide substantial radionuclide retention; environmental release remains a design-specific mechanistic calculation. |
| “Generation IV reactors need no evacuation planning.” | Emergency-planning requirements must follow accepted consequence analysis. |
| “One 200 MWe module has little fuel, so a six-module site has little radiological inventory.” | Module inventory and complete site inventory must be evaluated separately. |
7.32.34 The strategic comparison should therefore use two radiological metrics
Italy should evaluate both:
Metric A — Individual-module consequence
This measures intrinsic reactor safety.
and
Metric B — Complete-site consequence
This measures actual emergency-planning relevance.
A design may perform exceptionally well on Metric A but less strongly on Metric B if:
- many modules are concentrated;
- common systems are extensive;
- spent-fuel inventory is large.
Conversely, strong module independence can allow a multi-module site to retain much of the individual-module advantage.
That is an engineering question.
Not a marketing question.
7.32.35 The strongest SMR safety proposition is therefore conditional, not categorical
The technically defensible formulation is:
An SMR can produce materially lower off-site radiological consequences if its smaller inventory, fuel characteristics, passive decay-heat removal, barrier system, module independence and accident progression combine to produce a demonstrably lower environmental source term under both single-module and credible site-wide accident conditions.
Every element of that sentence matters.
Remove:
“if”
and the statement becomes too strong.
Master analytical chain — §§7.30–7.32
EXTERNAL ENVIRONMENT
│
▼
INDIVIDUAL + COMPOUND HAZARDS
│
▼
COMMON-CAUSE CHALLENGE?
│
▼
ONE OR MULTIPLE MODULES?
│
▼
SAFETY FUNCTIONS SURVIVE?
│
▼
FUEL DAMAGE?
│
▼
RADIONUCLIDE RELEASE FROM FUEL
│
▼
TRANSPORT / RETENTION
│
▼
CONTAINMENT / FUNCTIONAL CONFINEMENT
│
▼
ENVIRONMENTAL SOURCE TERM
│
▼
METEOROLOGY + DISPERSION
│
▼
PUBLIC EXPOSURE
│
▼
PROTECTIVE ACTION
Final government conclusion — §§7.30–7.32
The three issues addressed here are inseparable.
Compound hazards determine the accident sequence.
The accident sequence determines whether fuel damage occurs.
Fuel behaviour and engineered barriers determine the source term.
The source term, together with site-specific dispersion and exposure conditions, determines the possible off-site consequence.
That consequence determines the emergency-planning requirement.
The correct chain is therefore:
HAZARD
↓
ACCIDENT
↓
SOURCE TERM
↓
CONSEQUENCE
↓
EMERGENCY PLAN
not:
REACTOR IS SMALL
↓
ASSUME CONSEQUENCE IS SMALL
Italy’s current legal framework is already consistent with the first approach. Legislative Decree 101/2020 requires prevention and mitigation of accidents, avoidance of early and large radioactive releases, defence in depth against extreme external natural and unintended human-induced hazards, and consequence-based technical analysis for external emergency planning.
International standards reinforce the same conclusion. IAEA SSR-1 requires combined external hazards, causal relationships, uncertainty, multiple-installation effects and evolving site conditions to be evaluated explicitly. Fukushima demonstrated why: one extreme event can challenge several defence layers, several units and regional emergency infrastructure simultaneously.
For SMRs, the safety opportunity is genuine.
A smaller individual radioactive inventory, reduced absolute decay heat, longer coping times, simplified systems, passive heat removal and improved fuel retention can potentially produce much lower environmental source terms.
But Italy should buy demonstrated radiological performance, not the word “SMR”.
The appropriate procurement requirement is therefore:
Every candidate reactor must demonstrate its complete site-level radiological consequence under credible single-module, multi-module, spent-fuel and compound external-hazard scenarios, using design-specific source terms and Italian site conditions.
Only after that demonstration should government documents make claims concerning:
- reduced emergency-planning zones;
- reduced evacuation requirements;
- closer industrial co-location;
- reduced public consequence;
- superior off-site safety.
The final distinction should remain explicit throughout the report:
smaller module can mean smaller source term; smaller module does not automatically mean smaller site consequence.
This is written as the direct replacement for the existing §§7.30, 7.31 and 7.32; their numbering and original analytical sequence remain intact.
7.33 Italian law sets a demanding objective for early and large releases
Italy’s implementation of the post-Fukushima Euratom safety framework establishes an explicit objective for new nuclear installations.
They must be designed, sited, built, operated and decommissioned to prevent accidents and, if accidents occur, mitigate their consequences so as to avoid:
- early radioactive releases for which necessary off-site emergency measures could not be implemented in sufficient time;
- large radioactive releases requiring protective measures that could not be limited in space or time.
[L]
This is the correct legal reference for assessing vendor claims.
A vendor saying “our EPZ can be the site boundary” is not enough.
The Italian regulator must determine whether the safety analysis satisfies the statutory objective.
7.34 Defence in depth remains mandatory
The same Italian framework requires the operator to implement defence in depth.
It includes:
- minimisation of extreme external hazards;
- prevention of abnormal operation and failures;
- detection and control of abnormal conditions;
- control of design-basis accidents;
- control of severe conditions and prevention/mitigation of accident progression.
[L]
Passive safety changes how these layers are implemented.
It does not abolish them.
A credible SMR programme therefore cannot rely on a single claim such as:
“The reactor shuts itself down.”
Shutdown is only one function.
Long-term safety also requires:
- decay-heat removal;
- confinement;
- reactivity control;
- electrical resilience;
- monitoring;
- emergency response.
7.35 Emergency-planning zones cannot be assumed to disappear for SMRs
International regulatory work increasingly evaluates whether some SMRs can justify smaller emergency-planning zones because of:
- smaller inventories;
- passive systems;
- stronger retention;
- lower source terms.
The IAEA SMR Regulators’ Forum has specifically examined scalable emergency-planning arrangements.
The correct regulatory conclusion is:
EPZ size may be design- and site-specific.
It is not:
SMR = no EPZ.
The future Italian regulator should determine emergency-planning geometry from:
- source term;
- accident frequencies;
- dose projections;
- local meteorology;
- population;
- evacuation/sheltering feasibility.
7.36 The current Italian national emergency plan is not a domestic-reactor site plan
Italy already maintains a National Plan for the management of radiological and nuclear emergencies, updated in 2022.
Its central scenarios concern:
- accidents at nuclear installations beyond Italy’s borders capable of affecting national territory;
- other radiological/nuclear events of national relevance.
This plan provides valuable capabilities in:
- national coordination;
- monitoring;
- decision support;
- communications;
- international notification.
It is not a ready-made external emergency plan for a future reactor at Montalto, Trino, Latina or any other Italian site.
A domestic reactor requires the site-specific statutory process in Legislative Decree 101/2020.
7.37 The Prefect is central to site-specific emergency planning
Under Legislative Decree 101/2020, the Prefect prepares and updates the emergency plan for relevant installations using a specifically constituted radiological and nuclear emergency-planning committee.
Participants include:
- Questore;
- Fire Brigade;
- Carabinieri;
- maritime authority where relevant;
- Region or Autonomous Province;
- local administrations;
- National Health Service representatives;
- ARPA/APPA;
- licence holder/operator.
[L]
This is significant for site selection.
A technically attractive reactor location is not implementation-ready unless the surrounding institutional system can produce and execute the external plan.
7.38 Every commercial reactor requires an external emergency plan
Article 177 of Legislative Decree 101/2020 requires an external emergency plan for each covered nuclear installation, establishing coordinated protective measures for the population and property in the event of an accident.
The operator must provide the technical basis used by ISIN and the authorities to establish planning assumptions. [L]
The emergency-planning system therefore requires interaction between:
operator safety analysis → ISIN technical assessment → Prefect/territorial planning.
The operator cannot define the public emergency plan unilaterally.
7.39 A new installation cannot start activity before required emergency plans are approved
Italian law expressly provides that new installations for which emergency plans are necessary cannot begin activity before the competent authorities have approved those plans. [L]
For programme planning, this creates a hard commissioning gate.
Emergency planning cannot be left until the final months before fuel loading.
The process requires:
- technical source-term information;
- population mapping;
- intervention levels;
- communications;
- evacuation/shelter arrangements;
- health-response preparation;
- exercises.
It should begin years earlier.
7.40 Emergency plans must evolve with the site
The external plan must be reviewed:
- when relevant assumptions change;
- in any event at least every three years.
The review must take account of:
- physical-environment changes;
- demographic changes;
- available response resources;
- technological evolution;
- exercise results.
[L]
This creates a lifecycle planning obligation.
A reactor site acceptable with today’s surrounding population may require different response arrangements after decades of urban development.
7.41 Exercises are part of the safety system
Italian law requires periodic exercises to verify:
- emergency plans;
- implementation tools;
- coordination.
The Civil Protection Department and Prefect operate within their respective competences.
A new-build schedule should therefore include:
- command-post exercises;
- communications tests;
- monitoring deployment;
- field exercises;
- hospital/health-system testing;
- cross-border exercises where relevant.
Emergency preparedness becomes an operational capability, not a document.
7.42 Physical protection is a separate safety/security system
Nuclear safety asks:
How do we prevent or mitigate failures and accidents?
Nuclear security asks:
How do we prevent or mitigate malicious acts?
Italy is bound by the Convention on the Physical Protection of Nuclear Material, including the 2005 Amendment ratified by Law No. 58/2015.
National measures also require physical-protection plans for nuclear material and installations.
The fundamental physical-protection architecture uses combinations of:
- detection;
- delay;
- response;
- access control;
- material control;
- protected areas.
The detail of individual plant security architecture should remain restricted.
This report therefore does not publish tactical layouts, guard deployment or facility vulnerabilities.
7.43 Security must be designed in, not added after civil construction
An SMR’s compact size can potentially simplify security.
But modular designs also create new questions:
- multiple reactor modules;
- shared control rooms;
- factory-manufactured modules;
- transport of nuclear components;
- digital remote support;
- potentially more distributed sites.
The IAEA increasingly emphasises security by design for SMRs.
For Italy, physical security should therefore enter during:
- site selection;
- layout;
- building design;
- access planning;
- construction logistics.
Retrofitting security to a completed industrial design would create unnecessary cost and risk.
7.44 A brownfield can create security advantages and disadvantages
Existing industrial sites may offer:
- controlled perimeter;
- security staff;
- restricted access;
- port/logistics experience.
But nearby installations can also introduce:
- hazardous materials;
- complex road traffic;
- shipping;
- pipelines;
- shared industrial access;
- large temporary workforces.
Therefore a post-coal brownfield is not automatically easier to secure than a greenfield site.
Human-induced hazard and physical protection studies must be integrated.
7.45 Cyber security becomes a nuclear safety issue
Modern reactors use digital systems for:
- instrumentation;
- control;
- monitoring;
- safety support;
- physical security;
- maintenance;
- communications.
The IAEA explicitly recognises that cyber compromise of digital I&C and associated systems can threaten:
- nuclear safety;
- nuclear security;
- physical protection.
Computer security must therefore cover more than office IT.
It includes relevant:
- plant control networks;
- safety-support systems;
- physical-security systems;
- material-accountancy systems;
- engineering workstations;
- maintenance infrastructure.
7.46 Nuclear cyber security requires layered architecture and lifecycle control
A credible programme should require:
- defence in depth;
- security zoning;
- strict separation of systems according to criticality;
- controlled removable media;
- authentication/access control;
- logging/monitoring;
- configuration management;
- software integrity;
- incident response.
The specific technical architecture should remain in controlled security documentation rather than public reports.
The important government-level principle is that cyber approval should begin at the design stage, not after installation.
7.47 Vendor cyber risk is particularly important for an imported SMR
Italy’s first reactor is likely to use substantial foreign:
- software;
- instrumentation;
- engineering tools;
- remote technical support;
- proprietary maintenance systems.
Cyber sovereignty therefore depends partly on procurement contract terms.
The State should require clarity on:
- software ownership;
- update authority;
- vulnerability disclosure;
- patch management;
- supplier access;
- subcontractor security;
- long-term support.
A reactor whose safety-relevant digital systems become unsupported twenty years after construction creates a long-duration security liability.
7.48 NIS2 applies alongside nuclear-specific requirements
Italy implemented the European NIS2 Directive through Legislative Decree No. 138/2024, which entered into force in October 2024.
The broader European NIS2 framework applies cybersecurity obligations to essential sectors including electricity and expressly encompasses relevant electricity producers, including nuclear generation.
This regime requires organisational controls covering areas such as:
- risk management;
- incident handling;
- business continuity;
- supply-chain security.
But NIS2 is not a substitute for nuclear-specific computer security.
The correct hierarchy is:
general critical-infrastructure cyber law + nuclear-specific safety/security requirements.
7.49 Safety and security can conflict if architecture is poorly designed
Cyber security may favour:
- isolation;
- restricted connectivity.
Operational safety may require:
- information availability;
- diagnostic access;
- communications.
Physical security may restrict:
- movement;
- access.
Emergency response may require:
- rapid entry;
- evacuation.
These objectives must therefore be integrated.
A secure reactor should not become unsafe because security measures prevent required safety action.
A safe reactor should not become vulnerable because emergency or maintenance access bypasses security controls.
7.50 Insider threat must be included
Nuclear security cannot focus exclusively on external attackers.
Employees and contractors may possess:
- authorised access;
- engineering knowledge;
- credentials.
Therefore security programmes require measures covering:
- personnel reliability;
- access minimisation;
- separation of duties;
- monitoring;
- contractor control.
This issue becomes particularly important during construction, when thousands of temporary personnel may enter the site.
7.51 Construction security begins before nuclear fuel arrives
A reactor becomes security-sensitive before first fuel.
Construction involves:
- safety-related equipment;
- digital systems;
- proprietary designs;
- supply-chain components.
Counterfeit components, malicious modification or compromised software introduced during manufacturing can survive into operation.
Therefore security assurance should extend through:
factory → transport → site installation → commissioning → operation.
7.52 Italy’s present nuclear liability is strict and channelled to the operator
The Paris Convention framework establishes the distinctive nuclear-liability principle that liability for covered nuclear damage is generally channelled to the nuclear installation operator.
The regime is based on:
- strict liability;
- exclusive/channelling principles;
- mandatory financial security;
- jurisdiction rules.
This avoids requiring victims to prove negligence among multiple contractors.
It also means the licensed operator must be financially structured to meet the statutory liability regime.
7.53 Italy currently uses a €700 million general operator-liability amount
Italy implemented the amended Paris/Brussels regime through national legislation.
For ordinary covered nuclear installations, the general Italian operator-liability amount is €700 million per nuclear incident.
The amended international regime that entered into force on 1 January 2022 increased compensation significantly.
The Italian Foreign Ministry describes the general structure as:
- at least €700 million operator layer under the Paris Convention;
- supplementary public/international funding under the Brussels Convention;
- combined guaranteed compensation architecture reaching at least €1.5 billion.
[L/G]
7.54 Lower liability amounts exist for lower-risk activities
The revised framework permits lower amounts for specified categories.
The Italian Foreign Ministry records minima of approximately:
- €70 million for certain lower-risk installations;
- €80 million for nuclear-material transport.
[G]
These lower figures are relevant to the current Italian landscape of:
- research facilities;
- decommissioning;
- temporary storage;
- transport.
They should not be used as benchmarks for the future liability of an operating commercial power reactor.
7.55 “Unlimited operator liability” is not the present Italian baseline
Some Paris Convention states impose operator liability beyond the treaty minimum, including unlimited liability under national law.
Italy’s general current architecture instead uses the €700 million statutory level.
Therefore government documents should not state that Italian nuclear operators already face unlimited liability.
If the Government decides that a future new-build fleet justifies a higher or unlimited amount, that requires a deliberate legal/policy change.
This should be decided before the first project reaches financial close because liability structure affects:
- insurance;
- project finance;
- operator capitalisation.
7.56 Nuclear liability is not the same as ordinary plant insurance
Third-party nuclear liability covers a specific class of nuclear damage under the international/national regime.
A reactor project also requires commercial insurance or risk allocation for other exposures such as:
- construction damage;
- machinery breakdown;
- property;
- business interruption;
- delay in start-up;
- employer liability.
Those risks do not disappear because the Paris Convention exists.
The complete insurance package therefore contains several distinct layers.
7.57 Insurance market capacity must be tested before financial close
Nuclear liability insurance is specialised.
A programme seeking several new reactors should determine:
- domestic pool capacity;
- international reinsurance;
- exclusions;
- cyber-nuclear interaction;
- terrorism/security treatment;
- construction-period coverage.
If commercial capacity is insufficient, the State may be asked to assume residual risk.
That would create a contingent public liability and should be visible in MEF’s project assessment rather than emerging after procurement.
[U]
7.58 Liability and decommissioning funds are different financial obligations
The Chapter 6 lifecycle funds cover:
- spent fuel;
- waste;
- decommissioning.
Nuclear liability insurance covers damage arising from a nuclear incident.
One cannot substitute for the other.
The operator therefore needs both:
lifecycle funding
and
incident financial security.
7.59 Transboundary environmental notification is a real project requirement
Nuclear impacts do not stop at administrative borders.
The Espoo Convention treats nuclear power stations and reactors as projects capable of requiring transboundary environmental-impact assessment where significant adverse effects may occur in another Party.
The State of origin must notify potentially affected states sufficiently early for meaningful participation.
Similarly, Article 7 of the EU EIA Directive requires a Member State to provide project and environmental information to another Member State where significant transboundary effects are likely or where the affected state requests participation. [L]
For Italy, this can engage neighbouring states depending on:
- site;
- release pathway;
- watershed;
- meteorology;
- distance.
7.60 Transboundary consultation is impact-based, not a universal four-country veto
The commissioning brief identifies:
- France;
- Switzerland;
- Slovenia;
- Austria.
These are relevant neighbouring states.
But the legal requirement should not be simplified to:
“Every Italian reactor requires approval from all four.”
That is incorrect.
Transboundary procedure depends on potential significant effects and the applicable legal instrument.
A northern or north-eastern site may create a stronger case for direct participation by neighbouring countries than a southern Italian site.
The affected state receives consultation/participation rights.
It does not automatically receive a veto over Italy’s sovereign energy decision.
7.61 France, Slovenia and Austria engage EU environmental law directly
France, Slovenia and Austria are EU Member States.
Where relevant, a project may engage:
- EIA Directive Article 7;
- Euratom procedures;
- EU radiation-emergency cooperation.
A future Italian project close enough to create credible transboundary effects should engage these authorities early rather than waiting for formal late-stage notification.
Late consultation is a predictable litigation and diplomatic risk.
7.62 Switzerland requires a different legal route
Switzerland is not an EU Member State.
It remains relevant through:
- Espoo;
- bilateral/international cooperation;
- IAEA emergency conventions;
- Italian domestic transboundary emergency provisions.
Therefore a northern Italian reactor cannot simply assume that the EU procedure designed for France or Austria exhausts the Swiss consultation requirement.
7.63 Euratom Article 37 creates a separate Commission review
Under Article 37 of the Euratom Treaty, Member States provide the European Commission with general data on plans for disposal of radioactive waste where implementation could cause radioactive contamination of another Member State’s:
- water;
- soil;
- airspace.
The Commission then issues an opinion after consultation of its expert group.
This is not identical to an EIA.
It is a radiological transboundary review mechanism.
Italy has already used this procedure for nuclear activities including legacy-site decommissioning.
A future reactor programme must therefore include Article 37 in its regulatory critical path rather than discovering it after domestic authorisation. [L]
7.64 Emergency planning itself must consider effects in other states
Italian law is explicit.
Article 189 of Legislative Decree 101/2020 requires emergency planning to consider consequences that may affect other states, including non-EU states.
It requires the Civil Protection Department and ISIN, together with the Foreign Ministry, to cooperate with potentially affected EU Member States and third countries to facilitate radiological-protection measures and coordinate emergency plans. [L]
This creates a direct domestic statutory obligation beyond the environmental authorisation stage.
7.65 Transboundary notification should be treated as resilience planning, not diplomatic formality
A severe accident could require neighbouring states to consider:
- food controls;
- agricultural restrictions;
- monitoring;
- iodine prophylaxis policy;
- travel information.
Early coordination improves response even where the probability of such an event is extremely low.
For a northern Italian site, joint exercises and monitoring-data exchange could therefore be valuable regardless of the minimum legal requirement.
7.66 Security of off-site power belongs in both grid and nuclear safety analysis
A reactor supplies electricity to the grid.
It also depends on the grid for important operating and safety functions.
Loss of off-site power is therefore a safety scenario.
The site must possess robust alternative capabilities through combinations of:
- redundant grid connections;
- emergency generators;
- batteries;
- passive systems.
A site with a strong 380 kV node is valuable not only for export of generation but also because it can support robust off-site supply architecture.
The detailed design remains reactor-specific.
7.67 Black start should not be assumed from ordinary nuclear units
Most conventional reactors are not generally treated as primary national black-start resources because they require substantial auxiliary systems during start-up.
Some future designs may offer different capabilities.
Unless specifically demonstrated and licensed, Italy should not count an SMR as a black-start resource merely because it is small.
Black-start planning should remain with resources technically qualified for that service.
7.68 Cyber resilience of the grid connection matters as much as the reactor island
A plant may have highly protected internal I&C but still depend on:
- Terna communication;
- dispatch systems;
- metering;
- grid protection;
- market systems.
Cyber resilience therefore crosses organisational boundaries between:
- operator;
- Terna;
- vendors;
- telecom providers;
- regulator.
The interface should be treated as critical infrastructure.
7.69 Physical climate adaptation should be incorporated at initial design, not retrofitted
For a plant with a 60-year design life, adaptation measures can include:
- higher flood barriers;
- elevated safety equipment;
- diversified cooling;
- larger heat-sink margins;
- protected water intakes;
- wildfire management;
- extreme-temperature qualification.
Building these measures during original design is generally less disruptive than retrofitting them decades later.
The regulator should therefore require lifetime hazard projections rather than current-hazard snapshots.
7.70 System value and environmental value must be modelled together
The same reactor attribute can have opposite consequences.
Coastal site
System/environmental benefit: reliable heat sink, potentially strong grid and industrial port.
Risk: marine ecology, tsunami, sea-level rise.
Inland site
Benefit: potentially easier port-security separation and less tsunami exposure.
Risk: freshwater scarcity and river heat constraints.
Multi-module site
Benefit: staged capacity and smaller single-unit trip.
Risk: correlated common-cause hazards and shared systems.
Industrial cogeneration
Benefit: greater energy utilisation.
Risk: industrial external hazards.
A serious site/technology decision therefore cannot optimise one variable independently.
7.71 Court-of-Auditors-grade system KPIs
The future programme should monitor quantitative indicators including:
| KPI | Purpose |
|---|---|
| Nuclear equivalent availability factor | Real operating reliability |
| Forced outage rate | Adequacy contribution |
| Climate-related derating hours | Heat/water resilience |
| Planned outage overlap with system stress | Capacity planning |
| Largest credible infeed loss | Reserve requirement |
| Reactive-power capability | Grid support |
| Water withdrawal per MWh | Water impact |
| Water consumption per MWh | Drought impact |
| Thermal-discharge exceedance events | Environmental compliance |
| Safety-significant cyber incidents | Cyber resilience |
| Physical-security reportable events | Security |
| Emergency-plan exercise findings closed | Preparedness |
| Liability insurance/financial security coverage | Fiscal/legal protection |
| Transboundary actions completed on time | Regulatory execution |
These indicators should be auditable and published at an appropriate level without exposing sensitive security details.
7.72 Minimum integrated design requirements for an Italian FOAK
Before construction authorisation, the State should require demonstration of:
Grid
- Terna connection agreement;
- stability studies;
- N-1 compliance;
- loss-of-infeed analysis;
- reserve implications.
Water
- lifetime cooling-water balance;
- drought case;
- extreme-temperature case;
- alternative heat-sink case.
Climate
- future heat;
- flood;
- drought;
- sea level where relevant;
- compound hazards.
Seismic
- site-specific PSHA;
- capable-fault review;
- liquefaction;
- secondary hazards.
Nuclear safety
- deterministic safety analysis;
- probabilistic safety assessment;
- severe accident analysis;
- source term;
- defence in depth.
Emergency
- external emergency planning basis;
- territorial response capacity;
- exercise programme.
Security
- physical protection;
- cyber security;
- supply-chain security.
Liability
- operator financial security;
- insurance architecture;
- Paris/Brussels compliance.
International
- Espoo/EIA consultation where required;
- Euratom Article 37;
- emergency coordination.
Failure of one cannot be compensated by excellence in another.
7.73 Principal impact differences by reactor family
| Technology | System advantage | Environmental/safety issue requiring particular attention |
|---|---|---|
| BWRX-300 | ~300 MWe modular dependable generation; synchronous plant | LWR cooling, BWR operating model, site-specific source term |
| Holtec SMR-300 | PWR architecture, dry-cooling option promoted | Dry-cooling performance at Italian extreme heat; FOAK evidence |
| AP300 | AP1000-derived synchronous PWR | First-of-kind design evidence, water/cooling configuration |
| NUWARD | European PWR, cogeneration concept | Design still evolving; site cooling and final source term |
| Rolls-Royce SMR | 470 MWe firm unit | Larger single-contingency/cooling requirement than ~300 MWe designs |
| NuScale | Small independent 77 MWe modules | Multi-module common-mode risk; site total inventory |
| Xe-100 | 80 MWe modules; high-temperature heat | TRISO/graphite emergency/waste model; HALEU security |
| Natrium | Thermal storage; dispatchable output boost | Sodium fire chemistry, HALEU, advanced-reactor emergency case |
| newcleo LFR | Low-pressure lead system; industrial heat | Lead/material/fuel qualification and first-of-kind source term |
| EAGLES-300 | Italian-linked advanced system | Demonstration/licensing maturity before emergency assumptions can be validated |
No table entry represents a final safety judgment.
7.74 “Passive safety” must be verified under Italian external hazards
Passive systems can provide important resilience because they may rely on:
- gravity;
- natural circulation;
- stored water;
- convection;
- pressure differences.
That can reduce dependence on:
- powered pumps;
- operator action;
- external electricity.
But passive performance depends on physical conditions.
It must be demonstrated under:
- extreme ambient temperature;
- flooding;
- seismic motion;
- obstruction;
- multi-unit events.
The correct regulatory question is therefore not:
“Is the reactor passive?”
It is:
“Do the passive functions remain available for the full required coping period under the Italian site’s bounding external hazards?”
7.75 A first reactor should not receive reduced emergency planning merely to improve siting politics
A smaller EPZ may materially improve:
- siting options;
- public acceptance;
- emergency logistics.
That creates an incentive to assume favourable accident consequences.
The regulator must resist that sequencing.
The correct order is:
design safety analysis → source term → dose analysis → EPZ determination
not:
desired site → politically acceptable EPZ → safety analysis adjusted accordingly.
Regulatory independence is particularly important here.
7.76 Security classification must not become an excuse for insufficient public evidence
Some plant information must properly remain restricted.
This includes tactical physical-protection information and detailed cyber architecture.
But security classification should not prevent public disclosure of:
- high-level safety basis;
- emergency planning;
- environmental impact;
- regulatory findings;
- incident categories;
- compliance status.
A democratic siting process requires enough information for meaningful public scrutiny without revealing exploitable vulnerabilities.
7.77 Climate resilience should be included in financing due diligence
A plant derated regularly by hot water or drought earns less revenue.
Therefore climate adaptation is not only a safety/environmental issue.
It affects:
- capacity factor;
- CfD volume;
- debt service;
- project economics.
Lenders should receive:
- climate-adjusted output scenarios;
- cooling-water stress cases;
- adaptation CAPEX.
Otherwise financial models may systematically overstate plant availability.
7.78 Data-centre co-location should not receive privileged treatment without system evidence
Data centres could become valuable anchor customers.
But a private bilateral arrangement should not be allowed to create disproportionate national grid costs.
Government/ARERA/Terna should determine:
- who pays connection reinforcement;
- whether nuclear capacity is dedicated or shared;
- how outages are covered;
- whether co-located load participates in demand response;
- whether grid users subsidise private infrastructure.
A nuclear-data-centre strategy should therefore be evaluated as a system transaction, not just a commercial PPA.
7.79 Hydrogen co-location needs hazardous-installation screening
Hydrogen introduces:
- flammability;
- explosion;
- storage;
- pipeline hazards.
Therefore any electrolyser or industrial hydrogen facility adjacent to a reactor must be incorporated into the nuclear external-event safety analysis.
The economic benefit of close co-location must be balanced against the requirement to maintain sufficient physical separation and protection.
7.80 Security of heat customers matters to nuclear operations
A reactor supplying an industrial steam customer creates interdependence.
If the industrial facility shuts down suddenly, the reactor must safely reject or redirect heat.
Therefore cogeneration projects require:
- bypass systems;
- alternative heat rejection;
- contract/dispatch arrangements.
The nuclear safety case cannot depend on continuous availability of the industrial customer’s heat demand.
7.81 New nuclear should be evaluated under the same climate years as renewables
Terna already uses multiple climate years in adequacy modelling.
A future nuclear-system study should use the same climate scenarios for:
- renewable output;
- hydro;
- demand;
- nuclear water/temperature derating.
Otherwise the analysis would be internally inconsistent.
For example, a severe hot/dry climate year can simultaneously:
- reduce hydro;
- increase cooling demand;
- increase electricity demand;
- lower river flow;
- constrain thermal cooling.
Climate correlations matter.
7.82 Nuclear availability should not be assumed independent of climate
Traditional resource-adequacy models sometimes treat forced outages statistically independently from weather.
For an Italian fleet, this assumption should be tested.
Potential weather correlation includes:
- heat → cooling derating;
- drought → river restrictions;
- flood → multi-unit site challenge;
- wildfire → grid outage.
A future adequacy model should include these correlations where evidence supports them.
7.83 Multi-site diversification has value
An 8–16 GW future fleet concentrated on a few sites could face correlated:
- seismic;
- flood;
- transmission;
- regional grid;
risks.
Distributing modules across geographically distinct sites can improve resilience.
But diversification increases:
- licensing workload;
- security perimeters;
- operator staffing;
- local consultation;
- construction mobilisation.
Therefore the optimal fleet architecture is a trade between:
site replication economies
and
geographical risk diversification.
7.84 The security burden also scales with the number of sites
Twenty 300 MWe modules located at:
- five four-module sites
create a different security system from:
- twenty one-module sites.
The latter may improve geographical diversification but dramatically increase:
- protected perimeters;
- security staffing;
- emergency organisations;
- interfaces with local authorities.
This is another reason why “20 SMRs” is not a complete national plan.
The configuration matters.
7.85 Small reactors do not automatically imply small security costs
Many security costs are partly fixed per site:
- protected access;
- monitoring;
- response;
- cyber operations;
- emergency organisation.
Therefore a single small reactor can bear a higher security cost per MWh than a multi-unit site.
This should be included in economic comparisons.
7.86 Insurance could similarly favour fleet standardisation
Insurers and nuclear pools obtain greater confidence where:
- designs are standardised;
- operating experience accumulates;
- common claims data exist.
A heterogeneous Italian fleet of multiple FOAK technologies would be harder to price than a replicated design with international operating evidence.
Insurance is therefore another under-appreciated benefit of standardisation.
7.87 Transboundary relationships should begin before formal notification
For sites capable of affecting neighbouring states, Italy should create early technical channels with:
- French regulator/authorities;
- Swiss authorities;
- Slovenian authorities;
- Austrian authorities.
Possible topics include:
- monitoring;
- emergency communications;
- severe-accident modelling;
- exercises.
This does not transfer Italian licensing sovereignty.
It reduces late-stage conflict.
7.88 International notification can become a schedule risk if started too late
A project that completes its domestic environmental dossier and only then begins transboundary consultation risks:
- additional information requests;
- reopened alternatives;
- public hearings abroad;
- schedule delay.
Therefore the project schedule should include a dedicated transboundary workstream from the scoping stage.
7.89 System/environment/security risk register
| Risk | Consequence | Severity before mitigation |
|---|---|---|
| Nuclear capacity credited at nameplate value | Underestimated adequacy risk | HIGH |
| Excessive concentration at one grid node | Larger common-mode outage | HIGH |
| Cooling-water assumption based on historic climate | Future derating/safety challenge | CRITICAL |
| Dry cooling treated as performance-neutral | Understated cost/output loss | MEDIUM/HIGH |
| Site selected on civil seismic classification only | Inadequate nuclear safety basis | CRITICAL |
| EPZ assumed absent because reactor is SMR | Regulatory/safety failure | CRITICAL |
| Current foreign-accident national plan treated as domestic plant plan | Emergency-preparedness gap | CRITICAL |
| Physical security added late | Redesign/cost/security exposure | HIGH |
| Cyber treated as ordinary IT | Nuclear security/safety exposure | CRITICAL |
| Imported vendor digital dependence unmanaged | Lifecycle cyber/vendor lock-in | HIGH |
| €700m liability assumed unlimited | Incorrect fiscal/legal modelling | HIGH |
| Insurance capacity checked after procurement | State contingent liability | HIGH |
| Transboundary consultation delayed | Authorisation/litigation delay | MEDIUM/HIGH |
Gate S1 — Grid adequacy
Terna must certify the connection architecture and model the reactor within probabilistic national adequacy studies.
Gate S2 — Cooling
The project must demonstrate adequate normal and safety heat rejection under lifetime climate scenarios.
Gate S3 — Seismic/external hazards
Site-specific nuclear hazard analysis must be accepted by the safety regulator.
Gate S4 — Source term
The design must provide regulator-accepted severe-accident/source-term analysis.
Gate S5 — Emergency planning
The external emergency-planning basis must be demonstrably implementable.
Gate S6 — Physical security
Security by design must be incorporated before final layout.
Gate S7 — Cyber
Lifecycle nuclear cyber-security plan and supplier obligations must be approved.
Gate S8 — Liability
Operator financial security and insurance must satisfy Italian/Paris/Brussels requirements.
Gate S9 — Transboundary procedure
Espoo/EIA/Euratom processes must be triggered where applicable.
No project should pass into irreversible construction merely because it has succeeded on the energy-economics case while failing these gates.
7.91 Overall assessment
The strongest system argument for nuclear in Italy is not that it can replace renewables.
It is that a high-renewables Italian electricity system will still require significant quantities of dependable, weather-diversified capacity and system services.
Terna’s own adequacy modelling demonstrates the scale of the challenge when large quantities of conventional dispatchable generation retire without adequate replacement. Under extreme economic-retirement assumptions, expected loss-of-load conditions rise dramatically by 2030–2035. [G]
A nuclear fleet could reduce that exposure.
But its contribution must be compared with other firm/flexible resources and calculated probabilistically rather than credited automatically at nameplate output.
The strongest environmental constraint is water and climate.
Italy’s old nuclear geography was selected under a different climatic baseline.
A reactor operating from the late 2030s toward the end of the century must instead be designed for:
- hotter air;
- warmer water;
- drought;
- changing Po flows;
- extreme rainfall;
- flood;
- sea-level rise where coastal.
Dry cooling can materially reduce freshwater dependence but introduces cost and performance penalties. Coastal cooling reduces freshwater competition while increasing the relevance of tsunami, storm surge, marine ecology and sea-level change.
The strongest safety principle is equally clear.
The Italian legal framework already requires a new reactor to minimise the risk of extreme external hazards, apply defence in depth and avoid accident releases whose protective consequences become unbounded in time or geography. [L]
SMR characteristics may improve the accident source term.
They do not create a legal exemption.
Emergency planning remains mandatory and must be derived from the design and site. The current national radiological emergency architecture gives Italy an institutional base, but a domestic reactor requires a new site-specific external emergency plan involving the Prefect, ISIN/future regulator, Region, municipalities, health services, emergency services and environmental authorities. [L]
Physical and cyber security likewise cannot be appended after technology selection. Imported digital reactor platforms, vendor remote support, long-term software maintenance and complex international supply chains make cyber sovereignty a nuclear-safety issue as well as a general cybersecurity issue.
Liability must also be stated accurately.
Italy currently operates within the amended Paris/Brussels system and applies a general €700 million operator liability level, complemented by public/international compensation mechanisms that bring the guaranteed convention architecture to at least approximately €1.5 billion. Italy does not currently apply a universal unlimited-liability rule to nuclear operators. [L/G]
Before licensing active commercial reactors again, the State should determine whether this arrangement remains appropriate for:
- SMRs;
- multi-module sites;
- advanced reactors;
- future fleet scale.
Finally, a new Italian nuclear programme will have international consequences even though energy policy remains sovereign.
Depending on the site and impact assessment, Italy may owe formal environmental consultation to neighbouring states. Euratom Article 37 requires Commission review of relevant radioactive-discharge plans, and Italian emergency law expressly requires cooperation with potentially affected EU and non-EU states. [L]
The correct strategic conclusion is therefore not:
“SMRs are inherently small enough to integrate safely into Italy.”
It is:
Italy has several grid and industrial environments in which SMRs could potentially add valuable dependable low-carbon capacity, but every viable deployment must be jointly optimised for grid adequacy, water, climate, seismicity, accident consequence, emergency response, security, liability and cross-border obligations.
A reactor that produces inexpensive electricity but cannot secure its cooling water is not a viable reactor.
A reactor with excellent passive safety but an unworkable emergency plan is not a viable project.
A technically safe plant with unmanaged cyber/vendor dependency is not strategically secure.
A commercially attractive unit whose liability cannot be insured is not financeable.
And a low-carbon reactor that ignores future climate conditions is not a resilient national asset.
The Italian programme must satisfy all of those tests simultaneously.
CHAPTER 7 — LOAD-BEARING SOURCE REGISTER
Electricity system, adequacy and integration
G1 — Terna, National Resource Adequacy Assessment for Italy 2025. Probabilistic adequacy analysis, three-hour LOLE standard, climate sensitivity, thermal-retirement risk, storage requirement and data-centre/electrification demand effects.
G2 — Terna, 2025 Annual Report. Data-centre and renewable connection-request trends, including almost 80 GW of data-centre connection requests by end-January 2026.
G3 — Terna, July 2025 — “G for Grid Forming”. First Italian grid-forming battery project and system-stability objectives.
S1 — International Energy Agency, Nuclear Power and Secure Energy Transitions. Role of dispatchable nuclear in low-carbon systems, system stability, capacity and renewable integration.
S2 — OECD Nuclear Energy Agency, 2025 — The Costs of Decarbonisation / Costs of Generating Electricity. Need to complement plant LCOE with country-specific system costs, flexibility and security-of-supply analysis.
S3 — OECD-NEA — System Cost Analysis. Balancing, grid, adequacy and flexibility costs in low-carbon electricity systems.
SMRs, industrial heat and data centres
G4 — European Commission, 10 March 2026 — EU SMR Strategy. SMRs as potential contributors to flexible/firm electricity, industrial heat, hydrogen, data-centre supply and European decarbonisation.
G5 — European Commission, COM(2026)117 — detailed SMR/AMR strategy. Data-centre load, industrial applications, integration with renewables and European deployment policy.
G6 — European Commission, 21 September 2026 — data-centre energy-performance framework. Energy efficiency, flexibility, water efficiency and waste-heat integration.
G7 — European Commission, June 2026 — data-centre grid-integration roadmap. Flexible connections, clean power, system flexibility and environmental constraints.
Water, climate and cooling
G8 — ISPRA, 21 March 2026 — Italian water-resource assessment for 2025. Approximately 128 billion m³ renewable water availability and decline relative to historical averages and 2024.
G9 — ISPRA — Water Severity Observatory, August 2026. High water severity in the Po district, high temperatures, declining reserves and localised water stress.
G10 — Copernicus Climate Change Service, July 2026. Exceptional June 2026 heat in Western Europe and dry conditions affecting Italy.
G11 — Copernicus, summer 2026 climate analysis. Exceptional June–July temperatures and persistent heat/drought conditions affecting Western/Southern Europe.
S4 — OECD Nuclear Energy Agency — Climate Change: Assessment of the Vulnerability of Nuclear Power Plants and Approaches for their Adaptation. Heatwave, drought, flood and cooling-water vulnerabilities and adaptation requirements.
S5 — IAEA — Climate Change and Nuclear Power. Cooling-water temperature, precipitation, sea-level and extreme-weather implications for nuclear power.
S6 — IAEA — Nuclear cooling-water and cooling-system guidance. Wet, once-through and dry-cooling characteristics and trade-offs.
Seismic, hydrogeological and external hazards
I1 — IAEA SSR-1, Site Evaluation for Nuclear Installations. Nuclear site evaluation requirements covering seismic, flooding, external natural and human-induced hazards, ultimate heat sink and changing hazards over plant life.
I2 — IAEA SSG-56 / related site-evaluation guidance. Ultimate-heat-sink assessment, meteorological/hydrological hazards and lifetime external-event evaluation.
Accident prevention, defence in depth and source term
L1 — Legislative Decree No. 137 of 15 September 2017. Italian implementation of the amended Euratom nuclear-safety regime; prevention of early/large releases and mandatory defence in depth for new installations.
I3 — IAEA SMR Regulators’ Forum — Emergency Planning Zone work. Design- and consequence-based emergency planning for SMRs; no automatic elimination of EPZ.
I4 — IAEA SMR Platform — safety and emergency-planning considerations. Potential for reduced source terms and smaller EPZs in some designs while retaining fundamental emergency-preparedness principles.
Italian emergency planning
L2 — Legislative Decree No. 101 of 31 July 2020, Articles 174–189. Site-specific emergency planning, Prefect-led structure, operator/ISIN technical basis, external plans, periodic review, exercises and international cooperation.
G12 — Department of Civil Protection — National Plan for Radiological and Nuclear Emergencies, 14 March 2022. Existing national architecture principally addressing foreign-reactor and national radiological scenarios.
I5 — IAEA GSR Part 7 — Preparedness and Response for a Nuclear or Radiological Emergency. International requirements for emergency planning and response.
Physical protection
L3 — Law No. 58 of 28 April 2015. Italian ratification of the 2005 Amendment to the Convention on the Physical Protection of Nuclear Material.
G13 — Italian Interministerial Decree, 8 September 2017. Physical-protection requirements for nuclear facilities and nuclear material.
I6 — IAEA — Physical Protection of Nuclear Material and Nuclear Facilities. Detection, delay, response, graded approach and protection against sabotage/unauthorised removal.
I7 — IAEA, 2025 — Security by Design for SMRs. Integration of physical protection during SMR design and siting.
Cyber security
I8 — IAEA — Computer Security of Instrumentation and Control Systems at Nuclear Facilities. Nuclear I&C cyber threats, lifecycle security, suppliers and defensive architecture.
I9 — IAEA Nuclear Security Series No. 42-G. National nuclear computer-security strategy, threat assessment, coordination and capabilities.
I10 — IAEA — nuclear cybersecurity supply-chain guidance. Vendor, contractor and supplier cybersecurity requirements and incident-information obligations.
L4 — Legislative Decree No. 138/2024. Italian implementation of Directive (EU) 2022/2555 — NIS2.
L5 — Directive (EU) 2022/2555 — NIS2. Cybersecurity risk-management obligations applicable to essential energy-sector entities, including relevant electricity producers.
Nuclear liability and insurance
L6 — Law No. 1860/1962, Article 19 as amended by Law No. 97/2020. Italian general operator-liability amount of €700 million per covered nuclear incident.
G14 — Italian Ministry of Foreign Affairs — entry into force of amended Paris and Brussels protocols, 1 January 2022. €700m general operator layer, supplementary public/international protection to at least €1.5bn and lower limits for specified low-risk facilities/transport.
I11 — OECD Nuclear Energy Agency — Paris Convention. Strict/chanelled operator liability, financial security and minimum compensation framework.
I12 — OECD Nuclear Energy Agency — Brussels Supplementary Convention. Three-tier compensation system and aggregate international compensation architecture.
Transboundary consultation and notification
L7 — Convention on Environmental Impact Assessment in a Transboundary Context — Espoo Convention. Nuclear power stations and reactors included among covered project categories; early notification and consultation obligations where significant transboundary effects are likely.
L8 — Directive 2011/92/EU, Article 7. EU transboundary EIA notification and participation requirements.
L9 — Euratom Treaty, Article 37. Commission review of general data concerning planned radioactive-waste disposals capable of affecting another Member State.
G15 — European Commission — Article 37 recommendation and implementation guidance. Information requirements and Commission radiological assessment framework.
L10 — Legislative Decree 101/2020, Article 189. Italian statutory duty to consider impacts on other states and coordinate emergency planning with potentially affected EU and non-EU countries.
END OF CHAPTER 7
CHAPTER 8 — CRITICAL PATH RISKS: THE FAILURE MODES THAT KILL THE PROGRAMME
8.1 Executive finding
The principal risk to an Italian nuclear programme is not that one isolated technical problem proves nuclear power impossible. It is that several individually manageable problems accumulate until the programme becomes unlicensable, unfinanceable, unsitable or politically irreversible at an unacceptable cost.
The relevant failure chain is therefore broader than reactor technology.
A technically viable SMR programme can still fail because:
- the implementing legislation arrives late or leaves material questions unresolved;
- the safety regulator cannot recruit enough qualified specialists to review multiple unfamiliar reactor designs;
- site rules are published before the constitutional State–Region architecture is sufficiently robust;
- no municipality or industrial host is willing to advance from consultation into a bankable site process;
- litigation suspends or invalidates one or more authorisations;
- the selected FOAK proves substantially more expensive than assumed;
- financing cannot be closed without public guarantees that shift excessive construction or price risk to taxpayers or electricity consumers;
- an imported reactor creates long-duration dependence on foreign intellectual property, software, spare parts or fuel;
- fuel-cycle diversification fails;
- a HALEU-dependent reactor is licensed but cannot obtain fuel on time;
- Italian suppliers possess industrial capability but not the nuclear qualifications required by the selected vendor;
- regulator, operator and industrial training programmes compete for the same small pool of specialists;
- water and climate conditions invalidate an apparently attractive site;
- the National Repository remains unresolved;
- a future government or electorate changes policy after large sunk expenditure has already occurred;
- contingent public liabilities become materially larger than those shown in the original investment case.
The September 2026 enabling legislation itself recognises that the programme still needs a complete legal, institutional, industrial and financial architecture. Government is delegated to legislate within twelve months from entry into force on the programme, siting, licensing, safety authority, waste, spent fuel, fuel-cycle activities, financial guarantees, industrial development and possible support mechanisms. That breadth is evidence of how much infrastructure still has to be created before a commercial FOAK becomes a conventional construction project.
This chapter therefore does not treat “risk” as a rhetorical objection to nuclear power.
It treats risk as a sequence of observable programme conditions.
A risk becomes programme-threatening when one of four things occurs:
- a legal gate cannot be crossed;
- time extends enough to destroy the financing case;
- a key input has no credible alternative supplier;
- the State continues spending after the underlying deployment assumptions have ceased to be valid.
For audit purposes, the most important principle is therefore:
Every critical programme assumption must have a measurable trigger that forces reconsideration before additional irreversible expenditure is committed.
The Chapter 8 mandate is to identify exactly those failure modes.
8.2 Risk is cumulative
A nuclear project can survive one problem.
It can survive:
- a six-month licensing delay;
- one supplier requiring requalification;
- one financing round taking longer than planned;
- one site study requiring redesign.
The programme becomes vulnerable when these interact.
For example:
regulator delay → construction delay → additional financing cost → higher required strike price → larger State-aid package → renewed political opposition → financing delay.
Or:
repository delay → weaker taxonomy/waste credibility → investor concern → additional State guarantees → larger contingent fiscal exposure.
Or:
HALEU shortage → reactor commissioning delay → debt interest continues → plant cannot generate revenue → sponsor requests public relief.
The programme therefore requires interdependency analysis, not isolated departmental risk registers.
8.3 The critical-path architecture
The main programme chain is:
law → regulator → technology → site → environmental/safety authorisation → finance → nuclear-grade supply chain → fuel → construction → commissioning → waste/disposal → operation
Several of these activities can run in parallel.
But some dependencies cannot be bypassed.
A reactor cannot compensate for:
- no licence;
- no fuel;
- no safe site;
- no operator;
- no financing.
Likewise, an excellent site cannot compensate for an unlicensable reactor.
The most dangerous management error would be to allow downstream spending to proceed on the assumption that an unresolved upstream gate will inevitably be solved later.
8.4 Consolidated programme failure matrix
| Failure mechanism | Observable manifestation | Immediate consequence | Propagation |
|---|---|---|---|
| Implementing-decree delay | T0+12m framework incomplete or materially fragmented | No stable licensing basis | Site/vendor financing delayed |
| Regulator-capacity gap | Safety reviews cannot be staffed independently | Licensing queue expands | FOAK schedule loses credibility |
| Institutional reorganisation failure | ISIN/successor powers unclear | Regulatory vacuum/duplication | Litigation and vendor uncertainty |
| Site-host failure | No viable locality progresses | No project licence | Technology/finance work stranded |
| Constitutional dispute | Region/State competence challenged | Legislative/authorisation uncertainty | Delay or redesign |
| Administrative litigation | EIA/site/licence suspended or annulled | Construction stop | Financing cost increases |
| FOAK escalation | Cost exceeds financing envelope | Sponsor equity gap | State/consumer support pressure |
| Financing failure | No bankable revenue/risk-allocation model | Financial close impossible | Procurement cannot proceed |
| Imported-design lock-in | Single foreign vendor controls fuel/IP/software | Reduced negotiating leverage | Lifecycle cost/security exposure |
| Uranium/enrichment disruption | Contracted supply unavailable or politically constrained | Fuel-cycle cost/schedule pressure | Inventory drawdown |
| HALEU shortage | Qualified HALEU unavailable | Advanced reactor cannot commission | Project revenue delayed |
| Nuclear-grade supply-chain gap | Suppliers fail code/vendor qualification | Import dependency/delay | Local-content targets fail |
| Skills gap | Regulator/operator/vendor cannot recruit | Slower review/construction/operation | Schedule risk rises |
| Water/climate failure | Site cooling case fails future-climate test | Site redesign or exclusion | Sunk site-development cost |
| Waste/repository stalemate | Repository path remains politically unresolved | Back-end credibility weakens | Financing/public acceptance risk |
| Political reversal | New legislation/referendum changes programme direction | Projects paused/cancelled | Sunk-cost/compensation exposure |
| State-guarantee crystallisation | Cost/price/closure guarantees called | Public cash requirement | Fiscal/political repercussions |
The matrix is not a political ranking. It identifies how each failure propagates through the programme.
8.5 Regulatory delay is the first hard programme risk
The statutory twelve-month clock begins only when the enabling legislation enters into force.
Within that period, Government must convert high-level principles into an operative system addressing:
- eligible technologies;
- national programme;
- siting;
- authorisation;
- safety governance;
- financial guarantees;
- waste;
- spent fuel;
- decommissioning;
- fuel-cycle installations;
- public information;
- industrial policy.
The breadth makes a superficial decree particularly dangerous.
A fast but incomplete implementing package could produce more delay than a carefully integrated one if developers subsequently discover:
- overlapping administrative competences;
- inconsistent environmental and safety timetables;
- unclear appeal routes;
- uncertainty over regulator powers;
- incomplete funding rules.
The European Commission’s 2026 SMR strategy itself identifies long permitting timelines and regulatory fragmentation as obstacles to SMR deployment and calls for early regulator cooperation and more harmonised approaches.
The Italian risk is therefore two-sided:
late decrees delay the programme directly;
poor decrees delay it later through litigation, amendment and regulatory interpretation.
8.6 A decree date is not the same as regulatory readiness
Even if every delegated decree is published within twelve months, the programme can still be unready.
Regulatory readiness requires operational products such as:
- application guides;
- licensing stages;
- document requirements;
- review standards;
- codes and standards policy;
- foreign-regulator reliance procedures;
- inspection arrangements;
- fee structures;
- emergency-planning interfaces;
- cyber-security expectations;
- waste acceptance requirements.
A statute can be legally in force while applicants still lack enough regulatory clarity to prepare a bankable application.
Therefore Chapter 9 must distinguish:
law in force
from
licensing system usable.
8.7 ISIN capacity is a concrete, measurable constraint
The regulator-capacity issue is not speculative.
ISIN’s statutory staffing ceiling is 90 personnel, including 60 technical and 30 administrative/legal resources. Its 2026–2028 General Activity Plan states that further recruitment is planned until the statutory workforce is filled and explicitly identifies the need to strengthen technical/scientific capability in nuclear safety and radioprotection.
Earlier planning documentation projected a material gap against the 90-person establishment after retirements and recruitment effects. The broader institutional point has remained consistent: the regulator has had to rebuild its staffing base while simultaneously overseeing decommissioning, waste, research reactors, transport, radiological sources, safeguards and emergency functions.
On 1 July 2026, ISIN Director Francesco Campanella told the Senate that the nuclear-safety authority already exists but requires strengthening if its mandate is expanded to licensing new reactors. He specifically called for reinforcement of the staffing framework.
That creates a straightforward resource problem.
A regulator sized principally for:
- legacy decommissioning;
- radioactive waste;
- research installations;
- radiation protection;
cannot be assumed automatically capable of reviewing:
- multiple competing SMR designs;
- several sites;
- reactor safety cases;
- construction inspections;
- digital I&C;
- severe-accident analysis;
- advanced fuels;
- cyber-security;
- commissioning.
8.8 The statutory 90-person establishment itself may eventually become the constraint
Filling the existing staff ceiling is only the first question.
The second is whether 90 total staff is enough for a multi-reactor new-build programme.
The 2026 law leaves the future regulator architecture open, and the Senate approved an order of the day calling for stronger independence/resources and preservation of existing ISIN expertise if a new authority is created.
The correct staffing analysis therefore has two stages:
Stage 1
Can ISIN reach and retain its current authorised complement?
Stage 2
What workforce is required once Italy simultaneously reviews:
- one or more reactor designs;
- multiple candidate sites;
- repository activities;
- decommissioning;
- fuel-cycle projects;
- construction inspections?
The answer should emerge from workload modelling, not from the historical statutory number.
8.9 Regulator staffing cannot be solved quickly by ordinary recruitment
A nuclear regulator requires specialised personnel in:
- reactor physics;
- thermal hydraulics;
- severe accidents;
- structural mechanics;
- seismic engineering;
- metallurgy;
- probabilistic safety;
- radiation protection;
- waste;
- human factors;
- cyber security;
- safeguards.
Recruiting a competent engineer is not the same as creating an experienced nuclear regulator.
New staff require:
- training;
- mentoring;
- access to international reviews;
- supervised assessment work;
- knowledge transfer.
ISIN’s own planning documents emphasise professional development and specialised training.
The schedule risk is therefore experience accumulation, not merely headcount.
8.10 Regulator attrition and industry recruitment will compete
Once Italy begins a multibillion-euro programme, private developers and vendors will seek many of the same specialists required by the regulator.
Private-sector salaries may exceed public-sector compensation.
This creates a predictable labour-market conflict:
the faster the commercial programme expands, the harder it may become for the public regulator to retain scarce specialists.
A regulator that loses experienced staff to applicants creates:
- slower review;
- potential independence concerns;
- repeated retraining.
This risk must be modelled before construction begins.
8.11 Replacing ISIN could itself become a transition risk
Chapter 2 established that the enabling legislation permits evaluation of a new independent safety authority but does not automatically replace ISIN.
Institutional redesign can strengthen regulation.
It can also generate:
- transfer disputes;
- vacancies;
- unclear delegated authority;
- duplicated procedures;
- uncertainty over existing technical guides;
- loss of institutional memory.
ISIN’s 2026 Senate testimony explicitly argued for strengthening and transforming the existing body rather than ignoring the expertise already accumulated.
The relevant failure condition is therefore not:
ISIN versus new authority.
It is:
any transition in which licensing responsibility changes faster than staff, procedures and legal powers can be transferred.
8.12 Too many reactor designs can overload the regulator before Italy chooses one
Each additional design considered in depth generates separate technical work.
A BWRX-300 review is not interchangeable with:
- NUWARD;
- AP300;
- Xe-100;
- newcleo LFR;
- Natrium.
They differ in:
- coolant;
- fuel;
- accident phenomenology;
- source term;
- codes;
- digital systems.
A regulatory strategy attempting full parallel review of many designs would consume the scarce public capability that the programme most needs.
This is one reason the technology down-select must occur before full Italian licensing.
8.13 Site failure is not hypothetical: the repository process provides a warning
The National Repository process offers the clearest current Italian evidence of territorial siting difficulty.
After publication of the proposed CNAI, authorities across Italy were permitted to submit non-binding self-candidacies to host the repository.
The deadline expired on 12 March 2024.
No self-nominations were submitted.
A reactor is not the same facility as a waste repository.
But the episode demonstrates that the existence of technically screened areas does not guarantee a willing host.
Therefore an Italian reactor plan that assumes:
“municipalities will compete to host reactors because of economic benefits”
is not a bankable planning assumption until actual expressions of interest exist.
8.14 Reactor siting contains an additional uncertainty: the final law does not yet define a complete voluntary-host model
Chapter 2 established that explicit self-candidacy language is clearer for waste/storage facilities than for generating reactors.
For reactors, the future decrees must still define the balance between:
- proponent applications;
- State screening;
- municipal consultation;
- regional participation;
- compensation.
This means site-host strategy cannot yet be treated as a mature administrative process.
A developer needs to know:
- when it can secure land;
- whether municipal support is required;
- what regional agreement is required;
- how disagreement is resolved;
- when compensation is negotiated.
If these answers emerge only during the first project, the FOAK becomes an institutional prototype as well as a technological one.
8.15 A politically supportive site can still fail technically
Site willingness does not overcome:
- seismic exclusion;
- flood hazard;
- water shortage;
- population/emergency issues;
- protected landscapes;
- grid constraints.
The correct failure condition is therefore not merely:
no volunteer.
It is:
no volunteer among sites that also survive the technical screen.
That intersection is materially smaller than the list of all Italian municipalities.
8.16 A technically attractive site can be politically unusable
The reverse also applies.
Caorso illustrates this directly.
The site possesses:
- nuclear history;
- grid infrastructure;
- industrial land.
But Emilia-Romagna’s December 2025 institutional act seeks exclusion of renewed nuclear generation at the former site.
That resolution is not an automatic national veto.
It is nevertheless evidence that a theoretically attractive brownfield can acquire a large territorial-acceptance burden.
The project cost of overcoming that burden may be measured in years.
8.17 State–Region constitutional litigation is built into the historical reference class
Italy’s previous nuclear framework produced Constitutional Court litigation.
Judgment 331/2010 invalidated regional attempts to create unilateral territorial nuclear bans while confirming that nuclear generation and radioactive waste involve constitutional competences divided between State and Regions in different ways.
Judgment 33/2011 simultaneously demonstrated the other side of the balance: territorial participation cannot be reduced below constitutionally adequate levels. In particular, the Court found inadequate regional participation in part of the former authorisation architecture and emphasised the specific position of the directly affected Region.
This produces a narrow legal corridor.
The State cannot safely assume:
national importance means unilateral power.
A Region cannot safely assume:
regional opposition means absolute prohibition.
If the decrees misjudge that boundary, constitutional litigation becomes part of the programme schedule.
8.18 Constitutional litigation has nonlinear schedule consequences
A Constitutional Court challenge does not merely add lawyer cost.
If the contested provision governs:
- site agreement;
- authorisation;
- substitute powers;
- regulator architecture;
a judgment may require the procedure to be repeated under revised rules.
That can invalidate years of downstream work.
Therefore constitutional-risk analysis belongs before the first site procedure, not after litigation is filed.
8.19 Administrative litigation is even more likely than constitutional litigation
Every project will generate contestable administrative acts involving:
- EIA;
- site screening;
- water;
- landscape;
- grid;
- procurement;
- integrated authorisation;
- local agreements.
A TAR suspension can affect:
- land preparation;
- construction;
- financing drawdowns.
A final judgment requiring:
- new EIA;
- additional consultation;
- reconsideration of alternatives
can create multiyear consequences.
The relevant project-management metric should therefore be:
number of legally vulnerable decision points whose annulment would require upstream work to be repeated.
8.20 Litigation risk increases when schedule pressure leads to procedural compression
There is an inherent tension.
Political programmes often seek:
- shorter licensing;
- parallel procedures;
- compressed consultation.
But compressing procedure poorly can increase the probability that a court later invalidates the result.
The shortest nominal authorisation procedure is therefore not necessarily the shortest path to construction.
A legally robust procedure can have higher upfront administrative time but lower rework probability.
8.21 Political reversal is a genuine infrastructure risk in Italy
Italy has already experienced two major nuclear-policy reversals.
The existing nuclear programme was halted in the late 1980s after the 1987 referendums and subsequent policy decisions.
A renewed programme adopted during the 2009–2011 period was then terminated after Fukushima and the June 2011 referendum. The Chamber of Deputies’ 2026 legislative dossier provides the official reconstruction of both episodes.
This does not mean a future programme will necessarily reverse.
It means political continuity cannot be assumed over a 10–15 year pre-operation project.
8.22 Nuclear construction outlasts normal political cycles
Even the optimistic Italian schedule spans multiple:
- Parliaments;
- governments;
- regional administrations;
- municipal administrations.
Contracts therefore need rules for what happens if public policy changes after:
- vendor selection;
- land acquisition;
- manufacturing;
- first concrete;
- fuel procurement.
Without such rules, political risk becomes part of financing cost.
8.23 Cancellation risk is most expensive after the project becomes irreversible
Political reversal has different fiscal consequences at different stages.
| Stage | Principal sunk exposure |
|---|---|
| Early policy | Studies, staff, legal drafting |
| Site development | Land, investigations, EIA |
| Vendor pre-contract | Engineering/licensing |
| Final investment decision | Equity/debt commitments |
| Manufacturing | Long-lead components |
| Construction | Billions in sunk civil/mechanical works |
| Fuel procurement | Fuel-cycle contractual commitments |
Therefore political risk should be priced before FID.
A system in which Government can cancel without compensation may be difficult to finance.
A system in which Government guarantees full compensation transfers that risk to taxpayers.
There is no zero-cost solution.
8.24 FOAK cost escalation is the central commercial risk
Recent Western nuclear projects demonstrate why first-of-a-kind assumptions need strong contingency.
This does not mean a 300 MWe SMR will reproduce the cost of a 1,600 MWe EPR.
It means construction risk has repeatedly turned schedule into financing cost.
The OECD-NEA identifies construction risk as one of the principal drivers of nuclear cost of capital and emphasises that project management, overnight construction cost and financing structure interact. It explicitly states that this logic applies to SMRs as well as large Generation III reactors.
8.25 Hinkley Point C illustrates the cost of time
EDF’s February 2026 update placed Hinkley Point C’s completion cost at approximately:
£35 billion in 2015 money
equivalent to approximately:
£48 billion in current value
under the stated reference assumptions.
Unit 1 is organised around operation in 2030, with a possible 12-month delay to 2031.
EDF states that a 12-month delay could add approximately:
£1 billion in 2015 money
or approximately:
£1.4 billion in current value.
Hinkley is a large twin-EPR project and must not be used as a numerical cost proxy for an SMR.
Its relevance is the delay mechanism:
- labour remains mobilised;
- financing accrues;
- overhead continues;
- revenue begins later.
That mechanism applies to any capital-intensive reactor.
8.26 Darlington provides the most useful current SMR cost evidence
Ontario Power Generation’s public estimate for the four-unit Darlington BWRX-300 programme is approximately:
CAD 20.9 billion, including:
- interest;
- escalation;
- contingency.
OPG identifies approximately:
CAD 6.1 billion for the first SMR
plus approximately:
CAD 1.6 billion for systems and services shared across the planned four-unit fleet.
This is highly relevant for Italy.
It demonstrates why simple generic claims such as:
“a 300 MWe SMR costs $1–3 billion”
cannot be used as a financial-close assumption without a clearly defined scope.
The Darlington figures include categories that generic “overnight CAPEX” claims often omit.
8.27 FOAK and NOAK must be separated
The economic logic of SMRs depends heavily on repetition.
FOAK cost includes disproportionate expenditure on:
- design completion;
- first licensing;
- factory/tooling;
- first supplier qualification;
- site-specific engineering;
- first operator training.
Later units can potentially benefit from:
- repeat design;
- learning;
- shared systems;
- serial manufacture.
The European Commission’s March 2026 SMR strategy explicitly states that this business model remains unproven in practice and depends on achieving modularity and serial production.
Therefore the State must not assume NOAK cost before FOAK evidence exists.
Italy’s first reactor may be:
- first deployment of that design in Italy;
- first review by the Italian new-build regulator;
- first modern Italian nuclear operator;
- first new nuclear construction workforce in decades;
- first application of the new siting law.
If the selected reactor is also a global technology FOAK, Italy compounds:
technology FOAK + country FOAK + regulator FOAK + supply-chain FOAK.
The programme should explicitly calculate how many FOAK layers are being accepted.
8.29 Cost escalation can invalidate the political financing model before it invalidates the engineering
Suppose a project remains technically sound but costs rise 40%.
The consequences may include:
- required strike price rises;
- private equity return falls;
- State guarantee increases;
- electricity-consumer exposure increases;
- State-aid package must be revised.
The reactor may still be buildable.
The original financing proposition may no longer be.
This distinction is central to project governance.
8.30 Financing risk is not reducible to CAPEX
Nuclear electricity cost is particularly sensitive to cost of capital because most expenditure occurs years before electricity revenue begins.
The IEA states that nuclear projects are difficult to finance because of:
- capital intensity;
- long construction periods;
- complexity;
- cost-overrun risk.
It finds that predictable cash flows and mechanisms such as:
- long-term PPAs;
- Contracts for Difference;
- Regulated Asset Base structures
are important for attracting debt and reducing financing costs.
The OECD-NEA similarly finds that construction risk is a dominant determinant of project financing cost.
8.31 Italy still has no defined commercial support model
The enabling legislation permits future support.
It does not yet establish:
- CfD;
- RAB;
- sovereign construction loan;
- consumer levy;
- minimum market price;
- state equity;
- revenue floor;
- cost-overrun sharing.
The financial market therefore cannot yet answer the most important question:
Who loses money if the first Italian reactor costs much more than expected?
Until that question has a contractual answer, an Italian FOAK is not bankable.
8.32 The private market is unlikely to absorb unrestricted FOAK construction risk cheaply
The IEA observes that Governments continue to play an important role in nuclear financing even where private investors participate because construction risk and long-duration price risk are difficult for lenders to absorb.
The European Commission’s 2026 Clean Energy Investment Strategy similarly identifies higher technology and deployment risk as a specific financing problem for SMRs and commits EU/EIB tools to de-risk parts of the value chain.
Therefore an Italian financing plan based simply on:
“private investors will fund the plant”
is incomplete without a risk-allocation structure.
8.33 De-risking transfers risk; it does not remove risk
A CfD can remove wholesale-price risk from the project.
Someone else assumes it.
A State loan can reduce interest cost.
The State assumes credit risk.
A RAB model can reduce financing risk during construction.
Consumers may begin paying before the plant operates.
A sovereign guarantee can attract debt.
Taxpayers become contingent guarantors.
The fundamental public-finance question is therefore:
which risk is transferred to whom?
This must remain visible in all financing presentations.
8.34 Contingent state liabilities can exceed direct appropriations
Chapter 1 established that the initial statutory funding envelope is small relative to reactor capital cost.
The much larger potential fiscal exposure would arise later through:
- construction guarantees;
- debt guarantees;
- CfD obligations;
- political-shutdown compensation;
- fuel guarantees;
- waste backstops;
- operator insolvency;
- cost-overrun support.
These liabilities may not appear as immediate budget expenditure.
They can still become economically real.
MEF therefore needs a contingent-liability register alongside ordinary programme appropriations.
8.35 Hinkley illustrates the scale of long-term contract exposure
The UK Government’s 2025–2026 financial statements show the sensitivity of CfD liabilities to:
- commissioning date;
- load factor;
- generation profile.
For Hinkley Point C, delaying generation changes the value of the Government’s CfD position materially.
This is not evidence that Italy should or should not use a CfD.
It demonstrates that long-duration nuclear support contracts create public or consumer exposure that must be modelled under multiple operating scenarios.
8.36 Imported-design dependence is a lifecycle risk
If Italy chooses a foreign LWR-SMR, it avoids some technology-development risk.
It assumes other dependencies.
These can include:
- reactor design IP;
- safety analysis;
- proprietary software;
- fuel design;
- long-lead components;
- engineering changes;
- spare parts;
- vendor technical support.
The European Commission’s 2026 SMR strategy explicitly calls for strengthening European supply chains, protecting European IP and maintaining strategic autonomy while avoiding new dependencies.
That policy concern directly applies to Italy.
8.37 Vendor dependence becomes most dangerous after licence lock-in
Before technology selection, Italy can negotiate among vendors.
After:
- regulator accepts the design;
- site is engineered;
- operator is trained;
- supply chain is qualified;
switching vendors becomes extremely expensive.
The selected vendor therefore gains structural negotiating leverage.
Procurement must examine lifecycle terms before lock-in, including:
- spare-part pricing;
- software licensing;
- engineering support;
- fuel;
- design changes;
- intellectual-property access.
8.38 Imported safety software creates a special sovereignty question
A modern reactor can operate for 60–80 years.
Its digital systems may rely on:
- proprietary code;
- foreign cyber updates;
- vendor tools.
If Italy cannot obtain:
- updates;
- vulnerability remediation;
- long-term technical documentation,
the plant can become dependent on a company or jurisdiction whose strategic relationship with Italy changes decades later.
Therefore vendor sovereignty is not only about steel.
It includes code and configuration knowledge.
8.39 Foreign reference licensing is valuable but can create regulatory dependency
Reusing:
- Canadian;
- US;
- UK;
- French
regulatory work can materially reduce duplication.
But excessive reliance creates the possibility that:
- foreign design changes;
- foreign regulator findings;
- reference-project delay
directly alter the Italian schedule.
The Italian regulator must therefore retain enough independent technical capacity to decide whether a foreign finding remains applicable to the Italian site.
8.40 Uranium supply itself is diversified; conversion and enrichment are more concentrated
The 2025 Euratom Supply Agency data provide a useful distinction.
EU utilities purchased 14,678 tonnes of natural uranium in 2025 and held inventories equivalent to more than three average annual reload requirements across the EU fleet.
Natural uranium therefore exists in a geographically broader market than some public debate implies.
The narrower vulnerabilities sit in:
- conversion;
- enrichment;
- design-specific fuel fabrication.
The European Commission stated in 2026 that Western/EU conversion and enrichment capacity remained constrained relative to overall demand.
8.41 Russian enrichment remains a material EU exposure
According to the Euratom Supply Agency, in 2025 EU utilities received enrichment services approximately as follows:
- EU: 72.91%;
- Russia: 22.55%;
- other non-EU: 4.54%.
This is the relevant current baseline.
Europe has reduced some dependencies.
It has not eliminated nuclear fuel-cycle dependence on Russia.
An Italian programme beginning fuel procurement in the 2030s should therefore test its contracts against a scenario in which Russian enrichment is unavailable.
8.42 European replacement enrichment capacity is expanding but not instantaneous
The Commission states that additional European enrichment facilities are expected from 2027, while new conversion capacity is generally slower, with major additions not expected before the 2030s.
This means a conventional LEU SMR is not fuel-risk-free.
It is simply supported by a much more mature Western supply chain than HALEU or MOX fast-reactor systems.
8.43 Fuel inventory is a strategic buffer
ESA reports that EU utilities have increased inventories since Russia’s invasion of Ukraine and collectively held more than three average annual reloads of natural-uranium-equivalent inventory at the end of 2025, although individual utility positions vary.
A future Italian operator should therefore not rely exclusively on:
annual just-in-time fuel delivery.
Fuel-security planning should determine:
- strategic reload inventory;
- supplier diversity;
- enrichment diversity;
- fabrication alternatives.
Fuel inventory ties up capital.
It also reduces geopolitical outage risk.
8.44 HALEU is a qualitatively harder risk
HALEU is not merely “slightly more enriched fuel.”
It requires a still-developing commercial chain for:
- enrichment;
- deconversion;
- transport;
- fabrication.
The US Department of Energy states explicitly that HALEU is not currently available from domestic commercial suppliers at the scale required and that supply gaps can delay advanced-reactor deployment. The US has created a federal HALEU Availability Program precisely to address this problem.
That fact is strategically important to Italy.
If the United States — the principal near-term Western advanced-reactor market — is still using public intervention to establish HALEU availability, Italy should not treat HALEU supply as an ordinary commodity purchase.
8.45 European HALEU is even less mature
The Euratom 2026–2027 Research and Training Work Programme identifies European HALEU capability as a strategic objective for the early 2030s.
The Commission’s September 2026 radioisotope-security initiative also identifies development of EU-based metallic HALEU capacity as a future priority.
This means that a HALEU-dependent Italian reactor entering a near-term procurement process would depend on a fuel chain that Europe itself is still building.
8.46 A reactor can be complete and still be unable to start because the fuel is late
This is the essential HALEU failure mode.
A project may complete:
- civil construction;
- reactor installation;
- grid connection;
- commissioning systems.
Without licensed fuel:
there is no first criticality.
Debt interest continues while revenue remains zero.
The fuel schedule must therefore be part of the reactor critical path from the initial technology down-select.
8.47 MOX / fast-reactor fuel creates a different dependency
newcleo’s proposed fuel strategy is based around MOX and recycled materials rather than HALEU.
This avoids one dependency.
It creates another.
A commercial MOX strategy requires:
- plutonium-bearing material;
- fabrication;
- safeguards;
- transport;
- reprocessing arrangements.
The 2026 law allows future regulation of fuel fabrication and reprocessing, but Italy has no current commercial power-reactor MOX infrastructure.
Therefore a domestic LFR programme that assumes domestic fuel-cycle sovereignty would effectively require a second nuclear capital programme alongside the reactor fleet.
8.48 Fuel-cycle choice can determine deployment date more than reactor construction
A mature LWR design may be slowed primarily by:
- site;
- licensing;
- construction.
An advanced design may be slowed by all three plus:
- fuel qualification;
- fabrication facility;
- transport licence;
- safeguards.
This is why technology maturity must be defined by the weakest deployment subsystem.
8.49 Italian industrial capacity is real but uneven
Chapter 4 established a specialised Italian nuclear industrial base of approximately 70 companies under the Edison–Ansaldo Nucleare–TEHA study.
Those firms generated approximately €457 million of specifically nuclear-related activity in the 2022 baseline and supported around 2,800 jobs.
That is meaningful capability.
It is not a fleet-scale manufacturing system already able to supply 20 identical SMRs.
8.50 Nuclear-grade qualification is a schedule in its own right
The 2026 Ansaldo Energia–RINA programme is explicitly aimed at companies not currently active in nuclear but possessing transferable capabilities.
The process includes:
- gap assessment;
- certification;
- qualification;
- training.
This confirms a critical industrial distinction:
Italian manufacturing capability is larger than Italian nuclear-qualified capability.
A local-content target that ignores that distinction can create procurement delay.
8.51 Certification cannot be accelerated indefinitely
Nuclear qualification involves:
- documented quality systems;
- material traceability;
- supplier controls;
- welding qualification;
- NDE;
- configuration control;
- nuclear safety culture.
ISO 19443, for example, adds nuclear-specific quality and safety requirements beyond generic ISO 9001 and requires audited implementation, not a declaration of competence.
Therefore a company identified in 2027 as a potential supplier may not be ready for a safety-class 2028 order.
Supplier qualification must begin early enough.
8.52 The programme can fail by choosing local content faster than suppliers can qualify
Political pressure for high domestic content is economically understandable.
But requiring an unqualified domestic supplier to replace a qualified foreign safety-class supplier can create:
- regulatory delay;
- design change;
- schedule risk.
The national industrial objective must therefore distinguish:
- immediately localisable work;
- work localisable after certification;
- proprietary/vendor work that remains imported during FOAK.
Otherwise localisation becomes a schedule liability.
8.53 Serial manufacturing is unproven even if individual suppliers are excellent
Italy has companies capable of producing:
- unique nuclear vessels;
- forgings;
- piping;
- fusion structures.
SMR economics assume something different:
repeat production of many identical modules.
That requires:
- factory throughput;
- production-line learning;
- order visibility;
- standard design.
The Commission’s 2026 SMR strategy states explicitly that the economic case depends on modularity and serial production and has not yet been demonstrated in practice.
The existence of skilled fabricators is therefore necessary but not sufficient.
8.54 Weak order visibility can stop investment in factories
Manufacturers will not invest hundreds of millions in:
- specialised tooling;
- clean workshops;
- nuclear QA staff;
- automated welding;
for a programme consisting of one uncertain reactor.
The SMR industrial model needs:
- credible fleet volume;
- stable design;
- credible schedule.
This creates a circular dependency:
fleet commitment → factory investment → lower cost
but
Government may want proven lower cost before fleet commitment.
Breaking that circle is one of the core commercial-policy problems of SMRs.
8.55 Skills are a system-wide bottleneck
Italy’s skills challenge extends beyond welders.
A national programme requires simultaneous growth in:
- regulator staff;
- operator staff;
- nuclear engineers;
- safety analysts;
- QA;
- NDE;
- radiation protection;
- project controls;
- nuclear lawyers;
- emergency planners.
The IEA identifies workforce and supply-chain capability as essential conditions for nuclear expansion.
The European Commission’s 2026 SMR strategy similarly makes skills development a core deployment requirement.
8.56 Operator competence is a separate challenge from engineering competence
Italy has engineers with nuclear experience.
It does not currently have an Italian commercial power-reactor operating workforce running domestic reactors.
The future operator requires:
- licensed control-room staff;
- maintenance;
- chemistry;
- fuel handling;
- outage planning;
- radiation protection;
- emergency organisation.
These competencies must exist before fuel loading.
Training therefore needs to begin years before first operation.
8.57 Imported vendor training creates useful experience but also dependency
The first operator may rely heavily on:
- vendor simulators;
- foreign training centres;
- secondments at reference plants.
That is sensible.
But the State must ensure enough knowledge transfers to Italy to avoid permanent dependence on foreign operator support for ordinary plant operation.
The workforce strategy should therefore distinguish:
initial vendor assistance
from
long-term national competence.
8.58 Age profile and knowledge transfer matter
Nuclear competence is unusually dependent on tacit knowledge.
A senior safety engineer may have:
- decades of accident-analysis experience;
- regulator knowledge;
- code interpretation skill.
Replacing that individual with a newly qualified graduate does not preserve capability immediately.
This is particularly relevant to ISIN and legacy institutions.
The programme must therefore plan overlapping generations of staff rather than simple vacancy replacement.
8.59 Water can kill a site after years of development
Chapter 7 established that a reactor’s cooling and ultimate heat sink must be qualified for future climate conditions.
The Po district experienced significant stress in 2026.
On 25 June 2026, the Basin Authority reported:
- river flows materially below reference averages;
- Po flow at Pontelagoscuro below the 450 m³/s saline-intrusion threshold;
- saline intrusion reaching approximately 16–20 km in Delta branches;
- irrigation restrictions in affected territories.
This is not proof that Trino or Caorso cannot host a reactor.
It demonstrates that water availability can no longer be treated as a fixed legacy-site asset.
8.60 Water risk appears late if site screening is superficial
A project can spend years on:
- land;
- grid;
- politics;
before discovering that:
- drought flow;
- discharge temperature;
- environmental flow;
- competing water use
make the original cooling concept unworkable.
Therefore water modelling belongs in early site screening.
A late switch to dry cooling can affect:
- CAPEX;
- plant efficiency;
- site footprint.
8.61 Climate change can invalidate a site assumption without making the site physically impossible
Climate risk is often a design-cost multiplier rather than an absolute exclusion.
A site may remain usable only after adding:
- stronger flood barriers;
- larger heat exchangers;
- dry/hybrid cooling;
- elevated equipment;
- redundant intakes.
The programme risk is that the original cost estimate assumed these measures were unnecessary.
Climate adaptation must therefore be costed before final investment decision.
8.62 Coastal sites exchange drought risk for flood and marine risk
A coastal site can reduce freshwater dependence.
It increases exposure to:
- storm surge;
- sea-level change;
- marine heat;
- tsunami;
- coastal erosion.
Therefore moving a project from inland to coast does not eliminate climate risk.
It changes the risk family.
8.63 Waste remains a critical-path credibility risk even before it is a technical reactor constraint
Italy has no operating National Repository.
After the CNAI self-candidacy window closed in March 2024, no self-nominations had been received, and the process moved into Strategic Environmental Assessment.
Sogin’s CEO stated in June 2026 that the company’s current objective is completion of the National Repository in 2039.
That is an operator target, not a licensed schedule.
This creates a potential timing overlap in which Italy may attempt to:
- license a new reactor;
- while the repository site remains unresolved.
Legally possible steps and politically credible steps are not always identical.
8.64 Repository delay can propagate directly into new-build politics
The public-policy question is obvious:
Why create new nuclear waste before the old waste infrastructure is complete?
A Government may have technically valid answers concerning:
- decades between fuel loading and final disposal;
- existing interim storage;
- separate waste classes.
But if the repository remains visibly stalled, this argument becomes harder politically.
The repository therefore operates as a trust variable for the new-build programme.
8.65 Geological disposal remains a second unresolved waste gate
The National Repository is principally a final solution for VLLW/LLW and temporary storage for higher-activity material.
Italy still needs a final geological pathway for:
- HLW;
- long-lived ILW;
- spent fuel destined for disposal.
Therefore completion of the National Repository does not remove all back-end uncertainty.
This matters particularly for technology choices producing novel spent fuels.
8.66 Waste stalemate can affect financing
Investors examine:
- operator liabilities;
- waste levies;
- repository charges;
- taxonomy conditions;
- decommissioning obligations.
If disposal assumptions are undefined, future liabilities become harder to price.
The result can be:
- larger contingencies;
- higher return requirements;
- demand for State backstop.
Waste policy therefore affects cost of capital even decades before disposal.
8.67 Political opposition to waste and reactor siting can reinforce each other
Repository opposition is not the same as reactor opposition.
But the issues interact in public debate.
A territory considering a reactor may ask whether:
- spent fuel remains on site indefinitely;
- repository is delayed;
- geological disposal exists.
Therefore waste delay can reduce the number of politically viable reactor sites even where the reactor site itself is technically acceptable.
8.68 The programme can also fail through excessive optimism about the first-power date
Ministerial 2033–34 language and industrial 2035 ambitions are not licensed project schedules.
If these dates become embedded in:
- procurement;
- political promises;
- industrial investment;
the programme may begin treating normal nuclear licensing time as “delay.”
That can create pressure to:
- compress review;
- overpay suppliers;
- issue guarantees early.
Schedule realism is therefore itself a risk-control mechanism.
8.69 Reference-class forecasting is essential
The correct planning question is not:
“How long does the vendor say construction takes?”
It is:
“How long have comparable first-of-a-kind nuclear programmes taken from legal framework through commercial operation?”
Relevant reference classes include:
- Darlington BWRX-300;
- Vogtle AP1000;
- Hinkley EPR;
- Flamanville EPR;
- advanced reactor projects now moving into construction.
The point is not to assume Italy will repeat the worst case.
It is to prevent planning from assuming that no adverse case exists.
8.70 Schedule contingency must include pre-construction, not only construction
A vendor may advertise:
36-month construction.
Government schedule must also include:
- law;
- regulator;
- site;
- EIA;
- design review;
- procurement;
- financing;
- long-lead manufacturing;
- pre-operational testing.
Therefore “construction duration” is only one component of “time to first power.”
8.71 Imported-design changes can cause cascading rework
If the reference regulator requires a design change while Italy is already engineering the site, the consequences can include:
- civil redesign;
- supplier changes;
- new analysis;
- additional regulator review.
A first Italian project should therefore minimise premature detailed engineering against a design whose baseline is still changing materially.
This is particularly relevant to technologies still before final design approval.
8.72 Regulatory harmonisation can reduce risk but not eliminate national differences
The EU’s SMR strategy promotes:
- joint early reviews;
- regulator cooperation;
- standardisation.
This can lower duplication.
But Italy retains national responsibilities for:
- site;
- environmental law;
- emergency planning;
- security;
- national licence.
Therefore regulatory harmonisation is a risk reducer, not a licence substitute.
8.73 State aid can become part of the critical path
Where financing relies on selective public support, EU State-aid rules may require Commission approval.
If the support package changes materially because:
- costs rise;
- strike price changes;
- guarantee expands;
the approval strategy may also require revision.
Therefore State-aid engagement should begin before financing becomes final.
Late discovery that the economic package requires redesign can delay FID.
8.74 Off-balance-sheet treatment does not remove economic risk
A guarantee may not require cash payment at issuance.
A CfD may have little cost while market prices are high.
A compensation commitment may never be triggered.
These instruments still create contingent exposure.
A government-grade report should therefore publish:
- nominal guaranteed amount;
- expected value where appropriate;
- stress exposure;
- maximum credible cash requirement.
Without this, fiscal comparisons between technologies become distorted.
8.75 Premature closure is the most severe contingent-liability stress case
Suppose a State-backed reactor closes after ten years rather than sixty.
Potential unresolved exposures include:
- outstanding debt;
- unused fuel contracts;
- decommissioning fund shortfall;
- spent-fuel management;
- compensation claims;
- replacement capacity.
A financing model that works only under 60 years of uninterrupted operation is not fully stress-tested.
Chapter 9 should therefore include a premature-closure case in each project financing gate.
8.76 Multi-unit commitments can amplify FOAK failure
Fleet economics encourage ordering several identical modules.
But ordering too many units before FOAK evidence exists can lock in a defective cost base.
The programme therefore faces a sequencing problem:
order too few → no serial economics
versus
order too many too early → replicate FOAK problems.
A staged option structure can preserve fleet potential while allowing evidence from Unit 1 to influence later commitments.
8.77 Single-vendor fleet concentration has benefits and risks
Benefits:
- common training;
- common spare parts;
- simplified licensing;
- serial learning.
Risks:
- vendor insolvency;
- systemic design issue;
- fuel dependency;
- bargaining lock-in.
The programme should therefore distinguish:
standardisation
from
unmanaged single-source dependence.
8.78 Too much technology diversity creates the opposite problem
A fleet composed of:
- BWR;
- PWR;
- HTGR;
- LFR;
would require multiple:
- licensing competencies;
- fuel systems;
- operators;
- waste systems;
- training pipelines.
Diversification can reduce vendor concentration.
Excessive diversity destroys fleet economies.
The appropriate balance must be established by national programme design rather than through ad hoc project-by-project procurement.
8.79 The industrial-export strategy can partly hedge domestic delay
Italy’s nuclear manufacturers already export.
This creates an important resilience mechanism.
If domestic FOAK slips, qualified Italian firms can continue participating in:
- Romanian;
- French;
- UK;
- US/Canadian;
- fusion
programmes.
The Ansaldo–RINA qualification initiative is therefore useful independently of domestic construction timing.
Domestic nuclear industrial policy need not depend entirely on one Italian construction date.
8.80 Industrial policy itself can create sunk-cost risk
The opposite remains true.
If Government heavily subsidises factory conversion before:
- design selection;
- vendor qualification;
- fleet commitment;
firms may invest in:
- wrong code;
- wrong component;
- wrong capacity.
Industrial support should therefore follow credible demand signals.
8.81 The risk of “paper localisation”
A contract may contain a high percentage of “Italian value.”
That does not necessarily mean the most strategic systems are Italian.
Local content can concentrate in:
- concrete;
- civil works;
- conventional island;
while Italy remains dependent on foreign:
- fuel;
- reactor design;
- safety I&C;
- IP.
Therefore localisation reporting should distinguish:
economic local content
from
strategic sovereign content.
8.82 Fuel dependence is often more strategically important than component dependence
A missing imported valve can delay maintenance.
A missing fuel reload can stop the reactor.
Therefore fuel security deserves stronger lifecycle attention than many headline component-localisation percentages imply.
This is especially important for HALEU and vendor-specific fuel forms.
8.83 Cyber/vendor dependence belongs in the same risk register
Chapter 7 established that imported reactor systems may depend on foreign:
- software;
- updates;
- engineering tools.
A vendor relationship that deteriorates politically can therefore create:
- cyber;
- maintenance;
- spare-part
problems even where uranium supply remains secure.
Technology sovereignty must be assessed across the complete lifecycle.
8.84 Risk cannot be removed by transferring it to Sogin or the State
A recurring public-project error is to treat a problem as “solved” when it is transferred from a project company to a public entity.
Examples:
- State guarantees construction debt;
- Sogin assumes waste;
- taxpayers absorb decommissioning shortfall.
The project may become financeable.
The national risk remains.
Therefore the report should evaluate risk at consolidated public-sector level, not merely at project-company level.
8.85 Public support must have explicit exit conditions
Any public guarantee or support mechanism should specify:
- expiry;
- maximum exposure;
- conditions precedent;
- termination triggers.
Otherwise temporary FOAK support can become permanent fleet subsidy without explicit reconsideration.
This is particularly important if later units are expected to benefit from serial cost reduction.
8.86 Cost escalation should trigger re-approval rather than automatic funding expansion
A disciplined programme requires thresholds at which:
- Board;
- MEF;
- Government;
- Parliament where legally required
must reconsider the project.
Examples of relevant triggers include:
- projected cost exceeds approved financing envelope;
- schedule moves beyond defined band;
- required State guarantee increases materially;
- reference FOAK experiences major technical failure.
The purpose is not automatically to cancel.
It is to prevent incremental escalation from bypassing the original investment decision.
8.87 Site failure should trigger competition among areas, not repeated weakening of criteria
If the preferred candidate fails:
- seismic;
- flood;
- water;
the correct response is a different site or different technology/cooling solution.
It should not be automatic relaxation of safety/environmental criteria to preserve the political schedule.
Otherwise sunk-cost pressure can distort technical decision-making.
8.88 Technology failure should not automatically kill the entire national programme
Similarly, a failure of one vendor is not evidence that every nuclear technology is nonviable.
A resilient national programme should distinguish:
- technology-specific failure;
- site-specific failure;
- programme-wide failure.
This is why the State should maintain alternatives during early phases.
But alternatives must be limited enough not to overwhelm the regulator.
8.89 Some failure modes are recoverable; others destroy the business case
Recoverable with limited redesign
- supplier replacement;
- additional qualification;
- modest grid reinforcement;
- limited licensing clarification.
Potentially programme-transforming
- no viable site;
- no fuel pathway;
- regulator unable to license;
- FOAK cost far beyond approved envelope;
- major political reversal;
- waste architecture rejected without alternative.
The management response should therefore depend on whether the underlying national objective remains reachable.
8.90 A practical early-warning dashboard
The following indicators allow Government and audit bodies to detect deterioration before it becomes irreversible.
| Indicator | Warning signal |
|---|---|
| Delegated legislation | Key decrees incomplete near statutory deadline |
| Regulatory staffing | Vacancies remain in reactor-safety specialties as applications begin |
| Review workload | Safety-review milestones repeatedly slip |
| Site process | No technically credible host enters detailed investigation |
| Constitutional process | Competence disputes remain unresolved before site designation |
| EIA | Repeated data-deficiency requests or suspension |
| FOAK abroad | Reference project moves materially beyond cost/schedule base |
| Italian CAPEX | Forecast exceeds approved contingency |
| Financing | Equity/debt commitments conditional on expanding State support |
| Cost of capital | Financing price rises materially before FID |
| Fuel | Less than two credible long-term supply routes for conventional fuel; no qualified route for advanced fuel |
| HALEU | Commercial supply contract remains conditional on public allocation |
| Supply chain | Safety-class supplier qualification misses long-lead ordering date |
| Workforce | Operator/regulator vacancy rates rise as construction accelerates |
| Water | Cooling feasibility fails design drought/heat case |
| Waste | Repository siting milestones continue slipping without alternative |
| Public liabilities | Guarantee exposure expands faster than project physical completion |
| Policy stability | Material legislative change proposed after irreversible commitments |
These are management indicators rather than political forecasts.
8.91 Risk ownership must be explicit
| Risk | Primary owner of mitigation |
|---|---|
| Legislative framework | Government / Parliament |
| Regulatory resources | Regulator + Government funding framework |
| Site safety | Project applicant + regulator |
| Territorial governance | Government / Regions / municipalities within statutory process |
| Construction cost | Project company / EPC / vendor according to contract |
| Financing | Sponsor + lenders + State where support is chosen |
| Fuel | Operator/vendor |
| Nuclear-grade suppliers | Vendor/integrator + suppliers |
| Workforce | Operator/vendor/regulator/research system |
| Water/climate design | Applicant + regulator/environmental authorities |
| Waste funding | Operator for new build; State legacy framework for historical liabilities |
| Repository programme | Sogin/MASE under existing architecture |
| Political-policy change | Cannot be assigned to one technical actor; managed contractually/fiscally |
| Contingent State liability | MEF/Government oversight |
Risk without an owner tends to become State risk by default.
8.92 Conditions that should prevent irreversible FOAK commitment
Before final investment decision, the following conditions need to exist simultaneously if the programme is to remain internally coherent:
- implementing legislation is operative;
- regulator has a funded staffing plan aligned to actual review workload;
- the selected technology has a credible reference regulator and stable design baseline;
- at least one site has survived initial technical screening and territorial procedure;
- water/climate feasibility is established;
- environmental process has no unresolved fatal issue;
- fuel supply is contractually credible;
- key long-lead nuclear suppliers are qualified;
- operator training programme is funded and active;
- waste and spent-fuel financing rules are established;
- financing structure identifies who bears delay and cost overrun;
- public contingent liabilities are quantified;
- State-aid path is clear where relevant;
- reference FOAK evidence has not invalidated cost/schedule assumptions.
These are programme-coherence conditions, not a recommendation for or against nuclear deployment.
8.93 Conditions that should force project re-baselining
A project should be re-estimated rather than allowed to continue on its original baseline when:
- reference vendor changes reactor design materially;
- FOAK overseas cost changes materially;
- site cooling concept changes;
- regulator requires major redesign;
- construction start shifts substantially;
- fuel strategy changes;
- localisation percentage changes materially;
- interest rate/cost of capital changes significantly;
- repository/waste assumptions change.
The new baseline should show:
- cost;
- schedule;
- State support;
- electricity price;
- public liability
again.
Without re-baselining, management can preserve an obsolete headline while the real project changes underneath it.
8.94 Conditions that should trigger consideration of project termination
No universal numerical termination threshold is defensible before project definition.
But the decision framework should explicitly contemplate termination where:
- no site remains licensable;
- fuel cannot be supplied within a credible timeframe;
- design loses regulatory viability;
- financing cannot close without support outside authorised limits;
- the project ceases to meet the national-programme purpose that justified it.
The purpose of a kill-switch is not to make cancellation easy.
It is to ensure that sunk cost does not become the sole reason for additional spending.
8.95 Italy should distinguish programme failure from first-project failure
The national programme may still have value if one FOAK candidate fails.
Examples:
Site fails → different site may remain possible.
Vendor fails → alternative reactor may remain.
Advanced fuel slips → conventional LWR-SMR pathway may remain.
Conversely, some failures affect the national architecture:
- regulator breakdown;
- no territorial siting pathway;
- financing model politically/fiscally unacceptable;
- fundamental legislative reversal.
This distinction must be maintained in Chapter 9’s decision gates.
Each individual assumption can appear reasonable:
- decrees in one year;
- site found quickly;
- foreign licence reused;
- construction in four years;
- low financing rate;
- high local content;
- repository solved by 2039.
The programme becomes unrealistic if every optimistic assumption must occur simultaneously.
Reference-class planning requires a central schedule in which some delays occur.
The earliest scenario should be treated as the successful convergence of unusually favourable conditions, not as the baseline.
8.97 The €60–67.5 million statutory envelope is programme preparation, not risk capital
As established in Chapter 1, the law’s near-term appropriations are tens of millions of euros.
The true risk capital for a FOAK is orders of magnitude larger.
Darlington’s first BWRX-300 evidence alone demonstrates billion-dollar-scale first-unit expenditure before considering a specifically Italian financing architecture.
Therefore near-term appropriations should not create the impression that the State has already solved:
- construction financing;
- risk guarantees;
- waste funds;
- grid CAPEX.
It has not.
8.98 The EU can support de-risking, but EU tools will not finance the programme automatically
The Commission announced a €200 million guarantee aimed at supporting private investment connected with SMR development.
This is useful catalytic support.
It is small relative to a national fleet.
The European Commission’s own Clean Energy Investment Strategy states that SMR financing remains challenging because of high technology and deployment risk.
Italy should therefore not treat EU policy support as a substitute for its own financing model.
8.99 A failed FOAK can still generate industrial knowledge — but that does not make the financial loss disappear
There is a legitimate industrial argument that first projects create:
- skills;
- factories;
- regulatory knowledge;
- exports.
Hinkley and Sizewell illustrate how series effects and knowledge transfer can have economic value across projects; EDF records a £1.6 billion payment linked to project expertise and series benefits in the Sizewell/Hinkley structure.
But learning benefits do not automatically justify unlimited FOAK cost escalation.
The State must value learning explicitly rather than treating every overrun as a strategic investment after the fact.
8.100 Overall assessment
Italy’s prospective nuclear programme is exposed to a chain of mutually reinforcing risks, not one decisive technical uncertainty.
The most important institutional weakness is that the programme begins while the regulatory architecture is still being built.
ISIN has an existing professional base and has rebuilt capacity materially compared with earlier years, but its own 2026 planning still foresees recruitment toward the statutory staffing ceiling and its Director has explicitly stated that new-reactor licensing requires reinforcement.
The principal siting uncertainty is equally concrete.
Italy’s only current national radioactive-waste siting process failed to generate a voluntary self-candidacy during its designated window. That does not determine reactor-siting outcomes, but it demonstrates why territorial acceptance cannot be inserted into the schedule as an assumed administrative success.
The largest financial risk is the interaction of FOAK construction and cost of capital.
Current international evidence demonstrates that delay can translate directly into billions of additional financing and completion cost. Hinkley Point C is a large-reactor case, but its 2026 cost update makes the schedule-cost mechanism unmistakable. Darlington provides the more relevant SMR evidence: the first BWRX-300 and common infrastructure already represent multibillion-dollar commitments even before an Italian localisation, financing and licensing premium is known.
The largest external-dependency risk lies not in uranium ore alone but in the narrower parts of the nuclear fuel chain.
In 2025, Russia still accounted for 22.55% of enrichment services delivered to EU utilities, while the Commission acknowledged that Western conversion and enrichment capacity remained concentrated and constrained.
For HALEU reactors the problem is more acute. The United States is using a public HALEU Availability Program because commercial-scale supply is not yet adequate, while the EU’s own work programme targets development of European HALEU capability toward the early 2030s.
The largest industrial misconception would be to equate Italy’s broad manufacturing economy with an already qualified nuclear fleet supply chain.
Italy has approximately 70 identifiable specialist nuclear companies under the TEHA/Edison/Ansaldo assessment, but the July 2026 Ansaldo–RINA programme exists specifically because a wider population of capable firms still needs nuclear certification and qualification.
The most visible environmental risk is water and climate.
The Po basin’s 2026 conditions show that a river previously used by nuclear plants can simultaneously face reduced flows, irrigation restrictions and saline intrusion. Future reactor siting must therefore be based on late-century climate resilience rather than historic water availability.
The waste risk is not that Italy lacks technical knowledge of radioactive waste.
The risk is institutional and temporal.
The National Repository still has no selected host after the self-candidacy stage produced no volunteers, while Sogin’s current completion objective is 2039 and Italy still lacks a final geological disposal solution for the most long-lived material.
Finally, political continuity cannot be treated as a constant.
Italy’s nuclear policy has already reversed materially after both the 1987 and 2011 referendums. A future programme would span several political cycles before first operation.
The resulting programme principle is therefore:
Italy’s nuclear programme does not fail when one risk appears. It fails when the State continues to treat unresolved upstream assumptions as though they were already solved and commits irreversible capital before the evidence exists.
The correct critical-path discipline is consequently not to remove uncertainty — that is impossible.
It is to ensure that:
- every major risk has an owner;
- every major assumption has evidence;
- every irreversible expenditure has prerequisite gates;
- every public guarantee has a quantified limit;
- every major schedule/cost deviation triggers re-baselining;
- sunk cost never becomes the sole argument for continuing.
If those conditions are maintained, failures can remain project-specific and recoverable.
If they are not, individually manageable problems can propagate into a national programme failure.
CHAPTER 8 — LOAD-BEARING SOURCE REGISTER
Italian legal and regulatory architecture
L1 — Senate of the Republic, DDL No. 1924. Twelve-month delegated-legislation period and broad programme perimeter covering nuclear production, fuel cycle, waste, safety governance and financial architecture.
Senate — DDL 1924 official text
L2 — Senate, final proceedings, 23 September 2026. Parliamentary debate and approved order of the day concerning ISIN independence, resources and preservation of regulatory expertise.
Senate — Final proceedings on DDL 1924
Regulatory capacity
G1 — ISIN, General Activity Plan 2026–2028. Recruitment plans toward the statutory 90-person establishment, including 60 technical resources, and continued strengthening of specialist capability.
ISIN — General Activity Plan 2026–2028
G2 — ISIN, organisational regulation 2025. Statutory establishment of 90 personnel: up to 60 technical and 30 administrative/legal resources, including management positions.
ISIN — 2025 organisational regulation
G3 — ISIN Director Francesco Campanella, Senate hearing, 1 July 2026. Existing regulator requires reinforcement for a future new-reactor licensing mandate.
ISIN — Senate hearing on regulatory capacity
Territorial and litigation risk
L3 — Constitutional Court, Judgment No. 331/2010. Regional blanket nuclear prohibitions found unconstitutional; State and regional competences differentiated between environment/waste and energy-generation matters.
Constitutional Court — Judgment 331/2010
L4 — Constitutional Court, Judgment No. 33/2011. Requirements for adequate participation of affected Regions in nuclear authorisation architecture.
Constitutional Court — Judgment 33/2011
G4 — Sogin — National Repository localisation. No self-candidacies submitted by the March 2024 deadline; process moved to SEA of the CNAI proposal.
Sogin — National Repository siting process
G5 — Emilia-Romagna Official Bulletin, December 2025. Institutional position seeking exclusion of renewed nuclear generation at the former Caorso site.
Emilia-Romagna — Caorso institutional position
G6 — Sardinia Region, 30 July 2025. Formal regional opposition to the nuclear enabling framework.
Sardinia — Nuclear delegation position
G7 — Tuscany Region, 30 July 2025. Formal negative vote and governance concerns.
Tuscany — Nuclear delegation position
G8 — Umbria Region, 29 July 2025. Negative position and announced willingness to pursue constitutional litigation.
Umbria — Nuclear delegation position
Historical policy reversal
L5 — Chamber of Deputies Research Service, 25 May 2026. Official reconstruction of the 1987 nuclear exit and 2011 referendum terminating the then-renewed nuclear programme.
Chamber of Deputies — Nuclear delegation legislative dossier
Construction cost and FOAK reference class
I1 — Ontario Power Generation, May 2025. Darlington four-unit SMR programme approximately CAD 20.9bn including interest, escalation and contingency; first unit approximately CAD 6.1bn plus CAD 1.6bn of common systems/services.
OPG — Darlington SMR cost disclosure
I2 — EDF, 2025 annual results published February 2026. Hinkley Point C schedule and cost update: £35bn in 2015 money; possible one-year delay adds approximately £1bn in 2015 money.
EDF — Hinkley Point C schedule and cost update
I3 — Georgia Power — Vogtle Units 3 and 4 project cost/schedule history. Reference evidence for US nuclear new-build construction-risk escalation.
Georgia Power — Vogtle cost and schedule update
Financing and cost of capital
S1 — International Energy Agency, 2025, The Path to a New Era for Nuclear Energy. Nuclear financing difficulties, construction risk, role of government, predictable cash flows, CfDs/PPAs/RAB and lower cost of capital through risk allocation.
IEA — Financing nuclear projects
S2 — OECD Nuclear Energy Agency, Financing, Market Design and Project Management in Nuclear New Build. Construction risk as a major driver of cost of capital; relevance to both large reactors and SMRs.
OECD-NEA — Financing and project management in nuclear new build
S3 — OECD-NEA — New Perspectives for Financing Nuclear New Build. Risk allocation, government role and cost-of-capital framework.
OECD-NEA — Financing nuclear new build and cost of capital
G9 — European Commission, March 2026 — Clean Energy Investment Strategy. SMRs identified as facing higher technology and deployment risk; EU/EIB de-risking measures.
European Commission — Clean Energy Investment Strategy
G10 — European Commission, March 2026 — nuclear investment needs. €200m guarantee mechanism for SMR-related private-investment support.
European Commission — Nuclear investment needs
European SMR industrial and dependency risks
G11 — European Commission, COM(2026)117. SMR commercial model still unproven in practice; dependence on modularity, serial production, reliable supply chains and financing.
European Commission — SMR Strategy COM(2026)117
G12 — European Commission, 10 March 2026. European supply chain, regulatory cooperation, European IP and strategic-autonomy objectives.
European Commission — EU SMR Strategy announcement
Fuel, uranium and enrichment
G13 — Euratom Supply Agency, Annual Report 2025 / Market Observatory. 2025 uranium deliveries, inventories and enrichment-service origin; EU 72.91%, Russia 22.55%, other non-EU 4.54%.
Euratom Supply Agency — 2025 nuclear fuel market data
G14 — European Commission, REPowerEU four-year assessment, April 2026. Continuing Russian nuclear fuel-cycle dependence; constrained Western conversion and enrichment capacity; new enrichment capacity expected from 2027 and conversion additions later.
European Commission — REPowerEU nuclear-fuel-cycle dependency assessment
HALEU
G15 — U.S. Department of Energy — HALEU Availability Program. Commercial HALEU supply gap identified as a potential advanced-reactor deployment constraint.
U.S. DOE — HALEU Availability Program
G16 — U.S. Department of Energy — HALEU allocation process. Federal allocation programme supporting reactor/fuel developers while domestic commercial supply is established.
U.S. DOE — HALEU allocation process
G17 — European Commission, Euratom Work Programme 2026–2027. EU research and industrial objective to support European HALEU fuel capability from the early 2030s.
European Commission — Euratom Research and Training Work Programme 2026–2027
Italian industrial and qualification capacity
I4 — Edison / Ansaldo Nucleare / TEHA. Approximately 70 specialised Italian nuclear companies; €457m nuclear-related activity and ~2,800 supported jobs in the 2022 baseline.
Edison — Italian nuclear industrial-base study
I5 — Ansaldo Energia / RINA, 27 July 2026. Structured nuclear qualification programme targeted especially at companies not yet active in nuclear but possessing transferable capabilities.
RINA — Italian nuclear supply-chain qualification programme
I6 — RINA — ISO 19443. Nuclear-specific quality-management, safety-culture, supplier-control and material-traceability requirements.
RINA — ISO 19443 nuclear quality certification
I7 — Ansaldo Nucleare, February 2026. ISO 19443 certification of Ansaldo Nucleare as evidence of the specialist nuclear quality threshold required in the sector.
Ansaldo Nucleare — ISO 19443 certification
Water and climate
G18 — Po River Basin District Authority, 25 June 2026. Reduced flows, water-use restrictions and saline intrusion during summer 2026.
Po Basin Authority — June 2026 hydrological conditions
G19 — Po River Basin District Authority, 25 June 2026 — hydrological synthesis. River flows below reference levels and Pontelagoscuro below the saline-intrusion threshold.
Po Basin Authority — Hydrological status, 25 June 2026
Waste and National Repository
G20 — Sogin — National Repository and Technology Park. No self-nominations; continued CNAI Strategic Environmental Assessment and site-selection process.
Sogin — National Repository programme
G21 — Sogin, July 2026 Senate hearing. Decommissioning progress of 47.7% and operator objective of National Repository completion by 2039.
Sogin — Senate hearing on the National Repository and nuclear programme
G22 — Sogin, August 2026. ARERA restoration of National Repository advances after requested planning documentation was completed, illustrating continuing financial/regulatory oversight of the project.
Sogin — ARERA and National Repository programme financing
END OF CHAPTER 8
CHAPTER 9 — AN INSTALLATION PLAN WITH CLOCKS, OWNERS AND KILL-SWITCHES
9.1 Executive finding
Italy does not yet possess a reactor-construction schedule. It possesses the legal beginning of a programme from which such a schedule can eventually be produced.
That distinction determines this chapter.
At the factual cut-off of 26 September 2026, DDL No. 1924 had received final parliamentary approval on 23 September but remained recorded by the Senate as “approvato definitivamente, non ancora pubblicato” — finally approved, not yet published. The statutory twelve-month period for implementing legislative decrees therefore cannot lawfully be measured from 23 September. It begins only on the date the law enters into force. [L]
For programme control, this chapter therefore defines:
T0 = date of entry into force of the sustainable-nuclear enabling law
All mandatory statutory clocks are measured from T0.
Calendar years are then shown as planning ranges on the assumption that publication and entry into force occur without a prolonged delay after the report cut-off. If T0 shifts, every T0-linked milestone moves correspondingly unless work can lawfully be carried out as preparatory administrative activity.
The principal conclusion is that the Government’s public 2033–2034 “at best” statement is not impossible as a purely boundary-case political objective, but it lies outside a prudent central programme baseline. Minister Pichetto Fratin himself qualified 2033–34 with “ben che vada” and simultaneously acknowledged that the implementing rules must still establish permitting, the control-authority model and public-transparency architecture. [M]
The three planning cases retained in this report are therefore:
| Case | FOAK commercial operation | Planning interpretation |
|---|---|---|
| Disciplined / earliest credible | 2034–2036 | Requires unusually rapid legal implementation, mature imported reference design, early acceptable site, regulator expansion, financing closure and construction without major FOAK disruption |
| Central programme case | 2037–2040 | Allows realistic time for regulatory development, technology selection, site qualification, environmental assessment, financing and reference-project learning |
| Delayed case | Beyond 2042 | Triggered by material delay in decrees, regulator capacity, siting, litigation, financing, reference technology, waste or construction |
These are programme bands, not predictions.
The central insight is that first power is not controlled principally by the advertised construction duration of the reactor. It is controlled by the entire chain:
law → regulator → technology → site → environmental assessment → safety licence → financing → supply chain → construction → commissioning → operating licence.
A four-year reactor construction promise does not produce electricity in four years if six years are required before first nuclear concrete.
The reference class illustrates this clearly. Ontario Power Generation selected the BWRX-300 for Darlington in December 2021, submitted its construction-licence application in October 2022, obtained the construction licence in April 2025, passed the first major construction hold point in March 2026, and expects grid connection by the end of 2030. Its operating-licence review alone is currently expected by CNSC staff to require approximately 35 months from the March 2026 application. [I]
Italy in late 2026 is institutionally earlier than Darlington was when OPG selected its reactor in 2021. Italy still has to complete the statutory regulatory architecture itself.
Consequently, a credible Italian FOAK operating by 2034–36 requires almost every major programme step to proceed successfully and partly in parallel.
A 2037–40 result allows more realistic time for:
- implementing decrees;
- regulator recruitment and training;
- use of foreign reference licensing;
- technology down-selection;
- national site screening;
- detailed site investigation;
- environmental and transboundary procedures;
- financing and State-aid review;
- long-lead manufacturing;
- construction;
- commissioning.
The post-2042 case becomes increasingly likely whenever one of the programme’s non-compressible gates fails, particularly:
- no technically credible host site;
- regulator not ready to accept a new-build dossier;
- technology reference remains unstable;
- financing cannot close;
- construction licence slips;
- fuel chain is unavailable;
- major litigation requires a procedure to be repeated.
The 2050 question is even more demanding.
The 2024 PNIEC modelled a conservative case of approximately 8 GW of nuclear capacity by 2050, producing approximately 11% of electricity demand, with around 1.3 GW operating in cogeneration and delivering about 16 TWh of industrial heat. Without the model’s constraint limiting deployment to half of estimated technical potential, the modelled nuclear envelope rises to approximately 16 GW and 22% of electricity demand. These remain scenarios, not procurement commitments. [G]
The arithmetic has major industrial implications.
If the first 300 MWe-class unit enters service in 2035, reaching 8 GW by 2050 would require an average addition after first power equivalent to approximately 1.8 300-MWe modules per year; reaching 16 GW would require approximately 3.6 modules per year.
If first power slips to 2039, those rates rise to approximately:
- 2.4 modules per year for 8 GW;
- 4.8 modules per year for 16 GW.
If first power is only achieved in 2043, the implied average rises to approximately:
- 3.8 modules per year for 8 GW;
- 7.6 modules per year for 16 GW.
Those numbers are not proposed deployment targets. They demonstrate a constraint:
The later the FOAK becomes, the less credible the upper PNIEC envelope becomes unless Italy establishes parallel multi-site construction, serial manufacturing and very large financing capacity.
Therefore the FOAK and fleet programmes must be governed differently.
The FOAK objective is to prove that Italy can license, finance, construct and operate one standardised reactor design.
The NOAK objective is to prove that the same design can be replicated more quickly, more cheaply and with a larger Italian/European supply chain.
The State should not contractually lock an entire 8–16 GW fleet before the FOAK has generated enough evidence to validate the assumptions that justify serial deployment.
At the same time, it cannot wait until FOAK commercial operation to begin planning the second and third units, because that would make the PNIEC scale impossible.
The required strategy is therefore conditional parallelism:
develop later units before FOAK completion, but retain legally and financially enforceable stop/go gates so that a serious FOAK problem is not replicated across the fleet.
This chapter provides that architecture, as required by the commissioning mandate.
9.2 Programme principle: the State needs one integrated master schedule
The nuclear programme should not operate as separate ministerial schedules for:
- law;
- reactor procurement;
- repository;
- grid;
- industry;
- workforce.
Those schedules are interdependent.
The Government programme therefore needs one controlled Integrated Master Schedule — IMS in which every material milestone has:
- owner;
- planned date;
- dependency;
- evidence required for completion;
- schedule float;
- consequence if missed.
The IMS should be maintained by the central programme authority but must not interfere with the independence of the nuclear-safety regulator.
Its purpose is programme coordination.
It must never be used to pressure the regulator to produce a favourable safety decision to meet a ministerial date.
9.3 Institutional owner map
The programme requires one political-administrative owner but several independent functional owners.
| Function | Principal owner | Core responsibility |
|---|---|---|
| National programme coordination | Presidency of the Council + MASE | Integrated programme, legislative coordination, strategic milestones |
| Energy policy / authorisation architecture | MASE | National Nuclear Programme, integrated permitting framework |
| Nuclear safety | ISIN or lawful successor authority | Independent licensing, inspection and enforcement |
| Public finance | MEF | Guarantees, State exposure, fiscal risk, financing structure |
| Industrial policy | MIMIT | Supply-chain qualification, industrialisation, localisation |
| Research / technology | MUR + ENEA + CIRTEN | R&D, skills, advanced-reactor programmes |
| Grid | Terna | Connection, adequacy, reinforcements, system integration |
| Legacy waste / National Repository | Sogin | Decommissioning, Repository and historic waste |
| Regions | Affected Region(s) | Constitutional cooperation and regional competences |
| Municipalities | Host / affected municipalities | Local consultation and territorial procedures |
| Project development | Future licensed operator / project company | Design, site application, finance, construction and operation |
| Environment | MASE and competent environmental authorities | SEA/EIA and environmental conditions |
| Emergency planning | Prefect + Civil Protection + territorial authorities | External emergency preparedness |
| Nuclear liability/insurance | Operator + MEF/legal authorities | Financial security and public contingent-risk assessment |
| EU/Euratom interface | Government + regulator + Permanent Representation/Commission | Euratom, State aid, transboundary and regulatory cooperation |
| Foreign-policy coordination | MAECI | Bilateral and transboundary state relations |
No single body should simultaneously be:
- project promoter;
- nuclear safety regulator;
- environmental decision-maker;
- financier.
9.4 Programme Management Office
A central Nuclear Programme Office can coordinate implementation without becoming a safety regulator.
Its minimum functions should include:
- master schedule;
- risk register;
- inter-ministerial coordination;
- data standards;
- cost baseline;
- site-survey coordination;
- industrial database;
- skills plan;
- EU funding interface;
- public reporting.
The office should publish an annual programme baseline showing:
- current schedule;
- changes from prior year;
- major risks;
- committed public expenditure;
- contingent liabilities;
- physical progress.
The safety regulator’s findings should be incorporated as independent inputs, not edited into programme targets.
9.5 T0 is legally more important than the 23 September 2026 vote
At the cut-off, the Senate still records DDL 1924 as approved but not yet published. [L]
Therefore the first official nuclear-programme dashboard should show separately:
| Milestone | Status at 26 Sep 2026 |
|---|---|
| Parliament approves enabling legislation | Complete |
| Promulgation | Not confirmed in controlling cut-off source |
| Publication | Not confirmed |
| Entry into force | Not yet established for this report |
| T0 | Pending |
| T0+12m statutory decree deadline | Cannot yet be given an exact calendar date |
This protects the programme from creating a false statutory countdown.
9.6 Work can nevertheless begin before T0
The absence of T0 does not require Government to remain idle.
Preparatory work can include:
- drafting;
- data gathering;
- regulator workforce planning;
- international regulatory engagement;
- supply-chain mapping;
- site-screen methodology;
- Terna studies;
- skills planning;
- financing analysis.
The legal distinction is that such preparatory activity does not replace the delegated acts that require the law to enter into force.
This creates an opportunity to reduce later schedule pressure without misrepresenting the legal status.
9.7 Phase 0 — September 2026 to T0: mobilisation
Owner: Presidency / MASE.
Outputs
- establish programme governance;
- create controlled baseline database;
- freeze factual assumptions used in this report;
- prepare decree workstreams;
- define ISIN resource-gap assessment;
- initiate regulator-to-regulator cooperation;
- establish national site-survey methodology;
- issue non-binding technology information request;
- begin MEF financing-option analysis;
- begin updated waste-capacity forecast.
Gate 0 — legal activation
GO: law published and enters into force.
NO-GO for statutory implementation: T0 not reached.
Preparatory studies may continue.
No reactor should be represented as formally selected during this stage.
9.8 Phase 1 — T0 to T0+3 months: architecture freeze
The first three months should establish the structure that prevents later programmes from diverging.
MASE / Presidency
Produce:
- consolidated decree plan;
- statutory responsibility matrix;
- public programme schedule.
ISIN / future regulator
Produce:
- workload estimate;
- staff requirement by discipline;
- recruitment/training plan;
- foreign-regulator cooperation strategy.
The ISIN 2026–2028 plan confirms a statutory establishment of 90 staff, divided broadly between 60 technical and 30 administrative/legal personnel, and identifies additional recruitment needed to reach it. [G]
Its Director stated in July 2026 that the existing regulator should be strengthened for any expanded new-build licensing mandate. [G]
MIMIT
Produce:
- controlled supplier census;
- active certifications;
- qualification-gap map.
Terna
Produce:
- nuclear grid-integration assumptions;
- candidate transmission-node criteria.
Sogin
Produce:
- updated National Repository schedule;
- incremental new-build waste-capacity methodology.
9.9 Gate 1 — institutional readiness
Before substantive project procurement begins, the Government must be able to answer:
- who licenses;
- who authorises;
- who regulates safety;
- who coordinates environmental review;
- who owns commercial development;
- who pays.
GO: responsibilities are legally unambiguous.
HOLD: responsibility remains split or contradictory.
KILL/REDESIGN: proposed architecture conflicts materially with regulator independence or constitutional requirements.
9.10 Phase 2 — T0+3 to T0+6 months: parallel legal, site and technology work
Three activities should now proceed in parallel.
Legal track
- draft implementing decrees;
- Unified Conference negotiation;
- Council of State preparation;
- parliamentary-interface planning.
Technology track
Reduce the broad global market to approximately:
- 2–3 near-term water-cooled candidates;
- 1 advanced-reactor strategic track.
Site track
Apply national desktop criteria to:
- former nuclear sites;
- unfinished nuclear site;
- post-thermal brownfields;
- other qualifying industrial areas.
No site receives preferred status yet.
9.11 Technology Request for Information
The RFI should require vendors to provide one standard dataset.
Minimum fields:
- design status;
- reference regulator;
- active FOAK;
- output;
- fuel;
- enrichment;
- construction programme;
- overnight cost;
- all-in cost;
- Italian content potential;
- fuel contract options;
- waste volumes;
- cooling requirements;
- source term;
- dry-cooling capability;
- operator-training model;
- digital sovereignty terms;
- licence/IP restrictions.
This prevents vendor submissions from being compared on non-equivalent assumptions.
9.12 Phase 3 — T0+6 to T0+12 months: statutory package
The enabling act gives Government twelve months from entry into force for the delegated legislation. [L]
The programme schedule should therefore plan completion before the statutory end rather than use T0+12 as the drafting target.
The package should cover at minimum:
- National Nuclear Programme;
- licensing architecture;
- regulator structure;
- siting;
- territorial cooperation;
- environmental integration;
- waste;
- fuel cycle;
- decommissioning;
- operator guarantees;
- support mechanisms;
- public consultation.
9.13 Gate 2 — usable law, not merely published decrees
A formal publication date is insufficient.
The test is whether a developer can answer:
- What application must be submitted?
- To whom?
- Under which technical standards?
- In what sequence?
- With which environmental procedure?
- With what site evidence?
- With what financial guarantees?
- With what rights of appeal?
GO: answers are sufficiently complete to permit a bankable development programme.
HOLD: material rules remain undefined.
REDESIGN: decrees generate inconsistent or overlapping authorisation systems.
9.14 Phase 4 — T0+9 to T0+18 months: regulator implementation
Even where legislation is complete, the regulator still needs operational procedures.
Deliverables include:
- new-build licensing guide;
- pre-application process;
- design-review process;
- site-review process;
- construction-inspection plan;
- foreign-regulator reliance policy;
- nuclear cyber framework;
- severe-accident/source-term expectations;
- waste-interface criteria.
KPI set
| KPI | Auditable evidence |
|---|---|
| Technical authorised posts filled | HR records |
| New-build specialist disciplines covered | Workforce matrix |
| External technical-support contracts established | Contract register |
| Foreign regulator MoUs / working arrangements | Signed instruments |
| Licensing guides published | Regulator website |
| Review training complete | Training records |
| Application backlog | Regulator reporting |
9.15 Regulator gate
GO: regulator certifies that it can accept the defined pre-application/licensing workload without compromising existing safety functions.
HOLD: specialist gaps remain material.
No ministerial schedule should override this gate.
9.16 Phase 5 — 2027–2028 equivalent: technology pre-qualification
Assuming T0 occurs without material delay, this stage falls broadly in 2027–28.
The technology screen should now classify vendors into:
- deployment candidate;
- reserve candidate;
- strategic R&D track.
Minimum near-term candidate condition
The reactor must have:
- identifiable reference regulator;
- stable design baseline;
- credible fuel path;
- active deployment programme;
- data sufficient for site envelope;
- vendor willing to engage with Italian regulator;
- credible Italian/European supply-chain strategy.
A vendor concept without these attributes remains research/strategic technology rather than FOAK procurement candidate.
9.17 Gate 3 — technology down-select
A full Italian review should not proceed with five or ten reactor technologies.
By this gate the programme should retain approximately:
- one lead reference design;
- one viable fallback/reference competitor;
- one separate advanced-reactor R&D track where desired.
This is not a political ranking of technologies.
It is a regulatory workload requirement.
HOLD conditions
- design is still changing materially;
- fuel chain undefined;
- reference project experiences a major unresolved safety issue;
- vendor refuses adequate information transfer.
9.18 Foreign FOAK evidence must remain a live input
Technology selection should not be a one-time 2028 decision that becomes immune to later evidence.
The programme should monitor continuously:
- Darlington BWRX-300;
- Palisades SMR-300 if licensed;
- Wylfa Rolls-Royce;
- NUWARD development;
- AP300 review;
- Xe-100;
- Natrium;
- lead-reactor demonstrators.
The European Commission’s 2026 SMR strategy explicitly aims for first European deployment in the early 2030s and promotes fleet deployment, regulatory cooperation and common industrial standards. [G]
Italy’s later entry creates an informational advantage if it uses this evidence rather than committing too early.
9.19 Phase 6 — national site survey
The national site survey should now move from Chapter 3’s desktop screen into formal technical screening.
Owner
MASE programme office with:
- regulator technical criteria;
- ISPRA/INGV/basin data;
- Terna;
- Regions/local authorities;
- proponent input.
Initial objective
Reduce the national inventory to approximately:
- 3–5 technically credible areas;
- at least one reserve area independent of the lead site.
9.20 Site-survey KPI set
| KPI | Evidence |
|---|---|
| Candidate areas screened under identical criteria | National site database |
| Seismic desk screen complete | INGV/regulator dataset |
| Hydro/flood screen complete | Basin/ISPRA evidence |
| Cooling feasibility | Water balance |
| Grid capacity assessment | Terna study |
| Logistics route | Heavy-haul study |
| Protected-land constraints | GIS/environment file |
| Population/emergency screen | Territorial study |
| Current land rights/redevelopment conflicts | Legal due diligence |
| Regional/municipal position | Formal institutional record |
9.21 Phase 7 — T0+18 to T0+36 months: candidate site investigations
At this stage physical investigation begins.
It should include:
- boreholes;
- geophysics;
- groundwater monitoring;
- hydrology;
- meteorology;
- marine studies where coastal;
- capable-fault analysis;
- detailed grid connection;
- transport survey.
No candidate should receive final preferred-site status solely from the desktop ranking.
9.22 Gate 4 — site survivability
A candidate site can proceed only where there is no unresolved fatal issue in:
- seismicity;
- flooding;
- water;
- population/emergency planning;
- protected-land constraints;
- grid;
- legal control.
GO: at least one site survives and one credible backup remains.
HOLD: only one site survives but critical studies remain incomplete.
STOP/RESET: no candidate survives.
If Gate 4 fails, the programme returns to national site screening rather than weakening technical criteria.
9.23 Territorial consent and consultation track
The territorial process should begin before preferred-site announcement.
Activities include:
- regional institutional engagement;
- municipal consultation;
- publication of screening methodology;
- explanation of compensation principles;
- local infrastructure analysis.
The purpose is not to predetermine support.
It is to ensure that consultation occurs while alternatives remain real.
9.24 Phase 8 — 2028–2030 equivalent: detailed site–technology pairing
The lead reactor and candidate site now need to be engineered together.
This is the point at which generic technology becomes an Italian project.
Studies include:
- reactor siting envelope;
- foundation concept;
- seismic input;
- cooling system;
- ultimate heat sink;
- emergency-planning source term;
- grid interface;
- waste stores;
- security perimeter.
A technology that works generically may fail on one site.
A site suitable for one reactor may be unsuitable for another.
9.25 Project-development company
By the detailed site–technology phase, Italy requires a legally defined project developer/operator.
The operator’s ownership structure is not established by the enabling legislation.
It could in principle involve:
- existing utility;
- consortium;
- project company;
- mixed private/public capital.
This report does not select a corporate model.
Whatever model is chosen must possess enough capital and technical capability to become the legally responsible nuclear licence holder.
9.26 Operator capability gate
Before a construction application is accepted, the applicant must demonstrate that it is more than a financing SPV.
It requires:
- nuclear management system;
- safety culture;
- technical organisation;
- design authority interface;
- operator-training programme;
- emergency organisation;
- waste/decommissioning responsibilities.
A shell company supported entirely by contractors cannot substitute for the responsible nuclear operator required over decades.
9.27 Phase 9 — strategic environmental assessment / programme environmental work
Where legally applicable to the National Nuclear Programme, strategic environmental assessment should be completed early enough that later site decisions remain consistent with the evaluated national alternatives.
It should analyse:
- nuclear pathway;
- capacity envelope;
- site families;
- reasonable non-nuclear alternatives;
- cumulative effects;
- waste;
- grid;
- water.
The SEA cannot be allowed to become a late procedural correction after procurement has effectively fixed the outcome.
9.28 Phase 10 — project EIA and transboundary procedures
The project-specific EIA begins once sufficient design and site detail exists.
It must cover, among other things:
- construction;
- cooling;
- marine/freshwater impact;
- radiological discharges;
- biodiversity;
- traffic;
- waste;
- accident/environment interfaces.
Where significant transboundary effects are possible, Espoo/EIA procedures should begin early.
Euratom Article 37 should similarly be scheduled rather than treated as a post-authorisation formality.
9.29 Environmental gate
GO: environmental case provides an implementable set of conditions compatible with project design.
HOLD: additional data/seasonal studies required.
STOP/REDESIGN: environmental conditions eliminate the selected cooling/site concept.
The project then either:
- changes cooling design;
- changes layout;
- or returns to backup site.
9.30 Phase 11 — financial architecture
The commercial structure must develop in parallel with licensing, but final risk allocation should not be signed before design/site risk is sufficiently mature.
MEF-led questions
- Who bears construction overrun?
- Who bears delay?
- Who bears market-price risk?
- Who finances construction?
- What State support, if any, is provided?
- Who bears political-closure risk?
- How are waste/decommissioning funds ring-fenced?
- What contingent liability appears on the public risk register?
The European Commission’s March 2026 Clean Energy Investment Strategy explicitly recognises higher technology and deployment risks for SMRs and the need for de-risking, while emphasising mobilisation of private capital rather than treating public funding as the sole source. [G]
9.31 The State must separate sovereign functions from project investment
Several programme functions are intrinsically public.
Sovereign/public functions
Public financing is appropriate for:
- regulator;
- legislation;
- national site survey;
- public nuclear-safety infrastructure;
- emergency planning;
- international/Euratom functions;
- legacy radioactive waste;
- baseline research;
- public skills capacity.
These functions exist because the State regulates nuclear activity.
Project-specific functions
The project company/operator should ordinarily carry the commercial cost of:
- reactor procurement;
- detailed site development;
- project licensing dossier;
- construction;
- project engineering;
- operating workforce;
- fuel contracts;
- physical security;
- insurance;
- new-build waste;
- decommissioning fund.
A policy decision may transfer some commercial risk to the State or consumers.
Where that occurs, the transfer must be explicit.
Some expenditures require case-specific allocation.
Examples:
- transmission reinforcement;
- port upgrades;
- roads;
- water infrastructure;
- workforce academies;
- FOAK industrial qualification.
The programme should distinguish:
general public infrastructure
from
assets whose principal beneficiary is the nuclear project.
Otherwise project CAPEX may be understated by transferring necessary infrastructure to unrelated public budgets.
9.33 Financing gate before FID
Final Investment Decision should not occur until:
- project cost has a defined scope;
- financing committed;
- State-support mechanism approved;
- State-aid route complete or sufficiently certain;
- risk-allocation contracts executed;
- contingency funded;
- decommissioning/waste funding framework operative.
NO-GO: project depends on an undefined future bailout or guarantee.
9.34 CAPEX reporting requires a standard dictionary
Nuclear cost figures are frequently incomparable.
The programme should publish separately:
- overnight EPC cost;
- owner’s cost;
- site work;
- grid;
- development;
- licensing;
- financing during construction;
- escalation;
- contingency;
- fuel;
- initial spares;
- shared multi-unit infrastructure.
The commissioning brief notes that FOAK 300-MWe-class SMRs are often discussed in a broad $1.2–3+ billion range, but that cannot be treated as an Italian all-in budget without scope definition.
The most relevant current real-project comparator is Darlington.
OPG reports:
- CAD 6.1 billion for the first SMR;
- CAD 1.6 billion for systems/services common to the planned four units;
- approximately CAD 20.9 billion for the four-unit programme,
including interest, escalation and contingency. [I]
These are not directly comparable with vendor overnight-cost claims.
That is precisely why Italy requires a controlled cost dictionary.
9.35 Cost baseline gate
A FOAK should receive an official Baseline Cost 1.0 only when:
- technology selected;
- site selected;
- major engineering completed;
- licensing strategy fixed;
- financing assumptions defined.
Before that point, figures should be labelled:
planning estimates
not
project budgets.
9.36 Mandatory re-baselining
A project must be re-baselined if there is a material change in:
- reactor design;
- site;
- cooling;
- licensing requirements;
- financing rate;
- construction schedule;
- fuel system;
- localisation scope.
The report should show both:
old baseline
and
new baseline
so that scope change is not mistaken for ordinary cost escalation.
9.37 Phase 12 — State-aid process
Where the commercial package constitutes State aid, European Commission engagement should begin during financing design.
Late notification risks forcing redesign after commercial terms have already been negotiated.
Potential instruments might include:
- CfD;
- regulated revenue;
- guarantees;
- loans;
- equity.
This chapter does not select among them.
The implementation requirement is simply:
no irreversible financing assumption should depend on unapproved public support.
9.38 Phase 13 — supply-chain qualification
The industrial programme should become reactor-specific once the lead design is stable.
MIMIT / vendor / integrator
Map work packages into:
- already qualified Italian supplier;
- supplier requiring project approval;
- supplier requiring full nuclear conversion;
- imported proprietary component.
KPI
Percentage of safety-class procurement value covered by:
- approved supplier;
- supplier under qualification;
- no credible supplier.
This is more useful than a generic “number of companies.”
9.39 Long-lead items
The lead design should identify components whose manufacturing duration can control the schedule.
Possible examples:
- reactor pressure vessel;
- major forgings;
- steam generators;
- containment modules;
- large transformers;
- safety I&C.
Long-lead orders create a financing dilemma.
Order too late and construction waits.
Order before licence/FID and the State/project risks stranded components.
The procurement structure should therefore use conditional orders where commercially feasible.
9.40 Long-lead gate
GO: design reference sufficiently stable, vendor liability clear, project finance supports order.
HOLD: component would become unusable after likely design change.
STOP: order depends solely on political desire to preserve a headline date.
9.41 Phase 14 — workforce academy
The workforce programme must operate years before the reactor.
Regulatory stream
ISIN/future authority.
Operator stream
Future licensed operator.
Industrial stream
MIMIT/vendor/suppliers.
Academic stream
MUR, ENEA, CIRTEN, universities.
Emergency stream
Civil Protection, Prefectures, health system.
9.42 Workforce KPIs
| KPI | Target logic |
|---|---|
| Regulator specialist vacancies | Declining toward workload-defined staffing |
| Nuclear engineering MSc/PhD output | Sufficient for replacement and growth |
| Operator trainees | Cohort established years before fuel load |
| Certified welders/NDE personnel | Matched to construction schedule |
| Nuclear QA specialists | Supplier qualification demand covered |
| Simulator availability | Before operator licensing training |
| Emergency personnel exercises | Before fuel loading |
Raw employment claims are insufficient.
The relevant measure is competence in scarce safety-critical disciplines.
Construction should not begin because the programme calendar reaches a predetermined year.
It begins only after the legal and technical gates are passed.
Minimum conditions
- construction licence/authorisation;
- finalised site;
- accepted safety case;
- environmental approvals;
- financing;
- operator organisation;
- security design;
- supply chain;
- fuel strategy;
- waste/decommissioning funding.
9.44 Gate 5 — first nuclear concrete
This is one of the most important kill-switches in the programme.
Before first nuclear concrete:
GO only if
- regulator has authorised construction;
- financing is fully committed;
- reference design frozen sufficiently for construction;
- critical supply chain is qualified;
- unresolved litigation does not threaten the legal basis;
- cooling/grid solution is final;
- public contingent liability is approved.
Once first nuclear concrete occurs, sunk expenditure accelerates sharply.
Therefore this gate should require a formal cross-government investment decision separate from earlier political approval of the nuclear programme itself.
9.45 Disciplined case — illustrative calendar
The following calendar assumes early T0 and unusually successful execution.
| Period | Milestone |
|---|---|
| Late 2026 / early 2027 | T0; programme office fully mobilised |
| 2027 | Implementing decrees, regulator expansion, site survey, technology RFI |
| 2028 | Operational licensing framework; 2–3 design shortlist; 3–5 site areas |
| 2028–29 | Detailed site studies; reference-regulator work; financing design |
| 2029 | Lead design + lead/backup site selected for full development |
| 2029–30 | Detailed safety/environment/licensing applications |
| 2030–31 | Major licensing decisions; financial close/FID |
| 2031 | First nuclear concrete at earliest |
| 2031–34/35 | Construction |
| 2034–35 | Commissioning/fuel-loading sequence |
| 2034–36 | FOAK commercial operation band |
| 2033 onward | NOAK preparation proceeds conditionally |
| 2036–38 | First replicated units if FOAK indicators acceptable |
This schedule is aggressive.
It requires use of a mature foreign reference design rather than an Italian-led Gen-IV technology still requiring demonstration.
9.46 What must be true for a 2034 first-power boundary case
A 2034 outcome requires an exceptionally compressed sequence.
At minimum:
- T0 occurs without substantial delay;
- decrees usable by 2027;
- regulator capable of substantive review by 2028;
- chosen design already substantially licensed abroad;
- candidate site does not require years of unresolved political negotiation;
- environmental studies begin before technology selection is fully complete using a robust plant parameter envelope;
- construction authorisation no later than approximately 2030;
- first nuclear concrete around 2030–31;
- construction roughly four years;
- commissioning succeeds without major redesign.
Darlington demonstrates how demanding this is even in a jurisdiction with an operating nuclear regulator, experienced utility, existing nuclear site and prior environmental approval. Its technology was selected in 2021, construction licence obtained in 2025 and grid connection is targeted for 2030. [I]
Italy lacks several of those starting advantages.
Therefore 2034 is a boundary condition, not the base schedule.
9.47 What must be true for two units before or around 2035
Two Italian commercial units by roughly 2035 would require more than a successful single FOAK.
It would likely require:
- common design;
- common site or second highly advanced site;
- overlapping construction;
- supplier production for Unit 2 before Unit 1 has completed operation;
- financing for both units before full FOAK operational evidence exists.
That is a materially larger risk commitment.
The programme should therefore distinguish:
two units under construction
from
two units commercially operating.
The former is materially more feasible than the latter within a 2035 horizon.
9.48 Central case — illustrative calendar
The central case allows more time for institutional maturation and international reference evidence.
| Period | Milestone |
|---|---|
| 2026–27 | Legal entry into force and mobilisation |
| 2027–28 | Decrees and regulator implementation |
| 2028–29 | Technology shortlist and national site survey |
| 2029–31 | Site investigations and design/site down-select |
| 2030–32 | Environmental + safety applications |
| 2031–33 | Licensing review, State aid, financing |
| 2033–34 | FID / construction authorisation |
| 2034–38/39 | Construction |
| 2038–40 | Commissioning and commercial operation |
| 2037–40 | Central FOAK commercial-operation band |
| 2035 onward | Conditional NOAK site/licensing development |
| 2039 onward | Fleet replication based on FOAK evidence |
This case allows Italy to benefit from operating or late-construction evidence from several international SMR programmes.
9.49 Why 2037–40 is structurally more robust
By that period Italy could reasonably expect substantially more evidence on:
- BWRX-300 construction/operation;
- Wylfa/UK deployment;
- Holtec programme;
- AP300;
- NUWARD;
- Xe-100;
- Natrium.
The EU strategy itself targets first European SMR projects in the early 2030s rather than assuming commercial fleet maturity today. [G]
A central Italian schedule several years later can therefore use actual foreign fleet learning.
9.50 Delayed case — illustrative calendar
The delayed case is not a single failure.
It is the result of one or more critical gates slipping materially.
| Period | Possible condition |
|---|---|
| 2027–29 | Decree/regulator architecture delayed or repeatedly amended |
| 2028–32 | Site process fails or restarts |
| 2030–33 | Technology design/reference project changes materially |
| 2031–35 | Litigation/environmental review extends |
| 2033–36 | Financing remains unresolved |
| 2036–42 | Construction |
| Post-2042 | Commercial operation |
This scenario should be activated in planning whenever the project loses several years before FID.
The programme must not preserve a 2035 public date by progressively deleting contingency from later activities.
9.51 Scenario trigger rules
| Trigger | Effect |
|---|---|
| Decrees materially unusable by T0+18m | Earliest case removed |
| Regulator cannot accept full review by ~2028/29 | Earliest case removed |
| No credible site by ~2029 | Earliest case removed |
| No construction decision by ~2031 | 2034 boundary case removed |
| No FID by ~2034 | Central lower bound under pressure |
| No first concrete by ~2036 | Commercial operation likely shifts toward/post-2042 depending design |
| Major redesign after first concrete | Full re-baseline required |
Dates are planning thresholds, not statutory limits.
9.52 Construction phase
Once first nuclear concrete occurs, programme management changes from policy development to megaproject execution.
Key workstreams:
- reactor civil structures;
- conventional island;
- cooling;
- grid;
- safety systems;
- digital I&C;
- security;
- module manufacturing;
- site installation;
- quality documentation.
9.53 Construction KPIs
Court-of-Auditors-grade KPIs should include:
| KPI | Interpretation |
|---|---|
| Physical completion % | Real construction progress |
| Committed cost / approved budget | Cost exposure |
| Forecast final cost | Current full-project estimate |
| Contingency consumed | Remaining cost resilience |
| Critical-path float | Schedule resilience |
| Long-lead packages delivered on time | Supply-chain execution |
| Nuclear weld rejection/rework rate | Quality |
| Open significant NCRs | Manufacturing/construction control |
| Regulatory hold points passed | Licensing execution |
| Workforce productivity | Construction performance |
| Safety incidents | Construction safety |
| Local-content realised | Industrial-policy delivery |
Headline “percentage complete” should never be reported without cost and schedule context.
9.54 Cost kill-switch
A cost increase should force a formal re-approval where the revised forecast:
- exceeds the approved financing envelope;
- materially increases State support;
- materially changes the expected electricity-support mechanism.
The gate does not predetermine cancellation.
It forces a new decision on the new project, rather than allowing approval of the old project to authorise unlimited escalation.
9.55 Schedule kill-switch
Likewise, a schedule shift that:
- materially changes financing cost;
- causes fuel-contract expiry/restructuring;
- moves the project outside approved State-aid terms;
- destroys fleet-replication assumptions
requires re-baselining.
A project cannot remain “on budget” if the budget definition excludes the financing cost of delay.
9.56 Regulatory hold points
The Darlington project demonstrates an effective model.
Its construction licence contains explicit regulatory hold points that must be cleared before certain work may continue. CNSC removed the first such hold point in March 2026 after verifying prerequisites for the reactor-building foundation. [I]
Italy’s future regulator should similarly retain explicit stop authority at defined stages.
Potential Italian hold points could include:
- safety-critical foundation;
- reactor-vessel installation;
- primary-system closure;
- fuel-load readiness;
- initial criticality.
These must be regulator-controlled.
9.57 Phase 16 — operating-licence application should overlap construction
Darlington again provides relevant evidence.
OPG submitted its operating-licence application in March 2026 while construction was already under way, and the regulator anticipates a review lasting around 35 months. [I]
Italy should similarly avoid waiting until construction completion to begin the operating-licence process.
The operating case should mature alongside physical construction.
9.58 Phase 17 — fuel procurement
Fuel procurement begins well before fuel load.
For conventional LEU designs, the operator must secure:
- uranium;
- conversion;
- enrichment;
- fabrication;
- transport.
For HALEU/MOX designs, the schedule risk is much greater.
Fuel must therefore have its own critical path.
9.59 Fuel gate
At a defined point before commissioning, the operator must demonstrate:
- qualified fuel design;
- regulator-approved fuel basis;
- manufacturing slot;
- enrichment contract;
- transport licence path;
- contingency inventory.
NO-GO for fuel-load schedule: critical fuel supply remains conditional.
A physically complete reactor without fuel is not operational capacity.
9.60 Phase 18 — commissioning
Commissioning should be divided into clearly auditable stages:
- construction completion;
- component testing;
- integrated systems testing;
- hot functional testing where applicable;
- fuel load authorisation;
- initial criticality;
- low-power physics tests;
- power ascension;
- grid synchronisation;
- reliability demonstration;
- commercial operation.
“Construction complete” is not “commercial reactor operating.”
9.61 Gate 6 — fuel loading
Before fuel loading:
- operating licence/authorisation requirements satisfied;
- emergency plan approved;
- security fully operational;
- operator staff licensed/qualified;
- waste routes available;
- insurance/liability financial security effective;
- commissioning programme approved.
Fuel loading is a critical irreversible transition because the installation becomes an operating nuclear reactor rather than a nuclear construction site.
9.62 Gate 7 — commercial operation
Commercial operation requires more than grid connection.
Completion criteria should include:
- regulator approval;
- power-ascension test completion;
- unresolved safety findings within accepted status;
- grid compliance;
- commercial handover;
- operator organisation functioning independently.
The programme should publish the difference between:
first criticality
first electricity
and
commercial operation.
9.63 FOAK post-operation evidence period
The programme should not declare FOAK success on the day of first power.
The first unit needs a monitored early-operation period covering:
- availability;
- forced outages;
- maintenance;
- fuel performance;
- staffing;
- grid behaviour;
- operating costs.
The exact duration depends on replication schedule, but at least the first operating cycle provides uniquely valuable evidence.
9.64 NOAK development must begin before FOAK completion
Waiting until FOAK has operated for a full cycle before beginning later units would make an 8 GW 2050 pathway difficult.
Therefore later units should progress conditionally in parallel.
Possible pre-FOAK activities include:
- site studies;
- environmental assessments;
- land agreements;
- grid studies;
- supplier reservations;
- non-nuclear civil preparation where legally appropriate.
Irreversible commitments remain subject to FOAK performance gates.
9.65 Gate 8 — NOAK replication
A later unit should receive full replication approval only if evidence shows acceptable performance across:
- FOAK construction cost;
- FOAK schedule;
- reference design stability;
- supply chain;
- regulator experience;
- operating evidence where available.
GO
FOAK evidence supports the serial-production assumptions.
HOLD
FOAK exhibits material but correctable deviations.
REDESIGN
Systemic design/supply-chain issue makes replication inappropriate without modification.
9.66 Fleet standardisation
The economic argument for SMRs becomes stronger if Italy can repeat the same design.
Standardisation reduces:
- licensing repetition;
- operator training diversity;
- spares;
- fuel complexity;
- waste-package diversity.
Therefore the fleet plan should avoid unnecessary technology fragmentation.
This does not require committing the whole fleet to one supplier before evidence exists.
It means that every deviation from a standard design should have an explicit benefit sufficient to justify the extra complexity.
9.67 Possible fleet architecture
A national fleet can be organised through combinations such as:
- multi-module sites;
- repeated two-unit sites;
- industrial cogeneration sites;
- a limited number of geographically diverse hubs.
The optimal configuration will depend on:
- grid;
- water;
- security;
- site availability;
- module power;
- industrial heat.
The political shorthand of “20 SMRs” does not specify any of these variables and should not be treated as a procurement plan.
9.68 PNIEC 8 GW envelope translated into unit counts
For illustrative purposes only:
| Module size | Approx. units for 8 GW |
|---|---|
| 200 MWe | 40 |
| 300 MWe | 27 |
| 400 MWe | 20 |
| 470 MWe | 17 |
The PNIEC 8 GW case is therefore a fleet-scale industrial programme, not an extension of one FOAK project.
9.69 Full 16 GW technical-potential envelope
| Module size | Approx. units for 16 GW |
|---|---|
| 200 MWe | 80 |
| 300 MWe | 53–54 |
| 400 MWe | 40 |
| 470 MWe | 34 |
This shows why the 16 GW case cannot be discussed without:
- multiple sites;
- serial factories;
- operator scale;
- fuel contracts;
- large financing capacity.
It is a system scenario, not a plausible single procurement decision in the late 2020s.
9.70 Rate required to reach 8 GW by 2050
Using 300 MWe modules solely as a common reference:
| FOAK commercial year | Years to 2050 | Average 300 MWe-class additions needed for 8 GW |
|---|---|---|
| 2035 | ~15 | ~1.8 modules/year |
| 2039 | ~11 | ~2.4 modules/year |
| 2043 | ~7 | ~3.8 modules/year |
The arithmetic becomes more demanding after accounting for the fact that the first unit itself consumes part of this period.
9.71 Rate required for 16 GW
| FOAK commercial year | Average 300 MWe-class additions needed for 16 GW |
|---|---|
| 2035 | ~3.6 modules/year |
| 2039 | ~4.8 modules/year |
| 2043 | ~7.6 modules/year |
Again, this is mathematical illustration, not a proposed build rate.
The conclusion is operational:
A late FOAK and the 16 GW envelope cannot both be maintained without an extremely large parallel fleet-build system.
9.72 PNIEC numbers must remain scenario envelopes
The 2024 PNIEC itself states that the nuclear scenario does not alter the 2030 assumptions and is intended to explore a potential contribution to Net Zero by 2050. [G]
Accordingly, Chapter 9 should not convert:
8 GW modelled scenario
into:
8 GW State commitment.
Nor should 16 GW be represented as an adopted target.
The programme should update these envelopes after:
- actual design cost;
- electricity demand;
- renewable/storage cost;
- first site;
- FOAK results.
9.73 Capacity gate after FOAK
Before Government converts the initial programme into a fleet-scale procurement, the national model should be rerun using:
- actual FOAK cost;
- actual financing rate;
- actual availability;
- current renewables/storage costs;
- demand forecast;
- grid requirements;
- waste cost.
If the underlying economic comparison has materially changed, fleet scale should be re-examined.
9.74 National Repository dependency
The new-build project and Repository are legally distinct.
They are nevertheless programme-linked.
Sogin reports legacy decommissioning at 47.7% completion at end-2025. [G]
The Repository process therefore continues while new build is contemplated.
The FOAK schedule should include a dedicated waste interface specifying:
- existing repository schedule;
- interim-storage fallback;
- new-build waste capacity;
- geological-disposal funding.
9.75 Repository gate
Before FOAK FID, the State does not necessarily need an operating National Repository.
It does need a credible, funded and legally structured pathway.
GO: repository programme has a defined site/process trajectory and the new reactor has sufficient independent interim storage.
HOLD: national repository schedule uncertain but interim arrangements remain technically adequate.
STOP/REDESIGN: no credible lawful destination exists for waste categories generated by the selected technology.
9.76 New-build waste fund
Before construction, the operator’s financial guarantee should specify how it will finance:
- operational LLW/ILW;
- spent fuel;
- dry storage;
- repository charges;
- geological disposal;
- decommissioning.
The State should not wait until commercial operation to begin collecting lifecycle funding.
9.77 Grid-development integration
Terna should incorporate the actual nuclear project into:
- development plan;
- adequacy models;
- connection strategy.
The 2025 adequacy study demonstrates that the Italian system can become severely inadequate if large volumes of programmable thermal capacity retire without adequate replacement; it also explicitly models climate sensitivity. [G]
A nuclear unit should therefore be evaluated as part of the national adequacy portfolio rather than solely as generation CAPEX.
9.78 Grid gate
Before FID:
- connection point identified;
- required network reinforcement costed;
- construction schedule aligned;
- responsible payer identified.
A reactor ready before its transmission reinforcement provides no usable national capacity.
9.79 Emergency-planning schedule
External emergency planning should begin during detailed design.
Indicative sequence:
- preliminary source-term envelope;
- territorial planning basis;
- institutional mapping;
- detailed source term;
- final external plan;
- exercises;
- fuel-load readiness.
This prevents the emergency plan becoming a commissioning afterthought.
9.80 Security schedule
Physical and cyber security should be embedded throughout:
Design
- security-by-design;
- digital architecture.
Procurement
- supply-chain cybersecurity;
- controlled components.
Construction
- access control;
- temporary workforce vetting;
- configuration protection.
Commissioning
- operational security posture.
Security completion becomes a fuel-load prerequisite.
9.81 Skills clock
Workforce development should begin at least one full university/training cycle before major construction.
The programme should use a ten-year rolling workforce model.
Required annual projections:
- regulator;
- operator;
- construction;
- manufacturing;
- waste;
- emergency response.
The model must include retirements, not only new demand.
9.82 Court-of-Auditors annual scorecard
A national audit should be able to review one page containing:
| Area | KPI |
|---|---|
| Law | % mandatory implementing acts completed |
| Regulator | Technical staffing vs workload requirement |
| Technology | Design maturity/reference project status |
| Site | Investigations completed / fatal issues open |
| Environment | Authorisation milestones on schedule |
| Finance | Forecast cost / approved budget |
| Public risk | Guarantees / contingent liabilities |
| Supply chain | Qualified safety-class packages |
| Workforce | Filled critical positions |
| Grid | Reinforcement status |
| Waste | Repository and interim-storage milestones |
| Construction | Physical progress vs cost/schedule |
| Commissioning | Tests complete / open regulator findings |
| Fleet | NOAK cost/schedule improvement versus FOAK |
9.83 Programme traffic-light logic
GREEN
Milestone complete with evidence.
AMBER
Recoverable deviation with defined mitigation and remaining schedule float.
RED
Critical assumption no longer valid; formal re-baseline or gate closure required.
The programme should avoid a fourth informal category:
“politically green despite technically red.”
9.84 Kill-switch hierarchy
Kill-switch K1 — law
No usable legal framework → no formal FOAK licence.
K2 — regulator
Regulator cannot independently review → no application acceptance.
K3 — technology
No stable reference design/fuel → no Italian down-select.
K4 — site
No technically viable site → no project.
K5 — environment
Fatal environmental incompatibility → change design/site.
K6 — finance
No bankable risk allocation → no FID.
K7 — supply chain
Critical safety-class packages unavailable → delay or import, not unsafe substitution.
K8 — construction
Forecast final cost/schedule exceeds authorised programme envelope → formal re-approval.
K9 — fuel
No licensed fuel pathway → no fuel load.
K10 — operation
Operating licence/emergency/security incomplete → no criticality.
K11 — fleet
FOAK evidence invalidates replication case → freeze NOAK commitments.
9.85 The State should preserve exit options
Exit options become more expensive with each phase.
Therefore contract structure should seek to preserve:
- design fallback before detailed licensing;
- site fallback before major land investment;
- staged long-lead orders;
- staged NOAK options.
The principle is not to keep the programme permanently reversible.
It is to delay unnecessary irreversibility until enough evidence exists.
9.86 Conditional fleet options
Instead of committing immediately to dozens of modules, a procurement could in principle contain:
- firm FOAK;
- option for Unit 2;
- later fleet options subject to agreed conditions.
This preserves:
- supplier order visibility;
- negotiating leverage;
- possibility of serialisation;
while retaining evidence-based decision gates.
The final commercial form depends on procurement law and financing and is not determined here.
9.87 Disciplined case — milestone table
| Milestone | Disciplined case |
|---|---|
| T0 | 2026/27 assumption |
| Core decrees | 2027 |
| Regulator operational new-build framework | 2027–28 |
| Technology shortlist | 2028 |
| Lead/backup site advanced study | 2028–29 |
| Lead design/site pairing | 2029 |
| Major licensing submissions | 2029–30 |
| Major project authorisations / FID | 2030–31 |
| First nuclear concrete | 2030–31 |
| Fuel-load window | 2034–35 |
| Commercial operation | 2034–36 |
| First NOAK | 2036–38 |
| Serial fleet | late 2030s onward |
Every date depends on successful previous gates.
9.88 Central case — milestone table
| Milestone | Central case |
|---|---|
| T0 | 2026/27 assumption |
| Decrees/corrections | 2027–28 |
| Regulator scale-up | 2027–29 |
| Technology/site shortlist | 2028–30 |
| Detailed site qualification | 2029–31 |
| Major licensing submissions | 2030–32 |
| Authorisation/FID | 2032–34 |
| First concrete | 2033–35 |
| Commissioning | 2037–40 |
| Commercial operation | 2037–40 |
| NOAK deployment | 2039 onward |
9.89 Delayed case — milestone table
| Milestone | Delayed case |
|---|---|
| Legal/regulatory stabilisation | through 2029/30 or later |
| Site | 2030–33+ |
| Licensing | 2032–36+ |
| FID | 2035–38+ |
| First concrete | 2036–39+ |
| Commercial operation | post-2042 |
| Fleet-scale relevance by 2050 | Materially reduced unless build rate becomes very high |
9.90 Earliest case is not compatible with every reactor technology
A disciplined 2034–36 case structurally favours a design that by the late 2020s already has:
- mature licensing;
- active reference construction;
- conventional fuel.
It is difficult to reconcile with a reactor technology whose own demonstrator sequence extends into the 2030s.
That is why Chapter 5 separated:
- near-term LWR-SMR;
- advanced-reactor strategic track.
Technology choice changes the national clock.
9.91 Advanced-reactor pathway requires a different schedule
An Italian-linked LFR programme can be developed in parallel through:
- ENEA;
- Ansaldo;
- EAGLES;
- newcleo.
But its commercial deployment clock should be linked to:
- demonstrator licensing;
- materials qualification;
- fuel facility;
- operating evidence.
A Government can pursue this track without pretending it is the same project as a near-term imported LWR-SMR.
9.92 Parallel technology tracks need separate budgets
Mixing:
- near-term FOAK deployment;
- advanced-reactor R&D
inside one budget can obscure whether cost growth originates in:
- commercial project;
- national research.
The programme should maintain separate accounting.
9.93 Public information milestones
Public information should accompany substantive decisions rather than operate as a continuous generic campaign detached from them.
Key moments include:
- legal framework;
- site methodology;
- candidate-area stage;
- preferred-site stage;
- EIA;
- construction authorisation;
- fuel load.
At each stage the State should publish what has actually been decided and what remains undecided.
9.94 Transparency protects schedule
Transparent disclosure of:
- cost;
- delay;
- site findings;
- waste;
- regulator conclusions
may generate political controversy in the short term.
Concealing or minimising those issues increases later litigation and trust risk.
Therefore transparency is not merely a communications function.
It is part of project risk control.
9.95 2030 checkpoint
By 2030, under a programme genuinely capable of delivering the earliest/central cases, Italy should be able to show:
- operative regulatory architecture;
- adequately resourced safety regulator;
- small design shortlist or lead design;
- one or more technically serious candidate sites;
- project operator;
- active licensing work;
- financing architecture;
- industrial qualification programme;
- waste interface.
If these conditions do not exist by approximately 2030, a mid-2030s first-power narrative should be formally re-examined.
9.96 2035 checkpoint
By 2035, a programme consistent with the central path should show:
- FOAK under construction or commissioning;
- stable site/licensing basis;
- qualified operating organisation;
- financed waste/decommissioning obligations;
- NOAK candidates at defined stages.
If the FOAK has not reached construction by 2035, the programme should not continue presenting 8–16 GW by 2050 as though the original implied deployment rate were unchanged.
The capacity envelope needs re-baselining.
9.97 2040 checkpoint
By 2040, the programme should have enough evidence to answer whether it has become a fleet programme.
Possible evidence includes:
- operating FOAK;
- second/third units under construction;
- serial manufacturing;
- stable financing;
- reduced unit cost;
- regulator throughput;
- fuel supply.
If these are absent, national nuclear policy may remain a limited FOAK/industrial programme rather than a PNIEC-scale fleet.
9.98 2045 checkpoint
By 2045 the State should no longer be relying on assumptions for most critical parameters.
It should possess actual data for:
- unit cost;
- availability;
- outage duration;
- waste;
- staffing;
- financing;
- grid integration.
The 2050 capacity envelope should then be based primarily on operating/constructing evidence.
9.99 2050 is an envelope, not a finish line
A reactor commissioned in 2048 is not economically evaluated only through 2050.
It may operate for decades beyond.
Therefore the 2050 target should not incentivise:
- rushed licensing;
- inefficient last-minute procurement;
- excessive public guarantees
solely to hit a modelled capacity number.
The 2050 figure is part of the energy-system pathway.
Safety and lifetime economics remain dominant.
9.100 Overall installation plan
The Italian nuclear programme can be reduced to six state decisions.
Decision 1 — Can Italy create the law and regulator?
2026–2028.
Without this, everything else remains policy discussion.
Decision 2 — Is there a reactor and site combination worth licensing?
2027–2030.
This requires real evidence, not generic SMR optimism.
Decision 3 — Can the project be financed without hiding risk?
2029–2034 depending case.
FOAK risk allocation must be explicit.
Decision 4 — Can Italy construct it to the approved cost and schedule?
2031 onward in earliest case.
This becomes an evidence question rather than policy theory.
Decision 5 — Can Italy operate it safely and economically?
Mid/late 2030s onward.
Commercial operation supplies the first decisive evidence.
Decision 6 — Should the FOAK become a fleet?
That question is answered only after actual cost, performance, energy-system and industrial evidence exists.
The PNIEC provides an 8–16 GW 2050 analytical envelope, but does not answer Decision 6 in advance. [G]
The execution architecture therefore requires disciplined separation between:
programme authorisation
project authorisation
and
fleet replication.
The first parliamentary decision does not authorise the second.
The first reactor does not automatically authorise the fleet.
The most credible pathway to an Italian FOAK is consequently one in which later work begins early but irreversible commitments occur late.
Legal drafting, regulator recruitment, site surveying, supply-chain qualification and workforce development can and should overlap.
Construction cannot precede licensing.
Fuel loading cannot precede operating and emergency readiness.
Fleet replication cannot become unconditional before FOAK evidence.
The three timing cases can therefore be stated clearly.
Disciplined / earliest credible case — 2034–36
Possible only if:
- T0 and decrees occur rapidly;
- the regulatory system becomes usable by 2027–28;
- a mature Western reference design is selected;
- a viable site emerges rapidly;
- foreign regulatory work can be relied upon substantially;
- financing closes by approximately 2030–31;
- construction experiences no major FOAK disruption.
It is an upper-performance case.
Central case — 2037–40
Allows:
- meaningful regulator scale-up;
- several years of foreign SMR evidence;
- complete site investigation;
- environmental/transboundary review;
- financing negotiation;
- supply-chain qualification.
It is the more defensible planning band for government budgeting and workforce design.
Delayed case — post-2042
Results if any major gate resets:
- legislation;
- regulator;
- site;
- finance;
- waste;
- technology;
- construction.
This case should remain inside the official programme rather than be treated as an external failure scenario, because removing delay from the planning model does not remove delay from reality.
The final programme-control rule is therefore:
No date becomes more legally or technically true because it has been announced more often.
Every milestone must be earned through evidence.
The State can accelerate activities by:
- working in parallel;
- reusing foreign regulatory evidence;
- qualifying suppliers early;
- preparing sites early;
- financing the regulator properly.
It cannot legitimately accelerate by assuming away:
- safety review;
- environmental assessment;
- financing;
- fuel;
- emergency planning;
- waste.
The most important output of the 2026–2050 plan is consequently not a single commercial-operation date.
It is a system of clocks, owners, evidence requirements and kill-switches that prevents a political programme from turning into an open-ended fiscal commitment when one of its original assumptions no longer holds.
CHAPTER 9 — LOAD-BEARING SOURCE REGISTER
Italian legal clock and programme basis
L1 — Senate of the Republic, DDL No. 1924 — official legislative record. Final parliamentary approval on 23 September 2026; at the report cut-off still recorded as “approved definitively, not yet published.”
Senate — DDL 1924 official status
L2 — Senate of the Republic, DDL No. 1924, Article 1. Twelve-month delegation measured from entry into force, not final parliamentary vote.
Senate — DDL 1924 statutory delegation text
L3 — Senate final proceedings, 23 September 2026. Final parliamentary consideration of the nuclear enabling framework.
Senate — final proceedings on DDL 1924
Italian 2050 planning envelope
G1 — MASE, Piano Nazionale Integrato per l’Energia e il Clima 2024. Approximately 8 GW nuclear capacity in the conservative 2050 scenario, around 11% of electricity demand; approximately 1.3 GW cogeneration supplying 16 TWh thermal industrial heat; full estimated potential approximately 16 GW / 22%.
MASE — PNIEC 2024 full document
G2 — Chamber of Deputies Research Service, 2026. Parliamentary summary of PNIEC nuclear scenarios and clarification that the nuclear case does not modify the 2030 PNIEC assumptions.
Chamber of Deputies — nuclear and PNIEC scenario dossier
Public timing statements and industrial milestones
M1 — ANSA, 18 September 2026. Minister Pichetto Fratin: 2033–34 “at best”; permitting, agency model and transparency rules still require implementation.
ANSA — Pichetto Fratin on 2033–34 timing
M2 — ANSA, 19 September 2026. Ministerial political intention to present implementing rules rapidly; not a statutory deadline.
ANSA — implementing-rule timing statement
I1 — Edison, 25 June 2026. EDF/NUWARD/Edison/Italian industrial declaration targeting initial SMR plants around 2035.
Edison — EDF/NUWARD/Italian supply-chain declaration
Regulator readiness
G3 — ISIN, General Activity Plan 2026–2028. Current statutory staffing framework of 90 personnel and planned recruitment to maintain approximately 60 technical and 30 administrative/legal staff.
ISIN — General Activity Plan 2026–2028
G4 — ISIN Director Francesco Campanella, Senate hearing, 1 July 2026. Existing regulator requires strengthening and transformation for a possible new-reactor licensing mandate.
ISIN — Senate hearing on new-build regulatory capacity
G5 — ISIN Annual Report presentation, 7 July 2026. Existing workload, institutional development and safety-regulator capacity.
ISIN — 2026 Annual Report presentation
Foreign reference project — Darlington BWRX-300
I2 — Canadian Nuclear Safety Commission — Darlington New Nuclear Project. BWRX-300 selected in 2021; construction application in October 2022; construction licence April 2025; Unit 1 under construction; operating-licence application March 2026.
CNSC — Darlington New Nuclear Project
I3 — CNSC — Darlington operating-licence review protocol. Operating-licence application received 25 March 2026; review currently estimated at approximately 35 months.
CNSC — Darlington licence-to-operate review protocol
I4 — OPG, April 2026 — reactor-building basemat installation. Evidence that actual nuclear civil construction is under way.
OPG — BWRX-300 reactor-building foundation milestone
I5 — OPG 2025 year-end reporting, published 2026. First SMR expected to connect to grid by end-2030; first-unit plus common-infrastructure budget approximately CAD 7.7bn including interest, escalation and contingency.
OPG — Darlington SMR project cost and schedule
I6 — OPG, May 2025. Four-unit Darlington programme approximately CAD 20.9bn; first unit CAD 6.1bn plus CAD 1.6bn of systems/services shared across the four-unit programme.
OPG — Darlington four-unit programme financial baseline
European SMR deployment framework
G6 — European Commission, 10 March 2026 — EU SMR Strategy. Target for first European projects in early 2030s; fleet approach, supply-chain development, regulatory cooperation and strategic autonomy.
European Commission — EU SMR Strategy
G7 — European Commission — Small Modular Reactors policy portal. SMR strategy, European Industrial Alliance and projected EU SMR capacity of approximately 17–53 GW by 2050.
European Commission — Small Modular Reactors
G8 — European Commission, COM(2026)117. Detailed actions for fleet-based industrial deployment, regulatory cooperation, de-risking and supply-chain development.
European Commission — Future development and deployment of SMRs in Europe
Financing
G9 — European Commission, 10 March 2026 — Clean Energy Investment Strategy. Public capital as catalyst, private investment mobilisation, and specific recognition of higher technology/deployment risk for SMRs.
European Commission — Clean Energy Investment Strategy
G10 — European Commission — Clean energy investment policy. EIB financing and SMR de-risking mechanisms.
European Commission — Clean energy investment framework
G11 — European Commission — Nuclear investment needs. Planned €200m guarantee supporting private investment in innovative nuclear technologies.
European Commission — Nuclear investment needs
Grid and system planning
G12 — Terna, National Resource Adequacy Assessment for Italy 2025. 2030–2035 adequacy, climate-sensitive probabilistic modelling and consequences of programmable thermal-capacity retirement.
Terna — National Resource Adequacy Assessment 2025
Waste and decommissioning dependency
G13 — Sogin, 6 August 2026 — 2025 financial results. Overall Italian decommissioning programme at 47.7% completion at 31 December 2025.
Sogin — 2025 decommissioning progress
G14 — Sogin, 16 September 2026 — Sustainability Report 2025. Confirms 47.7% overall decommissioning completion.
Sogin — Sustainability Report 2025 announcement
END OF CHAPTER 9
CHAPTER 10 — ISSUES NOT IN THE POLITICAL BRIEF, AND THE DECISION THE GOVERNMENT ACTUALLY FACES
10.1 Executive finding
The strategic decision facing Italy is wider than whether to construct a small modular reactor.
By 2026 the country is simultaneously redesigning its electricity grid, adding very large quantities of renewable generation and storage, increasing Mediterranean and European interconnection, diversifying gas and LNG supply after the 2022 energy shock, developing carbon capture and storage, confronting new industrial electricity demand, rebuilding parts of its nuclear research and manufacturing ecosystem, and reconsidering civil fission after almost four decades without domestic nuclear generation.
The appropriate government comparison is therefore not:
nuclear versus renewables.
Nor is it:
nuclear versus gas.
The real comparison is among alternative system architectures capable of delivering different combinations of:
- decarbonisation;
- dependable capacity;
- affordability;
- industrial competitiveness;
- strategic autonomy;
- climate resilience;
- dispatchability;
- technological sovereignty.
Terna’s current network strategy itself illustrates the scale of the non-nuclear transformation already committed. The 2025 Development Plan foresees more than €23 billion of transmission-grid investment during 2025–2034, integration of at least 65 GW of additional renewable capacity by 2030 compared with 2023, approximately 71.5 GWh of new storage need by 2030 excluding existing pumped hydro, materially greater internal transfer capability and an increase of about 40% in cross-border electricity capacity through projects extending beyond the decade. [G]
The first MACSE storage auction already moved part of that architecture from planning to procurement. Terna awarded 10 GWh in September 2025 for delivery in 2028; bids exceeded the requested quantity by more than four times and the weighted-average clearing price was approximately €12,959/MWh-year, well below the reserve premium. [G]
Italy is therefore not choosing between building nuclear and doing nothing else.
The baseline system already requires:
- renewables;
- grid expansion;
- storage;
- interconnections;
- flexible demand;
- continuing firm capacity.
A nuclear fleet, if pursued, would become an additional element within that architecture rather than replace it.
Gas likewise remains strategically relevant. In 2025 Italian gas demand was approximately 63.42 bcm, while LNG imports exceeded 20 bcm, covering roughly one third of national demand. Snam’s network data show substantial diversification across pipeline and LNG entry points, including the new Ravenna FSRU. [I/G]
This diversified gas system gives Italy resilience that was weaker before the 2022 shock, but it remains dependent on international commodity supply. Nuclear changes the nature of that external dependency rather than eliminating external dependence altogether: uranium, conversion, enrichment, fuel fabrication, proprietary reactor technology and digital support can all remain foreign.
Gas combined with CCS is also moving from theory toward industrial demonstration. Ravenna CCS Phase 1 began in 2024 and is designed for approximately 25,000 tonnes of CO₂ per year, while Eni and Snam’s Phase 2 concept targets approximately 4 Mt/year by 2030, with potential longer-term expansion toward 16 Mt/year. [I/G]
Again, this does not establish that gas-plus-CCS is economically or systemically superior to nuclear. It establishes that Italy has another dispatchable decarbonisation pathway which must be compared using:
- fuel cost;
- carbon-capture rate;
- residual emissions;
- methane exposure;
- CO₂ transport/storage;
- capacity factor;
- financing;
- delivery time.
Interconnection adds another strategic dimension. Terna already operates approximately 30 international interconnections and plans new links or reinforcements involving France, Switzerland, Austria, Slovenia, Greece, Montenegro, Tunisia and other corridors. Its 2025 plan explicitly positions Italy as an electricity bridge between Europe, North Africa and the wider Mediterranean. [G]
A domestic reactor fleet could reduce exposure to imported electricity during some system conditions.
It would not make those interconnections obsolete.
The decision facing Government is therefore one of portfolio construction and strategic sequencing.
Four broad nuclear architectures remain open:
Architecture I — deploy a substantially mature Western water-cooled SMR and build Italian industrial participation around it.
Architecture II — make Italian-linked advanced reactors, particularly lead-cooled technology, the centre of the domestic programme and accept a later first-power horizon.
Architecture III — strengthen Italy principally as a European nuclear engineering/component/export power while postponing a domestic FOAK.
Architecture IV — postpone irreversible domestic new-build commitment until the National Repository, regulatory architecture and siting process have crossed specified maturity gates.
No one of these is inherently “the answer.”
Each solves a different strategic problem.
The correct government decision is to identify which national objective has priority, what conditions must exist for the selected architecture to work, and which residual risks Italy is prepared to retain.
This final chapter therefore does not select a political winner. It identifies the conditions under which each architecture becomes internally coherent and the conditions under which it ceases to be so, exactly as required by the commissioning mandate.
10.2 Nuclear must be compared with the actual Italian alternative portfolio
The counterfactual to new nuclear is not “no electricity.”
Italy already has a rapidly changing supply portfolio.
The principal alternatives or complements include:
- accelerated solar and wind;
- batteries and other storage;
- pumped hydro;
- internal transmission reinforcement;
- international interconnection;
- flexible demand;
- existing hydro;
- gas generation;
- gas plus CCS;
- electricity imports;
- industrial efficiency.
A serious comparison must therefore ask:
If Italy does not spend the next euro on nuclear, what combination of these resources provides the same electricity-system function, at what date and with what risk?
Conversely:
If Italy adds nuclear, which investments remain necessary anyway?
The answer to the second question is substantial.
Even with new reactors, Italy still needs:
- renewable generation;
- transmission;
- storage;
- international links;
- local distribution reinforcement;
- demand flexibility.
Nuclear competes principally for part of the firm low-carbon and energy-security role, not for the entire power-system investment programme.
10.3 Delivery date is as important as lifecycle cost
A technology available in 2029 and a technology available in 2039 cannot be compared only through a static €/MWh value.
Italy’s 2030 obligations, coal closures and near-term industrial demand occur before the credible first-power range for new nuclear established in Chapter 9.
Therefore the Government should use at least three comparison periods:
2026–2030
Nuclear contribution from new domestic reactors:
effectively zero.
The relevant technologies are:
- renewables;
- storage;
- grids;
- efficiency;
- gas/LNG;
- interconnection;
- existing hydro.
2030–2040
Potential entry period for a first nuclear unit.
The comparison becomes:
- mature renewables/storage;
- strengthened grid/interconnection;
- gas/CCS;
- first nuclear FOAK.
2040–2050
Potential nuclear fleet-replication period.
This is the period in which nuclear can materially alter the system architecture if FOAK deployment has succeeded.
Without this time segmentation, nuclear can appear to solve 2030 problems it cannot physically reach.
10.4 Renewables already have a deployment-scale advantage
Terna’s 2025 Development Plan assumes more than 65 GW of additional renewable capacity by 2030 relative to 2023, with a further increase beyond that date. [G]
This is a fundamentally different deployment scale from nuclear.
Solar and wind have:
- shorter project cycles;
- modular financing;
- many developers;
- geographically distributed deployment.
Their principal challenge is not whether individual turbines or PV modules can be built.
It is integrating them at very high penetration while maintaining:
- adequacy;
- flexibility;
- grid stability;
- transmission capacity.
Nuclear has almost the opposite profile.
Its main challenge is:
- development time;
- licensing;
- project finance;
- FOAK execution.
Once operating, it can supply large quantities of relatively weather-independent energy from a compact site.
The two technologies therefore solve different system constraints.
10.5 Storage is becoming an industrial system resource rather than a pilot technology
Italy’s first MACSE auction demonstrates that large-scale storage procurement is moving into the mainstream electricity architecture.
Terna awarded 10 GWh for delivery from 2028, with strong competition and prices far below the auction reserve premium. [G]
Terna’s broader planning requirement is approximately 71.5 GWh by 2030, excluding existing pumped hydro. [G]
This has two consequences for nuclear analysis.
First, nuclear should not be justified through an assumption that storage is unavailable.
Second, the system should not assume batteries can economically provide every form of firm capacity for arbitrarily long periods.
Storage economics depend strongly on:
- duration;
- cycling;
- price spread;
- capacity value;
- degradation.
The correct comparison therefore separates:
intraday storage
from
multi-day/seasonal firm-energy requirements.
10.6 Batteries and nuclear address different parts of residual-load risk
Batteries are particularly effective for:
- solar evening shift;
- fast frequency response;
- short-duration balancing;
- congestion management.
Nuclear is potentially effective for:
- continuous energy;
- long-duration low-renewable periods;
- dependable capacity;
- synchronous generation.
It is analytically weak to describe one as a simple substitute for the other.
The more realistic low-carbon system may include both.
The question is how much of each.
10.7 Pumped hydro remains strategically important
Italy already possesses significant hydro and pumped-storage experience.
Pumped hydro offers:
- long asset life;
- grid inertia;
- storage;
- reserve.
Its expansion is constrained by:
- geography;
- permitting;
- environmental impacts;
- water availability.
Nevertheless, existing and potential pumped hydro should be included in any nuclear counterfactual.
A reactor programme that compares itself only with lithium-ion batteries would understate the diversity of Italy’s storage options.
Terna plans more than €23 billion of transmission investment during 2025–2034.
Among major projects are:
- Tyrrhenian Link;
- Adriatic Link;
- Milano–Montalto;
- Central Link;
- ELMED;
- GR.ITA.2;
- SA.CO.I.3;
- additional north-border and internal reinforcements. [G]
Therefore nuclear should not be presented as a way of avoiding grid investment.
A nuclear project itself can require additional network reinforcement.
The strategic question is whether new nuclear:
- reduces some future renewable-collection/grid requirements;
- increases other concentrated-injection requirements;
- improves adequacy enough to reduce some firm-capacity investment.
Only system modelling can answer that.
10.9 Interconnection is part of Italian sovereignty, not the opposite of sovereignty
Energy-sovereignty rhetoric can incorrectly treat electricity imports as evidence of weakness.
Interconnection can increase resilience by giving Italy access to:
- diverse generation;
- reserve sharing;
- emergency supply;
- export markets.
The EU maintains a policy objective of at least 15% electricity interconnection by 2030. [G]
Terna expects its own network developments to increase Italy’s international exchange capability materially and characterises Italy as a future Mediterranean electricity hub. [G]
Strategic autonomy therefore should not mean electrical isolation.
It should mean avoiding dependence on one uncontrollable external source.
10.10 ELMED changes the Mediterranean electricity geometry
The Italy–Tunisia ELMED HVDC interconnector is particularly significant.
Terna describes it as an energy bridge between Europe and Africa intended to:
- strengthen supply security;
- facilitate renewable integration;
- deepen Mediterranean electricity exchange. [G]
A future Italian nuclear system would therefore operate inside a market that is becoming more, not less, geographically interconnected.
This can support nuclear by creating export capability during periods of domestic surplus.
It can also increase competition from lower-cost electricity produced elsewhere.
10.11 Gas remains Italy’s principal dispatchable security asset in the near term
Italian gas demand in 2025 was approximately 63.42 bcm.
Snam’s system received:
- approximately 40.41 bcm through foreign pipeline entry points;
- approximately 20.48 bcm through LNG terminal entry points;
- domestic production making up a much smaller share.
LNG volumes entering Snam’s fully consolidated terminals rose substantially during 2025, with Ravenna FSRU entering service. [I]
Gas therefore remains central to:
- electricity balancing;
- industrial heat;
- heating;
- security of supply.
New nuclear cannot materially displace that role before the 2030s.
10.12 The post-2022 gas system is more diversified but remains internationally exposed
The 2022 shock forced Italy to move rapidly away from the previous concentration on Russian pipeline gas.
The resulting architecture draws on:
- Algeria;
- Azerbaijan/TAP;
- LNG;
- Norway/northern routes;
- smaller sources.
The diversification is strategically valuable.
But the fuel remains internationally traded.
Snam itself identifies geopolitical instability in:
- North Africa;
- the Middle East;
- former Soviet regions;
as a material business and supply risk. [I]
Nuclear can reduce gas demand in electricity generation after deployment.
It does not eliminate the geopolitical problem immediately.
10.13 Nuclear converts one import exposure into another
A new domestic nuclear plant would produce electricity in Italy.
But depending on technology, Italy could still import:
- uranium;
- conversion;
- enrichment;
- fabricated fuel;
- proprietary reactor systems;
- specialist services.
The strategic difference is in the physical and commercial character of the dependency.
Nuclear fuel requirements are relatively small in physical volume compared with continuous gas flows and can be contracted and stockpiled over longer periods.
Gas supply, by contrast, requires continuous large-volume infrastructure.
That difference can increase resilience.
It does not create complete energy autarky.
10.14 Gas-plus-CCS is a genuine alternative firm low-carbon pathway that must be tested
The Ravenna CCS project means Italy has moved beyond discussing carbon capture only at policy level.
Phase 1 was designed to capture approximately 25,000 tonnes of CO₂ per year from the Casalborsetti gas-treatment facility and store it in the depleted Porto Corsini Mare Ovest field.
Eni reports capture performance above 90%, with peaks around 96%.
Phase 2 is intended to expand transport/storage capacity to approximately 4 Mt/year by 2030, subject to authorisation, with possible later expansion toward 16 Mt/year. [I]
This creates a plausible national infrastructure platform.
10.15 Gas-plus-CCS and nuclear have fundamentally different risk structures
| Variable | Nuclear | Gas + CCS |
|---|---|---|
| Construction lead time | Long | Generally shorter generation build; CCS network development also required |
| Fuel exposure | Uranium/enrichment/fuel services | Continuous natural-gas supply |
| CO₂ emissions | Very low operational | Reduced but not necessarily zero |
| Methane-chain exposure | Minimal | Remains relevant upstream |
| Dispatchability | High | High |
| Fuel price exposure | Lower share of generation cost | Much larger share |
| CO₂ transport/storage | Not required | Essential |
| Waste liability | Radioactive waste/spent fuel | Captured CO₂ storage monitoring/liability |
| Financing profile | Very high upfront capital | Fuel-heavy lifecycle + CCS infrastructure |
| Delivery before 2030 | New Italian nuclear: no | Some CCS/gas infrastructure: potentially yes |
The table is descriptive.
Which pathway is economically preferable depends on:
- gas price;
- carbon price;
- capture cost;
- storage cost;
- nuclear CAPEX;
- nuclear financing rate;
- system value.
10.16 CCS does not remove the need to evaluate residual emissions
A gas plant with CCS may still have:
- uncaptured stack CO₂;
- compression energy penalty;
- methane emissions upstream;
- transport/storage energy requirements.
Therefore comparison should use lifecycle emissions rather than treating “CCS” as equivalent to zero emissions.
Similarly, nuclear analysis should include:
- mining;
- enrichment;
- construction;
- fuel cycle;
- decommissioning.
Both technologies should be compared under the same methodology.
10.17 CCS creates a geological infrastructure dependency of its own
Nuclear is often criticised because it requires geological disposal of long-lived radioactive material.
Gas-plus-CCS also depends on long-term geological containment, although the materials and hazard mechanisms differ fundamentally.
The Italian decision therefore is not simply:
geological storage versus no geological storage.
It may involve choosing between different types of subsurface infrastructure:
- radioactive-waste geological disposal;
- CO₂ geological storage.
Each has different:
- volumes;
- hazards;
- monitoring;
- liability regimes.
10.18 Industrial heat may be more important than electricity in some sectors
Many industrial processes consume energy primarily as heat.
Examples include:
- chemicals;
- refining;
- food;
- paper;
- some mineral processing.
The relevant decarbonisation options include:
- direct electrification;
- heat pumps;
- electric boilers;
- hydrogen;
- biomass;
- gas plus CCS;
- nuclear heat.
A reactor located far from the industrial user loses much of the direct-heat advantage.
Therefore industrial heat should affect site selection rather than being added rhetorically to every nuclear project.
10.19 Nuclear industrial heat becomes attractive only under specific conditions
Direct reactor heat becomes internally coherent where:
- a large stable heat customer exists;
- temperature requirement matches reactor output;
- customer is geographically close;
- heat demand has a high load factor;
- reactor safety remains independent of customer operation;
- steam/heat network CAPEX is justified.
Where these conditions are absent, electricity production may be the more relevant nuclear product.
10.20 Hydrogen is a flexible option, not an automatic nuclear co-product
Electrolytic hydrogen can use nuclear electricity.
High-temperature reactors may eventually improve electrolysis efficiency through steam integration.
But the economic case still depends on:
- electrolyser cost;
- hydrogen demand;
- pipeline/storage;
- market price;
- utilisation.
The State should therefore not count hypothetical hydrogen sales as guaranteed FOAK revenue unless backed by actual contracted demand.
10.21 Water constraints could change the relative attractiveness of system pathways
Nuclear and gas/CCS are both thermal systems and can require significant cooling, depending on configuration.
Renewables generally have lower operational cooling-water needs.
Hydrogen electrolysis requires water but on a different scale and quality basis.
Future energy planning in Italy should therefore include a water-adjusted energy-system model, particularly for:
- Po Valley;
- southern industrial areas;
- coastal sites.
Water may become an allocation constraint shared by:
- power;
- agriculture;
- cities;
- industry.
10.22 Dry cooling could preserve nuclear siting options but changes economics
Chapter 7 established that dry cooling can reduce freshwater dependency while imposing:
- higher CAPEX;
- larger structures;
- lower efficiency;
- heatwave penalties.
Therefore water-stressed sites should not simply be excluded before testing dry/hybrid alternatives.
Equally, dry cooling should not be assumed costless to make an otherwise difficult site appear viable.
Its economic impact belongs inside the bid.
10.23 Insurance is a strategic programme question, not a legal footnote
Italy currently operates under the amended Paris/Brussels nuclear-liability framework.
The general operator layer is at least €700 million, with supplementary State/international compensation bringing the combined convention system to at least approximately €1.5 billion. [L/G]
That framework was calibrated while Italy had no active commercial power reactor.
Re-entry changes the policy environment.
Before FOAK financial close, Government needs to determine whether it will:
- retain the existing amount;
- raise the domestic operator requirement;
- create additional financial-security requirements.
This is a legal/fiscal design question.
It is not answered by reactor safety claims alone.
10.24 Insurance capacity should be tested against a fleet, not just one unit
A single FOAK and a 16 GW fleet create very different aggregate market exposure.
Government and operators should assess:
- nuclear pool capacity;
- reinsurance;
- construction insurance;
- cyber exclusions;
- terrorism/security exclusions;
- business interruption.
A fleet strategy that requires a State backstop because private capacity is insufficient should record that backstop as a contingent liability.
10.25 Italy needs a ten-year nuclear workforce architecture if it proceeds beyond study stage
The workforce issue is not solved by producing more generic engineers.
The programme requires specialised cohorts whose training times differ substantially.
A durable structure could take the form of a National Nuclear Skills Academy, operating as a distributed network rather than necessarily one physical campus.
Its role would be coordination rather than replacement of universities.
10.26 The academy would need separate professional streams
Regulatory stream
- reactor safety;
- probabilistic safety;
- severe accidents;
- safeguards;
- cyber;
- radiation protection.
Operator stream
- licensed reactor operators;
- maintenance;
- chemistry;
- fuel;
- outage management.
Engineering stream
- reactor physics;
- thermal hydraulics;
- structural mechanics;
- materials;
- I&C.
Manufacturing stream
- ASME/RCC-M;
- welding;
- NDE;
- nuclear QA;
- traceability.
Waste/decommissioning stream
- radiochemistry;
- waste conditioning;
- repository science;
- dismantling.
Emergency/security stream
- physical protection;
- emergency planning;
- health physics.
10.27 The academy should be a network of existing Italian capability
Italy does not need to invent all institutional capacity.
Chapter 4 identified existing centres including:
- ENEA;
- CIRTEN;
- Politecnico di Milano;
- Politecnico di Torino;
- Bologna;
- Pisa;
- Sapienza;
- Padova;
- Palermo;
- SIET;
- Ansaldo;
- Sogin;
- Nucleco.
The rational role of a national academy would be to:
- set workforce forecasts;
- coordinate curricula;
- finance scarce disciplines;
- arrange foreign placements;
- maintain simulator capacity;
- track qualified personnel.
10.28 Regulator training must remain institutionally separate from operator training
A common academy can share scientific education.
But regulatory independence requires a professional pathway in which regulator staff are not dependent upon the reactor operator for the core expertise needed to judge that operator.
Therefore:
- joint university courses are reasonable;
- operator-controlled regulator qualification is not.
The safety authority requires its own:
- career structure;
- training budget;
- international secondments;
- technical-support access.
10.29 International placements could accelerate Italian competence
Italy can use countries already operating or constructing relevant technology.
Examples could include training relationships with:
- Canada;
- France;
- United Kingdom;
- United States;
- Slovenia;
- Romania.
The objective should be to transfer:
- operating experience;
- regulator experience;
- manufacturing quality culture.
This can reduce the risk of rebuilding every competence domestically from theory.
10.30 Fuel security should be treated as a sovereign portfolio
A national fuel-security policy should distinguish:
- natural uranium;
- conversion;
- enrichment;
- fabrication;
- technology-specific fuel.
Conventional Western LWR-SMRs have a substantially more mature fuel market than HALEU-dependent or MOX-fast-reactor systems.
Therefore fuel security is one of the decisive differences between the four national architectures.
10.31 Fuel inventory can provide strategic resilience
Unlike gas, reactor fuel can be contracted far in advance.
A national policy could require operators to maintain:
- reserve reload capability;
- diversified suppliers;
- alternative enrichment contracts.
The exact inventory rule should depend on reactor technology and market structure.
The strategic principle is that Italy should avoid reproducing a single-source dependency analogous to its pre-2022 gas exposure.
10.32 Italy’s industrial strategy should not be measured only by domestic reactors
Chapter 4 demonstrated that Italian companies already participate in international nuclear projects.
Therefore industrial value can be generated through:
- exports;
- foreign reactor construction;
- lifetime services;
- fusion;
- decommissioning;
- waste management.
Domestic FOAK deployment is one route to industrial scale.
It is not the only route.
10.33 Export before domestic FOAK can reduce national programme risk
If Italian firms obtain contemporary references through:
- Cernavodă;
- UK programmes;
- French supply chains;
- North American SMRs;
- ITER/DTT;
they can qualify personnel and factories before the Italian reactor requires them.
This reduces the number of first-of-a-kind variables present simultaneously in the Italian project.
10.34 A component-power strategy is a real national architecture
Italy could decide that its comparative advantage lies not in owning reactor IP but in producing:
- heavy components;
- forgings;
- piping;
- EPC services;
- casks;
- decommissioning;
- fusion hardware;
- testing.
Such a strategy can be pursued even if domestic siting remains politically unresolved.
Its limitation is equally clear:
Italy would obtain less direct experience in:
- reactor operation;
- domestic regulatory licensing;
- long-term domestic fleet management.
This is precisely why Architecture III must be analysed as a distinct choice rather than described as “doing nothing.”
10.35 European industrial coordination increases the viability of an export strategy
The European Commission’s March 2026 SMR strategy explicitly promotes:
- European supply chains;
- fleet deployment;
- common standards;
- regulatory cooperation;
- local European content.
It estimates potential EU SMR deployment of roughly 17–53 GW by 2050. [G]
If such a market develops, Italian suppliers can participate even where the first units are:
- French;
- Polish;
- Romanian;
- Czech;
- Swedish;
- Dutch;
- British.
Domestic construction therefore should not be treated as the sole measure of nuclear industrial policy success.
10.36 “EU Nuclear Alliance” and “European Industrial Alliance on SMRs” are different institutions
The terminology should remain precise.
Nuclear Alliance
The Nuclear Alliance is a political grouping of pro-nuclear or nuclear-interested European states coordinating positions around EU energy policy.
By June 2026, official meeting records listed Italy among the participating states, alongside countries including France, Poland, Finland, Sweden, Romania, Czechia and others; Greece and Latvia were listed as observers at that meeting. [G]
This represents an evolution from earlier documentation in which Italy was described as an observer.
European Industrial Alliance on SMRs
This is a Commission-supported industrial platform launched to accelerate SMR development and European supply-chain coordination.
It is not the same organisation as the political Nuclear Alliance. [G]
Proposed SMR coalition
The 2026 Commission strategy additionally proposes an “SMR coalition” among interested Member States for deeper policy, licensing and economic cooperation around selected designs. [G]
These three structures should not be conflated.
10.37 Italy’s participation in the Nuclear Alliance creates policy leverage but no automatic reactor choice
The Alliance can strengthen Italy’s ability to argue at EU level for:
- technology neutrality;
- financing access;
- nuclear recognition in clean-energy policy;
- fuel-cycle investment;
- common industrial standards.
But Alliance membership does not:
- select Italy’s reactor;
- approve State aid;
- license a site;
- guarantee EU money.
It is a political coordination instrument.
10.38 Italy should use European cooperation primarily to reduce duplication
One of the greatest potential benefits of EU collaboration is regulatory reuse.
The European Commission’s 2026 strategy promotes:
- joint early reviews;
- regulatory sandboxes;
- regulator cooperation;
- possible alignment or mutual recognition where legally possible.
[G]
This can be particularly valuable for Italy because its regulator would otherwise have to rebuild new-build expertise while reviewing an entire unfamiliar reactor from first principles.
10.39 ENSREG has already created an SMR regulatory cooperation mechanism
The European Nuclear Safety Regulators Group has established an SMR Task Force.
Its March 2026 dashboard tracks regulatory engagement across Member States and multiple designs and explicitly notes that national licensing approaches remain distinct. [G]
This is important.
European regulatory cooperation can:
- share evidence;
- identify differences;
- avoid duplicated analysis.
It does not remove sovereign responsibility from the Italian regulator.
10.40 IAEA regulatory cooperation has moved beyond theory
The IAEA’s Nuclear Harmonization and Standardization Initiative has developed a Regulatory Cooperation Toolkit during 2025–26 specifically to support:
- collaborative reviews;
- joint review;
- reuse of existing regulator assessments.
[I]
The EAGLES-300 multinational pilot is the first real-world application of this framework for an advanced reactor design. [I]
This is particularly relevant to Italy because:
- ISIN participates in advanced-reactor cooperation;
- Ansaldo and ENEA are central to EAGLES.
10.41 Regulatory cooperation should be an Italian programme requirement, not a diplomatic add-on
For whichever near-term Western design Italy studies, ISIN/future authority should seek:
- observer status where possible;
- access to reference-regulator safety evaluation;
- direct regulator-to-regulator working groups;
- common issue tracking.
The Italian review can then focus resources on:
- national differences;
- site;
- Italian law;
- emergency planning;
- environmental conditions.
This is much more efficient than re-performing every mature generic assessment independently.
10.42 Cooperation must stop short of regulatory outsourcing
Italy remains responsible for:
- licence;
- site safety;
- enforcement;
- inspections.
ENSREG itself makes clear that licensing remains the sovereign responsibility of national regulators. [G]
Therefore “licence passport” should remain shorthand for reliance and reuse, not automatic acceptance.
Fincantieri, newcleo and RINA have been studying the feasibility of lead-cooled reactor technology for large-vessel propulsion.
The original cooperation envisaged a closed reactor of roughly 30 MWe with infrequent refuelling. [I]
Fincantieri’s 2026–2030 business plan continues to identify nuclear power as part of its longer-term sustainable propulsion ambitions. [I]
This creates an industrial opportunity.
It does not mean Italy possesses an operative maritime nuclear licensing regime.
10.44 International maritime nuclear rules themselves are being rewritten
SOLAS Chapter VIII already contains requirements for nuclear-powered ships and refers to the 1981 Code of Safety for Nuclear Merchant Ships. [I]
But the IMO has recognised that this framework needs modernisation.
In January 2026 its Ship Design and Construction Sub-Committee established a programme to revise:
- SOLAS Chapter VIII;
- the Nuclear Code.
The workplan envisages finalisation and adoption around 2030. [I]
This is decisive for Italian planning.
Commercial nuclear shipping cannot be treated as though the international legal framework were already mature.
10.45 ATLAS confirms the international regulatory gap is being taken seriously
In August 2026 the IAEA launched ATLAS — Atomic Technologies Licensed for Applications at Sea, with IMO participation.
The initiative explicitly addresses:
- safety;
- security;
- safeguards;
- legal frameworks;
- liability
for future maritime nuclear applications. [I]
This shows that the international system is entering the rule-making stage for technologies that Italian industry is already studying.
10.46 Maritime nuclear liability is particularly complex
A ship changes jurisdiction as it moves.
A future nuclear merchant vessel raises questions including:
- flag state;
- port state;
- nuclear operator;
- shipowner;
- territorial waters;
- nuclear material transport;
- accident jurisdiction;
- salvage;
- wreck management.
These questions cannot be resolved by applying a land-based reactor licence mechanically to a ship.
Therefore a maritime programme should have its own:
- legal workstream;
- regulator workstream;
- IMO/IAEA workstream;
- liability assessment.
10.47 Port acceptance may become as important as ship certification
A nuclear-powered merchant ship has limited commercial value if major destination ports will not admit it.
Therefore maritime nuclear economics depend partly on:
- international rule convergence;
- insurance;
- port-state acceptance;
- emergency planning in ports.
A technically successful Italian propulsion concept could therefore remain commercially constrained until international governance matures.
10.48 Floating power stations are another legally distinct category
A floating nuclear power unit anchored to supply a coastal grid is not identical to:
- a self-propelled nuclear ship;
- a land reactor.
IMO has already discussed the need for future work on non-self-propelled floating nuclear power units. [I]
Italy should therefore avoid putting:
- naval propulsion;
- floating power;
- land SMRs
under one generic “marine nuclear” authorisation.
They present different legal problems.
10.49 Fusion is strategically significant to Italy, but belongs on a different clock
Italy possesses one of Europe’s stronger fusion-industrial ecosystems.
Its assets include:
- DTT at Frascati;
- ITER supply-chain participation;
- superconducting magnets;
- breeding-blanket research;
- Eni/CFS investment;
- RFX infrastructure.
This is a real national capability.
It is not a credible replacement for fission generation in the early-to-mid 2030s.
10.50 DTT is already a substantial Italian industrial/scientific programme
The Divertor Tokamak Test facility is under construction at the ENEA Frascati Research Centre.
In February 2026, ENEA announced successful acceptance tests for the first of 16 high-power 170 GHz gyrotrons that will form part of DTT’s plasma-heating system. [G]
The project is designed to study one of fusion’s central engineering problems:
- managing extreme plasma exhaust heat.
This creates know-how relevant to future fusion reactors.
10.51 Italy’s Nuclear Research Programme explicitly treats fusion as long-term
ENEA’s 2026 Nuclear Research Programme places fusion within a long-term strategic vision and refers to the European roadmap toward a first demonstration plant around 2050.
The programme identifies:
- DTT;
- breeding-blanket work at Brasimone;
- Neutral Beam Test Facility;
- RFX-mod2
as key Italian infrastructures. [G]
That is the appropriate policy timescale.
Fusion should not be used rhetorically to postpone every fission decision on the assumption that commercial fusion will solve the 2030s system.
Nor should fission investment crowd out fusion industrial capability simply because fusion power arrives later.
They are different programmes.
10.52 ITER remains an industrial training ground for Italy
Europe is responsible for 45.6% of ITER construction contribution, much of it delivered through in-kind industrial components rather than cash. [I]
Italian companies including:
- Ansaldo;
- SIMIC;
- ASG Superconductors
have participated directly in major ITER manufacturing and assembly work. [I]
That experience has strategic value even before fusion commercialisation because it sustains:
- nuclear quality;
- advanced welding;
- superconductivity;
- remote handling;
- project integration.
10.53 Eni gives Italy a separate private-commercial fusion exposure
Eni has been a strategic investor in Commonwealth Fusion Systems since 2018.
In September 2025 it signed a power purchase agreement worth more than $1 billion for electricity expected from CFS’s first ARC facility in Virginia. [I]
This provides Italian industry with exposure to a different fusion-development model from the public ITER/DTT path.
It does not provide Italian domestic fusion electricity on a specified date.
The two facts should not be confused.
10.54 Fusion industrial policy can proceed regardless of the fission choice
All four national architectures analysed later can preserve:
- DTT;
- ITER;
- fusion magnets;
- CFS investment;
- research.
Therefore fusion is not one of the four mutually exclusive choices.
It is a parallel strategic technology portfolio.
10.55 Mediterranean energy security has changed structurally since 2022
The pre-2022 Italian energy-security architecture depended heavily on continuous fossil-fuel imports, including substantial Russian gas exposure.
The response has included:
- more Algerian supply;
- TAP/Azerbaijan;
- LNG;
- additional regasification;
- storage;
- electricity interconnections.
By 2025, LNG imports exceeded 20 bcm and the Ravenna FSRU had entered operation. [I]
The country is therefore more diversified.
But diversification is not the same as independence.
10.56 The Mediterranean is simultaneously a supply route and a geopolitical exposure
Italian energy infrastructure increasingly links the country to:
- Algeria;
- Tunisia;
- Libya;
- Eastern Mediterranean/Caspian routes;
- global LNG shipping.
Snam explicitly identifies political and economic instability in MENA and former Soviet supply regions as material risk. [I]
Energy policy must therefore consider:
- pipeline disruption;
- shipping disruption;
- LNG price competition;
- infrastructure sabotage;
- geopolitical instability.
A domestic nuclear fleet could reduce some of the volume exposed to those risks after it begins operating.
10.57 Electricity interconnection creates a different Mediterranean opportunity
ELMED connects Italy and Tunisia not through molecules but through electrons.
Terna’s stated objective is to turn Italy into a Mediterranean bridge capable of handling renewable-electricity flows between Africa and Europe. [G]
This could complement:
- Italian renewables;
- domestic nuclear;
- European interconnection.
Mediterranean energy security should therefore be analysed through both:
fuel corridors
and
electricity corridors.
10.58 Nuclear could change Italy’s bargaining position even without producing the majority of electricity
If Italy gains a meaningful domestic firm nuclear share, it may reduce marginal dependence on imported gas during:
- low-renewable periods;
- gas-price shocks.
That could alter:
- import volumes;
- bargaining leverage;
- gas-fired generation utilisation.
But the effect depends on fleet scale and completion date.
A single 300 MWe reactor has little macro-geopolitical impact.
Several gigawatts potentially do.
10.59 Strategic autonomy should not become autarky
A resilient Italian energy system can deliberately diversify across:
- domestic renewables;
- storage;
- nuclear;
- gas;
- CCS;
- interconnection.
The aim is to reduce the consequence of losing any one supply source.
Full national self-sufficiency in every energy technology is neither necessary nor realistically achievable.
The more useful concept is:
controlled interdependence with multiple substitutes.
10.60 Information ethics are part of programme governance
The 2026 law requires public information and consultation.
Italy’s history makes the ethical structure of that activity unusually important.
Both major public nuclear turning points — 1987 and 2011 — followed severe nuclear accidents abroad:
- Chernobyl;
- Fukushima.
The Chamber of Deputies’ official 2026 dossier explicitly reconstructs those episodes as central to Italy’s nuclear-policy history. [L]
Therefore the State cannot approach public information as though the population has no historical reference point.
10.61 Government information and political advocacy should remain distinct
A government has the right to present and defend its energy programme.
But the statutory public-information process should not disguise political promotion as independent safety communication.
The system should separate:
Government
Explains:
- policy objective;
- cost assumptions;
- alternatives;
- timetable.
Safety regulator
Explains independently:
- safety findings;
- inspections;
- licensing decisions.
Operator
Explains:
- project;
- commercial proposal;
- plant performance.
Scientific/public institutions
Provide:
- evidence;
- data;
- technical studies.
This division protects institutional credibility.
10.62 The IAEA’s own engagement guidance argues for transparency, not persuasion
The IAEA describes stakeholder engagement across the full nuclear lifecycle as a strategic necessity and identifies open and transparent communication as fundamental to trust.
Its guidance emphasises:
- early engagement;
- continuous dialogue;
- clear institutional roles;
- disclosure of performance and relevant incidents;
- information on waste responsibility. [I]
That approach is fundamentally different from a public-relations campaign designed only to increase approval ratings.
10.63 Uncertainty must be communicated explicitly
IAEA risk-communication guidance states that honesty can require the answer:
“We don’t know.”
It emphasises openness and the publication of relevant regulatory information while protecting legitimately sensitive security information. [I]
For Italy, that means public communication should distinguish:
- known cost;
- estimated cost;
- vendor target;
- approved schedule;
- political aspiration.
This report has applied that distinction throughout.
10.64 Public consultation must still have the capacity to change a decision
A consultation conducted after:
- site;
- reactor;
- financing
have all become irreversible is procedurally weak.
The IAEA’s environmental/stakeholder guidance stresses:
- integrity;
- openness;
- documentation;
- responsiveness;
- inclusion of both supportive and critical stakeholders. [I]
A credible Italian process should therefore document:
- objections;
- evidence received;
- government response;
- project changes arising from consultation.
10.65 The referendum legacy cannot be solved through messaging
The 1987 and 2011 votes are political facts.
They cannot be made irrelevant by:
- marketing;
- generational replacement;
- technology branding.
The way to reduce their destabilising effect is to build a process that demonstrates that the new decision is:
- legally new;
- technologically current;
- transparent;
- open to scrutiny;
- explicit about waste and cost.
Public legitimacy is generated through process and performance, not solely through communication.
10.66 Comparative system architecture table
| Pathway | Delivery profile | Firm-capacity contribution | Main external dependency | Main infrastructure constraint | Strategic characteristic |
|---|---|---|---|---|---|
| Accelerated RES + storage | Fast incremental | Depends on storage/flexibility portfolio | Equipment/minerals/supply chain | Grid + storage + land | High domestic renewable resource use |
| Interconnection-led | Medium, project-specific | Depends on neighbouring surplus | Foreign electricity systems | Cross-border transmission | Geographic diversification |
| Gas | Existing | High dispatchability | Imported gas | Pipeline/LNG + commodity price | Near-term flexibility |
| Gas + CCS | 2030s scale-up possible | High | Gas + CO₂ transport/storage | CCS network/storage | Dispatchable lower-carbon fossil pathway |
| LWR-SMR | 2030s | High if operating reliably | Fuel/vendor technology | Licensing/site/finance | Firm low-carbon domestic generation |
| AMR/LFR | Later 2030s/2040s | Potentially high | Advanced fuel / technology maturation | Demonstration/licensing | Higher domestic technology-content potential |
| Fusion | Long-term | Not available for near-term planning | Technology development | Demonstration/commercialisation | Strategic post-2040/2050 option |
The table is deliberately non-ranked.
10.67 Architecture I — licensed Western LWR-SMR with Italian industrialisation
This architecture gives priority to deployment maturity.
Italy selects a substantially mature allied-country water-cooled SMR and negotiates deep Italian participation around the foreign reactor platform.
Possible technology families include those analysed in Chapter 5.
The State does not attempt to own the fundamental reactor intellectual property before first deployment.
It attempts to own a large share of:
- engineering;
- manufacturing;
- construction;
- operations;
- lifecycle services.
10.68 Conditions under which Architecture I is internally coherent
Architecture I becomes coherent where:
- Government considers first-power timing a high-priority objective;
- at least one Western LWR-SMR has established credible licensing/construction evidence;
- conventional LEU fuel can be secured from diversified allied suppliers;
- Italy accepts dependence on foreign reactor design authority during the early fleet;
- vendor contract provides meaningful Italian/European localisation;
- an Italian site matches the design’s cooling and hazard envelope;
- regulator can leverage foreign reviews without surrendering independent judgment;
- FOAK financing can be closed on acceptable terms.
These are conditions, not a recommendation.
10.69 What Architecture I potentially buys Italy
- shorter technological learning curve;
- mature LWR fuel chain;
- easier regulatory reference;
- faster operator training than a wholly unfamiliar advanced reactor;
- early domestic generation;
- Italian supply-chain orders.
10.70 What Architecture I does not solve
- foreign reactor-IP dependency;
- fuel-cycle dependence;
- waste/repository requirement;
- FOAK financing risk;
- site politics;
- vendor software dependence.
Technology maturity reduces some risks.
It does not make the project domestically sovereign in every subsystem.
10.71 Architecture I failure condition
The architecture loses internal coherence if:
- the reference project experiences serious unresolved design failure;
- vendor refuses acceptable localisation/IP/support terms;
- financing premium destroys economic assumptions;
- no Italian site can host the chosen design;
- fuel diversification cannot be established.
In that case the problem may be the selected vendor/design rather than nuclear policy as a whole.
10.72 Architecture II — Italian-led AMR/LFR pathway
This architecture gives priority to technology sovereignty and advanced-reactor capability.
Italy builds the national programme around:
- ENEA;
- Ansaldo Nucleare;
- EAGLES;
- newcleo;
- lead-cooled-reactor infrastructure.
It accepts that commercial first power is likely later than under a mature LWR-SMR path.
10.73 Conditions under which Architecture II is internally coherent
Architecture II becomes coherent where:
- Government places a high value on domestic/European advanced-reactor intellectual property;
- first domestic electricity in the mid-2030s is not an overriding requirement;
- demonstration stages receive stable long-term funding;
- lead-material and component qualification progresses successfully;
- advanced fuel/MOX strategy becomes licensable and financeable;
- regulator develops fast-reactor competence;
- industrial policy is prepared to carry technology-development risk.
10.74 What Architecture II potentially buys Italy
- greater Italian engineering ownership;
- stronger advanced-reactor R&D ecosystem;
- exportable intellectual property;
- potentially higher-temperature industrial applications;
- different fuel-utilisation options.
10.75 What Architecture II does not solve
- near-term first power;
- fuel-cycle infrastructure;
- demonstration risk;
- geological disposal;
- FOAK finance;
- lead-reactor licensing precedent.
It deliberately trades schedule maturity for technology ownership potential.
10.76 Architecture II failure condition
It loses internal coherence if:
- demonstrators slip repeatedly;
- fuel fabrication cannot be established;
- materials/lead chemistry create unresolved licensing issues;
- Government continues promising LWR-like delivery dates despite an AMR development programme.
An advanced-reactor strategy can be rational only if its longer clock is accepted explicitly.
10.77 Architecture III — component exporter without immediate domestic FOAK
This architecture gives priority to industrial value with limited domestic project risk.
Italy strengthens:
- component manufacturers;
- engineering companies;
- nuclear qualification;
- fusion;
- decommissioning;
- foreign projects.
Domestic new-build remains optional or postponed.
10.78 Conditions under which Architecture III is internally coherent
Architecture III becomes coherent where:
- European/global reactor deployment creates sufficient export demand;
- Italian companies can qualify into foreign vendor chains;
- domestic siting or financing remains unresolved;
- Government values industrial participation even without immediate domestic generation;
- universities/research institutions retain enough nuclear competence without an operating fleet.
10.79 What Architecture III potentially buys Italy
- export revenues;
- nuclear skills retention;
- lower public FOAK exposure;
- manufacturing references;
- optionality for later domestic entry.
10.80 What Architecture III does not solve
- Italian firm low-carbon generation;
- domestic operator competence;
- national reactor licensing experience;
- reduced domestic gas/electricity import exposure.
It is an industrial strategy, not an electricity-generation strategy.
10.81 Architecture III failure condition
It loses coherence if:
- foreign programmes localise supply chains elsewhere;
- Italian firms cannot win sufficient nuclear orders;
- absence of domestic projects causes skills to migrate;
- industrial policy requires permanent subsidies without competitive export demand.
10.82 Architecture IV — defer domestic FOAK until waste/siting/institutional gates mature
This architecture gives priority to institutional sequencing and liability reduction.
Italy continues:
- regulation;
- research;
- supplier qualification;
- site methodology;
- Repository progress;
- European cooperation;
but delays the irreversible domestic reactor investment decision.
10.83 Conditions under which Architecture IV is internally coherent
Architecture IV becomes coherent where:
- Government considers repository/siting legitimacy more urgent than FOAK speed;
- current SMR cost evidence is judged too uncertain for investment commitment;
- foreign reference projects are expected to provide valuable learning during the delay;
- Italy can preserve industrial competence through exports and R&D;
- grid adequacy can be maintained using non-nuclear measures during the waiting period.
10.84 What Architecture IV potentially buys Italy
- additional FOAK evidence from abroad;
- lower technology-selection uncertainty;
- more time for regulator training;
- potential progress on National Repository;
- stronger legal/siting architecture;
- improved European fuel/supply-chain maturity.
10.85 What Architecture IV does not solve
- near-term need for firm low-carbon capacity;
- possible long-term gas dependence;
- industrial risk that foreign suppliers establish locked-in ecosystems without Italy;
- probability that later deployment rates required for PNIEC 2050 scenarios become very difficult.
Delay reduces some risks and increases others.
10.86 Architecture IV failure condition
It loses internal coherence if “temporary delay” becomes an indefinite absence of decision while:
- skills decay;
- supplier investment disappears;
- regulator competence is not maintained;
- no alternative adequacy plan is implemented.
A delay strategy requires explicit milestones just as a construction strategy does.
10.87 Comparative architecture matrix
| Strategic condition | Architecture I — Western LWR-SMR | Architecture II — Italian-led AMR/LFR | Architecture III — Export/component | Architecture IV — Delay domestic FOAK |
|---|---|---|---|---|
| Earliest domestic generation | Earlier | Later | None initially | Later |
| Italian reactor IP | Limited/moderate | High potential | Component IP | Preserved option |
| Fuel maturity | High for LEU | Lower / specialised | Project-dependent | Improves with time |
| Regulatory maturity | Highest potential | Lower | Limited domestic need | Time to improve |
| FOAK State exposure | Significant | Potentially higher technology risk | Lower | Deferred |
| Domestic adequacy contribution | Yes if deployed | Later | No | No near term |
| Export strategy | Strong | Potentially strong | Core objective | Possible |
| Waste requirement | Yes | Yes | Foreign-project only domestically | Legacy only until build |
| Repository political interaction | Immediate relevance | Immediate/later relevance | Primarily legacy | Can be matured first |
| 2035 compatibility | Potentially | Weak | Not applicable | Not applicable |
| Advanced-technology sovereignty | Moderate | Highest potential | Component-level | Optionality |
This table describes strategic characteristics.
It does not rank the architectures.
10.88 The Government could also sequence architectures rather than choose one permanently
The four architectures are not necessarily mutually exclusive over a 25-year period.
A possible policy sequence could involve, for example:
- Architecture III during the preparatory period;
- then Architecture I or II after defined gates;
- while maintaining fusion continuously.
Alternatively:
- Architecture IV for several years;
- followed by Architecture I once foreign FOAK evidence matures.
The key is that sequencing must be explicit.
Otherwise Government can claim simultaneously to pursue:
- immediate deployment;
- technology sovereignty;
- no FOAK risk;
- no foreign dependence;
even where those objectives conflict.
10.89 Architecture choice should be linked to the national objective, not the technology brand
The first decision is not:
Which reactor do we like?
It is:
What problem is the State attempting to solve?
Potential primary objectives include:
Electricity adequacy
Favors technologies with:
- high deployment maturity;
- dependable output.
Industrial sovereignty
Favors:
- domestic technology;
- IP;
- manufacturing.
Decarbonisation speed
Favors resources available soon.
2050 portfolio resilience
Allows longer-horizon nuclear development.
Export strategy
May be achieved without domestic operation.
The Government may pursue several objectives, but it should identify trade-offs explicitly.
10.90 A decision matrix should use conditions, not political scoring
A state decision dossier should compare each architecture against:
- first-power date;
- capital requirement;
- public guarantee;
- fuel dependence;
- domestic industrial value;
- regulator burden;
- site burden;
- waste burden;
- system adequacy value;
- export potential.
The Cabinet/Parliament then decides the political weighting.
This report does not provide a disguised “winner” by assigning political preferences to those weights.
10.91 The choice should be revisited at defined evidence points
At minimum:
2028–29
Review:
- decrees;
- regulator;
- international SMR evidence.
2030–32
Review:
- selected site;
- FOAK reference performance;
- financing.
FOAK FID
Review full architecture.
FOAK operation
Reassess fleet decision.
This prevents a 2026 strategic preference from becoming permanent despite contradictory later evidence.
10.92 Nuclear should be assessed against system cost, not only LCOE
LCOE is useful for comparing lifetime average production cost.
It does not measure:
- adequacy;
- transmission;
- storage;
- curtailment;
- balancing;
- grid-forming requirements;
- commodity risk.
Therefore the final State decision should compare total system cost under matched reliability and emissions constraints.
That analysis should include:
- nuclear;
- renewables;
- storage;
- gas/CCS;
- interconnection.
10.93 Gas scenarios must include fuel-price stress
Gas generation can have lower initial CAPEX than nuclear.
But its long-term electricity cost is sensitive to:
- gas price;
- carbon price;
- methane policy.
The financial comparison should therefore model:
- low gas;
- central gas;
- high gas;
- supply disruption.
Nuclear models should likewise stress:
- CAPEX;
- delay;
- financing.
Comparing optimistic nuclear with pessimistic gas, or vice versa, would produce a predetermined answer rather than an analysis.
10.94 Nuclear scenarios must include cost-of-capital stress
A reactor with low financing cost can produce a very different electricity price from the same reactor with a high required return.
Therefore the Government must show nuclear results under:
- sovereign-like financing;
- regulated/CfD financing;
- merchant/private financing.
The support mechanism should not be hidden inside a single LCOE.
10.95 Renewable scenarios must include curtailment and grid cost
A high-renewables scenario should not assume every generated MWh can be consumed.
It must incorporate:
- curtailment;
- storage losses;
- grid expansion;
- balancing.
Terna’s grid plan already demonstrates that very high renewable deployment requires major infrastructure. [G]
This is not a criticism of renewables.
It is the same whole-system accounting standard applied to nuclear.
Electricity imports are most valuable when neighbouring systems have spare capacity.
During a widespread European cold, dark, low-wind period, several markets can become tight simultaneously.
Therefore interconnection capacity should not be modelled as guaranteed firm generation.
It provides:
- diversification;
- trading;
- reserve sharing;
but its capacity credit should reflect correlated system conditions.
10.97 CCS scenarios must include transport and storage capacity
A gas plant cannot claim CCS decarbonisation unless:
- capture unit exists;
- pipeline/ship transport exists;
- storage injection capacity exists;
- monitoring and liability are established.
Ravenna Phase 2 is potentially important because it creates shared infrastructure.
But until the full chain is operational, nominal capture capability does not equal a mature national CCS system.
10.98 Mediterranean security should enter every scenario
The system should be stress-tested against:
- Algerian interruption;
- LNG price spike;
- Mediterranean shipping disruption;
- electricity-interconnection outage;
- uranium/enrichment disruption.
Different portfolios respond differently.
This is the correct way to quantify strategic resilience.
10.99 The Nuclear Alliance can support fuel and industrial resilience
Italy’s 2026 participation in the European Nuclear Alliance gives it an additional forum for coordination around:
- nuclear financing;
- EU taxonomy;
- fuel-cycle policy;
- post-2030 clean-energy framework.
The June 2026 Alliance statement called for a technology-neutral post-2030 framework recognising both nuclear and renewables as contributors to decarbonisation, security and competitiveness. [G]
This political coordination can reinforce national options.
It does not replace the domestic evidence base.
10.100 The European SMR strategy creates a fleet opportunity Italy should evaluate
The Commission is explicitly trying to avoid a European market composed of many incompatible national one-off reactors.
Its preferred industrial logic is:
- selected designs;
- multiple countries;
- repeated units;
- shared supply chains.
[G]
This matters to Italy because the economics of an Italian FOAK improve if the same design is simultaneously being built elsewhere in Europe.
Therefore technology selection should examine not only:
best reactor for Italy
but:
which reactor has a credible European fleet behind it.
10.101 Conversely, Europe-wide fleet lock-in can create concentration risk
A European fleet can reduce cost through standardisation.
It can also create systemic dependence on:
- one vendor;
- one fuel design;
- one digital platform.
Italy should therefore distinguish:
standardisation benefits
from
single-source strategic risk.
A European industrial policy should ideally develop multiple qualified suppliers inside a common reactor ecosystem.
10.102 The final decision is therefore a risk-allocation decision
Every architecture allocates risk differently.
Architecture I
Transfers more technology-development risk to a foreign mature vendor but retains:
- finance;
- site;
- construction;
- foreign dependency.
Architecture II
Retains more technological value in Italy but also retains more development risk.
Architecture III
Avoids domestic FOAK risk but leaves electricity-system benefits abroad.
Architecture IV
Reduces early commitment risk but increases schedule/opportunity risk.
There is no architecture in which all risk disappears.
10.103 The Government should state explicitly which risks it accepts
A final strategic decision should identify acceptable exposure in at least:
- public finance;
- foreign technology;
- fuel;
- site conflict;
- waste;
- delivery date;
- industrial dependence.
Without that statement, the debate defaults to reactor branding rather than sovereign risk management.
10.104 The four architectures should not be presented to the public as certainties
Each is conditional.
The correct language is:
“If these conditions are met, this pathway becomes executable.”
Not:
“This pathway will inevitably deliver these benefits.”
That distinction is particularly important given Italy’s 1987 and 2011 institutional memory.
10.105 Final government decision structure
The Government’s final decision can be organised around five questions.
Question 1 — Is domestic nuclear generation required for the national 2040–2050 system?
This is an electricity-system question.
It should be answered through total-system modelling.
Question 2 — How early must domestic nuclear electricity arrive?
This determines whether mature LWR-SMRs or later advanced reactors remain compatible with the policy objective.
Question 3 — How much foreign technology dependence is acceptable?
This determines the trade between:
- near-term deployment maturity;
- national IP.
Question 4 — What public financial exposure is acceptable?
This determines:
- CfD;
- guarantees;
- loans;
- fleet scale.
Question 5 — What institutional gates must be passed before commitment?
This determines whether Italy selects:
- immediate deployment;
- advanced development;
- industrial export;
- conditional delay.
10.106 Conditions that support Architecture I
Without ranking it against the others, Architecture I is most internally consistent where the State prioritises:
- earlier domestic firm low-carbon capacity;
- lower technology-development risk;
- conventional fuel maturity;
- accelerated licensing through foreign reference evidence.
It requires acceptance of:
- foreign reactor IP;
- imported fuel-cycle services;
- vendor relationship.
10.107 Conditions that support Architecture II
Architecture II is most internally consistent where the State prioritises:
- domestic advanced-reactor technology;
- long-term export IP;
- Italian research leadership;
- advanced industrial applications.
It requires acceptance of:
- later deployment;
- more development risk;
- advanced fuel-cycle complexity.
10.108 Conditions that support Architecture III
Architecture III is internally consistent where:
- domestic reactor economics remain uncertain;
- siting remains difficult;
- European nuclear construction nonetheless creates export demand;
- Italy wishes to preserve industrial optionality.
It requires acceptance that:
- domestic electricity-system nuclear benefits are deferred or absent.
10.109 Conditions that support Architecture IV
Architecture IV is internally consistent where:
- waste/siting/regulator readiness is considered a prerequisite to irreversible new build;
- foreign FOAK evidence is expected to materially reduce uncertainty;
- non-nuclear resources can maintain adequacy during the delay.
It requires acceptance of:
- later first power;
- potentially lower achievable 2050 nuclear capacity.
10.110 The decision can change as evidence changes
A strategic architecture selected in 2027 should not become immune from evidence.
If:
- BWRX or other LWR FOAK cost falls materially;
- LFR demonstrators progress faster;
- gas/CCS becomes highly competitive;
- storage costs collapse;
- repository siting succeeds;
the relative strategic conditions change.
The national programme must therefore preserve scheduled re-evaluation.
10.111 The decision not to build immediately is also a decision with costs
Delay can preserve option value.
But it can also:
- extend gas dependence;
- lose industrial timing;
- require faster later deployment;
- allow other European countries to capture supply-chain leadership.
Therefore the counterfactual cost of waiting should be quantified rather than assumed to be zero.
10.112 The decision to build immediately is likewise a decision with option cost
Early commitment can:
- secure vendors;
- create skills;
- obtain first-mover industrial position.
But it can also lock Italy into:
- immature cost assumptions;
- a design later surpassed;
- unresolved waste/siting arrangements.
Therefore early commitment also consumes option value.
10.113 The State should therefore distinguish reversible and irreversible decisions
Reversible now:
- research;
- workforce;
- site studies;
- regulator expansion;
- supplier qualification;
- European regulatory cooperation.
Harder to reverse:
- final site acquisition;
- vendor lock-in;
- multi-billion-euro construction;
- long-term price guarantees.
This distinction is the strongest common element across all four architectures.
10.114 Actions with value under all four architectures
Several investments retain value regardless of the final reactor decision:
- strengthen ISIN/future regulator;
- preserve ENEA/CIRTEN nuclear skills;
- qualify Italian companies for export;
- complete legacy decommissioning;
- advance the National Repository;
- develop geological-disposal strategy;
- participate in ENSREG/IAEA cooperation;
- continue DTT/ITER/fusion work;
- strengthen electricity grid;
- improve storage/interconnection.
These are option-preserving investments.
They do not predetermine the political decision to build reactors.
10.115 Actions that become valuable only after a specific architecture is chosen
Examples include:
- vendor-specific reactor factories;
- site-specific cooling infrastructure;
- technology-specific fuel facilities;
- proprietary I&C localisation;
- reactor-specific operator simulator.
These should follow, not precede, technology architecture selection.
10.116 Final strategic assessment
Italy is no longer deciding whether nuclear technology exists.
It is deciding whether and how nuclear should become part of an already transforming energy and industrial system.
The non-nuclear system will continue evolving regardless.
Terna is already planning:
- more than €23 billion of grid investment;
- more than 65 GW of additional renewables by 2030;
- more than 70 GWh of new storage requirement;
- major internal and international interconnections. [G]
Gas infrastructure has become significantly more diversified since the 2022 crisis, with LNG alone supplying more than 20 bcm in 2025. [I]
Ravenna CCS gives Italy a tangible alternative pathway for lowering emissions from continued gas and industrial use. [I]
Europe is simultaneously building a more coordinated nuclear framework. Italy was participating in the Nuclear Alliance by 2026, while the European Commission had launched:
- an SMR strategy;
- industrial fleet coordination;
- regulator cooperation;
- a proposed SMR coalition.
[G]
Italian industry has meaningful advantages in:
- nuclear engineering;
- heavy components;
- testing;
- fusion;
- advanced lead-reactor R&D.
It does not yet possess a complete sovereign commercial reactor and fuel chain.
Fusion strengthens the strategic industrial portfolio but does not materially alter the 2030s fission decision. DTT remains under construction, ITER remains a major international R&D programme, and ENEA itself places commercial fusion on a long-term European roadmap extending toward demonstration around 2050. [G/I]
Maritime nuclear power similarly represents a real industrial option but not a near-term substitute for land-based licensing. Fincantieri, newcleo and RINA have a genuine development programme, while IMO is still revising the international Nuclear Code and SOLAS framework with a 2030 horizon. [I]
The principal strategic finding is therefore that Italy faces four legitimate but materially different nuclear state architectures.
Architecture I
A mature Western LWR-SMR pathway.
Its defining condition is acceptance of greater foreign reactor-technology dependence in exchange for lower deployment novelty.
Architecture II
An Italian-linked AMR/LFR pathway.
Its defining condition is acceptance of a later and technically more uncertain deployment timetable in exchange for greater potential national technology ownership.
Architecture III
An export/component-power strategy without immediate domestic FOAK.
Its defining condition is that industrial value can be captured internationally while domestic generation remains unresolved.
Architecture IV
A conditional delay until waste, regulation and siting have matured further.
Its defining condition is that Italy possesses adequate alternative measures to preserve electricity-system adequacy and industrial skills during the delay.
None is costless.
None resolves every policy objective.
The Government therefore does not face one question called “whether nuclear is good.”
It faces a portfolio of sovereign choices about time, capital, technology ownership and risk.
The decision should be made only after using common assumptions across all competing system pathways.
The Government should not compare:
- nuclear including all financing cost
against
- renewable generation excluding storage/grid;
or:
- nuclear excluding waste
against
- gas including carbon cost;
or:
- one technology’s central case
against
- another technology’s worst case.
The comparison must be symmetrical.
It should report, under common demand and reliability assumptions:
- total system cost;
- emissions;
- water;
- fuel dependency;
- delivery date;
- public guarantees;
- grid investment;
- storage;
- waste;
- industrial value;
- climate exposure.
Only after those variables are visible does the political decision properly begin.
The public-information requirement should follow the same principle.
The State should not attempt to erase the historical significance of the 1987 and 2011 referendums. Those events remain part of the political legitimacy environment in which the new programme must operate. [L]
The appropriate institutional response is not to present a campaign.
It is to present an auditable decision.
That means publishing:
- what is known;
- what is estimated;
- what remains uncertain;
- what each alternative costs;
- what risks the State is assuming;
- what decision can still be reversed.
The IAEA’s contemporary stakeholder guidance reaches essentially the same institutional conclusion: trust requires early, continuous, open and responsive engagement, including communication of waste responsibilities and significant uncertainties. [I]
Italy’s nuclear question should therefore be decided not through the claim that one technology is inevitable, but through a transparent comparison of national pathways.
The central strategic choice can finally be stated in exact terms:
Does Italy want to buy deployment maturity, develop technology sovereignty, monetise industrial capability without immediate domestic deployment, or preserve option value until institutional and waste conditions are stronger?
Those are the four materially different choices.
The decision between them is political.
The conditions under which each can work are technical, legal, financial and measurable.
CHAPTER 10 — LOAD-BEARING SOURCE REGISTER
Electricity-system alternatives, renewables, storage and interconnection
G1 — Terna, 2025 National Electricity Transmission Grid Development Plan. More than €23 billion of investment during 2025–2034; >65 GW additional RES by 2030 compared with 2023; 71.5 GWh storage requirement; increased internal and international transfer capacity.
Terna — 2025 Grid Development Plan
G2 — Terna, 2025 Development Plan — Overview. Principal infrastructure to 2034/2040 including Tyrrhenian Link, ELMED, Milano–Montalto, Adriatic Link, GR.ITA.2 and foreign-border reinforcements.
Terna — 2025 Development Plan overview
G3 — Terna, first MACSE auction, 30 September 2025. 10 GWh awarded for 2028 delivery; bids >4× demand; weighted clearing price ~€12,959/MWh-year.
Terna — First MACSE auction results
G4 — European Commission — Electricity interconnection targets. EU 2030 target of at least 15%.
European Commission — Electricity interconnection targets
G5 — Terna — Italy–Tunisia ELMED interconnection. Europe–North Africa electricity bridge intended to support security and renewable integration.
Terna — ELMED Italy–Tunisia interconnection
Gas, LNG and Mediterranean energy security
I1 — Snam, 2025 financial results and 2026–2030 Strategic Plan. Italian 2025 gas demand ~63.42 bcm; LNG >20 bcm; Ravenna FSRU operating from May 2025.
Snam — 2025 gas-system results
I2 — Snam Annual Report 2025. 64.08 bcm network injections; 40.41 bcm foreign pipeline entries; 20.48 bcm LNG terminal entries; sharp reduction in Tarvisio/Russian pipeline volumes.
Snam — Annual Report 2025
I3 — Snam, geopolitical-risk disclosure. MENA, former Soviet and other external gas-supply risks.
Snam — Geopolitical and gas-supply risk disclosure
G6 — ARERA Annual Report summary. Italian gas-source diversification and historic shift away from concentrated Russian dependence.
ARERA — Annual Report 2026 summary
Gas plus CCS
I4 — Eni Annual Report 2025 — Ravenna CCS. Phase 1 approximately 25 kt CO₂/year; >90% capture efficiency; Phase 2 target 4 Mt/year by 2030 with possible later expansion up to 16 Mt/year.
Eni — Annual Report 2025 / Ravenna CCS
G7 — MASE PNIEC 2024. Ravenna CCS programme and potential future scale.
MASE — PNIEC 2024
G8 — MASE/UNMIG — Ravenna CCS Phase 1 monitoring framework.
MASE — Ravenna CCS Phase 1 monitoring documentation
European nuclear policy and alliances
G9 — European Commission, 10 March 2026 — EU SMR Strategy. First European SMRs targeted for early 2030s; European fleet approach, industrial supply chain, regulatory cooperation, fuel-cycle services and SMR coalition.
European Commission — EU SMR Strategy
G10 — European Commission, COM(2026)117. Detailed regulatory-cooperation, SMR coalition, IP protection and strategic-autonomy proposals.
European Commission — Future development and deployment of SMRs in Europe
G11 — European Commission — SMR policy portal. European Industrial Alliance on SMRs and projected 17–53 GW EU SMR capacity by 2050.
European Commission — Small Modular Reactors
G12 — Polish Ministry of Energy, 26 June 2026 — Nuclear Alliance meeting. Lists Italy among participating states; Greece and Latvia as observers; joint position on post-2030 technology-neutral clean-energy framework.
Polish Ministry of Energy — Nuclear Alliance meeting, June 2026
G13 — Polish Ministry of Energy, 16 March 2026 — Nuclear Alliance joint statement. Italy included among participating countries and support expressed for the EU SMR strategy.
Nuclear Alliance — March 2026 joint statement
Regulatory cooperation
G14 — ENSREG SMR Task Force Dashboard, March 2026. Tracks EU national regulator engagement with multiple SMR designs and confirms continuing national licensing sovereignty.
ENSREG — SMR Task Force Dashboard, March 2026
I5 — IAEA SMR Regulators’ Forum / NHSI. Regulatory Cooperation Toolkit available in 2026 to support joint, collaborative and leveraged regulatory review.
IAEA — SMR Regulatory Cooperation Toolkit
I6 — IAEA NHSI Phase II. EAGLES-300 multinational pre-licensing pilot and future Global Framework for Advanced Reactor Reviews.
IAEA — NHSI Regulatory Track Phase II
Maritime nuclear applications
I7 — Fincantieri/newcleo/RINA — maritime nuclear propulsion feasibility study. Approx. 30 MWe closed mini-reactor concept studied for large vessels.
Fincantieri — Nuclear naval propulsion feasibility programme
I8 — Fincantieri 2026–2030 Business Plan. Nuclear propulsion retained as a longer-term sustainable propulsion ambition.
Fincantieri — 2026–2030 Business Plan
I9 — IMO SOLAS. Chapter VIII contains basic nuclear-ship requirements and refers to the Code of Safety for Nuclear Merchant Ships.
IMO — SOLAS Convention and nuclear ships
I10 — IMO, January 2026. Workplan to revise the Nuclear Code and SOLAS Chapter VIII, with adoption work aimed at 2030.
IMO — 2026 nuclear-powered ship regulatory workplan
I11 — IMO, September 2026 — ATLAS. IAEA/IMO cooperation on safe, secure and safeguarded maritime nuclear technologies, including legal and liability frameworks.
IMO — ATLAS maritime nuclear initiative
Fusion, DTT and ITER
G15 — ENEA, February 2026 — DTT gyrotron milestone. DTT under construction at Frascati; first 170 GHz, 1 MW gyrotron successfully tested.
ENEA — DTT reaches major fusion milestone
G16 — ENEA, 2026 Nuclear Research Programme. Fusion as a long-term strategic programme; DTT, breeding blanket, neutral beam and RFX infrastructure; European demonstration horizon toward 2050.
ENEA — Italian Nuclear Research Programme 2026
I12 — ITER — member contribution structure. Europe provides 45.6% of construction contribution; most contributions delivered through industrial components and systems.
ITER — ITER Members and contribution structure
I13 — ITER — Italian industrial participation. Italian companies including Ansaldo Nucleare, SIMIC and ASG participate in major ITER assembly and magnet work.
ITER — European/Italian manufacturing contributions
I14 — Eni/CFS, September 2025. More than $1 billion offtake agreement for future ARC fusion electricity; Eni strategic investor since 2018.
Eni — Commonwealth Fusion Systems commercial partnership
Nuclear liability and insurance
G17 — Italian Permanent Representation to International Organisations in Paris — amended Paris/Brussels regime. General €700 million operator layer and combined compensation architecture of at least €1.5 billion.
Italian Foreign Ministry — Paris and Brussels nuclear liability regime
I15 — OECD Nuclear Energy Agency — Brussels Supplementary Convention. Three-tier compensation architecture.
OECD-NEA — Brussels Supplementary Convention
I16 — OECD Nuclear Energy Agency — Paris Convention. Strict/chanelled operator liability and mandatory financial security.
OECD-NEA — Paris Convention
Stakeholder engagement and information ethics
L1 — Chamber of Deputies Research Service, 25 May 2026. Official history of Italy’s nuclear programme and the 1987/2011 referendum episodes.
Chamber of Deputies — 2026 nuclear delegation dossier
I17 — IAEA, 2025 — stakeholder engagement in nuclear programmes. Open, transparent, early and continuous engagement identified as essential across the full nuclear lifecycle.
IAEA — Stakeholder engagement in nuclear programmes
I18 — IAEA risk-communication guidance. Honesty, openness, transparency and communication of uncertainty as foundations of public trust.
IAEA — Nuclear risk communication guidance
I19 — IAEA Nuclear Energy Series — stakeholder/public participation guidance. Integrity, documentation, responsiveness and inclusion of differing views in nuclear programme engagement.
IAEA — Stakeholder engagement and public participation guidance
END OF CHAPTER 10
CHAPTER 11 — FROM NUCLEAR EXIT TO POLICY RE-ENTRY: ITALY’S FOUR-DECADE POLITICAL, LEGAL AND GEOPOLITICAL REVERSAL, 1986–2026
11.0 Narrative Introduction — How Italy moved from nuclear withdrawal to the reconstruction of a national nuclear option
Italy’s return to nuclear policy under the government of Giorgia Meloni cannot be understood simply as the decision of one government to reverse the decision of another. It is the latest stage of a political, industrial and geopolitical cycle that has lasted almost forty years, during which nuclear power moved repeatedly between three very different roles in Italian public life: first as an instrument of technological modernisation, then as a symbol of unacceptable technological and institutional risk, and finally, after the European energy crisis that followed Russia’s invasion of Ukraine, as a possible component of national energy security, industrial competitiveness and decarbonisation.
That history matters because the contemporary Italian debate is often conducted through simplified slogans. One version says that Italians permanently abolished nuclear power in the 1987 referendum and that any subsequent attempt to reopen the issue represents a rejection of the popular vote. Another says that the referenda merely concerned minor technical provisions and therefore have little relevance to present policy. Neither description adequately captures what happened.
The first essential fact is that Italy was not historically a country outside nuclear technology. It was one of the earlier European states to develop commercial nuclear electricity. By the mid-1960s, Garigliano, Latina and Trino were operating, and Caorso later added a much larger boiling-water reactor to the system. Italy therefore entered the nuclear age as an industrial participant rather than as an external observer. The country accumulated engineering knowledge, operating experience, research capability and industrial expertise that remained significant even after commercial nuclear generation disappeared.
The second essential fact is that Italy’s withdrawal from nuclear electricity was not created by a single legal act. The 1987 referenda followed the shock produced by Chernobyl, but they did not contain a question stating that nuclear power was forever prohibited in the Italian Republic. The three questions concerned specific elements of the legal and institutional framework: plant siting powers, payments to local authorities hosting nuclear facilities and ENEL’s participation in foreign nuclear projects. The votes were nevertheless politically overwhelming. Roughly four out of five valid votes supported repeal in the first two questions, while more than 71% supported repeal of the provision concerning ENEL participation abroad.
That result created a political mandate much broader than the literal wording of the ballot papers. The nuclear system that existed before Chernobyl had lost political legitimacy. The Italian state then translated that political result into energy policy through decisions taken after the referendum. The closure of existing plants, abandonment of planned construction and conversion or cancellation of projects occurred through government decisions, CIPE resolutions and legislation. Caorso and Trino were formally ordered to close definitively by CIPE in July 1990; earlier measures had already closed Latina definitively, suspended Trino 2 and terminated construction of the nuclear plant at Montalto di Castro.
This distinction between referendum and implementation is more than a legal technicality. It explains why nuclear power could later return to political debate. Italy did not write an immutable constitutional prohibition against nuclear energy. It made a political decision, supported by a powerful referendum mandate, to dismantle the existing nuclear-development strategy. The consequences of that choice then accumulated over decades.
Italy ceased producing nuclear electricity, but it did not cease being a nuclear country in every other respect. It retained spent fuel, radioactive waste, decommissioning liabilities, research facilities, specialist engineering companies and a regulatory system required to supervise legacy nuclear activities. What disappeared was the electricity-producing fleet and the institutional continuity associated with constructing, licensing and operating new commercial reactors.
This created a peculiar asymmetry. Italy continued to bear some of the long-term obligations created by its earlier nuclear programme while receiving no electricity from domestic nuclear stations. At the same time, the European electricity system around Italy developed along very different national pathways. France retained and expanded a large reactor fleet. Switzerland maintained nuclear generation. Slovenia operated the Krško plant. Other countries, such as Germany, eventually moved toward their own nuclear exit, while several Central and Eastern European states maintained large nuclear shares.
Italy therefore did not leave a Europe that had uniformly abandoned nuclear power. It chose one particular national trajectory inside a continent that remained divided over nuclear energy.
The importance of that distinction became increasingly visible through the structure of the Italian power system. Italy expanded renewable electricity substantially and developed one of Europe’s major gas infrastructures, but natural gas also became deeply embedded in electricity generation and in the broader energy economy. Immediately before the geopolitical rupture of 2022, gas represented 42% of Italy’s total energy supply; 94% of that gas was imported, and approximately 41% of gas imports came from Russia. Gas was also responsible for roughly half of Italian electricity generation.
It would be historically incorrect to attribute that entire structure to the nuclear referenda. Italy had always possessed limited domestic fossil-fuel resources, and gas development reflected industrial, economic and environmental choices extending well beyond nuclear policy. Renewable deployment also changed the system profoundly. Nevertheless, the nuclear withdrawal removed one possible source of domestic, high-capacity-factor electricity from the national portfolio. What replaced it was not energy independence but a different configuration of dependencies.
This is one of the central themes necessary to understand the Meloni government’s later reversal. An energy system never becomes independent merely by eliminating one technology. It exchanges one set of dependencies for another. Nuclear power requires uranium, enrichment, fuel fabrication, technology and capital. Gas requires continuous fuel supply, pipelines, LNG terminals, foreign producers and exposure to international commodity prices. Renewable systems require extensive grids, storage, balancing, materials and manufacturing supply chains. The strategic question is therefore not whether dependency can be abolished. It is how dependency is diversified and which vulnerabilities a country chooses to accept.
For much of the period after 1987, however, nuclear power was politically different from every other energy technology in Italy. It became an identity question.
Chernobyl had transformed the perception of nuclear safety. The Italian debate subsequently fused technological risk with distrust of centralised decision-making, environmental politics, local control over territory and the right of citizens to intervene directly in major infrastructure choices. Nuclear power became capable of mobilising voters far beyond the relatively narrow technical question of electricity generation.
This helps explain why nuclear policy repeatedly became entangled with wider struggles over government authority.
It would be excessive to claim that opponents of nuclear power simply invented safety or environmental objections in order to attack governments. The historical record does not support that conclusion. Concerns about severe accidents, radioactive waste, construction cost, territorial consent and regulatory independence were substantive policy arguments and remain legitimate subjects of contemporary nuclear regulation.
But it is equally incomplete to describe Italian nuclear controversy as an exclusively technical debate.
In both the late 1980s and again in 2011, nuclear power became a vehicle through which wider political conflicts were expressed. The technology acquired symbolic weight. To oppose the government’s nuclear policy could also become a way of contesting the government’s competence, transparency or political authority. To support nuclear development could become a statement about modernisation, industrial sovereignty or confidence in the state’s ability to manage complex technologies.
This dynamic became especially visible during the fourth Berlusconi government.
By 2008–2009, the centre-right attempted the first serious reconstruction of an Italian nuclear new-build programme. The government created a legislative route toward new nuclear plants, fuel-cycle facilities and waste-management infrastructure. It represented the first major attempt to reverse the post-1987 settlement.
The programme immediately reopened all the unresolved conflicts of the earlier period: cost, siting, relations between the State and the Regions, waste, public consent and the interpretation of the referendum legacy.
Then Fukushima occurred.
The accident at Fukushima Daiichi in March 2011 changed the political environment in a manner strikingly similar to the way Chernobyl had changed it twenty-five years earlier. The Berlusconi government first suspended and then moved to dismantle its own nuclear legislative programme. The referendum nevertheless proceeded after judicial and political developments, and the result was again overwhelming. More than 25.6 million Italians voted in favour of repealing the remaining framework, corresponding to 94.05% of valid votes on the nuclear question.
The 2011 episode is particularly important because nuclear policy was now unmistakably entangled with the broader political confrontation surrounding Silvio Berlusconi’s government. Opposition forces openly connected the referendum campaign with wider questions about government legitimacy. At the same time, the government argued publicly that Fukushima had fundamentally changed the nuclear-safety environment and justified reconsideration of the programme.
Both dimensions belong in the historical record.
It is therefore more accurate to say that nuclear energy became a political multiplier. The underlying policy questions were real, but because nuclear power combined technological complexity, catastrophic-risk perception, major public expenditure, territorial conflict and national symbolism, it could amplify wider political struggles.
After the 2011 referendum, the nuclear question appeared politically closed for a second time.
But the energy system did not stop evolving.
Italy continued expanding renewable generation, energy efficiency and interconnection. At the same time, gas remained structurally important, and Italy continued to import substantial quantities of electricity through the European market. The contrast with France became especially visible because France preserved a large nuclear generation base while Italy did not.
That comparison must be handled carefully. France’s electricity system cannot be reduced to nuclear power alone, and differences in electricity prices or industrial performance cannot be attributed solely to the presence or absence of reactors. Hydropower, renewables, gas prices, interconnector availability, taxation, demand and market structure all matter.
Nevertheless, the physical relationship is real. France has been a net electricity exporter toward Italy every year since 1979. In 2025 the French net export balance toward Italy reached a record 26.2 TWh. RTE reported an average Italian wholesale electricity price of €116/MWh, compared with €61/MWh in France that year, while explicitly linking the export dynamic partly to France’s abundant competitive low-carbon generation and Italy’s continued dependence on gas.
The significance is not that Italy secretly “continued using French nuclear power” in some simplistic accounting sense. Electricity flows through an integrated market, and individual electrons are not allocated by technology. The more important geopolitical point is that Italy’s domestic nuclear exit did not remove nuclear energy from the continental system on which Italy depended. It removed nuclear generation from inside the Italian national electricity portfolio while neighbouring countries retained it.
For decades, that distinction remained politically manageable because security of energy supply was often treated primarily as a commercial question: acquire gas from diversified suppliers, build pipelines and LNG infrastructure, strengthen interconnections and increase renewables.
Russia’s full-scale invasion of Ukraine in February 2022 changed the strategic meaning of that arrangement.
Suddenly, the dependence of European energy systems on external fuel suppliers was no longer an abstract vulnerability. It became a central question of national security, foreign policy, inflation, industrial competitiveness and fiscal stability.
Italy was particularly exposed because of the importance of imported natural gas. The country responded rapidly and successfully in one respect: Russian gas dependence was reduced dramatically, with the Russian share of Italian gas imports falling to around 3% by November 2022.
But the geopolitical lesson extended beyond Russia.
Replacing Russian gas with gas from Algeria, Azerbaijan, LNG suppliers or other sources improved diversification, but it did not eliminate import dependence. It changed the geography of dependence.
That is the strategic environment in which Giorgia Meloni’s government came to power.
The centre-right coalition had already signalled the change during the 2022 election campaign. Its common programme did not present nuclear energy as a substitute for renewable development. It committed to increasing renewable production, diversifying energy supplies and improving energy efficiency while also calling for the evaluation of latest-generation nuclear technology without what it described as ideological preclusion.
This is important because the new nuclear narrative differed substantially from the political language of earlier decades.
The question was no longer framed primarily as:
nuclear versus environmentalism.
It was increasingly framed as:
nuclear plus renewables plus grids plus storage as components of a more diversified low-carbon system.
The new political language also added two concepts that had become much more important after 2022: energy sovereignty and strategic autonomy.
Those terms should not be interpreted literally as national autarky. Italy cannot mine every mineral, manufacture every solar panel, produce all of its gas or control every nuclear-fuel stage domestically. The practical meaning is resilience: avoiding excessive dependence on any single fuel, country, transport corridor or technological supplier.
The Meloni government’s approach after taking office was also more gradual than the idea of an immediate “nuclear return” suggests.
Italy did not immediately announce a reactor, a site or a construction programme. The first steps were institutional.
On 9 May 2023, the Chamber of Deputies adopted parliamentary motions addressing nuclear energy within the country’s pathway toward climate neutrality. This moved nuclear from coalition programme language into formal parliamentary policy discussion.
The next decisive institutional step came on 21 September 2023 with the first meeting of the National Platform for Sustainable Nuclear Energy. The platform brought together research institutions, academia, the nuclear-safety sector, decommissioning organisations and industry. ISIN described its objective explicitly as defining a pathway toward the possible resumption of nuclear-energy use in Italy and identifying opportunities for the existing national nuclear industrial chain.
This was an important transition.
For the first time in the new policy cycle, nuclear power was no longer merely the subject of political speeches. The government was beginning to reconstruct the network of institutions required to evaluate an actual programme.
The 2024 PNIEC moved the process another step forward.
Nuclear energy entered official long-term national energy-system modelling. One scenario examined approximately 16 GW of nuclear capacity by 2050, capable under the modelling assumptions of supplying roughly 22% of projected Italian electricity demand. The model also calculated differences in total system cost between scenarios with and without nuclear generation.
The significance of this step should not be confused with a construction commitment.
The PNIEC did not order 16 GW of reactors.
It did something more preliminary but institutionally important: it placed nuclear power inside the set of technologies that the Italian state was prepared to model seriously as part of its future decarbonised energy system.
The political transformation was therefore already substantial.
In 2011, government policy was dismantling the legal framework for new reactors.
By 2024, government energy modelling was calculating how reactors might contribute to the 2050 electricity system.
The next stage was necessarily legal.
Italy could not credibly move from scenarios to projects while retaining a legal and regulatory structure designed primarily for decommissioning, radioactive-waste management, research and radiation protection. A functioning new-build programme requires rules for siting, licensing, nuclear safety, fuel, waste, spent fuel, decommissioning, institutional responsibilities and public participation.
The Meloni government therefore moved toward a delegation law designed to reconstruct this architecture.
The bill was introduced by the government in October 2025, approved by the Chamber of Deputies on 4 June 2026, and then transmitted to the Senate.
On 23 September 2026, the Senate gave final parliamentary approval by 81 votes to 51, with 7 abstentions. The division was politically significant: Fratelli d’Italia, Lega and Forza Italia supported the measure, as did Action; the Democratic Party, Five Star Movement and the Green-Left alliance opposed it, while Italia Viva abstained.
At the cut-off date of this report, 27 September 2026, the parliamentary process had therefore been completed, but the Senate record still classified the measure as definitively approved and not yet published.
That is the point at which the language of a “return to nuclear power” must become precise.
Italy has not yet returned to nuclear electricity generation.
There is no newly licensed Italian power reactor.
There is no authorised new-build site.
There is no final investment decision.
There is no reactor under construction.
What has returned is the state’s willingness to create the legal and institutional option to build nuclear power again.
That distinction is fundamental to the rest of Chapter 11.
The Meloni government’s achievement to date is therefore political and institutional rather than physical. It has changed the status of nuclear power inside the Italian state. Nuclear has moved from being a technology excluded from practical national energy planning to being a technology for which Parliament has authorised the government to reconstruct an enabling framework.
This reversal is especially striking because it has occurred without erasing the political forces that opposed nuclear development in earlier periods.
The Democratic Party, Five Star Movement and the Green-Left alliance continue to oppose the current programme, although their arguments are not identical. The contemporary opposition debate focuses heavily on economics, timing, waste, regulatory governance, technological maturity and whether capital should instead be concentrated on renewables, grids and storage.
The governing parties, by contrast, frame nuclear power increasingly through security of supply, industrial competitiveness, European strategic autonomy and decarbonisation.
In other words, the dispute has changed.
The fundamental political conflict of 1987 was dominated by the consequences of Chernobyl.
The fundamental conflict of 2011 was shaped by Fukushima.
The conflict of the 2020s is shaped by a different combination of pressures:
climate targets, gas-price volatility, the Ukraine war, industrial competitiveness, electrification, artificial-intelligence and data-centre demand, the need for firm low-carbon generation, and growing European concern over strategic dependencies.
This does not make nuclear safety less important.
It changes the balance of risks that politics is being asked to evaluate.
During the post-Chernobyl period, Italian nuclear policy was driven by the fear that retaining nuclear power created unacceptable risk.
After 2022, policymakers were forced to confront the opposite category of question:
what risks are created by not having certain domestic generation options?
That does not generate an automatic answer in favour of nuclear power. Renewables, storage, interconnection, demand response and grids can all reduce fossil dependence. Nuclear itself creates cost, construction, waste, regulatory and supply-chain risks.
The strategic significance of the Meloni reversal is therefore not that one technology has finally been proven superior.
It is that the Italian state has reopened a technology option that had effectively remained outside national deployment policy for more than a decade.
That transformation also exposes the deepest weakness in Italy’s historical nuclear experience: policy discontinuity.
Nuclear infrastructure operates over generations. Governments operate over years.
A reactor programme requires continuity through:
technology selection, licensing, financing, construction, operation, waste management and decommissioning.
Italy’s political record instead contains repeated reversals:
nuclear development;
post-Chernobyl withdrawal;
Berlusconi relaunch;
post-Fukushima withdrawal;
Meloni relaunch.
For investors, regulators, manufacturers and local communities, that history matters almost as much as reactor technology.
If the political direction can change radically after each external shock or electoral cycle, financing becomes more difficult, industrial investment becomes riskier, skills are harder to retain and institutions repeatedly have to be rebuilt.
The strategic question behind Chapter 11 is therefore larger than whether the Meloni government is “pro-nuclear”.
It is whether Italy can now create a nuclear policy durable enough to survive changes of government while maintaining democratic legitimacy.
That requires separating the components that legitimately belong to political choice from those that should remain institutionally stable.
Governments may disagree over the desired nuclear share.
They may disagree over subsidies, technology selection and the pace of deployment.
But nuclear safety regulation, radioactive-waste accounting, emergency planning, decommissioning funds, fuel-security analysis and scientific evidence cannot function effectively if they are reinvented at every change of majority.
This is why the present debate cannot simply repeat the binary politics of earlier decades.
Italy now has to answer several questions simultaneously.
Can a new reactor programme be economically competitive enough to justify the capital committed to it?
Can nuclear complement, rather than obstruct, renewable deployment?
Can the state build an independent and technically credible regulatory system?
Can Italy define a waste and spent-fuel strategy before a new fleet produces additional material?
Can reactor technology and fuel be procured without replacing gas dependence with a new strategic dependence on one foreign nuclear vendor?
Can local communities participate in siting decisions without making nationally significant infrastructure institutionally impossible?
And above all, can the programme maintain legitimacy if its construction and operating life extends across many different governments?
These are the issues that the remainder of Chapter 11 disaggregates analytically.
The historical tables, referendum results, parliamentary votes and legal milestones that follow should therefore be read not as isolated facts but as components of one continuous strategic story.
Italy began the commercial nuclear era as an early European participant.
It withdrew after Chernobyl and the 1987 popular vote.
The state then institutionalised that withdrawal through the closure and cancellation decisions that followed.
It attempted to reverse course under Berlusconi.
Fukushima and the 2011 referendum closed that route again.
During the following decade, Italy deepened a power-system model combining renewables, gas and substantial cross-border electricity exchanges.
The Ukraine war then exposed the geopolitical dimension of imported energy dependency with exceptional clarity.
The Meloni coalition entered government having already reopened the nuclear question in its programme.
Between 2023 and 2026, that political intention moved through a sequence of increasingly concrete institutional stages:
parliamentary recognition;
the National Platform for Sustainable Nuclear Energy;
inclusion of nuclear scenarios in the PNIEC;
design of a new legal architecture;
government legislation;
and final parliamentary approval in September 2026.
The journey is therefore not:
“Italy banned nuclear power and Meloni simply reversed the ban.”
It is much more significant and much more complicated.
It is the history of a country that first built nuclear capability, then politically dismantled its generation programme, retained the liabilities and part of the expertise, attempted an unsuccessful return, became increasingly dependent on a different combination of imported energy sources, experienced a profound geopolitical energy shock, and has now decided to reconstruct the legal possibility of domestic nuclear generation.
That is the analytical framework within which every subsequent section of Chapter 11 should be read.
The essential transformation can be expressed in one sentence:
Italy has moved from treating nuclear power as a politically excluded technology to treating it once again as a legitimate strategic option whose actual deployment must still be proven technically, economically, institutionally and democratically.
Whether that transition eventually produces operating reactors is the next chapter of the Italian nuclear story.
As of September 2026, it has produced something more preliminary but historically important:
the end of Italy’s institutional refusal to consider nuclear generation as part of its future energy system.
11.1 Executive finding: Italy did not move from a legal “eternal ban” to an overnight nuclear revival
The history of Italian nuclear policy is usually compressed into a deceptively simple sequence:
1987 REFERENDUM
↓
ITALY BANS NUCLEAR
↓
DECADES WITHOUT NUCLEAR
↓
MELONI RESTORES NUCLEAR
That version is politically familiar.
It is not legally or historically precise.
The verified sequence is substantially more complex:
EARLY ITALIAN NUCLEAR LEADERSHIP
↓
FOUR COMMERCIAL POWER REACTORS
↓
CHERNOBYL — APRIL 1986
↓
POLITICAL AND PUBLIC REASSESSMENT
↓
1987 ABROGATIVE REFERENDA
↓
1987–1990 GOVERNMENT / PARLIAMENT / CIPE
DECISIONS IMPLEMENTING NUCLEAR WITHDRAWAL
↓
NO DOMESTIC NUCLEAR ELECTRICITY GENERATION
↓
DECOMMISSIONING + WASTE LEGACY
↓
2008–2010 BERLUSCONI NUCLEAR RELAUNCH
↓
FUKUSHIMA — MARCH 2011
↓
GOVERNMENT RETREAT + 2011 REFERENDUM
↓
SECOND POLITICAL CLOSURE
↓
2011–2022:
RENEWABLE EXPANSION + GAS DEPENDENCE +
CONTINUING ELECTRICITY IMPORTS
↓
2022 EUROPEAN ENERGY-SECURITY SHOCK
↓
CENTRE-RIGHT PROGRAMME:
REOPEN NUCLEAR OPTION
↓
2023 PARLIAMENTARY POLICY PIVOT
↓
2023 NATIONAL PLATFORM FOR
SUSTAINABLE NUCLEAR
↓
2024 PNIEC NUCLEAR SCENARIOS
↓
2024–2025 LEGAL FRAMEWORK DESIGN
↓
2025 GOVERNMENT DELEGATION BILL
↓
4 JUNE 2026 — CAMERA APPROVAL
↓
23 SEPTEMBER 2026 — SENATE FINAL APPROVAL
↓
27 SEPTEMBER 2026:
PARLIAMENTARY RE-ENTRY COMPLETED,
ACT NOT YET PUBLISHED / IN FORCE
The central conclusion of this chapter is therefore more precise:
The Meloni government has not yet restored nuclear electricity generation in Italy. It has restored nuclear fission to the formal domain of Italian national energy policy and obtained parliamentary approval for the legal delegation required to reconstruct a nuclear programme.
As of 27 September 2026, Italy has:
- no operating commercial nuclear power reactor;
- no authorised new nuclear construction site;
- no construction licence for a new power reactor;
- no final investment decision for a new nuclear plant;
- no new fuel-loading programme.
What has changed is nevertheless historically significant.
For the first time since the 2011 referendum, a government-backed legislative framework explicitly authorising the development of a new national nuclear legal architecture has completed parliamentary approval. The Senate approved the bill definitively on 23 September 2026, by 81 votes in favour, 51 against and 7 abstentions. The parliamentary record still described the measure, at the chapter’s cut-off date, as “approved definitively, not yet published.”
That distinction should remain explicit throughout this report.
11.1.1 Evidentiary protocol applied to this chapter
Because the subject is politically contested, this chapter applies a stricter hierarchy than an ordinary historical narrative.
| Evidence class | Source | Treatment |
|---|---|---|
| A — Primary legal | Constitution, Gazzetta Ufficiale, Constitutional Court | Treated as authoritative for legal status |
| A — Primary electoral | Ministry of Interior referendum archive | Treated as authoritative for votes |
| A — Primary parliamentary | Camera/Senato records | Authoritative for votes and what politicians actually said in Parliament |
| A — Institutional | MASE, ISIN, SOGIN, Terna, IEA, Eurostat, European Commission | Used for programme and system facts |
| B — Party programme | Official election programmes | Used only to establish documented party commitments |
| C — Political statement | Speech or declaration by political actor | Attributed explicitly; not converted into objective fact |
| D — Analytical inference | Synthesis from several verified facts | Identified as analysis, not historical fact |
The protocol excludes a particularly common error:
a claim about political motive is never treated as fact merely because an opponent alleged it.
This becomes essential when examining whether nuclear power was used to weaken or delegitimise governments.
There is clear documentary evidence that nuclear policy became entangled with broader government-opposition confrontation.
There is not sufficient evidence to state that opposition to nuclear power was merely or universally a pretext for destabilising governments.
Safety, economics, waste, territorial autonomy, energy strategy and public participation were also substantive documented arguments.
11.2 Italy was not historically marginal in nuclear power — it was one of Europe’s early nuclear countries
Italy’s nuclear history did not begin as the history of a technologically peripheral country.
During the first phase of commercial nuclear development, Italy built a diversified reactor fleet containing technologies from different Western nuclear traditions.
SOGIN’s current official records identify four Italian commercial nuclear power stations:
| Plant | Technology | Gross electrical power | Commercial operation | Plant stopped |
|---|---|---|---|---|
| Garigliano | BWR | 160 MWe | April 1964 | August 1978 |
| Latina | Magnox / gas-cooled reactor | 210 MWe initially; 160 MWe after 1969 | January 1964 | November 1986 |
| Trino “Enrico Fermi” | PWR | 272 MWe | January 1965 | March 1987 |
| Caorso | BWR | 860 MWe | December 1981 | October 1986 |
Latina was part of Europe’s pioneering commercial nuclear generation period. Garigliano represented an early European BWR installation. Trino introduced PWR industrial experience, while Caorso, at 860 MWe, represented a much larger second-generation plant.
This matters geopolitically.
Italy did not simply decide in the 1980s not to enter nuclear power.
It decided to abandon an industrial and operating capability that it had already developed.
Those are different strategic decisions.
11.2.1 An important correction: the 1987 referendum did not instantly switch off four operating reactors
This is one of the most persistent simplifications in public discussion.
By November 1987:
- Garigliano had been stopped since 1978;
- Latina had stopped in November 1986;
- Caorso had stopped for refuelling in October 1986 and was never subsequently restarted;
- Trino had stopped in March 1987.
The referendum therefore did not consist of voters pressing a legal switch that immediately shut down four normally operating plants.
The decisive consequence was different.
It transformed an already developing nuclear-policy crisis into a political mandate that successive institutions then converted into:
- abandonment of restart;
- cancellation of new nuclear projects;
- termination of construction;
- definitive plant closure;
- eventual decommissioning.
11.3 Chernobyl was the decisive accelerant, but Italian nuclear conflict had already begun
The explosion and fire at Unit 4 of the Chernobyl nuclear power plant on 26 April 1986 transformed the European political environment surrounding nuclear safety.
For Italy, Chernobyl did not create every objection to nuclear power from nothing.
But it radically increased:
- public risk perception;
- environmental mobilisation;
- political salience;
- pressure on parties to define positions;
- scepticism about future nuclear siting.
The shift was visible almost immediately in Parliament.
On 5 June 1986, Alessandro Natta and other MPs, led by the Italian Communist Party, submitted bill C.3819, proposing a consultative referendum on electricity production from nuclear plants.
This point is historically important because the PCI had not spent its entire post-war history opposing civil nuclear development.
The post-Chernobyl position represented an important political evolution.
Therefore it would be historically inaccurate to write:
“The Italian left had always opposed nuclear power.”
The documentary record supports a different formulation:
After Chernobyl, large parts of the Italian left moved decisively toward opposition to continued or expanded nuclear generation, joining environmental and radical movements that had already developed a stronger anti-nuclear position.
11.4 The 1987 anti-nuclear coalition was politically heterogeneous
The movement culminating in the 1987 referenda cannot be reduced to one party.
Parliamentary records show that Democrazia Proletaria, together with the Radical Party and environmental associations, played a central role in promoting the three nuclear abrogative referenda.
During the parliamentary debate of 24 April 1987, Democrazia Proletaria explicitly described its role in promoting the nuclear referendum campaign and the collection of more than one million signatures.
The political field increasingly included:
- environmental movements;
- Radical Party activists;
- Democrazia Proletaria;
- significant components of the PCI;
- parts of the broader left;
- local opposition movements.
Nuclear power was therefore becoming more than an engineering question.
It became simultaneously a debate about:
NUCLEAR SAFETY
+
CENTRAL STATE POWER
+
LOCAL CONSENT
+
ENVIRONMENT
+
TECHNOCRATIC AUTHORITY
+
ENERGY STRATEGY
+
PUBLIC DEMOCRATIC CONTROL
That combination explains why nuclear politics became unusually suitable for referendum mobilisation.
11.5 What Italians actually voted on in 1987
The greatest legal error in simplified accounts is the sentence:
“The 1987 referendum legally banned nuclear power.”
It did not.
The referendum of 8–9 November 1987 contained three nuclear-related abrogative questions.
Official Ministry of Interior results were:
| 1987 question | Turnout | Yes to abrogation | No | Legal subject |
|---|---|---|---|---|
| Localisation of nuclear plants | 65.10% | 80.57% | 19.43% | Abrogation of provisions concerning state intervention in siting |
| Contributions to local authorities | 65.12% | 79.71% | 20.29% | Abrogation of provisions concerning compensation/contributions linked to nuclear facilities |
| ENEL participation in foreign nuclear plants | 65.09% | 71.86% | 28.14% | Abrogation affecting ENEL participation in nuclear plants abroad |
The absolute Yes votes were respectively:
- 20,984,110;
- 20,618,624;
- 18,795,852.
These were decisive referendum victories.
But the legal object matters.
There was no ballot paper asking:
“Should nuclear power be permanently prohibited in the Italian Republic?”
11.5.1 Political meaning versus legal effect
Two levels must therefore be distinguished.
Political meaning:
VERY LARGE MAJORITY
↓
CLEAR REJECTION OF
CONTINUING THE EXISTING
NUCLEAR POLICY
Legal effect:
SPECIFIC STATUTORY PROVISIONS
↓
ABROGATED
The political meaning was broader than the literal legal text.
Government and Parliament then acted upon that broader political meaning.
This distinction is essential to understanding both the 2009 relaunch and the 2026 Meloni legislation.
11.6 The actual Italian nuclear exit was created by decisions taken after the referendum
The transition from referendum result to full nuclear withdrawal occurred through a sequence of governmental, parliamentary and administrative decisions.
Table 11.6-A — From referendum to actual shutdown
| Date | Decision | Consequence |
|---|---|---|
| 8–9 Nov 1987 | Nuclear referenda | Strong popular mandate against continuation of existing nuclear policy |
| Nov–Dec 1987 | CIPE decisions | Montalto works suspended; post-referendum implementation begins |
| 23 Dec 1987 | CIPE decision | Definitive closure of Latina/Foce Verde; Trino 2 work suspended |
| 1988 | New National Energy Plan | Nuclear withdrawal incorporated into wider energy planning |
| 10 Dec 1988 | Decree-Law 522 | Definitive interruption of Montalto nuclear construction |
| 10 Feb 1989 | Law 42/1989 | Conversion of the Montalto decision |
| 26 Jul 1990 | CIPE decision | Definitive closure of Caorso and Trino Vercellese |
Official Gazzetta Ufficiale records confirm the 26 July 1990 definitive closure of Caorso and Trino Vercellese.
Other official records confirm the 23 December 1987 decision closing Latina, suspending Trino 2, and the legislative termination and conversion of Montalto di Castro.
The historically correct chain is therefore:
REFERENDUM
↓
POLITICAL MANDATE
↓
GOVERNMENT / PARLIAMENTARY
ENERGY-POLICY CHANGE
↓
PROJECT CANCELLATION
↓
NO RESTART
↓
DEFINITIVE CLOSURE
The difference matters because it shows that Italy’s exit was not a mechanically self-executing constitutional prohibition.
It was a political decision implemented through ordinary state institutions after a referendum.
11.7 The 1987 nuclear question became entangled with a wider government crisis
The months around the 1987 referendum also demonstrate the first major case in which nuclear energy became intertwined with a broader struggle over government legitimacy and political procedure.
The sixth Fanfani government took office on 17 April 1987 during the crisis that followed the end of the Craxi government.
Parliament was dissolved on 28 April 1987, leading to early elections in June.
During this period opposition MPs openly questioned whether parliamentary dissolution and referendum timing might interfere with the scheduled popular consultations.
Prime Minister Fanfani defended the institutional handling of the issue and argued, in parliamentary exchanges, that arrangements being considered were intended to preserve the possibility that the referenda would take place even if Parliament was dissolved.
This episode supports a careful conclusion.
It demonstrates that nuclear policy had become part of a broader institutional and political confrontation.
It does not prove that the 1987 government crisis was created principally by nuclear policy.
The government crisis involved the broader collapse of the pentapartito political arrangement.
Nuclear energy became one element inside that political crisis rather than its sole cause.
11.8 Nuclear power became a high-value political symbol
From 1987 onward, nuclear energy possessed characteristics that made it unusually powerful in Italian political confrontation.
It touched:
- fear of catastrophic risk;
- trust in government;
- central versus local authority;
- environmental protection;
- industrial modernisation;
- electricity prices;
- scientific expertise;
- national sovereignty;
- foreign dependency.
The issue could therefore function simultaneously at two levels.
Policy level
COST
SAFETY
WASTE
SITING
TECHNOLOGY
ENERGY SECURITY
Political-symbolic level
TRUST IN GOVERNMENT
↓
TRUST IN TECHNOCRACY
↓
CENTRAL AUTHORITY
↓
RIGHT OF CITIZENS TO DECIDE
↓
GOVERNMENT CREDIBILITY
This dual character helps explain why nuclear issues repeatedly generated political confrontation disproportionate to the number of reactors actually operating in Italy.
11.9 Italy became a nuclear decommissioning state rather than a country without nuclear obligations
After the closure decisions, Italy stopped generating nuclear electricity.
It did not stop having nuclear responsibilities.
The country retained:
- irradiated fuel;
- radioactive waste;
- contaminated plant structures;
- research facilities;
- fuel-cycle installations;
- regulatory obligations;
- decommissioning requirements.
In 1999, the electricity-market reform transferred ENEL’s nuclear assets into SOGIN, creating the institutional mechanism for dismantling the former fleet and managing the legacy nuclear cycle. SOGIN eventually became responsible for the four commercial nuclear sites and other fuel-cycle facilities.
The strategic transformation can therefore be represented as:
BEFORE EXIT
NUCLEAR CAPABILITY
↓
ELECTRICITY
+ INDUSTRY
+ WASTE
AFTER EXIT
NO NUCLEAR ELECTRICITY
↓
BUT
↓
DECOMMISSIONING
+ WASTE
+ REGULATION
+ INDUSTRIAL KNOWLEDGE
+ COST
This is an important geopolitical point.
Italy retained part of the liability side of the nuclear cycle while losing the domestic generation side.
11.10 The post-nuclear energy system created a different dependency architecture
It would be analytically incorrect to claim that abandoning nuclear power alone created Italy’s subsequent energy dependence.
Italy had historically possessed limited domestic fossil resources, significant gas infrastructure and major industrial energy demand.
Renewable energy also expanded substantially over subsequent decades.
But the nuclear exit removed one potential domestic source of large-scale low-carbon dispatchable electricity from the national mix.
As a result, the Italian energy system evolved with a particularly important role for:
- imported natural gas;
- gas-fired power generation;
- electricity imports;
- interconnections with nuclear-producing neighbours.
The IEA’s 2023 review provides a particularly important pre-Ukraine-war baseline.
In 2021:
- natural gas represented 42% of Italy’s total energy supply;
- approximately 94% of gas was imported;
- around 41% of Italian gas imports came from Russia;
- gas generated around 50% of Italian electricity.
This created a strategic exposure that became unmistakable after Russia’s invasion of Ukraine.
11.10.1 The dependency was transformed, not eliminated
A useful geopolitical comparison is:
DOMESTIC NUCLEAR
↓
DEPENDENCIES:
URANIUM
ENRICHMENT
FUEL FABRICATION
VENDOR TECHNOLOGY
CAPITAL
GAS-DOMINANT SYSTEM
↓
DEPENDENCIES:
PIPELINES
LNG
EXPORTING STATES
GLOBAL GAS PRICE
CONTINUOUS FUEL DELIVERY
HIGH-RENEWABLE SYSTEM
↓
DEPENDENCIES:
GRID
STORAGE
MATERIALS
MANUFACTURING
WEATHER DIVERSITY
FLEXIBILITY
No energy system is dependency-free.
The question is which dependencies a state chooses to accept and diversify.
11.11 Berlusconi IV reopened the nuclear question in 2008–2009
The first major attempt to reverse the post-1987 settlement came under the fourth Berlusconi government.
Law 23 July 2009, No. 99, particularly Article 25, delegated the government to establish a new nuclear regulatory framework covering:
- siting of nuclear electricity plants;
- nuclear-fuel fabrication;
- irradiated-fuel storage;
- radioactive-waste storage;
- final disposal;
- construction and operating authorisation;
- compensatory measures for affected territories.
This was not simply renewed research funding.
It was a genuine attempt to rebuild a legal route toward commercial nuclear generation.
11.11.1 The 2009 relaunch was already politically divisive
The principal governing centre-right forces supported the programme.
But even the governing side was not completely uniform.
A particularly significant parliamentary record from 24 June 2009 shows three PdL deputies—Benedetto Fabio Granata, Fabio Rampelli and Marco Marsilio—announcing abstention on Articles 25 and 26 and referring to an earlier public declaration opposing the return to nuclear power.
This fact matters because it demonstrates that today’s political alignments cannot simply be projected backward.
The current centre-right coalition did not exist in its present form.
Fratelli d’Italia itself did not yet exist.
11.11.2 PD and Italia dei Valori opposed the relaunch
Parliamentary records document opposition from the Partito Democratico and Italia dei Valori to the Berlusconi nuclear programme.
The reasons advanced in debate included:
- economic competitiveness;
- construction times;
- safety;
- waste;
- the breadth of the legislative delegation;
- insufficient regional and local participation.
The opposition should therefore not be described merely as an emotional reaction.
It contained substantive public-policy arguments even though political competition was also intense.
11.12 The 2009 programme also became a State–Region constitutional conflict
The nuclear relaunch immediately raised another historic Italian fault line:
Who controls the territory?
Several regions challenged the nuclear legislation before the Constitutional Court.
The disputed issues included:
- state authority;
- regional competences;
- siting;
- authorisation;
- territorial government;
- consultation;
- the legal strength of State–Region agreement.
The constitutional conflict demonstrated that any future Italian nuclear programme would need to rebuild more than reactor regulation.
It would need a politically sustainable system for:
STATE
↕
REGIONS
↕
MUNICIPALITIES
↕
LOCAL COMMUNITIES
This issue remains highly relevant to the current Meloni framework.
11.13 Fukushima destroyed the political viability of the Berlusconi relaunch
On 11 March 2011, the Fukushima Daiichi accident transformed the political environment surrounding nuclear power for a second time.
The Berlusconi government initially moved toward a moratorium.
It then went further.
On 20 April 2011, Industry Minister Paolo Romani told the Senate that the government was repealing the entire legal framework concerning the programme for localisation, construction and operation of new nuclear plants.
Romani presented the government’s reasoning in substantive policy terms.
According to his parliamentary statement:
- Fukushima had changed the safety environment;
- Italian plans needed alignment with European post-Fukushima procedures;
- a broader national energy strategy was necessary;
- security of supply, environmental sustainability, affordability and reduced dependence on imported oil and gas had to be reconsidered.
This is the government’s documented explanation.
11.14 Opposition parties simultaneously alleged a tactical political motive
The same parliamentary record contains a sharply different interpretation.
Italia dei Valori’s Felice Belisario alleged that the government’s repeal was not simply an energy-policy reassessment.
He argued that the government also wanted to remove the nuclear question from the referendum package and thereby reduce the likelihood that referendum turnout would reach the quorum, particularly because another referendum concerned the politically explosive issue of the Prime Minister’s legittimo impedimento.
That allegation is historically relevant.
It must remain an attributed opposition allegation, not be rewritten as established governmental motive.
The documented facts are:
- the nuclear referendum was scheduled together with three other questions;
- one of those concerned legitimate impediment of the Prime Minister and ministers;
- the government attempted to repeal the underlying nuclear programme before the vote;
- opposition parties publicly claimed a tactical relationship between these events;
- the government publicly gave a different explanation centred on Fukushima, safety and energy-strategy reassessment.
That is as far as a defensible governmental report should go.
11.15 The 2011 referendum delivered an even stronger anti-nuclear result
The referendum eventually proceeded.
The relevant question concerned repeal of the new provisions permitting nuclear electricity generation in Italy.
The result was:
- turnout: approximately 54.79%, including overseas voters;
- Yes to repeal: 25,643,652 — 94.05%;
- No: 1,622,090 — 5.95%.
The quorum was therefore achieved.
The political signal was overwhelming among those participating.
Table 11.15-A — Comparison of Italy’s two nuclear referenda
| Element | 1987 | 2011 |
|---|---|---|
| Triggering context | Chernobyl / existing nuclear-policy crisis | Berlusconi relaunch + Fukushima |
| Legal mechanism | Three abrogative nuclear questions | Abrogation of the new nuclear framework |
| Nuclear turnout | ~65% | 54.79% |
| Highest anti-nuclear result | 80.57% on siting question | 94.05% |
| Immediate political consequence | Nuclear withdrawal implemented through subsequent state decisions | New-build programme blocked |
| Constitutional “permanent ban”? | No | No |
11.16 Neither referendum created an immutable constitutional prohibition on legislating about nuclear energy
This is one of the most legally sensitive parts of the current debate.
Article 75 referenda repeal legislation.
They do not amend the Constitution.
Constitutional Court doctrine nevertheless imposes an important constraint: Parliament cannot simply neutralise the popular vote by immediately restoring, formally or substantially, the same rules that voters have just repealed.
In judgment No. 199/2012, the Court held unconstitutional legislation that substantially restored a framework rejected in a referendum only weeks earlier, stressing the prohibition on immediate formal or substantive restoration of the repealed discipline where no relevant change of circumstances had occurred.
The constitutional doctrine should therefore be represented carefully:
REFERENDUM
↓
REPEALS SPECIFIC LAW
↓
LEGISLATURE CANNOT
IMMEDIATELY NULLIFY RESULT
BY REPRODUCING SAME RULES
↓
BUT
↓
SUBJECT MATTER IS NOT
REMOVED FOREVER FROM
PARLIAMENTARY LEGISLATION
This does not amount to a judicial ruling validating every provision of the 2026 Meloni legislation.
No such conclusion should be invented.
It means that the proposition:
“The 1987 and 2011 referenda constitutionally prohibited Italy from ever legislating again on nuclear energy”
is too broad.
The equally categorical opposite proposition:
“The referenda are now legally irrelevant”
would also be too broad.
They remain constitutionally and politically significant precedents.
11.17 Who opposed nuclear power — and why “always” requires precision
The phrase “who has always voted against nuclear power” cannot be applied literally across 1987–2026.
Italy’s party system changed dramatically.
Some current parties did not exist in 1987 or 2011.
Several historical parties no longer exist.
Political personnel migrated between organisations.
The responsible approach is therefore to identify documented continuity of opposition.
Table 11.17-A — Documented political opposition across the major nuclear turning points
| Political force / tradition | 1987 | 2009 | 2011 | 2026 | Documented principal arguments |
|---|---|---|---|---|---|
| Democrazia Proletaria | Strong promoter of anti-nuclear referenda | No longer relevant as same party | — | — | Safety, environmental and anti-nuclear programme |
| Radical Party | Major referendum promoter | Political structure changed | — | — | Direct democracy, environmental/safety concerns |
| Environmental/Green movements | Strong anti-nuclear mobilisation | Opposed relaunch | Opposed new nuclear | AVS voted against | Safety, waste, costs, renewable alternative, timing |
| PCI | Post-Chernobyl leadership supported referendum path | Party no longer existed | — | — | Safety and post-Chernobyl reassessment |
| PD | Did not exist | Opposed 2009 relaunch | Supported repeal/anti-nuclear outcome | Voted against 2026 bill | Costs, timing, safety, governance, waste, parliamentary control |
| Italia dei Valori | Did not exist | Opposed | Principal referendum promoter | No comparable current parliamentary role | Safety, costs, public mandate; also broader anti-Berlusconi confrontation |
| M5S | Did not exist | Did not yet have parliamentary role | Emerging movement period | Voted against 2026 bill | Cost/time comparison, waste, renewables/storage, technology maturity |
| AVS | Institutional predecessor parties differed | — | Green tradition opposed | Voted against | Timing, costs, waste, renewables, technological availability |
| PdL / Berlusconi centre-right | Different predecessor parties | Government promoted return | Government repealed programme after Fukushima | PdL no longer exists | Energy diversification/competitiveness; safety reassessment after Fukushima |
| FdI | Did not exist | Did not exist; some future FdI figures were in PdL | Did not yet exist | Supported | Energy security, industrial policy, decarbonisation, reduced fossil dependence |
| Lega | Different organisation/political phase | Supported governing relaunch | Supported governing position | Supported | Energy independence, industrial competitiveness |
| Forza Italia | Did not exist in 1987 | Core Berlusconi relaunch tradition | Government side retreated in 2011 | Supported | Diversification, competitiveness, energy security |
| Azione | Did not exist | Did not exist | Did not exist | Supported | Firm low-carbon generation, reduced gas dependence |
| Italia Viva | Did not exist | Did not exist | Did not exist | Abstained | Criticised bill structure while not rejecting nuclear option |
The table shows that the cleanest long-duration continuity lies not in one unchanged party organisation, but in political traditions.
The Italian environmental and Green tradition has maintained the strongest continuous anti-nuclear identity.
The PD has documented opposition to both the 2009 and 2026 new-build legislative initiatives, but the PD itself was founded only in 2007.
M5S cannot be projected backward into the 1987 debate.
11.18 The reasons for opposition have changed over time
Anti-nuclear politics has not relied on one argument.
1980s
Dominant concerns included:
- catastrophic accident risk;
- Chernobyl;
- siting;
- centralised decision-making;
- waste;
- environmental risk.
2008–2011
The debate increasingly included:
- capital cost;
- construction time;
- site governance;
- State–Region competences;
- waste repository;
- Fukushima;
- distrust of the Berlusconi programme.
2023–2026
Opposition arguments increasingly focus on:
- whether reactors can arrive soon enough for climate targets;
- cost relative to renewables and storage;
- SMR commercial maturity;
- unresolved waste;
- water/cooling requirements;
- breadth of the delegated legislation;
- parliamentary oversight;
- public participation.
For example, during the Senate’s 23 September 2026 debate, M5S senator Elena Sironi asked that reactor construction time, complete costs, radioactive-waste costs and decommissioning costs be compared transparently with renewables and storage.
PD senator Nicola Irto criticised what he characterised as an excessively broad governmental delegation and argued for a more autonomous nuclear-safety authority and stronger parliamentary involvement.
AVS senator Peppe De Cristofaro opposed the bill on the grounds that advanced nuclear technologies would arrive too late and divert political attention from renewable technologies. That was an explicitly political argument by AVS, not a finding adopted by this report.
11.19 Was nuclear power used as a political weapon against governments?
The evidence supports a qualified yes, but not the strongest possible version of that thesis.
Nuclear power repeatedly became a vehicle through which broader political dissatisfaction could be mobilised.
1987
Nuclear referenda became entangled with:
- collapse of the governing coalition;
- early elections;
- referendum timing;
- opposition allegations concerning institutional manoeuvring.
2011
The relationship became substantially more explicit.
The nuclear referendum was held together with:
- two water/public-service questions;
- the referendum on legitimate impediment affecting the Prime Minister and ministers.
Italia dei Valori openly framed the nuclear referendum within its broader political struggle against the Berlusconi government and alleged that the government’s repeal manoeuvre was intended partly to prevent referendum quorum effects.
This supports the conclusion that nuclear power became, at moments, a proxy battlefield over government credibility.
It does not establish that safety and energy arguments were insincere.
11.19.1 The defensible formulation
The strongest evidence-based formulation is:
Italian nuclear policy was repeatedly transformed from a sectoral energy-policy question into a referendum on wider political authority, institutional trust and government credibility.
The less defensible formulation would be:
“Anti-nuclear forces invented nuclear concerns solely to overthrow governments.”
The documentary record does not support that universal assertion.
Text schematic — political amplification
TECHNICAL ENERGY QUESTION
↓
SAFETY / COST / WASTE
↓
HIGH PUBLIC SALIENCE
↓
REFERENDUM MOBILISATION
↓
PARTY IDENTITY
↓
GOVERNMENT CREDIBILITY
↓
BROADER POLITICAL CONFRONTATION
↓
ENERGY POLICY BECOMES
A SYMBOLIC NATIONAL CHOICE
11.20 Europe did not follow Italy down one common path
The statement that “the rest of Europe continued with nuclear while Italy stopped” contains an important truth but requires qualification.
Europe did not follow one homogeneous strategy.
By 2024, 12 EU Member States operated nuclear power reactors, producing 649.5 TWh, equivalent to 23.3% of EU electricity generation.
France generated 380.5 TWh of nuclear electricity and obtained 67.3% of its electricity generation from nuclear.
Slovakia obtained 61.6%.
Hungary, Bulgaria, Belgium, Finland and Czechia were around the 40% range.
Germany, however, completed its nuclear exit in April 2023.
Italy, Austria, Denmark, Ireland, Portugal and several other Member States had no domestic nuclear electricity production.
Therefore:
EUROPE
│
├── FRANCE → LARGE NUCLEAR FLEET
├── SLOVAKIA → HIGH NUCLEAR SHARE
├── HUNGARY → HIGH NUCLEAR SHARE
├── CZECHIA → NUCLEAR + OTHER SOURCES
├── FINLAND → NUCLEAR + RENEWABLES
├── SWEDEN → NUCLEAR + HYDRO/WIND
├── GERMANY → NUCLEAR EXIT
└── ITALY → NUCLEAR EXIT + HIGH GAS ROLE
The correct comparative lesson is therefore not:
“Europe chose nuclear and Italy alone rejected it.”
It is:
“Several strategically important European economies retained nuclear capacity while Italy dismantled its domestic nuclear-generating capability; other European states chose different pathways.”
11.21 The Italian consequence was particularly visible in the relationship with France
France provides the clearest counterfactual reference because it sits directly across Italy’s electricity market border and built a large nuclear fleet after the 1970s oil crises.
In 2025, France recorded a 26.2 TWh net electricity export balance toward Italy, the highest ever measured on that border.
RTE states that France has been a net exporter to Italy every year since 1979.
In 2025:
- average Italian wholesale electricity price: €116/MWh;
- average French price: €61/MWh.
RTE attributes the 2025 flows to several factors, including abundant competitive low-carbon French generation, increased interconnection capability and higher Italian generation costs associated in part with Italy’s gas dependence.
These numbers are geopolitically significant.
But the causal conclusion must be disciplined.
They do not prove:
NO ITALIAN NUCLEAR
=
ALL OF ITALY'S PRICE PREMIUM
Electricity-price differences also depend on:
- gas prices;
- renewable output;
- hydro availability;
- transmission constraints;
- taxes and levies;
- market coupling;
- demand;
- plant availability;
- carbon prices.
What the evidence demonstrates is narrower and stronger:
France retained a large domestic low-carbon firm-generation fleet and became a persistent electricity exporter toward Italy, while Italy remained structurally reliant on net electricity imports and gas-fired generation.
Terna reports that in 2025 Italy imported 51.8 TWh, exported 4.9 TWh, produced 269.3 TWh net domestically, and consumed 312.2 TWh.
11.21.1 Italy did not become economically isolated from nuclear power
An interconnected market creates an important paradox.
Italy ceased producing nuclear electricity domestically.
But Italian consumers continued purchasing electricity from neighbouring systems containing large quantities of nuclear generation.
Electricity physically entering Italy cannot be labelled molecule-by-molecule or electron-by-electron as “nuclear electricity”.
Nevertheless:
ITALY
NO DOMESTIC NUCLEAR GENERATION
│
▼
EUROPEAN INTERCONNECTED MARKET
│
├── FRANCE: NUCLEAR-DOMINANT
├── SWITZERLAND: NUCLEAR + HYDRO
└── SLOVENIA: NUCLEAR + OTHER SOURCES
The practical geopolitical result was that the Italian decision removed nuclear generation inside national borders, not nuclear power from the continental system serving Italy.
11.22 “Others prospered while Italy suffered” requires a more exact formulation
A governmental report should avoid the monocausal claim:
“Nuclear countries prospered economically because they had nuclear power, while Italy declined because it did not.”
That cannot be demonstrated from the evidence.
GDP growth, industrial performance and competitiveness depend on far more than electricity technology.
However, a narrower conclusion is well supported:
Italy relinquished one source of domestic firm low-carbon electricity while several neighbouring competitors retained it, and Italy subsequently developed a power system with materially greater exposure to gas prices and electricity imports.
That exposure became especially consequential during periods of:
- high European gas prices;
- supply uncertainty;
- Russia-related geopolitical crisis.
This is a strategic opportunity-cost argument.
It is not a claim that every euro of Italian industrial disadvantage can be traced to the 1987 referendum.
11.23 The geopolitical shock of 2022 transformed the nuclear debate again
Russia’s full-scale invasion of Ukraine in February 2022 created the third major external shock in Italy’s nuclear-policy history.
The sequence is striking:
1986
CHERNOBYL
↓
NUCLEAR RISK BECOMES CENTRAL
2011
FUKUSHIMA
↓
NUCLEAR RISK BECOMES CENTRAL AGAIN
2022
RUSSIAN INVASION OF UKRAINE
↓
FOSSIL-FUEL DEPENDENCY RISK
BECOMES CENTRAL
The nature of the perceived risk changed.
In 1986 and 2011 the dominant question was:
What if nuclear technology fails?
After 2022 another question became politically unavoidable:
What if the external energy-supply system fails?
The IEA data show why the issue was especially acute for Italy.
Immediately before the crisis:
ITALIAN TOTAL ENERGY SUPPLY
↓
42% NATURAL GAS
↓
94% IMPORTED
↓
~41% OF GAS IMPORTS FROM RUSSIA
Italy responded rapidly through diversification.
By November 2022 Russian gas had fallen to around 3% of Italian gas imports, according to the IEA.
That success is important.
The crisis did not prove that Italy was incapable of adapting.
It did demonstrate the strategic consequences of concentrating energy dependence in imported fuels.
11.24 The 2022 centre-right programme formally reopened the nuclear option before the Meloni government took office
The return to nuclear policy under Meloni was not introduced after the election without prior programme evidence.
The official 2022 centre-right programme included, under the heading “The challenge of energy self-sufficiency”:
- increased renewable production;
- diversification of energy supply;
- domestic gas development;
- energy efficiency;
- European price-cap policies;
- consideration of latest-generation energy plants, including what the programme described as “clean and safe nuclear” without prejudicial vetoes.
This is important politically.
The coalition did not campaign on replacing renewables with nuclear.
Its published programme presented nuclear as one component of a broader energy-security agenda.
11.24.1 The programme reveals the new political framing
The older nuclear framing had been:
NUCLEAR
VS
ENVIRONMENT
The new centre-right framing became:
NUCLEAR
+
RENEWABLES
+
ENERGY SECURITY
+
INDUSTRIAL SOVEREIGNTY
+
DECARBONISATION
Whether that policy package can ultimately be delivered economically remains a separate analytical question.
But the political repositioning is clear.
11.25 The Meloni government did not begin with immediate nuclear legislation
The institutional path after October 2022 was comparatively gradual.
This is important because it shows that the present re-entry was constructed in stages.
During early 2023, Italy had not yet formally reconstructed a complete nuclear-policy framework.
Government representatives emphasised the need for parliamentary debate and the absence of a current legal-authorisation architecture.
The decisive parliamentary step occurred on 9 May 2023.
The Camera approved motion 1-00083, committing the government to evaluate the opportunity to include nuclear energy in the national energy mix and to support nuclear energy’s role within European energy policy and sustainable-investment frameworks.
That date should be considered one of the principal institutional turning points in the modern Italian nuclear story.
Before 9 May 2023
NUCLEAR =
COALITION POLICY OPTION
After 9 May 2023
NUCLEAR =
FORMAL PARLIAMENTARY POLICY
WORKSTREAM
11.26 The National Platform for Sustainable Nuclear converted political intent into institutional work
On 21 September 2023, the Ministry of Environment and Energy Security convened the first meeting of the Piattaforma Nazionale per un Nucleare Sostenibile — PNNS.
ISIN records the stated objective as defining a route toward the possible resumption of nuclear-energy use in Italy and assessing growth opportunities for the existing Italian nuclear industrial supply chain.
Participants included:
- public research institutions;
- academia;
- nuclear-safety institutions;
- decommissioning bodies;
- industry;
- nuclear-component manufacturers.
This was institutionally more important than a political speech.
It began reconstructing what Italy had largely ceased needing after 1990:
a coordinated national nuclear programme-development ecosystem.
Text schematic — from political commitment to programme architecture
2022 COALITION PROGRAMME
↓
PARLIAMENTARY DEBATE
↓
9 MAY 2023 MOTION
↓
21 SEPT 2023 PNNS
↓
TECHNOLOGY
REGULATION
INDUSTRY
FUEL
WASTE
SKILLS
↓
NATIONAL PROGRAMME DESIGN
11.27 The 2024 PNIEC moved nuclear from political debate into official energy-system modelling
The 2024 National Integrated Energy and Climate Plan — PNIEC marked another qualitative step.
For the first time in the current policy cycle, nuclear energy was incorporated into quantitative long-term Italian energy-system scenarios.
The model considered nuclear introduction in the 2035–2050 period.
The most expansive scenario considered approximately 16 GW of nuclear capacity by 2050, corresponding to around 22% of national electricity demand.
The PNIEC also examined a more conservative pathway.
Under the modelling assumptions used, the conservative nuclear scenario produced an estimated total energy-system cost approximately €17 billion lower over the modelling horizon than the corresponding net-zero scenario without nuclear.
This finding must be described correctly.
It is:
a model result conditional on the assumptions used.
It is not:
- a contracted cost saving;
- proof that Italian nuclear plants will cost a specified amount;
- a government guarantee;
- a forecast that 16 GW will be operating in 2050.
The PNIEC itself states that these values required subsequent consolidation and that the nuclear scenario did not alter the plan’s 2030 assumptions.
11.27.1 The strategic importance of the PNIEC was institutional
The major change was not the €17 billion model number.
It was this:
BEFORE
NUCLEAR = POLITICAL POSSIBILITY
AFTER PNIEC
NUCLEAR = VARIABLE INSIDE
OFFICIAL NATIONAL
ENERGY-SYSTEM PLANNING
That represents a much deeper policy re-entry.
11.28 The European environment was also changing
The Meloni government’s nuclear policy did not develop in isolation from European trends.
The EU itself remained divided over nuclear power, but nuclear gained a stronger place in European decarbonisation, industrial and energy-security policy.
In March 2026 the European Commission issued its dedicated SMR Strategy, seeking to support first European SMR projects in the early 2030s.
The Commission identified potential EU SMR capacity of approximately 17–53 GW by 2050, while stressing:
- European industrial supply chains;
- fleet deployment;
- regulatory cooperation;
- energy security;
- competitiveness;
- industrial heat;
- hydrogen;
- data-centre demand.
The European political environment surrounding Italian nuclear policy in 2026 is therefore profoundly different from that of 1987.
1987 European environment
CHERNOBYL
↓
RISK / SAFETY DOMINANT
2026 European environment
CLIMATE
+
UKRAINE / ENERGY SECURITY
+
INDUSTRIAL COMPETITIVENESS
+
STRATEGIC AUTONOMY
+
SMR INDUSTRIAL POLICY
Safety remains central.
But nuclear is now discussed simultaneously as an industrial-sovereignty technology.
11.29 The government moved from modelling to legal reconstruction in 2024–2025
Once nuclear had entered Parliament, PNNS and PNIEC planning, the next barrier was legal.
Italy could not credibly procure a reactor without reconstructing:
- authorisation law;
- regulatory responsibilities;
- safety governance;
- waste law;
- fuel law;
- siting procedures;
- public participation;
- nuclear liability interfaces;
- decommissioning obligations.
A working group chaired by constitutional-law expert Giovanni Guzzetta was established in 2024 to support development of the new framework.
The draft delegation process subsequently passed through governmental, financial and State–Region review.
The Council of Ministers approved the delegation bill, which was formally presented to the Camera on 17 October 2025 as A.C. 2669 by Prime Minister Giorgia Meloni and Environment and Energy Security Minister Gilberto Pichetto Fratin.
This was the point at which nuclear re-entry moved from policy planning into an explicit legislative project.
11.30 What the Meloni nuclear bill actually does
The final parliamentary text authorises the government to adopt delegated legislation covering, among other subjects:
- production and use of sustainable nuclear energy in Italy;
- development of national and European industrial supply chains;
- nuclear-fuel fabrication;
- fuel reprocessing;
- decommissioning existing facilities;
- radioactive-waste management;
- spent-fuel management;
- fusion research, development and use;
- reorganisation of institutional competences.
This is far broader than a statement saying:
“Italy wants SMRs.”
It begins constructing the legal architecture of the complete nuclear cycle.
Master institutional architecture
REACTOR POLICY
│
├── FUEL
├── REPROCESSING
├── LICENSING
├── SAFETY
├── WASTE
├── SPENT FUEL
├── DECOMMISSIONING
├── SUPPLY CHAIN
├── SKILLS
└── FUSION
↓
NATIONAL NUCLEAR
LEGAL FRAMEWORK
That breadth is strategically rational from a programme-design perspective because a commercial nuclear programme cannot legally consist only of a reactor.
It also explains one major opposition criticism: the breadth of powers delegated to the government.
11.31 The parliamentary path in 2026
The Camera approved A.C. 2669 on 4 June 2026 and transmitted it to the Senate.
The Senate then considered it as S.1924.
On 23 September 2026, it was approved definitively:
| Final Senate vote | Number |
|---|---|
| Present | 140 |
| Voting | 139 |
| In favour | 81 |
| Against | 51 |
| Abstentions | 7 |
11.31.1 Group positions in the final Senate vote
| Group / political component | Final position |
|---|---|
| Fratelli d’Italia | In favour |
| Lega | In favour |
| Forza Italia | In favour |
| Civici d’Italia–UDC–NM–MAIE–CP | In favour |
| Azione–Renew Europe | In favour |
| Partito Democratico | Against |
| Movimento 5 Stelle | Against |
| Alleanza Verdi e Sinistra | Against |
| Autonomies group | Against |
| Italia Viva | Abstained |
These positions are directly recorded in the Senate’s final-vote record.
This is significant because the 2026 cleavage is not perfectly government-versus-opposition.
Azione supported the legislation.
Italia Viva abstained.
The opposition field was therefore divided.
11.32 The pro-nuclear political coalition has also changed its language
The contemporary argument is substantially different from the Berlusconi-era framing.
The governing majority now presents nuclear power in connection with:
- energy sovereignty;
- decarbonisation;
- industrial competitiveness;
- supply-chain localisation;
- technological leadership;
- reduced dependence on imported fossil fuels.
This is partly a consequence of the geopolitical environment after 2022.
The argument can be represented as:
RUSSIAN GAS SHOCK
↓
ENERGY SECURITY
↓
NEED FOR DIVERSIFIED FIRM ENERGY
↓
NUCLEAR RE-ENTERS POLICY SET
+
RENEWABLES
+
STORAGE
+
GRIDS
+
LNG / GAS DIVERSIFICATION
Nuclear is no longer being presented principally as an alternative to environmental policy.
It is being incorporated into the language of European decarbonisation and strategic autonomy.
11.33 The anti-nuclear coalition has also changed its language
Likewise, the opposition is not simply repeating 1987.
The 2026 debate is much more heavily focused on:
COST
+
TIME
+
SMR COMMERCIAL MATURITY
+
WASTE
+
ALTERNATIVE INVESTMENT
+
PARLIAMENTARY CONTROL
+
PUBLIC PARTICIPATION
M5S explicitly requested transparent comparative analysis against renewables and storage.
PD challenged the institutional structure and breadth of the delegation and sought stronger independent safety governance.
AVS characterised the proposed pathway as too slow and argued that renewable technologies should receive priority.
The central contemporary conflict is therefore no longer:
“Is nuclear radiation frightening?”
It is increasingly:
“Is nuclear the economically and institutionally appropriate firm low-carbon complement to a renewable-dominated system?”
That is a more technically mature policy dispute.
11.34 The 2026 law does not erase the 1987 and 2011 votes
This distinction is politically important.
The government has chosen to interpret changed circumstances as permitting a new nuclear framework based on:
- fundamentally changed reactor technologies;
- climate-neutrality obligations;
- altered geopolitical conditions;
- EU taxonomy;
- SMR development;
- four decades of institutional change.
Opponents continue to invoke the democratic significance of the two anti-nuclear referenda.
Both statements can coexist legally.
The historical referenda remain real political events.
But the present electorate and legislature also operate in a different technological, geopolitical and legal environment.
The democratic conflict is therefore:
PAST POPULAR MANDATE
↓
1987 + 2011
VERSUS
CURRENT PARLIAMENTARY MANDATE
↓
2026
How that relationship is ultimately treated if constitutional litigation arises would be a question for the competent judicial institutions.
This chapter should not prejudge such litigation.
11.35 What exactly has Giorgia Meloni’s government changed?
The answer should be defined with unusual precision.
What has changed
The Meloni government has moved nuclear power from:
politically excluded technology
to:
formally evaluated national energy technology.
It has moved nuclear from:
external research and foreign industrial participation
to:
national programme planning.
It has moved nuclear from:
no prospective deployment model
to:
official PNIEC scenarios.
It has moved nuclear from:
no current legal road map
to:
a parliamentary-approved enabling delegation for reconstruction of the legal framework.
What has not happened
It has not yet:
- selected the national lead reactor;
- selected an Italian new-build site;
- obtained a nuclear construction licence;
- demonstrated a financing model;
- reached FID;
- constructed a reactor;
- produced one new nuclear kilowatt-hour.
Table 11.35-A — The difference between policy re-entry and physical nuclear return
| Stage | Status at 27 Sept 2026 |
|---|---|
| Nuclear political option | Completed |
| Parliamentary recognition | Completed |
| National stakeholder platform | Completed |
| Nuclear PNIEC modelling | Completed |
| Enabling legislation approved by Parliament | Completed |
| Law published/in force | Not yet at cut-off |
| Delegated implementing decrees | Not yet completed |
| Complete licensing framework | Not yet completed |
| Lead technology down-select | Not completed |
| Site selection | Not completed |
| Construction licence | None |
| FID | None |
| New reactor construction | None |
| New nuclear generation | None |
This table is the most defensible way to describe the “return of nuclear power under Meloni”.
11.36 The geopolitical meaning of the Meloni reversal is larger than the reactor itself
The policy reversal occurs in an international system that has changed profoundly since 1987.
Italy must now simultaneously manage:
- Russian geopolitical risk;
- Mediterranean energy routes;
- LNG dependency;
- European electricity integration;
- decarbonisation;
- industrial electrification;
- data-centre demand;
- critical-mineral dependencies;
- Chinese manufacturing dominance in parts of clean technology;
- US-European industrial competition.
Nuclear therefore enters a much wider strategic debate.
Old energy-sovereignty model
SECURE FOSSIL IMPORTS
↓
PIPELINES
+
LONG-TERM CONTRACTS
Emerging energy-sovereignty model
DOMESTIC RENEWABLES
+
NUCLEAR
+
STORAGE
+
GRIDS
+
INTERCONNECTION
+
DIVERSIFIED FUELS
+
INDUSTRIAL SUPPLY CHAINS
Under this model, sovereignty does not mean autarky.
It means diversifying dependencies so that no single foreign supplier, fuel route or technology becomes systemically dominant.
11.37 Nuclear does not automatically create Italian energy independence
This point must remain explicit despite the language used politically by supporters.
A new Italian nuclear fleet would still require foreign relationships involving:
- uranium;
- conversion;
- enrichment;
- fuel fabrication;
- reactor technology;
- specialist components;
- potentially software and maintenance.
The strategic comparison is therefore not:
NUCLEAR
=
INDEPENDENCE
It is:
NUCLEAR
=
DIFFERENT DEPENDENCY STRUCTURE
The potential advantage is that nuclear fuel:
- contains very high energy density;
- can be stored in advance;
- requires much smaller continuous physical flows than natural gas.
But foreign dependence remains.
The correct sovereignty question is therefore:
Would the complete nuclear fuel and technology chain be more geopolitically resilient than the marginal fossil and electricity dependencies it displaces?
That is a procurement question, not an ideological one.
11.38 Italy’s earlier choice had a long institutional cost
When a country stops constructing and operating reactors for nearly four decades, it does not simply preserve the previous system in suspended animation.
It loses or weakens:
- operator experience;
- regulator experience in new-build licensing;
- nuclear project-management continuity;
- construction qualification;
- university pipelines;
- industrial serialisation;
- vendor relationships.
Italy retained important nuclear competences through:
- decommissioning;
- research;
- engineering;
- international nuclear industry participation.
But this is not equivalent to operating a domestic fleet.
The cost of restart therefore includes institutional reconstruction.
This is one of the most important long-term consequences of policy discontinuity.
Text schematic
EXIT
↓
NO NEW ORDERS
↓
NO NEW CONSTRUCTION
↓
NO NEW OPERATING FLEET
↓
LESS NEW-BUILD REGULATORY PRACTICE
↓
SKILLS PIPELINE CONTRACTS
↓
RETURN DECISION
↓
INSTITUTIONAL REBUILD REQUIRED
This is independent of whether the original exit was politically justified.
It is simply an observable programme consequence.
11.39 Italy also avoided some risks and costs during the period without new nuclear construction
A balanced analysis must include the opposite side.
By not constructing new reactors after 1987 and 2011, Italy also avoided exposure to:
- nuclear new-build capital risk;
- potential construction overruns;
- additional spent-fuel generation;
- additional decommissioning liabilities;
- reactor operational risk;
- long-term commitments to specific reactor vendors.
That does not prove the exit was economically optimal.
It means the counterfactual cannot be written as:
“If Italy had continued nuclear power, all outcomes would necessarily have been better.”
The alternative Italian nuclear programme would itself have had:
- costs;
- construction risks;
- financing needs;
- waste obligations;
- technological decisions.
A serious geopolitical report should compare both sides.
11.40 The historical opportunity cost nevertheless became visible through imports
What can be stated objectively is that Italy became a large net electricity importer while neighbouring nuclear systems supplied substantial energy into the interconnected market.
France’s 2025 record net exports to Italy of 26.2 TWh, together with Italy’s total imports of 51.8 TWh, provide a particularly clear contemporary illustration.
This does not mean every imported MWh would economically have been replaced by an Italian reactor.
But it demonstrates that:
Italy’s decision not to maintain domestic nuclear generation did not eliminate its exposure to firm electricity generated abroad.
That is a strategic fact.
11.41 Nuclear politics repeatedly followed external shocks rather than steady long-term planning
One of the strongest historical patterns is the dominance of external shocks.
Table 11.41-A — External shock and Italian policy response
| Shock | Political effect |
|---|---|
| Chernobyl 1986 | Accelerated anti-nuclear shift |
| 1987 referendum | Led to implementation of nuclear exit |
| 2000s gas/import concerns | Helped reopen nuclear debate |
| Fukushima 2011 | Destroyed political viability of relaunch |
| 2011 referendum | Reinforced second exit |
| Russia–Ukraine energy shock 2022 | Raised value of energy-security argument |
| EU decarbonisation / SMR industrial strategy | Increased institutional legitimacy of new nuclear option |
| Meloni parliamentary programme 2023–2026 | Reconstructed policy/legal route |
This suggests a structural Italian weakness:
nuclear policy has historically oscillated with geopolitical and technological shocks rather than being governed by a politically durable multi-decade consensus.
That observation is analytical, not partisan.
The same institutional vulnerability would affect any future programme regardless of which coalition governs.
11.42 Policy reversibility is itself a nuclear investment risk
This history creates an additional problem.
Nuclear investments operate over:
- decades of construction and licensing;
- sixty or more years of operation;
- decades of decommissioning and waste management.
Italian political cycles operate over much shorter periods.
A vendor, investor or public utility considering billions of euros of nuclear investment must therefore ask:
2026 PARLIAMENT SUPPORTS NUCLEAR
↓
WHAT HAPPENS AFTER
ONE ELECTION?
↓
TWO ELECTIONS?
↓
THREE ELECTIONS?
Italy’s history contains:
REJECTION
→ RELAUNCH
→ REJECTION
→ RELAUNCH
Political reversibility therefore becomes a financial risk.
A sustainable nuclear programme would require more than one parliamentary majority.
It would ideally require durable institutional agreement around at least:
- safety authority;
- waste;
- site selection;
- financing rules;
- fuel security;
- research;
- industrial skills.
11.43 The real strategic challenge is therefore not winning the nuclear argument — it is depoliticising the technical core
The history suggests a central governance lesson.
Some elements of nuclear policy will always remain political:
- whether to use nuclear;
- public expenditure;
- site consent;
- energy mix.
But several functions should not change with electoral cycles.
These include:
SAFETY STANDARDS
WASTE ACCOUNTING
FUEL SECURITY
REGULATOR INDEPENDENCE
EMERGENCY PLANNING
TECHNICAL DATA
DECOMMISSIONING FUNDS
The stronger the technical core is insulated from partisan oscillation, the lower the risk that nuclear becomes again primarily a symbolic weapon in government-opposition conflict.
11.44 The Meloni government has changed the political default
This may ultimately be the most significant political achievement of the 2022–2026 period, irrespective of whether a reactor is eventually constructed.
Before the current cycle, the default political assumption was approximately:
Nuclear power cannot realistically return unless a government first overcomes the legacy of two referenda.
By September 2026, the default has shifted toward:
Nuclear power is once again a legitimate technology for formal state planning, but every project must still survive regulatory, economic, technological, territorial and political tests.
That is a profound change.
It does not determine the final reactor decision.
It changes what decisions are politically and legally discussable.
11.45 Master political chronology — 1960s to September 2026
1960s
ITALY AMONG EARLY EUROPEAN
COMMERCIAL NUCLEAR STATES
│
▼
1964–1981
GARIGLIANO / LATINA / TRINO / CAORSO
│
▼
26 APRIL 1986
CHERNOBYL
│
▼
5 JUNE 1986
PCI CONSULTATIVE REFERENDUM PROPOSAL
│
▼
1986–1987
ANTI-NUCLEAR MOBILISATION
│
▼
8–9 NOVEMBER 1987
THREE ABROGATIVE REFERENDA
│
▼
~72–81% YES
DEPENDING ON QUESTION
│
▼
1987–1990
CIPE / GOVERNMENT / PARLIAMENT
IMPLEMENTS EXIT
│
▼
26 JULY 1990
CAORSO + TRINO
DEFINITIVELY CLOSED
│
▼
1990s
NO COMMERCIAL NUCLEAR GENERATION
│
▼
1999
SOGIN / DECOMMISSIONING ERA
│
▼
2008–2009
BERLUSCONI IV RELAUNCH
│
▼
LAW 99/2009
NEW-BUILD LEGAL ARCHITECTURE
│
▼
2010
IMPLEMENTING REGULATION
│
▼
11 MARCH 2011
FUKUSHIMA
│
▼
APRIL 2011
GOVERNMENT REPEALS
NEW-BUILD PROGRAMME
│
▼
12–13 JUNE 2011
REFERENDUM
│
▼
94.05% YES TO REPEAL
│
▼
2011–2021
SECOND NUCLEAR EXCLUSION PERIOD
│
▼
2021
GAS:
42% OF TOTAL ENERGY SUPPLY
94% IMPORTED
~41% OF GAS IMPORTS FROM RUSSIA
│
▼
FEBRUARY 2022
RUSSIAN INVASION OF UKRAINE
│
▼
2022
CENTRE-RIGHT ELECTION PROGRAMME
REOPENS NUCLEAR OPTION
│
▼
OCTOBER 2022
MELONI GOVERNMENT
│
▼
9 MAY 2023
CAMERA MOTION 1-00083
│
▼
21 SEPTEMBER 2023
PNNS FIRST MEETING
│
▼
JUNE 2024
PNIEC NUCLEAR SCENARIOS
│
▼
2024–2025
LEGAL FRAMEWORK DESIGN
│
▼
17 OCTOBER 2025
A.C. 2669 PRESENTED
│
▼
4 JUNE 2026
CAMERA APPROVAL
│
▼
23 SEPTEMBER 2026
SENATE:
81 YES
51 NO
7 ABSTENTIONS
│
▼
27 SEPTEMBER 2026
PARLIAMENTARY PROCESS COMPLETE
BUT ACT NOT YET PUBLISHED
│
▼
NEXT PHASE
IMPLEMENTING LEGISLATION
+
REGULATION
+
TECHNOLOGY
+
SITE
+
FINANCE
+
LICENSING
11.46 Master political-cleavage matrix
The history can be compressed into five successive nuclear debates.
| Period | Central political question |
|---|---|
| 1960s–1970s | Can nuclear modernise and industrialise the Italian energy system? |
| 1986–1990 | Can nuclear risks remain politically acceptable after Chernobyl? |
| 2008–2011 | Can Italy reverse the referendum-era exit and reduce energy dependence? |
| 2011–2021 | Does Fukushima make a new nuclear programme politically and economically unjustifiable? |
| 2022–2026 | Can advanced nuclear contribute to energy security, decarbonisation and industrial competitiveness alongside renewables? |
This evolution is crucial.
Italy is no longer having precisely the same nuclear debate it had in 1987.
11.47 Master geopolitical dependency schematic
ITALIAN NUCLEAR EXIT
│
▼
DOMESTIC NUCLEAR GENERATION → 0
│
├──────────────────────────┐
▼ ▼
RENEWABLE GROWTH GAS-BASED GENERATION
│
▼
IMPORT DEPENDENCE
│
▼
RUSSIAN EXPOSURE
│
▼
2022 SHOCK
│
▼
RAPID GAS DIVERSIFICATION
│
▼
LNG / NEW PIPELINE SOURCES
│
▼
DEPENDENCY TRANSFORMED
RATHER THAN ELIMINATED
│
▼
NUCLEAR OPTION REOPENED
│
┌──────────────┼──────────────┐
▼ ▼ ▼
CLIMATE SECURITY INDUSTRY
│ │ │
└──────────────┼──────────────┘
▼
MELONI NUCLEAR POLICY
The schematic should not be interpreted as asserting that nuclear exit caused every subsequent gas import.
It describes a change in strategic architecture.
11.48 The strongest argument for the historical reversal is diversification, not technological absolutism
The history does not demonstrate that Italy should become:
- entirely nuclear;
- entirely renewable;
- entirely gas-free immediately.
It demonstrates the risks associated with over-concentration.
1987–2022 progressively exposed Italy to one configuration of dependency.
A future nuclear programme would create another.
The government-level question should therefore be:
Which combination of nuclear, renewables, storage, grids, hydro, demand flexibility, interconnection and transitional gas minimises simultaneous exposure to foreign fuel, weather, technology, capital and geopolitical risk?
This is a more defensible strategic question than asking which single technology “wins”.
11.49 The essential historical correction: Italy did not spend forty years under a constitutional nuclear prohibition
The legal and political sequence can be compressed into four distinct concepts:
1987
POPULAR REJECTION
OF EXISTING NUCLEAR POLICY
≠
CONSTITUTIONAL BAN
1990
POLITICAL / ADMINISTRATIVE
IMPLEMENTATION OF EXIT
≠
PERMANENT CONSTITUTIONAL PROHIBITION
2011
POPULAR REPEAL OF
NEW NUCLEAR FRAMEWORK
≠
REMOVAL OF PARLIAMENT'S
LEGISLATIVE POWER FOREVER
2026
NEW PARLIAMENTARY FRAMEWORK
≠
OPERATING NUCLEAR FLEET
This distinction should be maintained rigorously throughout the full report.
It removes two competing myths:
Myth 1
“The referenda permanently outlawed nuclear power.”
Myth 2
“The referenda never mattered legally.”
Both are too simplistic.
11.50 Final geopolitical assessment
Italy’s nuclear history from Chernobyl to the Meloni government is not simply the story of a technology that disappeared and returned.
It is the history of four different national anxieties.
First anxiety — technological catastrophe
After Chernobyl:
Can the State protect society from nuclear risk?
Second anxiety — democratic legitimacy
After 1987:
Can governments pursue nuclear power after a strong referendum rejection?
Third anxiety — economic and environmental credibility
During the 2009–2011 relaunch:
Can a new nuclear programme demonstrate acceptable cost, safety, waste management and territorial legitimacy?
Fourth anxiety — geopolitical dependency
After 2022:
Can Italy afford an energy system structurally exposed to external fuel markets and geopolitical shocks while pursuing deep decarbonisation?
The Meloni government’s nuclear policy emerged primarily within the fourth environment.
That does not erase the previous three.
It must solve all four simultaneously.
The new programme must demonstrate:
SAFETY
+
DEMOCRATIC LEGITIMACY
+
ECONOMIC CREDIBILITY
+
WASTE SOLUTION
+
GEOPOLITICAL RESILIENCE
+
INDUSTRIAL VALUE
Failure in any one category could reproduce the conditions for another political reversal.
The history therefore produces one overriding governmental lesson:
Italy’s central nuclear problem has never been only reactor technology. It has been the inability to maintain a politically durable settlement connecting technology, risk, territory, cost and national strategy across several decades.
The government led by Giorgia Meloni has succeeded in one historically important respect: it has moved nuclear power back from political exclusion into parliamentary legislation and national energy planning.
It has not yet solved the harder question.
That question begins after parliamentary approval:
Can Italy convert political re-entry into a technically credible, economically bankable, democratically durable and geopolitically resilient nuclear programme without repeating the policy reversals of 1987 and 2011?
As of 27 September 2026, that remains an open question.
The evidence supports neither predetermined success nor predetermined failure.
It supports a much narrower conclusion:
For the first time since 2011, Italy has crossed the institutional threshold from debating whether nuclear power may belong in national policy to constructing the legal machinery through which a future nuclear programme could actually be authorised.
That is the historically verified meaning of Italy’s nuclear return under the Meloni government.
11.51 Final decision schematic — from referendum state to nuclear-option state
ITALY 1987–1990
│
▼
NUCLEAR EXIT DECISION
│
▼
NO DOMESTIC GENERATION
│
┌───────────┼────────────┐
▼ ▼ ▼
GAS ROLE IMPORTS DECOMMISSIONING
│ │ │
└───────────┼────────────┘
▼
2009 RELAUNCH
│
▼
FUKUSHIMA
│
▼
2011 REFERENDUM
│
▼
SECOND POLITICAL EXIT
│
▼
2022 GAS SHOCK
│
▼
ENERGY-SECURITY REASSESSMENT
│
▼
2022 COALITION PROGRAMME
│
▼
MAY 2023 PARLIAMENT
│
▼
PNNS
│
▼
PNIEC 2024
│
▼
GOVERNMENT LEGAL DESIGN
│
▼
A.C. 2669
│
▼
CAMERA — 4/6/26
│
▼
SENATE — 23/9/26
│
▼
PARLIAMENTARY APPROVAL
│
▼
┌─────────────┐
│ ITALY 2026 │
└──────┬──────┘
│
▼
NUCLEAR-OPTION STATE
│
┌────────────────┼────────────────┐
▼ ▼ ▼
IMPLEMENTING TECHNOLOGY REGULATOR /
LEGISLATION DOWN-SELECT LICENSING
│ │ │
├────────────────┼────────────────┤
▼ ▼ ▼
SITE FUEL WASTE
│ │ │
└────────────────┼────────────────┘
▼
FINANCE
│
▼
FID
│
▼
CONSTRUCTION LICENCE
│
▼
CONSTRUCTION
│
▼
FIRST CRITICALITY
│
▼
DOMESTIC NUCLEAR POWER
NONE OF THE STAGES BELOW
“NUCLEAR-OPTION STATE” IS YET COMPLETE
AS OF 27 SEPTEMBER 2026
This chapter deliberately makes the politically sensitive distinction between proven facts and attributed accusations—particularly for the 1987 and 2011 episodes—while still documenting where nuclear was unquestionably used as part of a wider struggle over government legitimacy. It also avoids the legally dangerous simplification that either referendum constituted a permanent constitutional ban, and it avoids the opposite error of claiming that the referenda are now irrelevant.
Yes. I’ll use exactly that hierarchy from now on: H1 for the chapter title, H2 for first-level sections, H3 only when a genuine second level is needed. I’ll also keep the chapter more discursive and avoid fragmenting it into dozens of numbered micro-sections.
Chapter 12 — Financing the Italian Nuclear Programme
Italy can decide that nuclear energy belongs in its future energy mix, identify technically plausible sites, select a credible reactor technology, reconstruct its regulatory system and develop an industrial supply chain. None of those decisions, individually or collectively, guarantees that a single reactor will ever be built.
The decisive transition occurs when a project becomes bankable.
Bankability means that the institutions providing equity and debt are prepared to commit capital on terms that allow the project to reach construction, survive the construction period and produce an acceptable return while electricity remains affordable enough to be politically and economically sustainable.
For nuclear power this question is unusually difficult because the technology combines characteristics that financial markets normally prefer not to see concentrated in one investment:
- very high initial capital expenditure;
- long development periods before construction;
- long construction periods before revenue;
- technology and execution risk;
- political exposure extending across several governments;
- regulatory risk;
- uncertain future electricity prices;
- exposure to inflation and interest rates;
- long asset life;
- decommissioning and waste liabilities extending beyond the commercial operating period.
The consequence is fundamental.
The question facing Italy is not simply:
How much does an SMR cost?
The economically relevant question is:
Who provides the capital, at what cost, when is that capital recovered, which party absorbs each category of risk, and who ultimately pays if the project costs substantially more or takes substantially longer than expected?
That is the real financing problem.
As of 27 September 2026, Italy has not yet answered it.
The parliamentary-approved delegation bill provides funding for the development of the new nuclear framework, but it does not finance the construction of a commercial reactor fleet. Article 5 of the text approved by the Senate provides €20 million for each of 2027, 2028 and 2029 for investments associated with implementation of the delegation, while separate comparatively small appropriations support public-information activities. The parliamentary technical analysis also explicitly recognises that the financial consequences of future support for nuclear plants cannot yet be quantified ex ante and that measures creating additional expenditure will require corresponding funding legislation.
This distinction is essential.
CURRENT PUBLIC NUCLEAR PROGRAMME FUNDING
≠
REACTOR CAPEX
The current money finances the creation of the programme architecture.
It does not constitute financing for:
- a BWRX-300;
- a Rolls-Royce SMR;
- a NUWARD plant;
- an AP300;
- an advanced reactor;
- or a national multi-gigawatt fleet.
Italy must therefore develop a second architecture alongside the legal and regulatory architecture already analysed in this report:
the nuclear financial architecture.
That financial architecture will largely determine whether nuclear remains a strategic policy option or becomes an investable infrastructure programme.
12.1 Nuclear financing is principally a risk-allocation problem
The cost of a nuclear power station is normally discussed as though it were principally an engineering quantity.
The language used is familiar:
- overnight cost;
- €/kW;
- total project CAPEX;
- LCOE.
Those quantities matter.
But nuclear financing introduces another variable capable of transforming the final economic result even when the engineering cost remains unchanged:
the cost of capital.
The OECD Nuclear Energy Agency identifies construction risk, electricity-price risk and political risk as three of the most important factors driving the financing cost of nuclear new build. Its analysis concludes that the financing structure cannot be separated from the allocation of those risks.
The International Energy Agency reaches a closely related conclusion. Its 2025 analysis notes that nuclear projects remain difficult to finance because of their capital intensity, construction duration and technical complexity, and that governments continue to play a central role even where private investors participate.
This produces a central principle for Italy:
There is no financing model that makes nuclear risk disappear. A financing model only determines who carries that risk and when.
Consider construction overrun.
If a €3 billion project becomes a €4.5 billion project, the additional €1.5 billion must be absorbed somewhere.
Possible bearers include:
VENDOR
│
├── fixed-price contract
│
▼
loss / reduced margin
INVESTORS
│
├── additional equity
│
▼
lower return
LENDERS
│
├── restructuring / additional debt
│
▼
higher financial exposure
CONSUMERS
│
├── regulated tariff / higher strike price
│
▼
higher electricity payments
STATE
│
├── guarantee / equity / rescue
│
▼
taxpayer exposure
The cost has not disappeared.
It has been allocated.
The same applies to every major nuclear risk.
Table 12.1-A — Principal nuclear financial risks and the parties that can carry them
| Risk | Economic consequence | Possible risk bearer |
|---|---|---|
| Development failure | Pre-construction expenditure lost | Developer / State / vendor |
| Licensing delay | Higher development and financing cost | Developer / State / investors |
| Construction delay | Interest during construction rises | Investor / consumer / State / contractor |
| CAPEX overrun | Additional financing required | Vendor / shareholders / State / consumers |
| Electricity-price risk | Revenue may be insufficient | Generator / offtaker / consumers / State |
| Interest-rate risk | Debt becomes more expensive | Project / State / consumer |
| Inflation | Labour/material/project cost rises | Project / contractor / consumer |
| Technology risk | Performance below design expectation | Vendor / owner |
| Fuel-price risk | Operating cost changes | Operator |
| Fuel-availability risk | Plant cannot operate as planned | Operator / State depending on support |
| Availability risk | Lower electricity sales | Operator |
| Political shutdown | Asset becomes stranded | Investor / State depending on protection |
| Change in law | Costs or operation altered | Investor / State depending on contract |
| Waste-cost escalation | Lifecycle liability increases | Operator / waste fund / State residual |
| Decommissioning-cost escalation | End-of-life cost increases | Operator / fund / State residual |
| Market-design change | Revenue architecture changes | Investor / State |
| Early plant closure | Capital recovery truncated | Investor / consumer / State depending on regime |
This table illustrates why statements such as:
“the private sector will finance the reactors”
are incomplete.
The private sector may provide capital.
But the critical question is:
under which protections?
A private bank can lend against a nuclear project only if the probability of repayment is sufficiently high.
An institutional investor can provide equity only if the expected return compensates for the remaining risks.
The State can reduce the required return by absorbing or mitigating some risks.
But then part of the risk moves onto:
- taxpayers;
- electricity consumers;
- public-sector balance sheets;
- future governments.
The financing problem is therefore ultimately an allocation of sovereign, consumer and private risk.
The nuclear project has three distinct financial periods
A useful distinction is between:
DEVELOPMENT
↓
CONSTRUCTION
↓
OPERATION
They present fundamentally different financing conditions.
During development, the project spends money but may never receive a licence. Expenditure on engineering, site studies, regulatory work and procurement preparation is therefore high-risk capital.
During construction, capital expenditure accelerates dramatically, yet the reactor still produces no electricity. This is normally the most difficult financing phase.
During operation, the asset finally generates revenue. At that point risk is transformed. Construction risk disappears, while operational performance, electricity prices, fuel and long-term policy become dominant.
That means a financing instrument effective during operation may be insufficient during construction.
This is one of the most important distinctions between a Contract for Difference and a Regulated Asset Base structure.
The former principally stabilises electricity revenue after production begins.
The latter can begin producing regulated revenue before the plant is completed.
The distinction substantially changes financing cost and risk transfer.
12.2 The financing instruments available to Italy
Italy should not decide that it needs a “nuclear financing model” and then mechanically import the model used by another country.
Different national models reflect different:
- fiscal capacities;
- utility structures;
- electricity markets;
- regulatory systems;
- political choices;
- risk tolerances.
Instead, Italy should treat financing as a design exercise.
The principal instruments can be combined.
12.2.1 Revenue-support models: CfD, RAB and long-term PPAs
The first category does not necessarily provide the construction capital itself.
It gives investors greater confidence that, once the plant exists, it will earn sufficiently predictable revenue.
This is crucial because future wholesale electricity prices over forty or sixty years cannot be forecast with enough confidence to support highly leveraged nuclear investment.
A purely merchant reactor would effectively accept:
CAPEX TODAY
↓
YEARS OF CONSTRUCTION
↓
FUTURE WHOLESALE PRICE
UNKNOWN
↓
REVENUE UNCERTAIN
That exposure substantially increases the return demanded by investors.
For a first Italian reactor, pure merchant financing would therefore place construction risk and long-term market-price risk simultaneously on the investor.
International evidence suggests that this is a particularly difficult combination for nuclear new build. OECD-NEA work emphasises the importance of long-term revenue stabilisation through mechanisms such as tariffs, PPAs and Contracts for Difference.
The Contract for Difference
A two-way CfD establishes a reference or strike price.
Simplified:
IF MARKET PRICE < STRIKE PRICE
support mechanism
↓
pays difference
↓
generator
IF MARKET PRICE > STRIKE PRICE
generator
↓
returns difference
↓
support mechanism / consumers
The economic objective is not simply to subsidise nuclear power.
It is to reduce revenue uncertainty.
That lower uncertainty can reduce the return demanded by investors and therefore the financing cost embedded in each MWh.
The best-known European nuclear example is Hinkley Point C in the United Kingdom. Its CfD originally provided a strike price of £92.50/MWh in 2012 money for 35 years, with the price reduced by £3/MWh following satisfaction of the Sizewell C condition.
Hinkley demonstrates both the attraction and the limitation of the CfD model.
It provides strong long-term operating revenue certainty.
But the CfD does not itself eliminate construction-period financing risk because payments principally arise after electricity generation begins.
Therefore:
CfD
SOLVES / REDUCES:
electricity-price risk
DOES NOT AUTOMATICALLY SOLVE:
construction risk
CAPEX overrun
completion risk
For Italy, a two-way CfD could be particularly important because EU electricity-market rules now explicitly include nuclear energy among technologies eligible for direct price support through two-way CfDs or equivalent mechanisms.
Under Regulation (EU) 2024/1747, direct price-support schemes for investment in new nuclear generation concluded from 17 July 2027 must, where the relevant provisions apply, take the form of a two-way CfD or an equivalent arrangement with the same effects. The regulation also requires preservation of efficient market participation and limits distortions of competition.
This makes the two-way CfD a particularly relevant instrument for any Italian commercial programme beginning later in the decade.
But it does not mean that Commission approval is automatic.
State-aid analysis remains separate.
The Regulated Asset Base model
The RAB model approaches the financing problem from another direction.
Instead of waiting until electricity production begins, the project receives an allowed regulated revenue during some or all of the construction period.
The United Kingdom introduced the model specifically for new nuclear through the Nuclear Energy (Financing) Act 2022.
Under the model, the nuclear company can receive regulated revenue during:
- design;
- construction;
- commissioning;
- operation.
The costs are collected through electricity suppliers and ultimately transferred to consumers. The UK government’s stated rationale is that earlier revenue lowers construction-period financing requirements and therefore reduces the total cost of capital.
Sizewell C is now implementing this architecture. Consumers began contributing through the nuclear RAB levy in January 2026, before the station produces electricity. The project’s published 2026 business case explicitly states that this approach reduces the compounding effect of financing costs during construction.
That is the central RAB trade-off.
RAB ADVANTAGE
EARLY REGULATED REVENUE
↓
LOWER INVESTOR RISK
↓
LOWER COST OF CAPITAL
↓
LOWER LIFETIME FINANCING COST
RAB DISADVANTAGE
CONSUMERS START PAYING
↓
BEFORE ELECTRICITY EXISTS
↓
CONSUMERS EXPOSED TO
CONSTRUCTION PERFORMANCE
This is not merely a technical financing distinction.
It is a political choice.
Under a conventional CfD, consumers principally pay once output exists.
Under a RAB model, consumers may begin paying years earlier.
Therefore an Italian RAB-type model would require exceptional transparency about:
- approved construction budget;
- cost-control mechanisms;
- regulator powers;
- overrun-sharing;
- allowable return;
- milestones;
- project cancellation;
- clawback;
- consumer compensation.
A badly designed RAB system can reduce financing cost by transferring excessive construction risk to consumers.
A well-designed RAB system can reduce the risk premium sufficiently that total lifetime consumer cost falls despite earlier payments.
The result depends on governance.
Long-term Power Purchase Agreements
A long-term PPA can provide another form of revenue certainty.
For example:
NUCLEAR PROJECT
│
▼
20–30 YEAR PPA
│
▼
DATA CENTRE
INDUSTRIAL CONSORTIUM
UTILITY
PUBLIC OFFTAKER
This can be attractive for large consumers seeking:
- reliable low-carbon electricity;
- predictable long-term price;
- decarbonisation credentials.
Italy’s growing data-centre demand and industrial decarbonisation needs make this model particularly relevant.
But a PPA does not automatically solve a FOAK financing problem.
The financial value of the PPA depends on:
- credit quality of the offtaker;
- contract duration;
- termination provisions;
- price structure;
- project delay treatment;
- minimum volume;
- replacement-customer risk.
A hyperscale technology company may have excellent credit quality.
But a sixty-year nuclear plant cannot assume that one data-centre customer will remain commercially unchanged for sixty years.
The appropriate structure may therefore combine:
BASE REVENUE STABILISATION
+
SELECTED CORPORATE PPAs
+
MARKET EXPOSURE
rather than making one industrial customer responsible for the entire project business case.
12.2.2 Capital-side instruments: public equity, loans and guarantees
Revenue certainty addresses only one side of the project.
The second side is the actual provision of capital.
A nuclear project can draw from:
- sponsor equity;
- institutional equity;
- utility balance sheet;
- commercial debt;
- state loans;
- state-guaranteed debt;
- export-credit agencies;
- European financial instruments.
Corporate balance-sheet financing
A financially strong utility can finance part of a reactor using its own balance sheet.
The advantage is simplicity.
The disadvantage is concentration.
A sufficiently large nuclear project can threaten the credit quality of the utility itself if construction overruns become extreme.
For Italy this matters because the FOAK financing question should not be reduced to whether Enel, Edison or another company is theoretically large enough to invest.
The question is:
How much nuclear construction risk can any one corporate balance sheet absorb without endangering the utility’s wider investment programme?
That wider investment programme includes:
- grids;
- renewables;
- storage;
- international operations;
- conventional generation;
- customer infrastructure.
The State should therefore avoid creating a structure in which one national utility becomes a de facto absorber of unlimited FOAK risk.
State equity
The government can invest directly in the project company.
This provides capital and signals political commitment.
It can also reduce perceived political risk.
But state equity transforms project risk into an explicit taxpayer investment.
If the project succeeds:
STATE
↓
receives shareholder value
If it fails:
STATE
↓
absorbs equity loss
The Sizewell C structure demonstrates one modern hybrid model. According to the project’s 2026 business case, the UK government holds 44.9% of the equity, alongside institutional and industrial investors.
Italy could theoretically adopt an analogous public-private project company.
But a decision to take state equity should follow a separate MEF evaluation because it creates:
- direct fiscal exposure;
- governance obligations;
- potential consolidation questions;
- political pressure during overruns.
State-backed loans
Government lending can reduce financing costs dramatically because sovereign borrowing normally carries lower rates than project finance exposed to construction risk.
The Czech Dukovany model is particularly important for Italy because it operates inside the EU legal order.
For the single-unit support package approved by the European Commission in 2024, the Czech project combined:
- a subsidised state loan covering most construction costs;
- a 40-year revenue-support mechanism similar in effect to a two-way CfD;
- protection against specified political or policy changes;
- clawback mechanisms to prevent excess remuneration;
- requirements intended to preserve market participation.
This is a highly instructive model.
It demonstrates that the financing architecture need not be:
STATE
OR
PRIVATE MARKET
It can instead be:
STATE CHEAP DEBT
+
PRIVATE / UTILITY EQUITY
+
LONG-TERM REVENUE SUPPORT
+
MARKET PARTICIPATION
+
CLAWBACK
However, the subsequent Czech attempt to expand support to two new units triggered a fresh formal Commission investigation in December 2025.
The proposed package included a low-interest state loan estimated initially at €23–30 billion, a proposed 40-year two-way CfD and protection against adverse policy changes. The Commission opened an in-depth investigation rather than granting automatic approval.
That development is directly relevant to Italy.
It demonstrates that:
approval of one nuclear State-aid model does not create an unlimited precedent for another.
Scale matters.
Design matters.
Market impact matters.
State guarantees
Instead of lending directly, the government can guarantee part of project debt.
This can lower the lender’s risk.
But the economic exposure does not disappear.
A guarantee creates a contingent liability:
NO PROJECT FAILURE
↓
STATE PAYS NOTHING
PROJECT DEFAULT
↓
GUARANTEE CALLED
↓
STATE PAYS
This type of exposure is politically attractive because the fiscal cost may initially appear small.
It can also become dangerous because the headline budget may understate the risk assumed by the State.
For this reason, guarantees should be valued as financial options and reported explicitly in the public accounts and programme risk register.
Italy should never describe guaranteed commercial debt as:
“fully private financing.”
It is private capital carrying public credit support.
European instruments
Europe can support part of the financing architecture, but current instruments should not be mistaken for a substitute for national project finance.
The Euratom lending facility can finance nuclear power and fuel-cycle investment in Member States, but its current overall lending ceiling is €4 billion, of which approximately €3.67 billion has already been allocated. The Commission reports no current ongoing Euratom loan operations.
Therefore the existing Euratom loan envelope, without reform or expansion, is far too small to finance a significant Italian fleet.
The European Commission’s March 2026 SMR strategy also contemplates an additional €200 million InvestEU guarantee top-up for initial commercial innovative nuclear technologies. This can help de-risk projects and mobilise private capital, but €200 million at EU level is clearly a catalytic instrument rather than reactor CAPEX funding.
The European Investment Bank is also becoming more relevant. In July 2026 the EIB approved an €800 million loan for the upgrade of Romania’s Cernavodă nuclear plant, demonstrating that nuclear financing can fall within its current energy-autonomy and transition activity.
For Italy, European institutions can therefore contribute to:
- debt;
- guarantees;
- R&D;
- supply-chain investment;
- fuel-cycle facilities;
- early FOAK de-risking.
They cannot currently be assumed to finance the majority of national reactor construction.
Table 12.2-A — Principal financing models available to Italy
| Model | Construction-period revenue | Price certainty | Public exposure | Principal strength | Principal weakness |
|---|---|---|---|---|---|
| Pure merchant | No | None | Low initially | Maximum market discipline | Very difficult for FOAK nuclear |
| Utility balance sheet | No | Depends on market | Indirect | Simple ownership structure | Concentrates risk on utility |
| Corporate PPA | Normally no | High for contracted output | Low–medium | Strong offtaker supports revenue | Does not remove construction risk |
| Two-way CfD | Normally after generation | High | Consumer/State support | Reduces price risk | Construction financing remains difficult |
| RAB | Yes | Regulated | Consumer exposure during build | Can materially reduce cost of capital | Consumers pay before completion |
| State loan + CfD | Debt supplied cheaply + operating support | High | High but visible | Strong bankability | State balance-sheet exposure |
| State equity + private capital | Depends on revenue regime | Depends | Direct taxpayer equity | Aligns State and investor interest | Political/fiscal exposure |
| Sovereign-guaranteed debt | No unless paired with support | Depends | Contingent | Lowers borrowing cost | Hidden/contingent fiscal risk |
| Export-credit finance | Normally no | Depends | Foreign sovereign/ECA support | Supports vendor exports | Can constrain vendor choice |
| Hybrid structure | Design-specific | High if properly structured | Shared | Allows risk optimisation | Complex governance |
Italy should assume from the beginning that the realistic answer will probably be a hybrid, not a single instrument.
12.3 Cost of capital can change the economics as much as reactor cost
Nuclear plants are unusually sensitive to financing costs because so much money is committed years before commercial revenue begins.
This creates interest during construction.
The longer the construction period and the higher the required return on capital, the larger the difference between:
overnight engineering cost
and
cost at commercial operation.
Consider a purely illustrative example.
Assume:
- €3.0 billion overnight project cost;
- seven-year construction programme;
- capital spending distributed evenly across the seven years;
- financing cost capitalised until commercial operation.
This is not an estimate for any specific reactor.
It is only a demonstration of financing sensitivity.
Table 12.3-A — Illustrative effect of financing cost during construction
| Financing rate | Overnight construction expenditure | Approx. accumulated cost at operation | Financing addition |
|---|---|---|---|
| 4% | €3.0 bn | ~€3.52 bn | ~€0.52 bn |
| 7% | €3.0 bn | ~€3.97 bn | ~€0.97 bn |
| 10% | €3.0 bn | ~€4.47 bn | ~€1.47 bn |
| 12% | €3.0 bn | ~€4.84 bn | ~€1.84 bn |
These numbers intentionally exclude many real project complexities.
They simply illustrate the mathematical point:
SAME REACTOR
SAME CONCRETE
SAME TURBINE
SAME LABOUR
BUT
DIFFERENT COST OF CAPITAL
↓
VERY DIFFERENT FINAL COST
This is why comparing reactor vendors solely on quoted overnight €/kW can be misleading.
A reactor with:
€5,000/kW
at expensive finance
can ultimately be more expensive than one with:
€6,000/kW
at materially cheaper finance
depending on schedule and risk.
12.3.1 Why WACC becomes a strategic variable
The Weighted Average Cost of Capital — WACC — represents the combined required return on:
- debt;
- equity.
Simplified:
WACC
=
cost of debt × debt share
+
cost of equity × equity share
adjusted where appropriate for taxation and structure.
Investors demand a higher return when they perceive greater risk.
Therefore WACC can be reduced through:
- mature technology;
- completed licensing;
- stable political framework;
- credible construction management;
- guaranteed or regulated revenue;
- State credit support;
- strong vendor guarantees;
- replicable fleet programme.
This creates a powerful connection between chapters that might otherwise appear separate.
REGULATORY CERTAINTY
↓
LOWER RISK
STANDARDISED DESIGN
↓
LOWER RISK
PROVEN FOAK ABROAD
↓
LOWER RISK
LONG-TERM REVENUE CONTRACT
↓
LOWER RISK
POLITICAL DURABILITY
↓
LOWER RISK
LOWER RISK
↓
LOWER WACC
↓
LOWER NUCLEAR COST
This means that the political instability analysed in Chapter 11 has a direct financial price.
If investors believe that a future Italian government could:
- reverse the nuclear programme;
- alter the support mechanism;
- block the site;
- rewrite market rules;
- prevent operation;
they will demand protection or a higher return.
Therefore:
Political credibility is a financing asset.
The repeated Italian sequence:
EXIT
→ RELAUNCH
→ EXIT
→ RELAUNCH
can translate directly into a political-risk premium unless the programme establishes sufficiently durable legal and contractual protections.
Construction risk is the most dangerous financing risk
A CfD can address electricity-price uncertainty.
It cannot pour concrete.
The central problem of nuclear new build remains execution.
The OECD-NEA’s recent financing work concludes that construction and completion risk are among the most critical parameters in nuclear new-build projects.
A one-year delay creates several simultaneous effects:
ONE-YEAR DELAY
│
├── additional site cost
├── additional labour
├── additional project management
├── inflation
├── additional interest
├── deferred electricity revenue
└── possible contractual claims
This is why project finance lenders are reluctant to assume uncapped nuclear construction risk.
The first Italian project should therefore contain explicit contractual rules governing:
- target completion date;
- maximum acceptable delay;
- contingency;
- vendor responsibility;
- force majeure;
- regulatory delay;
- owner-caused delay;
- liquidated damages;
- additional equity requirements;
- government intervention triggers.
FOAK and fleet finance should not be treated identically
An important distinction is required between:
ITALIAN FOAK
and
ITALIAN NOAK / FLEET REPLICATION
Even if Italy selects a reactor that already operates abroad, the first Italian unit will still contain country-FOAK elements:
- Italian licence;
- Italian site;
- Italian supply chain;
- Italian grid integration;
- Italian workforce;
- Italian emergency planning.
That justifies a higher financing contingency.
If the first unit succeeds and identical plants follow, risk should decline.
The financing architecture should therefore be designed to capture learning.
For example:
FOAK
- greater State support;
- larger contingency;
- conservative debt;
- stronger guarantees.
Units 2–4
- lower public risk;
- more private debt;
- lower required return.
Mature fleet
- increasingly conventional infrastructure finance.
The government should resist the opposite path:
FOAK FAILS TO CONTROL COST
↓
STATE SUPPORT INCREASES
↓
SECOND PROJECT RECEIVES
EVEN GREATER GUARANTEE
That would socialise poor performance instead of rewarding learning.
12.4 EU State aid and electricity-market law are part of the financing design
Italy cannot design nuclear financing solely as a national fiscal decision.
The programme sits within:
- EU electricity-market rules;
- State-aid law;
- competition law;
- public-procurement law;
- Euratom law.
The existence of EU recognition of nuclear energy does not provide automatic approval for any financing mechanism.
This distinction is essential:
NUCLEAR PERMITTED IN ENERGY MIX
≠
EU TAXONOMY ELIGIBILITY
≠
STATE-AID APPROVAL
≠
PUBLIC PROCUREMENT COMPLIANCE
Each is a different legal question.
Two-way CfDs now have a specific EU framework
The 2024 electricity-market reform is highly relevant to Italy.
For new nuclear investments falling within direct price-support schemes, the regulation establishes two-way CfDs or equivalent schemes as the standard form from 17 July 2027.
The purpose is to combine:
- revenue predictability for the generator;
- repayment of excess revenue when market prices are high;
- continued exposure to efficient market signals;
- protection against excessive distortions.
That structure aligns well with nuclear financing needs.
But State aid still needs separate assessment under Articles 107 and 108 TFEU.
The Dukovany precedent is useful but not a blank cheque
The Commission’s 2024 approval of the Czech support mechanism is particularly instructive because it shows what the Commission examined.
The Czech package was modified to include:
- a two-way-like revenue mechanism;
- reduction of support duration from 60 to 40 years;
- calibration of support to the project funding gap;
- controls on shareholder return;
- clawback of additional profits;
- continuing exposure to wholesale-market signals;
- open-market sale requirements for much of the plant’s generation.
This demonstrates the Commission’s concern with:
NECESSITY
+
PROPORTIONALITY
+
NO OVERCOMPENSATION
+
COMPETITION
+
MARKET PARTICIPATION
Italy should build these principles into its financing architecture from the beginning rather than design a support package and attempt to repair it later during Brussels review.
The December 2025 Commission investigation into the expanded two-unit Dukovany package provides a further warning.
Even where a single-reactor support package has previously been approved, a larger subsequent package can require a fresh investigation because:
- scale changes;
- financing changes;
- competitive effects change.
Italy should therefore begin State-aid dialogue before FID
The inefficient sequence would be:
ITALY DESIGNS SUPPORT MODEL
↓
PROJECT SELECTED
↓
FINANCIAL TERMS AGREED
↓
STATE AID NOTIFIED
↓
COMMISSION REQUIRES REDESIGN
The stronger sequence is:
PRELIMINARY FINANCING MODEL
↓
EARLY COMMISSION DIALOGUE
↓
COMPETITION / MARKET TEST
↓
MODEL REFINED
↓
PROCUREMENT
↓
FINAL NOTIFICATION
↓
FID
The State-aid process should therefore run in parallel with:
- technology selection;
- owner/operator design;
- electricity-market design;
- fiscal planning.
State support should not eliminate electricity-market discipline
Nuclear generation should continue responding to market signals where technically appropriate.
The Czech model demonstrates one possible approach: even with long-term revenue support, the plant remains exposed to actual market prices in its operating decisions.
This becomes increasingly important in an Italian system with high solar penetration.
During periods of extremely low electricity prices, nuclear operators should retain incentives to:
- optimise maintenance;
- reduce output where technically efficient;
- redirect energy to heat or hydrogen where possible;
- avoid inefficient market distortions.
The support system should not become:
GENERATOR PRODUCES
REGARDLESS OF SYSTEM VALUE
↓
CONSUMER ALWAYS PAYS
It should instead aim for:
INVESTMENT REVENUE CERTAINTY
+
OPERATING MARKET DISCIPLINE
EU financing support can reduce risk but cannot substitute for Italian decisions
The 2026 European SMR strategy recognises financing as a central deployment barrier.
It states explicitly that the SMR business model still needs to prove serial modular construction in practice and calls for public de-risking tools to mobilise private investment.
This is important for Italy.
But it should not generate an illusion that Brussels will finance the fleet.
The current European instruments are mainly catalytic.
Table 12.4-A — European instruments relevant to an Italian nuclear programme
| Instrument | Potential role | Limitation |
|---|---|---|
| EU two-way CfD framework | Enables structured long-term price support | National scheme still requires design and State-aid compliance |
| InvestEU SMR guarantee | FOAK de-risking | Proposed scale small relative to reactor CAPEX |
| Innovation Fund | Innovative/pre-commercial technology support | Not full commercial fleet finance |
| Euratom loans | Nuclear/fuel-cycle project lending | Existing €4bn overall ceiling largely allocated |
| EIB | Debt/project support | Project-specific assessment required |
| IPCEI | Innovative nuclear industrial cooperation | Primarily industrial/innovation instrument |
| EU State-aid framework | Allows compatible public support | Requires necessity/proportionality/competition test |
The appropriate Italian expectation is therefore:
European instruments can lower part of the programme’s financing cost. They will not decide who pays for the Italian fleet.
That remains principally an Italian policy decision.
12.5 A credible Italian financing architecture should separate FOAK support from permanent subsidy
Italy should not begin by choosing a financing label.
It should begin by defining the problem to be solved.
For the first commercial reactor, the financing architecture must provide enough certainty to cover:
- development risk;
- construction risk;
- long-term electricity-price risk;
- political and regulatory risk;
while simultaneously preventing:
- unlimited taxpayer liability;
- unlimited consumer exposure;
- uncontrolled vendor claims;
- excessive investor returns.
A reasonable analytical starting point for an Italian FOAK would therefore be a hybrid financing architecture.
This is not a recommendation that Italy adopt one exact structure today.
It is the structure that should be tested during detailed financial design.
Potential Italian FOAK architecture
ITALIAN STATE
│
┌─────────────┼─────────────┐
│ │ │
▼ ▼ ▼
LIMITED EQUITY CHEAP / GUARANTEED POLITICAL /
SENIOR DEBT REGULATORY
PROTECTION
│ │ │
└─────────────┼─────────────┘
▼
PROJECT COMPANY
│
PRIVATE EQUITY
│
VENDOR COMMITMENT
│
▼
CONSTRUCTION
│
▼
COMMISSIONING
│
▼
TWO-WAY CfD
│
┌─────────────┼─────────────┐
▼ ▼ ▼
MARKET SALES INDUSTRIAL CORPORATE
OFFTAKE PPAs
Such a model could separate the key objectives.
Public involvement could reduce the risk premium where markets cannot efficiently bear risk.
Private equity could maintain commercial discipline.
Vendor exposure could ensure that construction failure is not entirely transferred to the State.
The two-way CfD could stabilise operating revenue.
Industrial PPAs could provide additional long-duration contracted demand.
The exact proportions should be determined only after:
- reactor selection;
- site selection;
- cost estimate;
- owner/operator structure;
- State-aid consultation.
The State should never offer an unlimited completion guarantee
This should be a hard principle.
An unlimited State promise to ensure project completion at any cost would destroy budget discipline.
The project company and vendor must retain meaningful economic exposure to:
- delay;
- construction quality;
- cost overrun;
- poor performance.
Otherwise the incentive structure becomes:
PRIVATE RETURN
+
PUBLIC DOWNSIDE
That is not a sustainable financing model.
Public support should be conditional on milestone performance
State capital should be released against verified milestones.
For example:
| Funding gate | Required evidence |
|---|---|
| Development capital | Stable reference design |
| Additional development capital | Regulatory review sufficiently advanced |
| Site-development capital | Site passes preliminary safety screen |
| FID support | Bankable fuel + site + licence path |
| First major construction tranche | Nuclear construction authorisation |
| Subsequent tranches | Cost/schedule milestones |
| Operating support | Successful commissioning |
| Fleet support | FOAK performance evidence |
This creates:
PERFORMANCE
↓
CAPITAL
rather than:
POLITICAL COMMITMENT
↓
UNLIMITED CAPITAL
Consumer protection must be explicit
If consumers fund the project through:
- CfD;
- RAB;
- nuclear levy;
the support mechanism should contain:
- transparency;
- return caps;
- gain sharing;
- clawback;
- performance incentives;
- independent auditing.
Consumers should participate in upside if they are required to carry downside.
For example:
IF PROJECT OUTPERFORMS
↓
PART OF SAVINGS
↓
RETURNED TO CONSUMERS
This principle already appears in European nuclear support mechanisms including Hinkley and Dukovany.
Taxpayer, consumer and investor exposures should be reported separately
One of the most important accounting reforms would be creation of a Nuclear Fiscal Risk Statement.
It should appear annually in public programme reporting.
It should identify:
Direct expenditure
- state equity;
- grants;
- regulator expenditure;
- site infrastructure.
Contingent liabilities
- sovereign guarantees;
- completion guarantees;
- political-risk guarantees;
- insurance backstops.
Consumer commitments
- CfD payments;
- RAB payments;
- levies.
Future liabilities
- waste;
- decommissioning;
- spent fuel;
- repository obligations.
This prevents a programme from appearing inexpensive merely because liabilities are shifted outside immediate government expenditure.
Table 12.5-A — Example nuclear public-exposure register
| Exposure | Government budget | Consumers | Project company | Future liability |
|---|---|---|---|---|
| Development studies | ✓ | possible | ||
| State equity | ✓ | |||
| Construction debt guarantee | contingent | ✓ | ||
| CfD | possible | ✓ | long term | |
| RAB | ✓ | long term | ||
| Waste fund | tariff/plant | ✓ | ✓ | |
| Decommissioning fund | tariff/plant | ✓ | ✓ | |
| Severe accident public backstop | contingent | operator/insurance | ✓ | |
| Political shutdown compensation | contingent | possible | ✓ |
The exact assignments would depend on the final model.
The table illustrates the transparency requirement.
FOAK financing and fleet financing should be deliberately different
The State can justify greater support for the first reactor because the FOAK creates public goods:
- regulator learning;
- supply-chain qualification;
- workforce development;
- reference operating experience.
But that support should decline if the technology proves successful.
A possible architecture is:
FOAK
│
├── high public de-risking
├── limited private leverage
└── high contingency
UNIT 2
│
├── lower public guarantee
├── more private debt
└── lower contingency
UNITS 3–6
│
├── fleet finance
├── institutional capital
└── increasingly commercial risk
MATURE FLEET
│
└── public support principally revenue/system policy,
not construction rescue
If public support instead increases from plant to plant, this would indicate that learning and standardisation are not occurring.
That should trigger programme review.
No FID should occur before the financing model survives a full stress test
The nuclear Final Investment Decision should be treated as a sovereign financial gate.
Before FID, the government should publish or internally certify stress tests for at least:
- construction delay;
- capital overrun;
- interest-rate increase;
- electricity-price decline;
- lower capacity factor;
- fuel-price increase;
- extended outage;
- political change;
- delayed waste facility;
- vendor insolvency.
Table 12.5-B — Minimum financial stress cases before Italian FOAK FID
| Stress case | Minimum test |
|---|---|
| CAPEX +20% | Who provides extra capital? |
| CAPEX +50% | Does project remain viable? |
| Construction +2 years | Financing requirement and consumer cost |
| Construction +5 years | Stop/restructure threshold |
| WACC +200 basis points | Impact on revenue requirement |
| Market prices materially lower | CfD / PPA exposure |
| Capacity factor lower than plan | Debt-service resilience |
| Fuel cost doubles | Operating economics |
| Vendor insolvency | Completion strategy |
| Government changes policy | Contractual exposure |
| Waste cost materially increases | Fund adequacy |
| Project cancelled after major spend | Loss allocation |
The project should fail the FID gate if these questions do not have explicit answers.
Italy should establish financial kill-switches before money is committed
This is particularly important because sunk costs can distort political decisions.
Once billions have been spent, governments can become reluctant to stop a failing programme because stopping makes the loss visible.
Therefore the termination rules should be determined before construction.
Potential triggers include:
REFERENCE DESIGN UNSTABLE
↓
NO FID
FUEL CHAIN NOT CONTRACTIBLE
↓
NO FID
STATE-AID APPROVAL ABSENT
↓
NO FID
CAPEX EXCEEDS APPROVED ENVELOPE
BEFORE NUCLEAR CONSTRUCTION
↓
REPROCURE / STOP
CONSTRUCTION OVERRUN
EXCEEDS PREDEFINED THRESHOLD
↓
INDEPENDENT REVIEW
ADDITIONAL STATE GUARANTEE
WOULD EXCEED FISCAL LIMIT
↓
PARLIAMENTARY REAUTHORISATION
The objective is not to make cancellation easy.
It is to prevent escalation from becoming automatic.
Bankability should be judged against an integrated test
A project becomes genuinely bankable only when all the following converge:
TECHNOLOGY
+
LICENCE
+
SITE
+
FUEL
+
CONSTRUCTION CONTRACT
+
OWNER / OPERATOR
+
REVENUE MODEL
+
DEBT
+
EQUITY
+
STATE-AID APPROVAL
+
WASTE FUNDING
+
POLITICAL DURABILITY
↓
FID
If one of these components is absent, the project is not financially complete.
Master comparison — what each instrument actually solves
| Instrument | Development risk | Construction risk | Price risk | Political risk | Cost of capital |
|---|---|---|---|---|---|
| Merchant | Investor | Investor | Investor | Investor | High |
| PPA | Investor | Investor | Reduced | Investor | Moderate–high |
| CfD | Investor | Investor | Strongly reduced | Partially reduced | Moderate |
| RAB | Shared | Shared with consumers | Reduced | Shared | Potentially lower |
| State loan | Shared | State/project | Depends on revenue model | Partly State | Lower debt cost |
| Sovereign guarantee | Investor + State backstop | Shared | Depends | State | Lower |
| State equity | State/project | State/project | Depends | State | Lower/mixed |
| Hybrid | Shared deliberately | Shared deliberately | Reduced | Shared | Potentially optimised |
There is no universally superior model.
The correct choice depends on what Italy is willing to expose:
TAXPAYERS
vs
CONSUMERS
vs
PRIVATE INVESTORS
to which risks.
The financing decision is therefore a political-economic decision, not a banking footnote
This is the central conclusion of Chapter 12.
Italy can theoretically finance nuclear power.
The European and international evidence demonstrates several workable structures.
The unresolved question is not whether financial instruments exist.
It is:
what balance of public and private risk Italy considers acceptable.
A financing architecture excessively dependent on private capital will demand a high return because investors must price risks they cannot control.
That can make nuclear unnecessarily expensive.
A financing architecture excessively dependent on the State can conceal risk, weaken project discipline and expose taxpayers to unlimited overruns.
A financing architecture excessively dependent on electricity consumers can lower WACC while forcing households and industry to pay for construction before electricity exists.
The Italian solution must therefore optimise rather than eliminate risk.
The core financial principle should be:
allocate each risk to the party best able to control, absorb or diversify it.
Construction performance should remain substantially with:
- owner;
- vendor;
- contractors.
Electricity-market risk can be reduced through:
- two-way CfD;
- PPAs.
Uninsurable political risk may require:
- State protection.
Long-duration fuel risk belongs principally within:
- operator procurement;
- strategic State oversight.
Waste and decommissioning should be financed progressively through:
- ring-fenced lifecycle funds;
rather than transferred to future taxpayers.
The FOAK may require substantial public de-risking because Italy is rebuilding a national nuclear capability.
But public support should not become a permanent substitute for industrial performance.
The financing architecture should therefore contain a deliberate path:
PUBLIC DE-RISKING
↓
SUCCESSFUL FOAK
↓
REPLICATED DESIGN
↓
LOWER UNCERTAINTY
↓
LOWER WACC
↓
MORE PRIVATE CAPITAL
↓
LOWER PUBLIC EXPOSURE
That is the economic promise of fleet deployment.
If the opposite occurs:
FOAK
↓
COST OVERRUN
↓
MORE STATE SUPPORT
↓
UNIT 2 OVERRUN
↓
MORE STATE SUPPORT
then the programme has failed to achieve the industrial learning on which modular nuclear economics depend.
The government should therefore judge the first reactor not only by whether it reaches criticality.
It should judge it by whether it creates a financeable second reactor.
That is a far more demanding test.
The ultimate financial objective of the Italian nuclear programme should not be to prove that the State can mobilise enough money to construct one heavily protected FOAK.
It should be to demonstrate that Italy can move from:
STATE-DE-RISKED FOAK
to:
REPLICABLE,
INVESTABLE,
INDUSTRIAL NUCLEAR FLEET
without transferring unlimited risk to taxpayers or consumers.
As of September 2026, Italy has not yet reached that point.
The present legislative framework finances the reconstruction of the programme, not the commercial plants themselves. The parliamentary technical material explicitly recognises that the cost of future support measures cannot yet be determined and will require future financial provision.
This should not be regarded as a deficiency at the present stage.
It is the next decision.
But it is now one of the most important unresolved decisions in the entire Italian nuclear programme.
Before a reactor technology is finally procured, Italy should therefore determine:
- the prospective owner and operator;
- the maximum State-equity exposure;
- whether public debt or guaranteed debt will be used;
- whether revenue will be stabilised through a two-way CfD;
- whether a RAB-like construction-phase mechanism is politically acceptable;
- the role of industrial and data-centre PPAs;
- the maximum taxpayer contingent liability;
- the maximum consumer exposure;
- the State-aid strategy;
- the treatment of construction overruns;
- the profit-sharing and clawback architecture;
- the waste and decommissioning funding mechanism;
- the circumstances under which the State must stop financing the project.
The nuclear financing decision can finally be reduced to one government question:
What combination of public capital, private capital and consumer support minimises the lifetime cost of the programme while preserving construction discipline and preventing any one group—taxpayers, consumers or investors—from carrying risks it cannot reasonably control?
Until that question has a quantified answer, Italy may possess a nuclear strategy.
It does not yet possess a bankable nuclear programme.
Chapter 13 — Building the Nuclear State
The most difficult part of restarting nuclear power in Italy may not ultimately be choosing a reactor.
It may be rebuilding the State capable of governing one.
Italy is not beginning from zero. It already possesses a nuclear regulatory authority, radioactive-waste institutions, research organisations, university competence, industrial suppliers, radiation-protection legislation, emergency arrangements and decades of experience managing the residual obligations of its earlier nuclear programme.
But there is a fundamental difference between a State capable of supervising:
- decommissioning;
- radioactive waste;
- research reactors;
- radioactive sources;
- spent fuel from a historical programme;
and a State capable of:
- selecting new reactor technology;
- licensing a new nuclear power plant;
- supervising nuclear construction;
- regulating fuel procurement;
- approving commissioning;
- controlling commercial operation;
- supervising a multi-reactor fleet;
- maintaining safeguards;
- managing radiation protection;
- planning long-term waste and spent-fuel disposition;
- sustaining the entire institutional system for a century.
Italy currently possesses much of the first architecture.
It does not yet possess the complete second architecture.
That distinction is central to the whole nuclear programme.
The International Atomic Energy Agency defines national nuclear-power infrastructure not simply as the reactor and its associated industrial facilities but as the governmental, legal, regulatory, managerial, technological, human and industrial infrastructure required to support the programme throughout its lifecycle. The IAEA Milestones Approach therefore treats the creation of national institutions as a prerequisite to a successful nuclear programme rather than an administrative consequence of reactor procurement.
This matters particularly for Italy because nearly four decades have passed since the State last licensed and operated a domestic commercial nuclear power programme.
The country preserved significant capability.
But institutional continuity was broken.
A regulator supervising decommissioning develops important expertise in:
- nuclear materials;
- waste;
- radiological protection;
- inspections;
- physical protection;
- environmental monitoring.
It does not automatically accumulate continuous experience in:
- reviewing a new commercial reactor safety case;
- design certification;
- new-build construction inspection;
- commissioning;
- reactor operating licences;
- digital I&C qualification;
- first-of-a-kind licensing;
- multi-unit operational oversight.
Similarly, an engineering company that continues supplying foreign nuclear projects preserves valuable industrial capability.
That does not automatically recreate a domestic nuclear owner-operator.
The central institutional task for Italy is therefore not merely to “create a nuclear authority” or “give more powers to ISIN”.
It is to create a coherent system in which different institutions perform clearly separated functions.
At minimum, a national programme requires five distinct centres of responsibility:
POLITICAL GOVERNMENT
│
▼
sets national policy
NUCLEAR PROGRAMME ORGANISATION
│
▼
implements the programme
OWNER / LICENSEE / OPERATOR
│
▼
owns and operates the plant
INDEPENDENT REGULATOR
│
▼
licenses and supervises safety
EURATOM / IAEA SAFEGUARDS SYSTEM
│
▼
verifies peaceful nuclear-material use
These functions can cooperate closely.
They must not be confused.
The institution promoting nuclear power should not decide whether its own reactor is safe.
The regulator should not become the project developer.
The government should not assume the technical responsibilities of the operator.
The reactor vendor should not become the final authority on whether its own design complies with Italian safety requirements.
And responsibility for safety cannot disappear into a network of contractors.
EU nuclear-safety law is explicit on this final point: the prime responsibility for nuclear safety rests with the licence holder and cannot be delegated, including where contractors and subcontractors perform activities relevant to nuclear safety.
The institutional architecture must therefore be designed before Italy reaches the point at which one company is ready to request a construction licence.
As of 27 September 2026, Parliament has completed approval of the sustainable-nuclear delegation bill, but the Senate still records the measure as definitively approved and not yet published. The detailed implementing institutional architecture therefore remains to be completed through the delegated legislation and subsequent regulatory measures.
That creates a rare opportunity.
Italy can decide the institutional model before commercial project pressure determines it.
The State should use that opportunity.
13.1 Italy must move from a legacy nuclear administration to a full lifecycle nuclear State
Italy already possesses many of the institutions needed to build a future nuclear system.
But they were largely developed or maintained for a country without operating commercial nuclear power reactors.
The future programme must therefore distinguish between:
existing institutional capability
and
capability required for new nuclear deployment.
The most important existing regulator is the Ispettorato nazionale per la sicurezza nucleare e la radioprotezione — ISIN.
ISIN is currently Italy’s competent independent regulatory authority for nuclear safety and radiation protection. Its responsibilities include technical assessment, inspections and supervision concerning:
- nuclear installations undergoing decommissioning;
- research reactors;
- radioactive waste;
- spent fuel;
- nuclear materials;
- passive physical protection;
- radioactive-material transport;
- ionising-radiation sources;
- environmental radioactivity.
It also represents Italy in major international nuclear regulatory organisations and performs national emergency-notification functions.
That is a substantial institutional base.
It means Italy does not face the problem encountered by a country entering nuclear power with no regulator, no radiation-protection framework and no nuclear-material experience.
But the scale and nature of the future task would change profoundly if Italy moved from:
4 DECOMMISSIONING POWER-REACTOR SITES
+
RESEARCH / FUEL-CYCLE FACILITIES
+
WASTE
to:
NEW REACTOR DESIGN REVIEW
+
NEW SITES
+
NUCLEAR CONSTRUCTION
+
COMMISSIONING
+
OPERATING FLEET
+
NEW FUEL CYCLE
+
NEW SPENT FUEL
The future Italian nuclear State will therefore have to manage three programmes simultaneously.
Programme A — the legacy programme
This already exists.
It includes:
- dismantling Caorso;
- dismantling Trino;
- dismantling Latina;
- dismantling Garigliano;
- managing legacy spent fuel;
- managing existing radioactive waste;
- completing the National Repository programme;
- managing other historical nuclear installations.
Programme B — the new nuclear programme
This would include:
- technology evaluation;
- siting;
- licensing;
- construction;
- operation;
- new fuel procurement;
- spent-fuel management;
- new waste;
- eventual new-reactor decommissioning.
Programme C — national nuclear infrastructure
This is neither an old plant nor a new plant.
It includes:
- regulator capability;
- safeguards;
- emergency arrangements;
- human resources;
- universities;
- training;
- laboratories;
- nuclear quality infrastructure;
- government programme management;
- international cooperation.
These three programmes interact but should not be merged into one institution.
For example:
SOGIN
↓
LEGACY DECOMMISSIONING
+
WASTE RESPONSIBILITIES
FUTURE OPERATOR
↓
NEW REACTORS
+
NEW OPERATIONAL WASTE
ISIN
↓
REGULATES BOTH
SOGIN’s expertise can support the national programme.
It should not transform the regulator into the project owner.
Similarly, ENEA can provide research and technical capability.
It should not become a substitute for an independent regulator or commercial operator unless legislation explicitly assigns a specific function and conflicts are managed appropriately.
Terna can evaluate grid integration.
It should not select reactor technology.
MASE can define national energy policy.
It should not determine whether a safety case is technically acceptable.
The fundamental governance requirement is therefore:
one institution may contribute to several parts of the programme, but each sovereign responsibility must have one clearly identifiable accountable owner.
Table 13.1-A — Core institutional functions of the future Italian programme
| Function | Principal type of institution |
|---|---|
| National nuclear policy | Government / Parliament |
| Programme coordination | Government programme organisation |
| Safety regulation | Independent nuclear regulator |
| Radiation protection regulation | Competent authorities / ISIN within statutory functions |
| Project ownership | Commercial/public project company |
| Nuclear licence | Licence holder |
| Plant operation | Nuclear operating organisation |
| Technology supply | Reactor vendor |
| EPC/construction | Contractor structure |
| Grid integration | Terna |
| Legacy decommissioning | SOGIN |
| New-reactor decommissioning | Future operator/licensee funding structure |
| Waste-policy governance | State + responsible implementer |
| Safeguards | Operator + Euratom/IAEA + national competent authorities |
| Emergency planning | Operator + Prefect/Civil Protection + ISIN technical support |
| Nuclear research | ENEA/universities/industry |
| Workforce development | State + universities + operator + regulator + industry |
The most dangerous institutional condition would be ambiguity.
For example:
MASE thinks Nuclitalia is responsible
↓
Nuclitalia thinks future operator is responsible
↓
future operator not yet established
↓
vendor fills the gap
This would gradually allow a foreign technology supplier to become the de facto source of:
- programme architecture;
- engineering requirements;
- licensing knowledge;
- training;
- technical standards.
That would create a severe asymmetry between the Italian State and the vendor.
Italy should therefore construct state capability before commercial dependence becomes irreversible.
The institutional sequence should precede procurement
The correct order is:
NATIONAL POLICY
↓
PROGRAMME GOVERNANCE
↓
REGULATOR CAPACITY
↓
OWNER / OPERATOR MODEL
↓
WORKFORCE PLAN
↓
TECHNOLOGY PROCUREMENT
↓
LICENSING
↓
CONSTRUCTION
The dangerous alternative is:
SELECT FOREIGN REACTOR
↓
SIGN INDUSTRIAL AGREEMENTS
↓
DISCOVER WHO REGULATES IT
↓
DISCOVER WHO OPERATES IT
↓
BUILD INSTITUTIONS UNDER TIME PRESSURE
That sequence would maximise vendor leverage and weaken State decision quality.
13.2 Italy needs a permanent nuclear programme organisation — but it must not become a second regulator
A nuclear programme spans too many ministries and institutions to be coordinated effectively through occasional interministerial meetings.
The IAEA commonly uses the concept of a Nuclear Energy Programme Implementing Organisation — NEPIO.
The NEPIO is not necessarily one particular legal model.
Its function is to provide central national coordination during the development of the nuclear programme and to ensure that the multiple infrastructure conditions necessary for nuclear power are addressed coherently. The IAEA defines it as the organisation created by government to study and initially promote development of the nuclear programme and to coordinate the conditions necessary for successful implementation.
Italy needs the function even if it chooses another name.
It should not simply reproduce PNNS.
The National Platform for Sustainable Nuclear has been useful as:
- consultation structure;
- expertise network;
- policy-development platform.
A programme entering licensing and procurement requires something different:
a permanent executive programme office with decision-tracking authority.
13.2.1 The programme office should coordinate, not regulate
The new body should answer questions such as:
- Is the delegated legislation on schedule?
- Is ISIN staffing compatible with the licensing programme?
- Has the owner/operator model been decided?
- Is the workforce pipeline sufficient?
- Has the technology shortlist been reduced?
- Are candidate sites progressing?
- Is Terna undertaking the required studies?
- Is fuel security addressed?
- Is the waste programme compatible with deployment?
- Has State-aid dialogue started?
- Is financing architecture progressing?
- Are international agreements required?
- Are procurement milestones aligned?
It should not answer:
“Is the reactor safe enough to receive a licence?”
That belongs to the regulator.
The distinction should be absolute.
Proposed Italian programme architecture
A defensible model could be:
PARLIAMENT
│
▼
defines legislation and oversight
PRESIDENCY OF THE COUNCIL
│
▼
NATIONAL NUCLEAR PROGRAMME COUNCIL
│
├── MASE
├── MEF
├── MIMIT
├── MAECI
├── Ministry of Health
├── Interior / Civil Protection interfaces
└── other competent ministries
│
▼
NUCLEAR PROGRAMME EXECUTIVE OFFICE
(NEPIO FUNCTION)
│
├── schedule
├── financing coordination
├── international agreements
├── workforce
├── technology programme
├── industrial policy
├── sites
├── fuel strategy
└── programme risk register
SEPARATE
ISIN
│
▼
SAFETY REGULATORY DECISION
SEPARATE
OWNER / LICENSEE / OPERATOR
│
▼
PROJECT IMPLEMENTATION
This is an analytical institutional proposal, not a description of institutional arrangements already enacted.
The distinction should be maintained throughout the report.
Why Presidency-level coordination may be necessary
Nuclear policy crosses portfolios that no single line ministry completely controls.
MASE can lead energy and environmental policy.
But MEF determines critical financing questions.
MIMIT has industrial-policy interests.
MAECI is relevant for:
- nuclear cooperation agreements;
- supplier-country relations;
- non-proliferation diplomacy;
- Euratom/IAEA coordination.
The Ministry of Interior and Civil Protection structures become critical for emergency arrangements.
Health and labour authorities are relevant to radiation protection and occupational exposure.
Regional governments become decisive during siting.
A programme office located too deeply inside one sectoral administration may therefore lack the authority to resolve cross-government conflicts.
The NEPIO function should provide:
- integrated schedule;
- integrated programme budget;
- cross-ministry decision log;
- national risk register;
- milestone reporting;
- escalation to political decision-makers.
It should maintain one national integrated schedule
Today different institutions can have different clocks.
For example:
LEGISLATION CLOCK
REGULATOR CLOCK
VENDOR CLOCK
SITE CLOCK
GRID CLOCK
WASTE CLOCK
FINANCING CLOCK
If these are not integrated, the slowest becomes the actual reactor schedule.
The programme office should therefore maintain one master schedule.
Table 13.2-A — National nuclear programme dashboard
| Workstream | Accountable body | Programme milestone |
|---|---|---|
| Delegated legislation | Government | Framework in force |
| Nuclear safety rules | ISIN / competent legal process | Licensing basis available |
| Regulator staffing | State / ISIN | Review capacity demonstrated |
| Owner/operator | Government/market | Entity designated |
| Technology shortlist | Programme/owner | Gate 1 complete |
| Site candidacy | State/local authorities | Candidate sites available |
| Grid | Terna | Preliminary connection studies |
| Fuel | Owner/State oversight | Contractible pathway |
| Waste | Government/SOGIN/future operator | Integrated pathway |
| Financing | MEF/project | Bankability model |
| State aid | Government/Commission | Approval path |
| Workforce | National programme | Training pipeline active |
| Emergency planning | State/operator | Framework established |
| Safeguards | Operator/Euratom/IAEA | Design provisions established |
| Procurement | Owner | Tender-ready specification |
The dashboard should not merely show:
GREEN
AMBER
RED
It should identify:
- responsible entity;
- legal dependency;
- next decision;
- delay in months;
- critical-path impact.
The programme office should disappear or transform when its original role ends
One institutional danger is permanent bureaucratic accumulation.
The NEPIO function is especially important during programme formation.
Once:
- policy is stable;
- owner/operator exists;
- regulator is fully functional;
- project implementation is mature;
some functions should transfer to permanent institutions.
The programme office should not evolve into a parallel:
- utility;
- regulator;
- engineering company.
A sunset or transformation mechanism should therefore be considered.
Its long-term role could become:
national fleet strategy and cross-government coordination
rather than direct project control.
13.3 The future owner/operator and the regulator must be institutionally distinct and technically powerful
The most important corporate decision after technology selection may be the identity of the licence holder.
The licence holder is not a ceremonial legal vehicle.
EU nuclear-safety law assigns it the prime responsibility for nuclear safety, and that responsibility cannot be delegated. It extends to activities of contractors and subcontractors that affect nuclear safety.
This creates an essential distinction between:
- reactor vendor;
- EPC contractor;
- owner;
- licence holder;
- operator.
These roles may partially overlap.
They should never be conceptually confused.
13.3.1 Nuclitalia is not currently the Italian nuclear operator
Nuclitalia is strategically important.
It was established in May 2025 by:
- Enel — 51%;
- Ansaldo Energia — 39%;
- Leonardo — 10%.
Its stated role is to study advanced nuclear technologies, assess market opportunities and evaluate promising SMR designs, initially focusing on water-cooled systems.
That does not currently make it:
- the owner of a reactor;
- the applicant for a construction licence;
- the nuclear licence holder;
- the future licensed operating organisation.
No such project exists yet.
This distinction matters because an assessment company can operate with a fundamentally different organisational structure from a nuclear operating company.
A future operator needs permanent capability in:
- nuclear safety;
- reactor physics;
- operations;
- maintenance;
- chemistry;
- fuel;
- radiation protection;
- emergency preparedness;
- engineering;
- configuration management;
- cyber security;
- quality assurance;
- procurement;
- outage management;
- human performance.
Italy therefore has several possible future models.
Model A — existing utility becomes owner/operator
For example:
UTILITY
│
├── project development
├── licence
├── construction supervision
└── operation
Advantages:
- existing power-sector capability;
- balance sheet;
- electricity-market experience;
- generation portfolio;
- operational culture.
Disadvantages:
- nuclear capability must be rebuilt internally;
- large project risk concentrated in one company.
Model B — dedicated nuclear operating company
STATE / UTILITIES / INDUSTRIAL PARTNERS
│
▼
NUCLEAR OPERATING COMPANY
│
▼
LICENCE HOLDER
Advantages:
- nuclear-specific governance;
- separate project balance sheet;
- dedicated management;
- easier fleet replication.
Disadvantages:
- must build operational culture from zero;
- complex shareholder governance.
Model C — joint venture with experienced foreign nuclear operator
ITALIAN OWNER
+
FOREIGN REFERENCE OPERATOR
↓
JOINT OPERATING COMPANY
Advantages:
- immediate access to operating experience;
- training;
- procedures;
- human-performance systems.
Disadvantages:
- foreign dependency;
- governance complexity;
- sovereignty questions;
- potential long-term operator dependence.
Italy should probably evaluate all three rather than assume that the current technology-assessment vehicle automatically becomes the licence holder.
The owner must be an intelligent customer
This concept is fundamental.
Even under a turnkey contract, the owner cannot outsource understanding of its plant.
It must maintain sufficient internal competence to challenge:
- vendor claims;
- contractor performance;
- safety analysis;
- design changes;
- quality deviations.
Otherwise:
VENDOR
↓
designs plant
↓
explains design
↓
evaluates problem
↓
proposes solution
↓
owner simply accepts
That is not a strong nuclear governance model.
The owner must be able to say:
No. Demonstrate it.
Prime responsibility cannot be transferred to the vendor
Suppose the reactor vendor provides:
- design;
- fuel;
- software;
- operating procedures;
- training.
The operator still retains prime safety responsibility.
The legal principle is explicit under Euratom law.
Therefore:
VENDOR ERROR
DOES NOT
REMOVE OPERATOR RESPONSIBILITY
This is one reason why Italy must create operator competence early.
ISIN must become stronger without becoming promotional
ISIN’s current legal position is an important institutional advantage.
It is already designated as an independent regulatory authority for nuclear safety and radiation protection. Its statutory design gives it regulatory, organisational, administrative and accounting autonomy and independence of judgement.
That independence must be protected during the nuclear restart.
The pressure will increase.
Government may want:
- faster licensing;
- political milestones;
- first power before a target year.
Investors may want:
- predictable review;
- rapid decisions.
Vendors may want:
- acceptance of foreign licensing evidence.
Regions may want:
- additional requirements.
The regulator’s response must remain:
Safety decisions are based on safety evidence.
EU law explicitly requires the competent nuclear regulator to be:
- functionally separate from organisations promoting or using nuclear energy;
- free from instructions in its regulatory work;
- independently budgeted;
- adequately staffed;
- able to prevent and resolve conflicts of interest.
This requirement should shape the implementing legislation.
Table 13.3-A — Functions that ISIN should and should not perform
| ISIN should | ISIN should not |
|---|---|
| Define/participate in safety requirements | Promote reactor sales |
| Review safety cases | Select commercial vendor |
| Inspect construction | Negotiate reactor price |
| Verify licence compliance | Own project equity |
| Enforce requirements | Guarantee construction schedule |
| Suspend activity where legally justified | Protect project economics |
| Review radiation protection | Conduct political advocacy |
| Support emergency technical assessment | Become plant operator |
| Participate in international regulator cooperation | Accept government schedule as safety criterion |
The institutional firewall should be visible to the public.
Regulatory independence is not isolation
Independence does not mean ISIN works alone.
The regulator can use:
- universities;
- ENEA;
- laboratories;
- foreign regulators;
- technical support organisations;
- external experts.
IAEA standards explicitly allow regulatory bodies to obtain external technical support while maintaining regulatory responsibility.
The principle should be:
EXTERNAL EXPERTISE
↓
SUPPORTS ISIN
BUT
REGULATORY JUDGEMENT
↓
REMAINS WITH ISIN
Foreign licence reuse must not create foreign regulatory dependence
The cooperation already beginning through international reviews can reduce duplication.
This is desirable.
But the Italian regulator should eventually possess enough internal capability to understand and independently judge the foreign evidence it reuses.
Otherwise:
REGULATORY RELIANCE
↓
becomes
↓
REGULATORY DEPENDENCE
That distinction is critical for sovereign safety authority.
13.4 Human capital is a critical-path infrastructure, not an education-policy appendix
Nuclear programmes are built by organisations.
Organisations are built from people.
If Italy begins training the required workforce only when reactor construction begins, the programme will already be late.
IAEA human-resource guidance is explicit that investments in:
- education;
- training facilities;
- international recruitment;
- overseas training;
- staff secondments;
may be necessary before the final reactor design has been selected.
Human resources must therefore be treated as one of the programme’s first construction projects.
The workforce problem is not one number
Claims such as:
“Italy will need 10,000 nuclear workers”
are not useful without explaining which workers, when and for what purpose.
The programme requires several different labour markets.
Table 13.4-A — Nuclear workforce families
| Workforce | Principal function |
|---|---|
| Government policy specialists | Programme governance |
| Nuclear regulator | Licensing and inspection |
| Owner engineers | Intelligent customer |
| Reactor operators | Plant operation |
| Maintenance technicians | Equipment reliability |
| Reactor physicists | Core/fuel management |
| Thermal-hydraulic engineers | Safety/operation |
| Structural/seismic engineers | Civil safety |
| Electrical engineers | Grid and plant systems |
| I&C specialists | Control/protection systems |
| Cybersecurity specialists | Digital security |
| Radiation-protection staff | Worker/public protection |
| Chemists | Coolant/radiochemistry |
| Fuel specialists | Procurement/management |
| Waste engineers | Conditioning/disposal |
| Emergency planners | Preparedness |
| Nuclear-quality specialists | QA/QC |
| NDE inspectors | Component integrity |
| Qualified welders | Nuclear construction |
| Project controls staff | Cost/schedule |
| Procurement specialists | Nuclear-grade supply chain |
| Legal specialists | Licensing/contracts |
| Safeguards specialists | Material accountancy |
| Security specialists | Physical protection |
These people become necessary at different times.
The regulator must be staffed before the applicant
This sequencing principle is essential.
Suppose an owner submits a sophisticated safety case in 2029.
If the regulator begins recruiting reviewers in 2029:
APPLICATION READY
↓
REGULATOR NOT READY
↓
LICENSING DELAY
Therefore:
regulatory capacity must lead project capacity, not follow it.
EU law requires national regulators to have sufficient numbers of staff with appropriate qualifications, experience and expertise.
This obligation cannot be satisfied by relying indefinitely on contractors.
External technical support is legitimate.
Core judgement must remain internal.
Italy should create a national workforce model
The model should not begin by choosing an arbitrary jobs target.
It should begin with the programme schedule.
For every programme year, it should ask:
WHAT ACTIVITIES OCCUR?
↓
WHAT COMPETENCIES ARE REQUIRED?
↓
HOW MANY PEOPLE?
↓
WHEN MUST TRAINING BEGIN?
A useful structure would be:
Phase 1 — Institutional build-up
Priority:
- government;
- regulator;
- programme office;
- technology assessment;
- safeguards;
- legal capability.
Phase 2 — Licensing and procurement
Priority expands toward:
- safety analysts;
- site engineers;
- quality assurance;
- procurement;
- fuel;
- project finance;
- environmental specialists.
Phase 3 — Construction
Workforce expands sharply into:
- civil engineering;
- nuclear-qualified manufacturing;
- welding;
- inspection;
- electrical installation;
- I&C;
- commissioning.
Phase 4 — Commissioning and operation
Priority shifts toward:
- licensed operators;
- maintenance;
- chemistry;
- radiation protection;
- fuel management;
- outage management.
This is why the workforce curve does not follow reactor output.
It precedes it.
Text schematic — the human-capital lead time
POLICY DECISION
│
▼
REGULATOR TRAINING
│
▼
OWNER ENGINEERING
│
▼
SUPPLY-CHAIN QUALIFICATION
│
▼
CONSTRUCTION WORKFORCE
│
▼
OPERATOR TRAINING
│
▼
COMMISSIONING
│
▼
FIRST POWER
Many of the people needed at the end of this chain must enter education or training near the beginning.
Italy should use foreign plants as training infrastructure
Italy’s late-entry position can become an advantage.
Before domestic reactors exist, Italian personnel can train at:
- operating foreign nuclear stations;
- regulator organisations;
- vendor engineering centres;
- reference construction projects.
Secondments should target:
- reactor operations;
- construction inspection;
- regulatory review;
- outage management;
- fuel management;
- emergency preparedness.
The objective should not be simply to attend courses.
It should be to obtain embedded operational experience.
For example:
ITALIAN ENGINEER
↓
2–3 YEARS AT FOREIGN
REFERENCE PROJECT
↓
RETURNS TO ITALIAN
PROGRAMME
↓
TRANSFERS EXPERIENCE
The exact duration would depend on role and bilateral agreements.
The principle is more important than the number.
A national nuclear academy should be a network rather than one building
Italy already possesses important educational capability through:
- universities;
- ENEA;
- CIRTEN;
- industry;
- research centres.
A future “Italian Nuclear Academy” need not reproduce all of this in a new physical institution.
It could function as a national qualification network:
UNIVERSITIES
+
ENEA
+
CIRTEN
+
ISIN
+
OWNER
+
VENDORS
+
FOREIGN OPERATORS
↓
NATIONAL NUCLEAR
COMPETENCE SYSTEM
It should coordinate:
- curricula;
- scholarships;
- apprenticeships;
- simulators;
- foreign placements;
- specialist certifications;
- operator licensing;
- continuing professional development.
Nuclear-qualified trades deserve equal attention
A frequent planning mistake is to focus only on nuclear engineers.
A construction programme also needs:
- welders;
- pipefitters;
- electricians;
- concrete specialists;
- NDE personnel;
- quality inspectors.
A reactor cannot be built with PhDs alone.
Nuclear construction differs from ordinary industrial construction because:
WORK
↓
MUST BE DONE CORRECTLY
+
DOCUMENTED CORRECTLY
+
TRACEABLE
+
INSPECTABLE
The nuclear quality culture must therefore penetrate the entire supply chain.
Retention is as important as recruitment
A programme with large gaps between projects risks losing trained workers.
For example:
FOAK CONSTRUCTION
↓
5 YEAR GAP
↓
NEXT PROJECT
can destroy workforce continuity.
Skilled workers may leave.
Suppliers may exit nuclear qualification.
This is another argument for a fleet programme rather than isolated one-off reactors if the FOAK is successful.
Table 13.4-B — Human-resource failure modes
| Failure | Programme consequence |
|---|---|
| Regulator hired late | Licensing delay |
| Operator hired late | Commissioning delay |
| Excessive contractor dependence | Weak institutional memory |
| No foreign secondment | Low practical experience |
| Trades not qualified | Construction bottleneck |
| Long gap between units | Workforce dispersal |
| Uncompetitive public salaries | Regulator loses staff to industry |
| No succession planning | Ageing expertise |
| Vendor-only training | Long-term vendor dependence |
The salary issue deserves particular attention.
A regulator competing for the same nuclear specialists as:
- utilities;
- vendors;
- engineering companies;
cannot maintain independence if its remuneration and career structure make retention impossible.
Institutional independence therefore has a human-capital dimension.
13.5 Safeguards and radiation protection must be built into the programme from the design stage
Two functions remain particularly easy to misunderstand because they are sometimes absorbed rhetorically into “nuclear safety”.
They are:
- safeguards;
- radiation protection.
Neither is identical to reactor safety.
The distinction should be explicit:
SAFETY
↓
prevents and mitigates accidents
SECURITY
↓
protects against malicious acts
SAFEGUARDS
↓
verifies nuclear material
remains in peaceful use
RADIATION PROTECTION
↓
controls exposure of workers
and the public
All four systems interact.
None can substitute for another.
13.5.1 Safeguards must be designed into the reactor and fuel cycle
Italy is part of the Euratom safeguards system.
The European Commission’s safeguards function verifies that nuclear materials are not diverted from their declared peaceful uses and that obligations associated with nuclear supplies and international agreements are respected.
This system is not optional.
A future Italian reactor operator would need to maintain detailed nuclear-material accountancy and control from the moment it holds nuclear material.
The current Commission Regulation Euratom 2025/974, which entered into force in July 2025 and replaced the earlier Regulation 302/2005, requires operators to maintain effective nuclear-material accountancy and control systems containing information on:
- quantities;
- category;
- chemical/physical form;
- composition;
- location;
- transfers.
The records must allow the Commission to verify the declared flows and stocks.
This means that before first fuel arrives, the reactor must already possess:
- material-balance areas;
- measurement points;
- accounting procedures;
- inventory systems;
- containment/surveillance provisions;
- reporting processes;
- trained staff.
Safeguards cannot be added after construction.
The European Commission now explicitly promotes safeguards by design for new reactor systems, including SMRs.
The correct sequence is:
REACTOR DESIGN
↓
SAFEGUARDS REQUIREMENTS
↓
MEASUREMENT POINTS
↓
CAMERAS / SEALS / ACCESS
↓
ACCOUNTANCY SYSTEM
↓
CONSTRUCTION
not:
REACTOR BUILT
↓
WHERE DO WE PUT
SAFEGUARDS EQUIPMENT?
Advanced fuels materially change safeguards complexity
For conventional LEU LWR fuel, safeguards are well established.
HALEU and MOX do not remove safeguards.
They can increase material-accountancy and security significance.
MOX is especially important because plutonium-bearing material enters the programme.
If Italy ever pursues:
- MOX fabrication;
- reprocessing;
- closed-cycle fuel;
the safeguards system expands far beyond reactor fuel receipt.
It must then encompass:
MATERIAL INPUT
↓
PROCESS
↓
MATERIAL BALANCE
↓
RECOVERED MATERIAL
↓
WASTE
↓
NEW FUEL
This is another reason why closed-cycle strategy must be treated as a national infrastructure programme rather than merely a reactor feature.
Italy should build a dedicated safeguards competence centre
ISIN already performs national functions relating to international safeguards obligations.
A new power programme would multiply the scope.
Italy should therefore ensure sufficient national competence in:
- nuclear material accountancy;
- measurements;
- uncertainty;
- inventory verification;
- fuel movements;
- Euratom reporting;
- IAEA interfaces.
The operator needs safeguards staff.
The State needs competent oversight.
These are separate responsibilities.
Radiation protection begins during design
Radiation protection addresses exposures during:
- normal operation;
- maintenance;
- refuelling;
- outages;
- waste handling;
- decommissioning.
Italy already has a comprehensive legal framework through Legislative Decree 101/2020, implementing Directive 2013/59/Euratom.
The decree establishes three fundamental radiation-protection principles:
- justification;
- optimisation;
- dose limitation.
For workers and the public, optimisation requires exposures to be kept as low as reasonably achievable, taking technical, economic and social factors into account.
The EU Basic Safety Standards similarly require occupational protection to include:
- prior risk assessment;
- optimisation;
- worker classification;
- controlled and supervised areas;
- individual monitoring;
- medical surveillance;
- training.
This means radiation protection is partly a plant-design discipline.
A badly designed plant can create decades of avoidable occupational exposure.
Examples include:
- poorly shielded valves;
- inaccessible components;
- inadequate remote handling;
- unnecessarily long maintenance tasks;
- contamination traps.
A better design applies ALARA principles upstream.
Text schematic — design affects lifetime dose
EQUIPMENT LAYOUT
↓
ACCESSIBILITY
↓
MAINTENANCE TIME
↓
WORKER EXPOSURE
SHIELDING
↓
DOSE RATE
↓
WORKER EXPOSURE
REMOTE HANDLING
↓
LESS HUMAN PRESENCE
↓
LOWER EXPOSURE
The State should therefore require occupational-radiation performance to form part of reactor comparison.
Table 13.5-A — Radiation-protection evidence required before reactor selection
| Area | Required information |
|---|---|
| Normal-operation dose | Expected worker exposure |
| Maintenance dose | Major task exposure |
| Refuelling | Worker dose characteristics |
| Collective dose | Annual projection |
| Hot spots | Design mitigation |
| Shielding | Design basis |
| Remote maintenance | Capability |
| Contamination control | Architecture |
| Effluents | Expected liquid/gaseous discharges |
| Environmental monitoring | Proposed network |
| Waste handling | Occupational exposure |
| Decommissioning | Dose-reduction design features |
The objective should not be to rank technologies using one speculative dose number before operation exists.
It should be to determine whether occupational-radiation protection is designed in.
Environmental radiological baselines must begin before construction
Before the first reactor operates, Italy should establish long-term baseline measurements of:
- air;
- soil;
- water;
- food;
- sediments;
- background radiation.
This creates a pre-operational reference against which future environmental monitoring can be assessed.
Italy already maintains national environmental-radioactivity monitoring through the ISIN-coordinated RESORAD system and SINRAD.
A new reactor would require a denser site-specific programme integrated with the national network.
Institutional independence must extend across all these functions
The same principle returns repeatedly.
The nuclear programme has institutions that want the project to succeed.
It must also have institutions whose mission is to say no when necessary.
That is not institutional conflict.
It is the architecture of nuclear governance.
A credible system therefore needs deliberate separation:
PROMOTION
│
▼
"HOW DO WE BUILD IT?"
OPERATION
│
▼
"HOW DO WE RUN IT SAFELY?"
REGULATION
│
▼
"CAN IT BE LICENSED?"
SAFEGUARDS
│
▼
"WHERE IS THE NUCLEAR MATERIAL?"
RADIATION PROTECTION
│
▼
"ARE PEOPLE AND ENVIRONMENT PROTECTED?"
The answers should not come from one organisation.
Master institutional architecture for an Italian nuclear programme
PARLIAMENT
│
▼
NATIONAL LEGISLATION
│
▼
GOVERNMENT / POLICY LEVEL
│
┌────────────────┼────────────────┐
│ │ │
▼ ▼ ▼
MASE MEF MIMIT
│ │ │
└────────────────┼────────────────┘
▼
NUCLEAR PROGRAMME OFFICE
(NEPIO FUNCTION)
│
programme coordination
│
▼
OWNER / DEVELOPER
│
▼
LICENSEE
│
▼
OPERATING ORGANISATION
│
┌───────────────┼───────────────┐
▼ ▼ ▼
VENDOR EPC FUEL SUPPLIER
INDEPENDENT PARALLEL LINE
ISIN
│
SAFETY / INSPECTION
│
▼
LICENSING CONTROL
INTERNATIONAL CONTROL LINE
EURATOM + IAEA SAFEGUARDS
│
▼
NUCLEAR MATERIAL CONTROL
The structure is deliberately not hierarchical between:
- operator;
- regulator.
The operator is not subordinate to ISIN as a corporate organisation.
It is subject to regulatory authority within the legal framework.
Similarly, the regulator should not be subordinated in its safety judgement to the programme office.
Table 13.5-B — Institutional conflicts that Italy must prevent
| Conflict | Required safeguard |
|---|---|
| Programme office pressures regulator for schedule | Statutory regulatory independence |
| Vendor dominates technical knowledge | Strong owner engineering capability |
| Operator understaffed | Licence conditions / workforce requirement |
| Regulator loses staff to industry | Competitive independent staffing policy |
| Technical support organisation becomes de facto regulator | ISIN retains judgement |
| Government financing creates pressure for licence | Legal separation of economic and safety decisions |
| Safeguards added late | Safeguards-by-design |
| Radiation protection treated as operations-only issue | Design-stage ALARA |
| SOGIN legacy role confused with future operator | Separate mandates |
| Nuclitalia assessment role assumed to equal operator | Formal owner/operator designation required |
The programme should have institutional readiness gates
Technology should not advance faster than the State.
A useful system would require formal institutional gates.
Gate I1 — Programme governance
Before technology down-select:
- programme office operational;
- ministries’ responsibilities defined;
- decision hierarchy established.
Gate I2 — Regulator capability
Before formal design review:
- ISIN staffing plan approved;
- technical-support access established;
- licensing methodology available.
Gate I3 — Owner capability
Before construction licence:
- owner/licensee established;
- nuclear management system operating;
- intelligent-customer capability demonstrated.
Gate I4 — Workforce
Before major construction:
- construction workforce qualification programme functioning;
- operator training pipeline active;
- regulator resources sufficient.
Gate I5 — Safeguards
Before nuclear-material receipt:
- material-accountancy system approved;
- Euratom interfaces established;
- safeguards equipment integrated.
Gate I6 — Radiation protection
Before commissioning:
- radiation-protection organisation staffed;
- dosimetry;
- environmental baseline;
- monitoring systems operational.
Gate I7 — Operational readiness
Before fuel loading:
- operators licensed;
- emergency arrangements exercised;
- maintenance organisation ready;
- procedures validated;
- regulator ready for operational oversight.
The basic principle is:
REACTOR READY
+
STATE READY
+
OPERATOR READY
=
FUEL LOAD
If one element is missing:
NO FUEL LOAD
The Italian State should measure capability, not institutions created
A common public-sector error would be to claim progress because:
- committee established;
- office created;
- memorandum signed;
- academy announced.
These are inputs.
The real question is:
Can the institution perform the required nuclear function?
For example:
REGULATOR EXISTS
≠
REGULATOR CAN REVIEW
AN ADVANCED REACTOR
Similarly:
NUCLEAR ACADEMY EXISTS
≠
LICENSED OPERATORS AVAILABLE
and:
NUCLITALIA EXISTS
≠
ITALIAN LICENSEE EXISTS
Programme KPIs should therefore measure capability.
Table 13.5-C — Institutional capability metrics
| Institution | Weak metric | Strong metric |
|---|---|---|
| Regulator | Number of employees | Safety-review competencies available |
| Programme office | Meetings held | Critical decisions closed on schedule |
| Owner | Company incorporated | Nuclear management system demonstrated |
| University system | Courses announced | Qualified graduates entering programme |
| Training | Hours delivered | Personnel certified for defined roles |
| Safeguards | Office established | Material-accountancy system validated |
| Radiation protection | Procedures written | Monitoring/dosimetry operational |
| International cooperation | MoUs signed | Staff embedded in reference programmes |
This distinction is fundamental because nuclear programmes can appear administratively advanced while remaining technically unprepared.
Final government conclusion — Chapter 13
Italy does not need to invent a nuclear State from nothing.
It needs to transform an existing legacy nuclear governance system into a full lifecycle nuclear governance system.
That transformation is arguably as demanding as reactor construction.
The State must simultaneously create or strengthen:
- central programme coordination;
- regulatory capability;
- owner/operator capability;
- nuclear workforce;
- safeguards;
- radiation protection;
- emergency institutions;
- quality infrastructure.
The core principle should be separation of roles.
The institution promoting the programme should not regulate it.
The institution regulating the programme should not own it.
The vendor should not become the operator’s substitute for technical competence.
The operator should not be allowed to outsource responsibility for safety.
And the State should not allow schedule pressure to become regulatory pressure.
The correct architecture is:
GOVERNMENT
↓
SETS POLICY
PROGRAMME OFFICE
↓
COORDINATES DELIVERY
OWNER / OPERATOR
↓
BUILDS AND OPERATES
ISIN
↓
REGULATES INDEPENDENTLY
EURATOM / IAEA
↓
VERIFY SAFEGUARDS
RADIATION-PROTECTION SYSTEM
↓
PROTECTS WORKERS AND PUBLIC
This institutional separation is not bureaucratic duplication.
It is one of the fundamental safety barriers of the nuclear programme.
The most important transformation required over the remainder of the 2020s is therefore not simply:
NO REACTORS
↓
NEW REACTORS
It is:
LEGACY NUCLEAR STATE
↓
PROGRAMME STATE
↓
LICENSING STATE
↓
CONSTRUCTION STATE
↓
OPERATING NUCLEAR STATE
Each transition requires capabilities that must exist before the next one begins.
The Meloni government’s enabling legislation creates the political and legal opportunity to begin this institutional reconstruction. As of 27 September 2026, however, Parliament has approved the delegation framework while the detailed delegated architecture remains to be completed.
That means the most important institutional decisions are still ahead.
Italy must determine:
- who exercises the permanent NEPIO/programme coordination function;
- how that organisation relates to MASE, MEF, MIMIT and the Presidency of the Council;
- who will own the first reactor;
- who will hold the nuclear licence;
- who will operate the plant;
- how operator competence will be demonstrated before construction;
- how ISIN’s independence, budget and staffing will be protected;
- how foreign regulatory evidence will be used without producing regulatory dependency;
- how the national nuclear workforce will be built before licensing and construction;
- how Euratom and IAEA safeguards will be incorporated from the design stage;
- how occupational and public radiation protection will be integrated into design rather than added during operation;
- how institutional readiness will be tested before fuel loading.
The State should not permit commercial pressure to answer those questions by default.
They should be answered deliberately through legislation, regulation and programme design.
The ultimate test of the Italian nuclear restart will therefore not be whether Italy can purchase a sophisticated reactor.
Many countries can purchase technology.
The more difficult test is whether Italy can recreate the institutional capability to understand it, licence it, regulate it, operate it, challenge its vendor, protect its workforce, account for its nuclear material and govern its liabilities independently for many decades.
Only when that capability exists will Italy have moved from possessing a nuclear policy to possessing a nuclear State.
Chapter 14 — Procurement, Construction and Fleet Operations
A nuclear programme is not completed when a reactor technology has been selected, financed and licensed.
At that point the most operationally unforgiving phase begins.
Italy must convert:
- a reference design;
- contractual commitments;
- thousands of technical requirements;
- millions of components and documents;
- multiple national and international suppliers;
- civil works;
- mechanical systems;
- electrical systems;
- digital control systems;
- nuclear-qualified materials;
- trained personnel;
into one physical installation whose configuration corresponds exactly to the safety case approved by the regulator.
This is where the distinction between a nuclear strategy and a nuclear delivery capability becomes decisive.
A country may possess excellent nuclear engineers and still fail to build a reactor efficiently.
A reactor vendor may possess a licensed design and still fail to reproduce it economically.
A contractor may build an industrial plant successfully and still be unprepared for nuclear construction.
A component can satisfy its mechanical specification and still be unusable because:
- documentation is incomplete;
- material traceability is missing;
- welding procedure qualification is inadequate;
- supplier QA was not approved;
- inspection records are defective;
- configuration does not match the approved design.
Nuclear construction therefore differs from ordinary large infrastructure in an important respect.
The product being built is simultaneously:
A PHYSICAL POWER STATION
+
A REGULATED SAFETY CASE
+
A COMPLETE DOCUMENTARY RECORD
The three must remain aligned.
The International Atomic Energy Agency describes nuclear project management as the organisation, coordination and control of a complex combination of human resources, equipment, material, supply chains, schedule and quality. Its guidance stresses that competent construction management reduces not only physical project cost but also accumulated interest during construction, while poor interface control, design changes and weak owner capability can generate major delay and additional cost.
This observation is particularly important for Italy.
The temptation during a nuclear restart will be to believe that procurement risk can be transferred abroad:
select an established reactor vendor, award a turnkey contract and require the supplier to deliver the plant.
That model can transfer important responsibilities.
It cannot eliminate the responsibilities of the Italian owner or licence holder.
Even under a highly integrated engineering, procurement and construction arrangement, the future Italian nuclear operator must remain able to understand:
- what has been purchased;
- which requirements apply;
- which supplier built each component;
- what deviations occurred;
- how those deviations were resolved;
- what configuration was ultimately installed;
- whether the plant handed over corresponds to the licensed design.
The procurement system should therefore be designed around a central principle:
Italy should buy a nuclear plant without outsourcing the ability to understand, control and eventually operate it.
This distinction becomes even more important if the national objective is not one isolated reactor but a fleet.
The first Italian reactor will inevitably contain a significant country-FOAK component.
The economic justification for an SMR programme, however, depends heavily on what happens afterward.
The programme must progress from:
FOAK
↓
LEARNING
↓
STANDARDISATION
↓
REPETITION
↓
SHORTER CONSTRUCTION
↓
LOWER RISK
↓
LOWER FINANCING COST
↓
FLEET ECONOMICS
If every new site introduces:
- a different reactor;
- different civil design;
- different turbine;
- different fuel;
- different safety systems;
- different digital platform;
- different waste package;
- different licensing interpretation;
the programme will repeatedly pay the cost of first-of-a-kind deployment.
Factory production alone cannot compensate for continual redesign.
That makes procurement, configuration control and fleet standardisation central strategic questions, rather than administrative matters to be addressed after reactor selection.
14.1 Italy must choose a contracting model before choosing how much risk it believes it has transferred
There is no single contractual model for nuclear new build.
International experience broadly distinguishes between highly integrated turnkey arrangements and more fragmented approaches in which the owner contracts separately for different packages.
IAEA guidance historically describes three broad families:
- turnkey;
- split-package;
- multi-contract or non-turnkey structures.
In a turnkey arrangement, one principal contractor accepts broad responsibility for design and construction and may also participate extensively in commissioning, startup and initial fuel supply.
In non-turnkey structures, responsibility is distributed among several contractors, leaving the owner with substantially greater responsibility for project integration and interfaces.
The contractual choice fundamentally alters the competence Italy must possess.
Turnkey / EPC model
A simplified arrangement is:
ITALIAN OWNER
│
▼
MAIN EPC / REACTOR CONTRACTOR
│
├── NSSS
├── civil
├── turbine island
├── electrical systems
├── I&C
├── procurement
└── subcontractors
The principal advantages are apparent.
The owner receives:
- fewer major contractual interfaces;
- one principal counterparty;
- greater nominal responsibility concentration;
- simpler claims architecture;
- potentially stronger schedule integration.
For a country rebuilding nuclear-owner capability, this can be attractive.
But the words turnkey and fixed price can create a dangerous illusion.
A contractor can only accept risks it understands and can price.
If uncertainties are excessive, the contractor will either:
- charge a substantial risk premium;
- exclude important risks;
- seek contractual relief later;
- refuse to bid.
The owner therefore needs to understand exactly what the EPC price includes.
A €4 billion “fixed-price” contract may still exclude:
- site conditions;
- major licensing changes;
- owner-driven design changes;
- grid works;
- cooling infrastructure;
- fuel;
- security modifications;
- inflation above defined thresholds;
- force majeure;
- regulatory changes;
- certain commissioning failures.
The real risk structure is contained in the contractual definitions, not the marketing description.
Table 14.1-A — What “turnkey” can and cannot mean
| Issue | Can potentially be transferred to EPC | Cannot safely be assumed transferred |
|---|---|---|
| Detailed construction management | Yes | — |
| Major supplier coordination | Yes | — |
| Procurement schedule | Yes | — |
| Construction productivity | Substantially | Not all external causes |
| Design responsibility | Substantially | Italian licensing responsibility remains |
| Quality of subcontractors | Contractually yes | Owner still needs oversight |
| Regulatory compliance | Contractor supports | Licence holder remains responsible |
| Site conditions | Contract-specific | Often owner risk |
| Political change | Rarely fully | Usually State/owner |
| Grid connection | Sometimes separate | Must be allocated explicitly |
| Fuel availability | Depends on package | Strategic State/owner issue remains |
| Final nuclear safety responsibility | No | Licence holder retains it |
The fundamental distinction is:
CONTRACTUAL RESPONSIBILITY
≠
NUCLEAR SAFETY RESPONSIBILITY
The licence holder cannot make itself institutionally ignorant simply because a contractor has accepted commercial responsibility.
Split-package contracting
A second model divides the project into several large contractual packages.
For example:
OWNER
│
├── REACTOR ISLAND
│
├── TURBINE ISLAND
│
├── CIVIL WORKS
│
├── ELECTRICAL
│
├── I&C
│
└── BALANCE OF PLANT
This model can increase competition.
It may also facilitate Italian industrial participation because domestic companies can bid directly for substantial packages rather than operating solely as subcontractors under a foreign EPC organisation.
But the owner then assumes interface risk.
That risk can be severe.
Suppose:
REACTOR VENDOR
designs interface A
CIVIL CONTRACTOR
builds interface B
TURBINE CONTRACTOR
requires interface C
If the three assumptions do not correspond exactly, the owner must resolve the incompatibility.
Interface problems can produce:
- redesign;
- construction rework;
- delay;
- contractual claims;
- licensing changes.
The more fragmented the contracting model, the more technically sophisticated the owner must become.
Multi-contract model
At the most fragmented end, the owner contracts directly with dozens or hundreds of major suppliers.
This can maximise local industry and competitive procurement.
It also creates the highest demand for owner capability.
The owner effectively becomes the principal system integrator.
For Italy’s FOAK, such a model would be high risk unless the owner possessed a deeply experienced nuclear project organisation.
Table 14.1-B — Contract-model trade-off
| Model | Owner integration burden | Vendor concentration | Italian direct procurement opportunity | Interface risk |
|---|---|---|---|---|
| Turnkey/EPC | Lower | High | Medium | Lower–medium |
| Split package | Medium–high | Medium | High | High |
| Multi-contract | Very high | Lower | Very high | Very high |
There is no universally superior model.
The choice depends on Italian owner maturity.
The correct question is therefore not:
Which contract gives Italy the lowest headline EPC price?
It is:
Which contractual structure assigns each risk to an organisation capable of controlling it without creating unmanageable interfaces for the Italian owner?
Owner capability should determine procurement fragmentation
The first Italian project should be conservative about interfaces.
Later projects may be different.
A rational programme could evolve as follows:
ITALIAN FOAK
↓
highly integrated contractual structure
↓
Italian owner learns
↓
Italian suppliers qualify
↓
greater domestic package responsibility
↓
fleet replication
rather than:
ITALIAN FOAK
↓
maximum local content immediately
↓
large number of inexperienced nuclear interfaces
↓
schedule failure
Industrial policy and project delivery must therefore be coordinated.
Localisation should occur where Italian industry can genuinely control:
- quality;
- schedule;
- documentation;
- nuclear standards.
It should not be maximised mechanically.
Procurement must freeze the reference plant
Perhaps the most important contractual discipline is design stability.
A factory-based fleet cannot emerge if every buyer demands national customisation.
The government and owner should therefore identify a reference design and limit deviations.
The correct sequence is:
REFERENCE DESIGN
↓
ITALIAN REGULATORY DIFFERENCES
↓
SITE-SPECIFIC REQUIREMENTS
↓
MINIMUM NECESSARY MODIFICATIONS
↓
DESIGN FREEZE
↓
SERIAL PROCUREMENT
The damaging alternative is:
REFERENCE REACTOR
↓
MINISTRY MODIFICATION
+
REGULATOR MODIFICATION
+
UTILITY PREFERENCE
+
LOCAL SITE PREFERENCE
+
ITALIAN SUPPLIER REDESIGN
↓
ITALIAN UNIQUE REACTOR
At that point the programme would have sacrificed one of the principal economic arguments for SMR deployment.
Change orders must become a sovereign project-control issue
Large infrastructure projects rarely avoid changes entirely.
But nuclear projects can become financially unstable when changes occur after:
- design freeze;
- procurement;
- manufacturing;
- concrete placement.
A design change can affect multiple downstream activities.
For example:
VALVE REQUIREMENT CHANGES
↓
PIPE DESIGN CHANGES
↓
SUPPORT CHANGES
↓
CIVIL EMBEDMENT CHANGES
↓
PROCUREMENT CHANGES
↓
SAFETY ANALYSIS UPDATE
↓
REGULATOR REVIEW
Therefore every change should be classified according to:
- safety significance;
- cost;
- schedule;
- licensing impact;
- interface impact.
No politically requested “small modification” should bypass this process.
14.2 Nuclear supply-chain localisation requires qualification, traceability and a different industrial culture
Italy possesses a substantial advanced industrial base.
That does not mean every high-quality Italian manufacturer is immediately a nuclear-qualified supplier.
The distinction is essential.
A company may produce:
- excellent pressure vessels;
- offshore piping;
- aerospace components;
- high-integrity valves;
- advanced electrical systems;
and still require additional qualification before supplying safety-related nuclear components.
Nuclear quality does not mean simply:
“better manufacturing.”
It means that the product is manufactured inside a controlled system able to demonstrate continuously that every applicable safety requirement has been satisfied.
The US NRC definition is useful because it expresses the principle clearly: nuclear QA consists of the planned and systematic actions necessary to provide adequate confidence that a structure, system or component will perform satisfactorily in service. It includes procedures, records, inspections, corrective actions and audits, and extends across licensees and suppliers.
Italy will ultimately use the European and Italian regulatory/code framework applicable to the selected reactor, not US rules automatically.
But the underlying quality logic is universal.
The nuclear product is the component plus its evidence
Consider a nuclear safety-related valve.
Its deliverable is not merely:
VALVE
It is:
VALVE
+
MATERIAL CERTIFICATES
+
HEAT / BATCH TRACEABILITY
+
WELD RECORDS
+
PROCEDURE QUALIFICATION
+
PERSONNEL QUALIFICATION
+
NDE RECORDS
+
DIMENSIONAL INSPECTION
+
PRESSURE TEST
+
DEVIATION HISTORY
+
QUALITY RELEASE
If critical records are missing, the physical valve may become unusable.
This creates a major strategic challenge for a country rebuilding nuclear construction.
The nuclear supply chain must learn that:
documentation is part of the product.
Qualification should begin years before construction
The wrong approach would be to wait until EPC procurement and then discover that important Italian suppliers lack:
- required QA systems;
- code stamps;
- qualified welding procedures;
- nuclear references;
- auditing history.
The correct approach is:
2026–2028
SUPPLY-CHAIN MAPPING
↓
GAP ANALYSIS
↓
QUALIFICATION PROGRAMMES
↓
AUDITS
↓
REFERENCE ORDERS / FOREIGN PROJECTS
↓
ITALIAN FOAK PROCUREMENT
This allows Italian firms to use ongoing foreign nuclear programmes as qualification platforms.
Supplier categories should determine qualification burden
Not every item requires identical nuclear quality treatment.
A nuclear project contains:
SAFETY-CLASS COMPONENTS
+
IMPORTANT-TO-SAFETY COMPONENTS
+
CONVENTIONAL INDUSTRIAL COMPONENTS
The procurement process must classify them correctly.
Over-classification raises cost unnecessarily.
Under-classification compromises safety.
This is one reason why engineering judgement must remain integrated with procurement.
Commercial-grade components require formal dedication where credited for safety
Modern supply chains increasingly use high-quality commercial components where specialised nuclear suppliers no longer exist or where industrial technology has moved into broader commercial markets.
This is not inherently unacceptable.
But components credited with a safety function require a controlled process demonstrating that they can perform that function.
The NRC’s commercial-grade dedication system provides one established example: critical characteristics must be identified and verified through inspection, testing or analysis before a commercial component is accepted as equivalent for the relevant nuclear safety function.
Italy will need an equivalent regulatory logic appropriate to its chosen codes and licensing framework.
The important principle is:
AVAILABLE ON COMMERCIAL MARKET
≠
AUTOMATICALLY ACCEPTABLE
FOR NUCLEAR SAFETY FUNCTION
Counterfeit, fraudulent and suspect items must be treated as programme risk
Nuclear supply chains are long.
A major reactor can contain components produced:
- in several countries;
- by multiple tiers of subcontractors;
- over several years.
This creates exposure to:
- counterfeit material certificates;
- fraudulent test results;
- substituted materials;
- unapproved manufacturing changes;
- unauthorised parts.
Historic NRC experience led to explicit controls strengthening engineering involvement, procurement verification and detection of fraudulently marketed products.
Italy should treat this as both:
- quality risk;
- security risk.
The future nuclear owner should maintain full supplier visibility beyond Tier 1.
Supply-chain map
OWNER
│
▼
TIER 1 — MAJOR CONTRACTOR
│
▼
TIER 2 — SYSTEM SUPPLIERS
│
▼
TIER 3 — COMPONENT SUPPLIERS
│
▼
TIER 4 — MATERIAL / SUBCOMPONENT
│
▼
RAW MATERIAL SOURCE
For safety-significant items, the programme should know who occupies every relevant level.
Table 14.2-A — Minimum supplier qualification dimensions
| Dimension | Required evidence |
|---|---|
| Technical capability | Product can meet specification |
| Nuclear QA | Approved management/quality programme |
| Codes/standards | Applicable certification |
| Material traceability | Complete |
| Welding | Qualified processes/personnel |
| NDE | Qualified procedures/personnel |
| Manufacturing history | Demonstrated |
| Financial health | Supplier can survive project duration |
| Cybersecurity | Appropriate for digital supply |
| Counterfeit prevention | Controls established |
| Subsupplier oversight | Visible and audited |
| Corrective-action programme | Functioning |
| Records retention | Lifecycle requirements met |
| Configuration control | Design/revision controlled |
| Capacity | Can meet fleet schedule |
Financial health deserves particular attention.
A technically excellent specialist supplier that becomes insolvent during construction can create major delay.
Nuclear supply-chain resilience therefore requires a combination of:
- technical;
- financial;
- geopolitical;
assessment.
Local content must be separated from nuclear-qualified local content
Suppose 70% of expenditure occurs in Italy.
That figure is economically interesting.
It says little about nuclear sovereignty unless the Italian firms control high-value functions.
Italy should distinguish:
LOCAL SPEND
↓
jobs / GDP
NUCLEAR-QUALIFIED LOCAL CONTENT
↓
industrial competence
STRATEGIC LOCAL CONTENT
↓
engineering / IP / safety /
maintenance sovereignty
Pouring concrete locally and manufacturing reactor internals locally are not strategically equivalent.
The programme should therefore report localisation by work package rather than one percentage.
Table 14.2-B — Localisation hierarchy
| Level | Example | Strategic value |
|---|---|---|
| Basic local expenditure | accommodation, general services | Low |
| Conventional construction | civil works | Medium |
| Nuclear construction | safety-related civil/mechanical | High |
| Nuclear components | valves, piping, heat exchangers | High |
| Digital/I&C | control systems | Very high |
| Design engineering | safety/design ownership | Very high |
| Fuel | enrichment/fabrication capability | Strategic |
| Lifecycle services | maintenance/spares | Strategic |
| Export rights | ability to supply fleet abroad | Very high |
Quality culture matters as much as written QA manuals
A supplier can possess a sophisticated QA manual and still perform poorly.
The real test is behaviour.
An effective nuclear quality culture requires workers to:
- stop work when something is wrong;
- document deviations;
- refuse unauthorised repair;
- preserve traceability;
- escalate defects.
The undesirable culture is:
"MAKE IT FIT"
The nuclear culture must be:
"SHOW THAT IT CONFORMS"
This difference should be part of supplier assessment.
14.3 Construction must be managed as configuration control, schedule control and evidence production simultaneously
Nuclear construction contains millions of individual activities.
The challenge is not merely to complete them.
The challenge is to complete them:
- in the correct sequence;
- to the approved design;
- with verified quality;
- with evidence adequate for licensing and commissioning.
The owner therefore needs an integrated project-controls system.
At minimum it should combine:
- cost;
- schedule;
- engineering;
- procurement;
- construction progress;
- risk;
- change control;
- licensing;
- quality;
- document management.
One master schedule should integrate all critical paths
Construction schedule alone is insufficient.
A reactor can be physically ready but unable to proceed because:
- regulator hold point not released;
- fuel unavailable;
- commissioning procedure not approved;
- grid connection incomplete;
- operator training incomplete.
The master schedule should therefore integrate:
ENGINEERING
│
PROCUREMENT
│
FACTORY MANUFACTURING
│
CIVIL CONSTRUCTION
│
INSTALLATION
│
LICENSING
│
GRID
│
FUEL
│
COMMISSIONING
│
OPERATOR READINESS
The critical path can move between them.
Project progress should not be measured by money spent
A project can spend 70% of its budget without being 70% complete.
Progress should be measured by objective physical milestones.
Examples include:
- design packages released;
- excavation complete;
- basemat complete;
- major modules delivered;
- reactor vessel installed;
- containment completed;
- electrical energisation;
- control-room availability;
- system turnover;
- hot functional testing;
- fuel load.
The government should be sceptical of broad statements such as:
“construction is 80% complete”
unless the methodology is defined.
Earned-value and physical-progress controls should be independent of contractor invoicing
The project owner must know:
PLANNED WORK
vs
ACTUAL WORK
vs
ACTUAL COST
A contractor invoice demonstrates expenditure.
It does not independently demonstrate progress.
Design completion should lead construction
Starting construction before engineering maturity can create apparent schedule acceleration followed by expensive rework.
The dangerous sequence is:
CONSTRUCTION STARTS EARLY
↓
DESIGN STILL CHANGES
↓
INSTALLED WORK INVALIDATED
↓
DEMOLISH / REBUILD
↓
DELAY
Therefore each major construction package should have a defined engineering-readiness threshold.
Modular construction creates a different project-control problem
SMRs promise greater factory fabrication.
This can reduce on-site construction.
It does not eliminate project management.
It transfers part of it from the site to factories.
The project becomes:
FACTORY A
│
FACTORY B
│
FACTORY C
│
PORT / RAIL / ROAD
│
SITE ASSEMBLY
The owner must control:
- factory schedule;
- factory quality;
- module transport;
- storage;
- sequence of arrival;
- dimensional interface.
A module arriving six months early can be a problem if it cannot be stored safely.
A module arriving six months late can stop site construction.
Logistics should therefore be treated as part of construction design
For large modules Italy must establish:
- manufacturing location;
- port availability;
- vessel capability;
- road geometry;
- bridge limits;
- rail possibilities;
- heavy-lift equipment;
- site receiving area.
This links Chapter 14 directly back to Chapter 3.
A technically excellent reactor whose modules cannot economically reach the candidate site is not an appropriate reactor/site combination.
Quality control must extend into the factories
The regulator and owner cannot inspect quality only when components arrive in Italy.
Critical manufacturing activities may occur abroad years earlier.
International regulatory practice therefore includes supplier and vendor inspections. The NRC, for example, inspects nuclear steam system suppliers, architect-engineering organisations, component manufacturers and testing laboratories as part of new-reactor QA oversight.
Italy should therefore establish rights for:
- owner surveillance;
- ISIN inspection;
- access to manufacturing records;
- witness and hold points;
inside foreign vendor facilities where relevant.
These rights must be written into procurement contracts.
Non-conformances are inevitable; uncontrolled non-conformances are unacceptable
In complex manufacturing, deviations will occur.
The existence of a non-conformance does not necessarily indicate programme failure.
The relevant question is how it is managed.
The correct process is:
NON-CONFORMANCE IDENTIFIED
↓
DOCUMENTED
↓
TECHNICAL EVALUATION
↓
REPAIR?
REWORK?
ACCEPT-AS-IS?
REJECT?
↓
REGULATORY REVIEW IF REQUIRED
↓
CONFIGURATION UPDATED
The unacceptable process is:
PROBLEM FOUND
↓
FIELD FIX
↓
NO DOCUMENT
Nuclear construction requires a strong corrective-action system. NRC vendor oversight continues to identify and inspect precisely these areas, including procurement control, nonconforming components and corrective action.
Commissioning begins long before first fuel
Commissioning should not be treated as the short period between construction completion and first power.
Its purpose is to demonstrate systematically that installed:
- structures;
- systems;
- components;
perform according to:
- design;
- safety requirements;
- operating procedures.
The IAEA requires the operating organisation to bear overall responsibility for safe commissioning even where contractors perform commissioning activities. The operator should approve contractor activities, establish hold points and involve future operating staff as early as possible.
This principle is especially important for Italy.
The plant should not be:
BUILT BY EPC
↓
HANDED TO ITALIAN OPERATOR
↓
OPERATOR LEARNS PLANT
The stronger sequence is:
ITALIAN OPERATOR
│
├── design review
├── construction surveillance
├── commissioning
└── testing
↓
assumes operation
By first fuel load, operators should already know the plant intimately.
Typical commissioning progression
The precise programme depends on reactor design, but conceptually:
CONSTRUCTION COMPLETION
↓
SYSTEM TURNOVER
↓
COMPONENT TESTING
↓
SYSTEM TESTING
↓
INTEGRATED TESTING
↓
ELECTRICAL ENERGISATION
↓
HOT FUNCTIONAL / NON-NUCLEAR TESTING
↓
REGULATORY HOLD POINT
↓
FUEL LOAD
↓
FIRST CRITICALITY
↓
LOW-POWER PHYSICS TESTS
↓
POWER ASCENSION
↓
TURBINE / GRID TESTS
↓
100% POWER TESTING
↓
COMMERCIAL OPERATION
Every stage should have pre-defined acceptance criteria.
Fuel load should be the strongest readiness gate in the programme
Before nuclear fuel enters the reactor, Italy should require simultaneous readiness of:
- plant;
- operator;
- regulator;
- emergency system;
- safeguards;
- radiation protection;
- security;
- grid;
- waste systems.
A physical construction programme that finishes before those systems are ready should wait.
The correct rule is:
CONSTRUCTION COMPLETE
≠
PERMISSION TO LOAD FUEL
Fuel loading transforms the project fundamentally.
From that moment the installation becomes a much more significant nuclear-risk system.
Table 14.3-A — Minimum pre-fuel-load conditions
| Area | Required condition |
|---|---|
| Plant | Systems required for fuel load accepted |
| Safety case | Approved |
| Licence | Applicable authorisation issued |
| Operators | Qualified/licensed |
| Procedures | Approved |
| Emergency arrangements | Operational/exercised |
| Radiation protection | Operational |
| Safeguards | Operational |
| Physical security | Operational |
| Cybersecurity | Approved for required systems |
| Spent-fuel pool | Ready |
| Waste systems | Ready |
| Off-site power | Available |
| Grid interfaces | Ready as required |
| Fuel | Inspected/accepted |
| Regulator | Inspection/readiness complete |
Political announcements about “first nuclear fuel arriving” should therefore never override this gate.
14.4 Commercial operation is the beginning of the asset lifecycle, not the end of the project
The political system naturally focuses on:
first electricity.
The nuclear operator must focus on the next sixty years.
Once commercial operation begins, the centre of competence moves from construction management toward:
- operational safety;
- maintenance;
- reliability;
- fuel management;
- ageing;
- configuration;
- operating experience.
The plant must maintain:
SAFETY
+
AVAILABILITY
+
CONFIGURATION CONTROL
+
ASSET CONDITION
throughout its operating life.
Maintenance should be designed before operation
IAEA SSG-74 treats maintenance, testing, surveillance and inspection as an integrated system required to ensure structures, systems and components continue performing their intended functions.
This means the maintenance programme should already exist during commissioning.
Italy should not discover after operation that:
- critical valve cannot be accessed;
- major pump cannot be removed efficiently;
- inspection area lacks space;
- shielding is inadequate;
- spare parts cannot be sourced.
Maintainability is a design requirement.
Maintenance strategy contains several layers
It can include:
- corrective maintenance;
- preventive maintenance;
- predictive/condition-based maintenance;
- surveillance;
- in-service inspection;
- testing.
A mature programme increasingly moves away from:
EQUIPMENT FAILS
↓
REPAIR
toward:
MONITOR CONDITION
↓
PREDICT DEGRADATION
↓
INTERVENE BEFORE FAILURE
But safety-significant systems may still require periodic prescribed inspection and testing regardless of predictive analytics.
Refuelling outages become central operational events
For conventional LWR SMRs, refuelling outages combine:
- fuel replacement;
- major maintenance;
- inspection;
- statutory testing;
- modifications.
Outage performance directly affects capacity factor and plant economics.
A nominal 300 MWe reactor operating at 90% annual capacity factor produces substantially more energy than the same unit operating at 75%.
Therefore financing assumptions in Chapter 12 depend on operational performance in Chapter 14.
Table 14.4-A — Operational variables with direct economic effect
| Variable | Economic consequence |
|---|---|
| Capacity factor | Electricity revenue |
| Unplanned outage rate | Lost generation |
| Refuelling duration | Lost generation |
| Maintenance cost | OPEX |
| Fuel cycle length | Fuel/O&M |
| Major component replacement | Lifecycle CAPEX |
| Spare-part lead time | Outage risk |
| Staffing | Fixed OPEX |
| Waste generation | Lifecycle cost |
| Regulatory outage | Revenue loss |
Standardisation becomes especially valuable during operation
If Italy operates four identical units:
COMMON TRAINING
+
COMMON SPARES
+
COMMON PROCEDURES
+
COMMON MAINTENANCE
+
COMMON FUEL
+
COMMON SIMULATORS
become possible.
If it operates four different reactor families:
4 TRAINING SYSTEMS
+
4 SPARE-PART SYSTEMS
+
4 FUEL SYSTEMS
+
4 MAINTENANCE REGIMES
+
4 DIGITAL PLATFORMS
may be required.
This is one of the strongest arguments against excessive technological diversity in the first national fleet.
Strategic spare parts should be procured with the plant
Some nuclear components can have very long manufacturing lead times.
Italy should define strategic spare inventories covering items whose failure could produce:
- prolonged outage;
- single-vendor dependence;
- geopolitical exposure.
The procurement contract should therefore address:
- initial spares;
- lifetime spares;
- obsolescence;
- alternative supplier qualification;
- technical drawings;
- manufacturing data.
The worst lifecycle model would be:
FOREIGN VENDOR
↓
PROPRIETARY PART
↓
ONLY QUALIFIED SUPPLIER
↓
60 YEARS OF DEPENDENCE
The operator should negotiate lifecycle sovereignty at the time of original procurement.
Digital obsolescence may become more important than mechanical obsolescence
A reactor commissioned around 2040 could operate around 2100.
Its original digital systems will not.
Hardware, operating systems and communication technologies can become obsolete far faster than major nuclear structures.
Therefore procurement must include:
- software lifecycle;
- source-code or escrow arrangements where appropriate;
- cybersecurity patching;
- hardware replacement;
- qualification of successor systems;
- long-term vendor support.
Digital modernisation should be expected, not treated as an exceptional event.
Configuration management is the memory of the plant
During sixty years of operation, the reactor will undergo:
- modifications;
- equipment replacement;
- software updates;
- procedure changes;
- safety upgrades.
The operator must always know:
What plant actually exists today?
The following must remain aligned:
PHYSICAL PLANT
=
DRAWINGS
=
DATABASES
=
SAFETY ANALYSIS
=
OPERATING PROCEDURES
If they diverge, the operator loses control of configuration.
Configuration management must therefore begin during construction and continue until decommissioning.
Operating experience should feed back into every plant
The IAEA requires systematic operating-experience feedback so that events, causes and corrective actions at one installation can prevent recurrence elsewhere.
For an Italian fleet this becomes especially valuable.
If Unit 1 identifies:
- valve degradation;
- software issue;
- human-factor weakness;
Units 2–6 should benefit before the problem repeats.
This creates the desired fleet loop:
UNIT 1 EXPERIENCE
↓
CORRECTIVE ACTION
↓
FLEET MODIFICATION
↓
UNIT 2–6 IMPROVEMENT
Ageing management begins before the plant becomes old
IAEA SSG-48 treats ageing management throughout:
- design;
- construction;
- commissioning;
- operation;
- long-term operation;
- decommissioning.
This is important because ageing mechanisms can begin immediately.
Examples include:
- fatigue;
- corrosion;
- irradiation embrittlement;
- cable ageing;
- thermal degradation;
- concrete ageing.
The operator should maintain a structured ageing-management programme from startup.
Long-term operation should not be assumed automatically
If a reactor has an original design life of 60 years, operation beyond that period requires a future technical and regulatory case.
SSG-48 identifies relevant considerations including:
- condition of structures and components;
- current standards;
- ageing-management programmes;
- time-limited ageing analyses;
- operating experience.
Therefore the Italian business case should distinguish:
LICENSED / DESIGN OPERATING PERIOD
from:
POSSIBLE LIFE EXTENSION
Revenue assumptions should not automatically credit unapproved future operation.
14.5 Fleet replication and decommissioning must be designed before the FOAK is built
The economic promise of modular nuclear power is not one reactor.
It is repetition.
A FOAK can be expensive because it bears:
- design completion;
- first licensing;
- first factory setup;
- first supplier qualification;
- first operator training;
- country-specific regulatory learning.
The economic proposition becomes more attractive only if later units reuse these investments.
The national programme should therefore treat the first reactor as:
the prototype of a fleet, not an isolated infrastructure project.
This changes procurement strategy.
The FOAK should deliberately generate reusable assets
These include:
- approved reference safety case;
- qualified suppliers;
- trained regulator;
- trained operator;
- simulator;
- construction procedures;
- QA programme;
- approved fuel pathway;
- spare parts;
- waste packages;
- emergency arrangements.
Then:
UNIT 1
↓
KNOWLEDGE ASSET
↓
UNIT 2
↓
LOWER UNCERTAINTY
Fleet economics require cadence
Imagine Italy builds:
UNIT 1 — 2039
UNIT 2 — 2048
UNIT 3 — 2057
Much of the industrial workforce may disperse between projects.
Factories lose serial production.
Suppliers must requalify.
The programme repeatedly relearns.
Compare:
UNIT 1
↓
UNIT 2
↓
UNIT 3
↓
UNIT 4
with overlapping production.
This enables:
- labour continuity;
- repeat manufacturing;
- factory utilisation;
- supplier investment;
- lower financing uncertainty.
Therefore the State should not approve a FOAK without at least understanding the conditions under which a subsequent fleet would be procured.
That does not mean committing to the entire fleet before FOAK evidence exists.
It means preserving the option.
The programme should use conditional fleet gates
For example:
FOAK CONSTRUCTION
↓
GATE A:
schedule within threshold?
↓
FOAK COMMISSIONING
↓
GATE B:
performance acceptable?
↓
FIRST OPERATING YEARS
↓
GATE C:
cost / availability / waste
acceptable?
↓
FLEET REPLICATION
This balances:
- learning;
- industrial continuity;
against:
- lock-in risk.
Design changes between units should be tightly controlled
The NOAK programme should resist unnecessary change.
But operating experience may reveal genuine safety improvements.
The rule should therefore be:
NO CHANGE
UNLESS BENEFIT EXCEEDS
LOSS OF STANDARDISATION
with safety changes always receiving priority.
Decommissioning begins conceptually at design stage
Perhaps the strongest historical lesson Italy can extract from its original nuclear programme is that reactor shutdown does not terminate the nuclear liability.
Italy today is still managing decommissioning and waste from plants that ceased generating decades ago.
The new programme should therefore avoid repeating a model in which decommissioning becomes the responsibility of future governments after electricity revenues have disappeared.
The European Commission’s current recommendation on decommissioning finance applies the polluter-pays principle and calls for adequate resources to be accumulated during the productive life of the installation. For new installations, it recommends segregated decommissioning funds and regular independent review of both funding and cost estimates.
Directive 2011/70/Euratom similarly requires Member States to ensure adequate financial resources are available when needed for spent-fuel and radioactive-waste programmes, taking account of the responsibility of the generators.
The principle for Italy should therefore be:
ELECTRICITY GENERATED
↓
REVENUE EARNED
↓
DECOMMISSIONING CONTRIBUTION
↓
RING-FENCED FUND
↓
FUNDS AVAILABLE
AT FINAL SHUTDOWN
not:
PLANT CLOSES
↓
OPERATOR REVENUE ENDS
↓
STATE DISCOVERS LIABILITY
Decommissioning-by-design can reduce future cost
Design decisions made before construction can facilitate:
- component removal;
- segmentation;
- decontamination;
- waste minimisation;
- remote handling.
Examples include:
- avoiding unnecessary material activation;
- providing lifting points;
- preserving dismantling access;
- reducing contamination traps;
- maintaining documentation.
Decommissioning should therefore appear in the reactor procurement specification.
Table 14.5-A — Decommissioning information required at procurement
| Item | Required evidence |
|---|---|
| Preliminary decommissioning plan | Available before operation |
| Activated-material inventory | Estimated |
| Major component removal | Demonstrated concept |
| Waste forecast | Lifecycle estimate |
| Remote dismantling | Where necessary |
| Decontamination strategy | Defined |
| Spent-fuel end-state | Identified |
| Decommissioning cost estimate | Site-specific methodology |
| Funding mechanism | Established |
| Update frequency | Defined |
| Financial shortfall responsibility | Assigned |
| Records retention | Lifetime + decommissioning |
Decommissioning funds should be protected from corporate failure
If the operator becomes insolvent 50 years later, the decommissioning fund must remain available.
Therefore a segregated structure is strategically preferable to an accounting provision on the operator’s ordinary balance sheet.
The Commission has specifically recommended separate funds and independent oversight for new nuclear installations.
Fleet decommissioning creates a second industrial programme
If Italy ultimately operates several reactors, decades later it will also possess a decommissioning fleet.
That future workload can itself become an industrial capability.
Italy already has substantial expertise through SOGIN and associated companies.
The new programme can transfer this legacy experience into design for decommissioning.
This is one area where Italy’s previous nuclear history can create a genuine competitive advantage.
Master lifecycle schematic
The complete programme should therefore be understood as:
TECHNOLOGY SELECTION
↓
PROCUREMENT
↓
SUPPLIER QUALIFICATION
↓
DESIGN FREEZE
↓
CONSTRUCTION
↓
COMMISSIONING
↓
FUEL LOAD
↓
OPERATION
↓
MAINTENANCE
↓
AGEING MANAGEMENT
↓
POSSIBLE LONG-TERM OPERATION
↓
FINAL SHUTDOWN
↓
DECOMMISSIONING
↓
SITE RELEASE / LONG-TERM WASTE
There is no point at which responsibility disappears.
Table 14.5-B — Who controls what across the nuclear lifecycle
| Phase | Primary accountable actor |
|---|---|
| Technology procurement | Owner |
| Contract integration | Owner |
| Design | Vendor/engineering organisations under owner control |
| Manufacturing | Suppliers under QA |
| Construction | EPC/contractors under owner oversight |
| Safety compliance | Licence holder |
| Regulatory approval | ISIN |
| Commissioning | Operating organisation |
| Fuel loading | Operator subject to regulatory authorisation |
| Commercial operation | Operator |
| Maintenance | Operator |
| Ageing management | Operator |
| Waste generation | Operator |
| Decommissioning funding | Operator/fund framework |
| Final decommissioning | Licence holder/implementer |
| Regulatory release | Regulator |
Italy should establish a Nuclear Configuration Record extending beyond the operator
One valuable national safeguard would be a legally protected lifecycle documentation requirement.
For every reactor, records should preserve:
- design baseline;
- manufacturing records;
- deviations;
- modifications;
- inspection;
- maintenance;
- irradiation history;
- material data.
Some of these records may need to remain usable many decades after original contractors have disappeared.
A reactor commissioned in 2040 could be decommissioned in the twenty-second century.
The documentation system must therefore be designed for extraordinary longevity.
Procurement must address vendor disappearance
A reactor vendor existing today may:
- merge;
- restructure;
- leave the market;
- fail financially;
decades later.
Italy should therefore obtain sufficient:
- drawings;
- technical data;
- configuration information;
- licensing data;
- software rights;
- spare-part data;
to protect lifecycle continuity.
The commercial contract should distinguish proprietary vendor IP from the operator’s legitimate need to maintain nuclear safety.
The State should maintain a fleet performance observatory
Once reactors operate, Italy should publish or maintain an auditable fleet scorecard.
Table 14.5-C — Proposed national operating scorecard
| Indicator | Unit |
|---|---|
| Capacity factor | % |
| Forced outage rate | % |
| Planned outage duration | days |
| Unplanned scrams | number |
| Occupational collective dose | person-Sv |
| Significant safety events | classified |
| Fuel reliability | defined indicator |
| Radioactive waste generated | m³/TWh by class |
| Water use | m³/MWh |
| Maintenance backlog | risk-weighted |
| Major component reliability | indicator |
| Operating cost | €/MWh |
| Decommissioning fund adequacy | % funded |
| Spent-fuel inventory | tonnes / assemblies |
| Supplier concentration | key components |
| Cyber/obsolescence backlog | risk category |
Such reporting should not be used for simplistic ranking.
Its function would be to detect deterioration and verify whether the economic assumptions used to justify the fleet are being realised.
The second reactor is the real test of SMR economics
The first reactor can always be explained as exceptional.
It can receive:
- special political attention;
- public funding;
- additional vendor resources;
- bespoke problem-solving.
The true test of a modular nuclear programme is whether the second and third units become easier.
A successful programme should demonstrate:
FOAK COST
↓
UNIT 2 COST LOWER
FOAK DURATION
↓
UNIT 2 DURATION SHORTER
FOAK REGULATORY EFFORT
↓
UNIT 2 REUSES EVIDENCE
FOAK SUPPLIER PROBLEMS
↓
UNIT 2 SUPPLY CHAIN STABLE
If this does not happen, the hypothesis of fleet learning is not being demonstrated.
That should influence subsequent investment decisions.
Italy therefore needs explicit replication tests
Before Unit 2 receives FID, government and owner should ask:
- Did Unit 1 maintain sufficient design stability?
- Were Italian suppliers qualified successfully?
- Did construction remain within the approved contingency?
- Were major design changes required?
- Did commissioning reveal systemic problems?
- Is fuel supply secure?
- Is regulator workload scalable?
- Can the same site/design be replicated?
- Has WACC decreased?
- Is decommissioning/waste funding adequate?
If the answer is repeatedly no, the correct response is not automatic fleet continuation.
Final government conclusion — Chapter 14
Nuclear procurement should not be understood as buying a power station.
Italy would be purchasing and then maintaining a regulated industrial system whose obligations continue for more than a century.
The procurement decision therefore determines far more than:
- reactor price;
- construction schedule.
It determines:
- how much technical sovereignty Italy retains;
- how much interface risk the owner carries;
- how much domestic industry can participate credibly;
- how much vendor dependence remains after commissioning;
- whether later reactors can actually become cheaper;
- whether the plant can be maintained safely for decades;
- whether future governments inherit adequate decommissioning resources.
The central procurement principle should therefore be:
Transfer contractual risk where another party can genuinely control it, but never transfer knowledge that the Italian owner needs in order to remain an intelligent nuclear licence holder.
For the first unit, Italy should probably avoid excessive contractual fragmentation unless the future owner has already demonstrated the technical capability to manage complex nuclear interfaces.
Localisation should be ambitious but disciplined.
The target should not be the largest possible Italian percentage.
It should be the largest nuclear-qualified, schedule-compatible and strategically valuable Italian share.
Quality assurance must begin before contracts are awarded.
Supplier qualification must occur before construction demand peaks.
Traceability must extend from raw material to installed component.
Construction progress must be measured through physical and regulatory milestones rather than expenditure alone.
Commissioning must be led by the future operating organisation, not treated as the final service provided by the EPC contractor.
Fuel loading must remain a hard readiness gate.
Operation must then be governed through:
- configuration management;
- preventive maintenance;
- ageing management;
- operating-experience feedback;
- spare-part sovereignty;
- digital lifecycle control.
Finally, the programme must fund and plan decommissioning from the first day of operation.
Italy already possesses direct historical evidence of what happens when nuclear generation ends but nuclear liabilities remain.
The new programme has an opportunity to institutionalise that lesson.
The complete strategic chain should therefore be:
PROCURE
↓
QUALIFY
↓
BUILD
↓
VERIFY
↓
COMMISSION
↓
OPERATE
↓
MAINTAIN
↓
REPLICATE
↓
DECOMMISSION
Every stage should inform the next.
And every stage should preserve enough information and financial resources for the stage that follows.
The objective should not be merely to build Italy’s first new reactor.
It should be to build the first reactor in a manner that makes:
- the second reactor easier;
- the fleet safer;
- the industry stronger;
- the operator more independent;
- the eventual decommissioning liability fully funded.
That is the difference between constructing a nuclear plant and creating a sustainable nuclear programme.
Chapter 15 — The Nuclear Counterfactual
The most important question in the Italian nuclear debate is not whether nuclear power possesses technical advantages.
It is not whether solar power is cheaper per installed kilowatt.
It is not whether batteries are becoming less expensive.
And it is not whether an individual SMR can generate electricity continuously.
The decisive national question is:
What does Italy have to build, finance, import and operate if nuclear power is included in the 2050 energy system — and what must replace it if nuclear power is excluded?
That is the nuclear counterfactual.
It is the comparison that should ultimately determine whether a national nuclear programme creates economic and strategic value.
The comparison must be conducted at total-system level.
An electricity system cannot be planned by selecting the technology with the lowest isolated levelised cost of electricity and multiplying that technology until annual generation equals annual demand.
Electricity must be available:
- every hour;
- in every season;
- during heatwaves;
- during low-wind periods;
- after sunset;
- during drought;
- during transmission outages;
- when electricity imports are constrained;
- when industrial demand peaks.
The relevant system therefore contains much more than electricity-generating plants.
It includes:
GENERATION
+
TRANSMISSION
+
DISTRIBUTION
+
STORAGE
+
FLEXIBILITY
+
RESERVES
+
INTERCONNECTIONS
+
FUEL
+
DEMAND RESPONSE
+
HYDROGEN / POWER-TO-X
+
CARBON CAPTURE
Different generation mixes require different quantities of these complementary infrastructures.
For that reason, the Italian decision cannot responsibly be reduced to:
NUCLEAR LCOE
versus
SOLAR LCOE
The correct comparison is:
COMPLETE SYSTEM A
versus
COMPLETE SYSTEM B
where both systems must achieve approximately the same:
- electricity demand;
- decarbonisation objective;
- security of supply;
- adequacy;
- flexibility;
- industrial requirements.
Italy now possesses unusually useful official evidence for conducting this comparison.
The 2024 PNIEC, drawing on TIMES-RSE modelling developed with the National Platform for Sustainable Nuclear, compared a 2050 net-zero system with nuclear and one without nuclear. In the conservative nuclear case, approximately 8 GW of nuclear capacity is introduced by 2050. The model finds that the nuclear pathway can reach net zero with an estimated total-system cost around €17 billion lower over the modelling horizon than the comparable no-nuclear pathway. Crucially, the PNIEC itself states that this is a total-energy-system comparison, not simply an electricity-generation-cost comparison, and that the result requires further consolidation in future long-term strategy work.
That qualification is essential.
The €17 billion result is:
a model output under defined assumptions.
It is not:
- money already saved;
- a government-guaranteed benefit;
- proof that any reactor at any cost is economically justified;
- proof that the 16 GW high-nuclear case would create exactly the same benefit.
The conservative model case referred to in this comparison uses approximately 8 GW of nuclear capacity, not the maximum 16 GW potential discussed elsewhere in the PNIEC.
A second body of evidence was published by Terna in 2025.
Terna took the PNIEC 2050 framework and developed a detailed electricity-system study. Importantly, for its direct nuclear versus no-nuclear comparison it holds total electricity demand at approximately 583 TWh in both scenarios.
This removes one complication in the original PNIEC optimisation and asks a simpler physical-system question:
If Italy must supply the same 583 TWh of electricity in 2050, what changes when nuclear generation is removed?
The answer is highly instructive.
Nuclear does not disappear and leave an empty hole.
It is replaced by a portfolio consisting principally of:
- additional renewable capacity;
- additional storage;
- additional programmable generation;
- additional imports.
That is the real counterfactual.
It should become the basis of Italian nuclear policy analysis.
15.1 Italy’s 2050 electricity system will be radically larger and more electrified regardless of the nuclear decision
The nuclear debate often begins from today’s Italian electricity system.
That can be misleading.
The electricity system that might contain substantial nuclear generation in 2040–2050 will not resemble the system of 2026.
Italy’s final electricity demand is expected to increase substantially because decarbonisation transfers energy consumption from direct fossil-fuel use into electricity.
Important drivers include:
- electric vehicles;
- rail electrification;
- heat pumps;
- industrial electrification;
- hydrogen production;
- synthetic fuels;
- data centres;
- other digital infrastructure.
Terna’s adequacy work already projects demand rising from today’s level toward approximately 361.9 TWh in 2030 and 396.9 TWh in 2035 in its reference modelling.
The longer-term transformation is much larger.
Terna’s 2025 study based on the PNIEC nuclear scenario identifies approximately:
- 583.1 TWh total electricity demand in the 2050 nuclear case;
- 478.0 TWh of final electricity consumption;
- 81.5 TWh for Power-to-X;
- 23.6 TWh of losses.
The original PNIEC no-nuclear optimisation produced a somewhat lower demand of 551.7 TWh, partly because the model finds greater electrification economically advantageous in the nuclear case.
The difference in demand is itself economically important
The PNIEC model does not simply replace one generating technology with another.
It optimises the complete energy system.
Because the model assumes that nuclear electricity can economically substitute part of the more expensive dispatchable low-carbon generation required in the no-nuclear scenario, the nuclear pathway supports somewhat greater:
- direct electrification;
- hydrogen production;
- synthetic-fuel production.
The result is:
LOWER-COST LOW-CARBON ELECTRICITY
↓
MORE ELECTRIFICATION BECOMES ECONOMIC
↓
MORE FOSSIL FINAL USE CAN BE DISPLACED
This is why comparing only electricity generation costs can miss broader system effects.
A power technology can affect:
- heating technology choices;
- industrial fuel decisions;
- hydrogen economics;
- transport electrification.
The counterfactual therefore extends beyond the power sector.
Table 15.1-A — Official PNIEC 2050 demand comparison
| Variable | With nuclear | Without nuclear |
|---|---|---|
| Total electricity requirement | 583.1 TWh | 551.7 TWh |
| Final electricity consumption | 478.0 TWh | 453.4 TWh |
| Power-to-X | 81.5 TWh | 75.8 TWh |
| Losses | 23.6 TWh | 22.5 TWh |
| National production | 596.8 TWh | 566.2 TWh |
These figures are PNIEC modelling outputs rather than forecasts guaranteed to occur.
The scale of the transformation becomes clearer when compared with current demand.
Terna’s final 2025 statistical publication records:
- electricity demand: 312.2 TWh;
- domestic net production: 269.3 TWh;
- imports: 51.8 TWh;
- exports: 4.9 TWh.
The 2050 system analysed by Terna therefore has to serve an electricity requirement far above today’s level.
This means that the strategic question is not:
“Should existing Italian renewable electricity be replaced with nuclear?”
The future system requires enormous new investment even with nuclear.
Nuclear does not replace the renewable transition
This deserves particular emphasis because the political debate often creates an artificial binary choice.
The PNIEC conservative nuclear scenario still assumes approximately:
- 245 GW of photovoltaic capacity;
- 51 GW of wind capacity.
In the underlying PNIEC electricity generation comparison, imports remain limited and both systems are overwhelmingly renewable-led.
Terna’s own broader transition strategy likewise expects approximately 107 GW of solar and wind capacity by 2030, compared with 57 GW installed at the end of 2025.
Therefore:
NUCLEAR SCENARIO
≠
LOW-RENEWABLE SCENARIO
It is:
VERY HIGH RENEWABLES
+
NUCLEAR
+
STORAGE
+
GRID
+
FLEXIBILITY
The no-nuclear system is:
EVEN MORE RENEWABLES
+
MORE STORAGE
+
MORE OTHER PROGRAMMABLE CAPACITY
+
MORE IMPORT DEPENDENCE
in Terna’s equal-demand comparison.
This distinction is one of the most important findings of the entire book.
The nuclear decision is primarily about the last portion of deep decarbonisation and firm low-carbon capacity, not whether Italy should build renewable energy.
Italy will need to build enormous quantities of renewable generation in either case.
15.2 What physically replaces nuclear energy in a no-nuclear Italy
The strongest counterfactual evidence comes from Terna’s 2025 hourly system modelling.
Unlike the original PNIEC optimisation, Terna compares nuclear and no-nuclear systems against the same approximate 583 TWh electricity requirement.
This allows the replacement effect to be observed directly.
15.2.1 More renewables and more storage
In Terna’s equal-demand scenario, the system containing nuclear uses approximately:
- 180 GW solar;
- 46 GW onshore wind;
- 20 GW offshore wind.
Total variable/non-programmable renewable capacity is around 246 GW.
Without nuclear, that rises to approximately:
- 200 GW solar;
- 50 GW onshore wind;
- 20 GW offshore wind.
Total variable renewable capacity becomes approximately 270 GW.
The no-nuclear system therefore contains around 25 GW more wind and solar capacity.
That is not an argument against renewables.
It is simply the physical replacement requirement generated by the model.
The same occurs with storage.
Terna finds an economically useful utility-scale storage level of approximately:
- 196 GWh with nuclear;
- 216 GWh without nuclear.
The no-nuclear counterfactual therefore requires around 20 GWh of additional storage in this particular study.
The reason is straightforward.
Solar and wind produce energy when environmental conditions permit.
Storage moves some of that energy through time.
Nuclear contributes energy according to a much more controllable production profile.
Removing nuclear therefore increases the amount of temporal balancing required.
Text schematic — physical replacement
NUCLEAR REMOVED
│
├────────► MORE SOLAR
│
├────────► MORE WIND
│
├────────► MORE STORAGE
│
├────────► MORE PROGRAMMABLE GENERATION
│
└────────► MORE IMPORTS
The key point is that these measures must be evaluated together.
An additional solar plant is not the complete replacement for an SMR.
The correct replacement is the combination of:
ENERGY
+
CAPACITY
+
FLEXIBILITY
+
SEASONAL SECURITY
required to perform the same system function.
Storage cannot simply be added without limit
Terna’s modelling identifies an important economic constraint.
Additional storage initially allows more renewable generation to be integrated and reduces overgeneration.
But beyond a certain point, additional storage produces progressively lower system benefit.
In the equal-demand 2050 scenarios, Terna identifies approximately:
- 196 GWh in the nuclear case;
- 216 GWh in the no-nuclear case;
around the relevant optimisation region.
This reflects a general physical reality.
Storage solves time shifting.
It does not generate primary energy.
And different storage durations solve different problems.
A simplified classification is:
BATTERIES
↓
hours / daily balancing
PUMPED HYDRO
↓
hours / multi-day balancing
HYDROGEN / OTHER LONG-DURATION SYSTEMS
↓
potentially longer periods / seasonal balancing
The economically optimal mix depends on:
- technology cost;
- efficiency;
- duration;
- renewable profiles;
- network geography;
- demand flexibility.
Therefore the no-nuclear counterfactual cannot simply assume unlimited cheap batteries.
It must specify:
what storage technology performs which balancing function.
Daily storage does not eliminate seasonal imbalance
Italy’s 2050 system will contain enormous solar generation.
That creates strong:
- daytime;
- spring/summer;
energy availability.
But winter demand can be high while solar production is lower.
Terna’s 2050 analysis shows that programmable generation and imports retain greater weight particularly during autumn and winter in the no-nuclear scenario.
This demonstrates an important distinction:
DAILY FLEXIBILITY
≠
SEASONAL ADEQUACY
Batteries can shift afternoon solar production into evening demand.
They do not automatically shift July solar power into January.
Flexibility becomes vastly more important in either future
Even the nuclear scenario does not eliminate flexibility requirements.
Terna finds that, relative to 2023, its 2050 nuclear scenario requires flexibility approximately:
- 6.7 times greater on the daily scale;
- 2.4 times greater on the weekly scale;
- 5.2 times greater on the monthly scale.
Daily flexibility is projected to be provided heavily by storage, while electrolysers and renewable curtailment also become important.
Thus nuclear is not:
“the alternative to flexibility.”
It changes the quantity and composition of the flexibility portfolio.
Table 15.2-A — Terna equal-demand 2050 counterfactual
| System variable | With nuclear | Without nuclear |
|---|---|---|
| Electricity requirement | ~583 TWh | ~583 TWh |
| Solar/wind/hydro production | 435 TWh | 474 TWh |
| Nuclear production | 69 TWh | — |
| Other programmable production | 42 TWh | 66 TWh |
| Net imports | 48 TWh | 57 TWh |
| Storage losses | 11 TWh | 14 TWh |
| Zero-emission coverage | 89% | 84% |
| Overgeneration | 4.8% | 4.4% |
These figures require careful interpretation.
The 69 TWh nuclear figure comes from Terna’s subsequent electricity-system scenario and differs slightly from the 64.2 TWh in the original PNIEC conservative nuclear scenario.
The studies use related but not identical assumptions.
They should not be merged into one synthetic dataset.
More programmable generation is also required
In Terna’s direct comparison, the no-nuclear system requires approximately 66 TWh of other programmable generation, compared with about 42 TWh in the nuclear case.
This is significant.
A deeply renewable electricity system still needs resources capable of producing electricity independently of immediate solar and wind output.
Possible sources include:
- reservoir hydro;
- bioenergy;
- gas with CCS;
- hydrogen-derived fuels;
- imports;
- demand response.
The no-nuclear debate must therefore answer a question often omitted from public discussion:
What provides the final programmable low-carbon electricity when wind and solar output are insufficient?
The PNIEC provides one answer.
In its no-nuclear net-zero pathway, greater reliance is placed on:
- natural gas with CCS;
- bioenergy with CCS.
The original PNIEC model shows gas generation with CCS falling from approximately 11.5 TWh without nuclear to 4 TWh with nuclear.
Bioenergy with CCS falls from approximately:
- 12.5 TWh without nuclear
- to 6 TWh with nuclear.
The reason bioenergy with CCS becomes particularly significant is that CCS does not capture 100% of fossil CO₂.
To reach economy-wide net zero while some residual emissions remain in difficult sectors, the model uses negative emissions from bioenergy with CCS to compensate residual emissions elsewhere.
This creates an important counterfactual dependency.
A no-nuclear net-zero strategy may require greater confidence in:
- CO₂ capture;
- CO₂ transport;
- CO₂ storage;
- sustainable biomass supply;
- long-term storage integrity.
CCS is no longer theoretical in Italy — but fleet-scale electricity dependence remains unproven
Italy has a genuine CCS development pathway.
The Eni-Snam Ravenna project began Phase 1 in 2024, designed to capture approximately 25,000 tonnes of CO₂ per year.
Eni’s 2025 reporting states that Phase 2 authorisation began in June 2025, targeting transport and storage capacity of approximately 4 million tonnes per year by 2030, with potential subsequent expansion toward 16 million tonnes per year depending on demand.
This is strategically important.
Italy has:
- depleted offshore gas fields;
- transport/storage expertise;
- industrial emitters.
CCS should therefore not be dismissed as imaginary.
But there is another distinction:
CCS PROJECT EXISTS
≠
CCS POWER SYSTEM EXISTS
Italy has not yet demonstrated a fleet of gas-fired power stations operating with CCS at the scale implied by a deeply decarbonised 2050 electricity system.
Therefore nuclear and no-nuclear scenarios contain different technological uncertainties.
Nuclear pathway uncertainty
- reactor cost;
- construction duration;
- licensing;
- fuel;
- public acceptance.
No-nuclear firm-generation uncertainty
- CCS cost;
- capture performance;
- CO₂ transport;
- storage infrastructure;
- biomass availability;
- long-duration storage;
- required import availability.
This is precisely why the counterfactual must compare risks, not merely today’s technology costs.
15.3 The economic comparison must be based on total system cost, not single-technology LCOE
The most frequently used economic number in the Italian nuclear debate is the PNIEC estimate of approximately €17 billion lower total system cost in the conservative nuclear scenario.
It is useful.
It must be used correctly.
The PNIEC explicitly explains that the TIMES-RSE model optimises the complete energy system and that, because the presence of nuclear changes the economics of final-use electrification, the correct comparison is total system cost rather than electricity-generation cost alone.
The modelling result indicates:
under the assumptions used, allowing approximately 8 GW of nuclear capacity lowers the discounted cost of achieving the modelled net-zero system by about €17 billion relative to the corresponding no-nuclear case.
It does not establish that any nuclear programme is cheaper.
The conclusion depends on assumptions concerning:
- reactor CAPEX;
- WACC;
- construction duration;
- capacity factor;
- nuclear OPEX;
- renewable CAPEX;
- storage costs;
- gas prices;
- carbon prices;
- CCS cost;
- hydrogen technology;
- electricity demand;
- nuclear deployment timing.
Change those inputs and the output changes.
The correct economic question is marginal
The relevant question is not:
“Is solar cheaper than nuclear?”
Solar and nuclear occupy different system positions.
The relevant question is:
What is the cost of the additional system required to replace the last unit of firm low-carbon nuclear generation?
At low renewable penetration, additional solar and wind generation can be exceptionally valuable.
Existing dispatchable plants and grids absorb variability.
As variable renewables approach a very large share of total annual generation, additional integration requirements can increase.
Those requirements include:
- storage;
- curtailment;
- grid reinforcement;
- reserve;
- demand flexibility;
- dispatchable backup.
This does not mean renewable energy becomes “bad” at high penetration.
It means the economic unit becomes:
RENEWABLE GENERATION
+
INTEGRATION SYSTEM
just as the economic unit for nuclear is:
REACTOR
+
FINANCING
+
FUEL
+
GRID
+
WASTE
+
DECOMMISSIONING
Both sides must be fully costed.
Italy’s 2030 strategy does not depend on nuclear
Timing is central.
Terna’s 2025 system study is explicit that accelerated renewable deployment is the only currently available large-scale option in the short-to-medium term for reducing fossil generation and exposure to gas prices.
The PNIEC-related transition requires approximately €130 billion of investment by 2030 across renewables, storage and grids, with renewable electricity injected into the system increasing from approximately 113 TWh in 2023 to 227 TWh in 2030.
Therefore:
2026–2030
RENEWABLES + GRID + STORAGE
ARE THE MAIN DECARBONISATION ENGINE
Whether Italy eventually chooses nuclear does not alter that requirement.
The nuclear counterfactual becomes progressively relevant in the 2035–2050 system, when the problem changes from:
how to add low-cost renewable energy quickly
to:
how to operate a near-zero-carbon system reliably and economically with very high electrification.
This distinction prevents nuclear policy from delaying investment that Italy already needs regardless of the nuclear decision.
Nuclear becomes valuable only if delivered at competitive total cost
The existence of a system benefit does not mean any reactor price is acceptable.
Suppose nuclear is modelled as economically useful at:
CAPEX A
+
WACC A
+
CONSTRUCTION TIME A
but the actual Italian FOAK delivers:
CAPEX = 2 × A
WACC = much higher
CONSTRUCTION = years later
the economic comparison must be rerun.
The €17 billion modelling benefit could:
- shrink;
- disappear;
- reverse.
That is why Chapters 12 and 14 are essential to Chapter 15.
Nuclear economics depend on:
TECHNOLOGY
↓
PROCUREMENT
↓
CONSTRUCTION PERFORMANCE
↓
FINANCING COST
↓
SYSTEM VALUE
A reactor that cannot be delivered efficiently may not justify itself merely because nuclear as a technology has theoretical system value.
The same discipline applies to the no-nuclear counterfactual
The opposite error must also be avoided.
A no-nuclear scenario should not assume:
- zero-cost grid reinforcement;
- unlimited cheap storage;
- unlimited biomass;
- unlimited interconnector availability;
- perfectly flexible hydrogen production;
- CCS at optimistic cost;
- no renewable permitting delays.
Every counterfactual technology has a delivery risk.
Table 15.3-A — Major economic sensitivities
| Nuclear pathway | No-nuclear pathway |
|---|---|
| Reactor CAPEX | Renewable CAPEX |
| Nuclear WACC | Storage cost |
| Construction duration | Storage duration requirement |
| Capacity factor | Renewable capacity factor |
| Fuel security | Long-duration flexibility cost |
| Waste/decommissioning | CCS cost |
| Fleet learning | Biomass availability/cost |
| Vendor concentration | Grid expansion |
| Refuelling/outage risk | Curtailment |
| Regulatory delay | Permitting/land constraints |
| Water/cooling | CO₂ transport/storage |
| Technology replication | Import availability |
A government counterfactual should stress-test both columns symmetrically.
Industrial electricity competitiveness cannot be inferred from one generation cost
Italy has a real competitiveness concern, but it should be stated precisely.
ARERA’s 2026 annual-report summary finds that, for important non-household consumption classes using 2024 data, total electricity prices paid by Italian firms were around 9–11% above the euro-area average in significant consumption bands.
However, when taxes, levies and recoverable components are removed, the differential becomes much smaller; for some medium-large industrial classes Italy was approximately at euro-area parity.
This is an important correction to simplistic arguments.
Industrial electricity competitiveness depends on:
- wholesale energy;
- network costs;
- levies;
- taxation;
- exemptions;
- contractual arrangements.
A nuclear plant can affect the energy component.
It does not automatically determine the entire industrial bill.
France nevertheless provides a useful system-level comparison
In 2025 France exported a record net 26.2 TWh of electricity to Italy.
The average annual wholesale price was approximately:
- €61/MWh in France;
- €116/MWh in Italy.
RTE attributes the large export flow to several factors, including:
- abundant low-carbon French generation;
- recovery of nuclear output;
- interconnection availability;
- Italy’s continued gas dependence.
The correct lesson is not:
“Nuclear automatically halves electricity prices.”
That conclusion would be unsupported.
France also possesses:
- hydro;
- renewables;
- different demand;
- different taxation;
- different market conditions.
The relevant observation is narrower:
A system with abundant domestic low-variable-cost firm generation can possess significant strategic and commercial value in an interconnected European electricity market.
Italy has historically occupied the opposite trading position.
Terna’s final 2025 statistics record imports of 51.8 TWh and exports of only 4.9 TWh.
The counterfactual question is whether part of this structural external dependence should continue, or whether investment should shift part of firm generation inside Italy.
15.4 Nuclear changes Italy’s dependency structure; it does not eliminate dependency
Energy sovereignty is often discussed as if technologies could be divided into:
- independent;
- dependent.
No modern energy system works that way.
Italy’s present system contains several different external dependencies.
Terna’s 2050 system study provides a striking measurement.
For 2023, Italy’s overall energy import dependence was approximately 75%, compared with around 58% for the EU.
Within the electricity system, Terna characterised the 2024 supply structure approximately as:
- 41% domestic renewables;
- 16% direct electricity imports;
- 43% non-renewable generation, overwhelmingly dependent on imported fuel.
Terna therefore describes both a direct and an indirect external energy dependence.
This distinction is fundamental.
An Italian gas-fired power station is physically located in Italy.
Its energy input may still come from:
- Algeria;
- Azerbaijan;
- LNG markets;
- other exporters.
Domestic generation is not necessarily domestic energy sovereignty.
Nuclear changes the physical nature of fuel dependence
Nuclear power would create another international fuel chain:
URANIUM
↓
CONVERSION
↓
ENRICHMENT
↓
FUEL FABRICATION
↓
ITALIAN REACTOR
Italy currently lacks a complete domestic power-reactor nuclear-fuel chain.
Therefore nuclear power does not produce energy autarky.
But nuclear fuel dependence differs materially from gas dependence.
Natural gas requires continuous high-volume physical supply.
Nuclear fuel contains very high energy density and can be procured and stored far in advance.
The strategic distinction is:
GAS DEPENDENCE
↓
CONTINUOUS FLOW DEPENDENCE
NUCLEAR FUEL DEPENDENCE
↓
PERIODIC INVENTORY DEPENDENCE
That can create different resilience characteristics.
But the benefit depends on:
- diversified uranium suppliers;
- diversified enrichment;
- fabrication capability;
- strategic inventory.
HALEU or MOX pathways could create additional dependence rather than reduce it if supply chains remain concentrated.
The correct sovereignty question is therefore:
Does the selected nuclear-fuel architecture create a more manageable strategic dependency than the energy imports it displaces?
Interconnectors are strategic assets in both scenarios
A no-nuclear pathway should not be criticised simply because it imports electricity.
Cross-border electricity trade has major economic benefits.
Interconnectors allow Italy to:
- import when foreign electricity is inexpensive;
- export domestic surplus;
- share reserves;
- use geographical diversity;
- reduce required domestic capacity.
Terna’s planning strategy therefore continues strengthening international and internal transmission irrespective of nuclear policy.
The mistake would be to treat interconnections as guaranteed domestic generation.
During correlated European stress conditions:
- low wind can affect several countries;
- drought can affect several hydro systems;
- gas prices can affect multiple markets;
- nuclear outages abroad can affect imports;
- transmission can be constrained.
Imports are therefore an economically valuable resource.
They should not automatically be treated as identical to domestic firm capacity.
Terna’s 2050 counterfactual quantifies the difference
In its equal-demand study, Terna finds net electricity imports of approximately:
- 48 TWh with nuclear;
- 57 TWh without nuclear.
This result is important because neither system becomes electrically autarkic.
Even the nuclear scenario remains integrated with Europe.
The difference is one of degree.
The appropriate strategic objective is therefore not:
ZERO IMPORTS
It is:
IMPORT WHEN ECONOMICALLY ATTRACTIVE
↓
NOT BECAUSE DOMESTIC SYSTEM
CANNOT FUNCTION WITHOUT THEM
The gas counterfactual is particularly important
Italy demonstrated after 2022 that gas supply can be diversified rapidly.
The IEA records that in 2021:
- gas accounted for 42% of Italian total energy supply;
- 94% was imported;
- roughly 41% of gas imports came from Russia.
By November 2022 Russia’s share had fallen to around 3% following rapid diversification.
This was a significant Italian policy success.
But diversification is not the same as removal of commodity exposure.
Gas prices remain determined on international and European markets.
Terna’s 2050 system analysis notes the very strong relationship historically between the Italian day-ahead electricity price and the variable cost of gas-fired combined-cycle generation.
For 2019–2024 Terna reports, for example:
| Year | Italian PUN | Estimated CCGT variable cost |
|---|---|---|
| 2019 | €52/MWh | €43/MWh |
| 2020 | €39/MWh | €32/MWh |
| 2021 | €126/MWh | €116/MWh |
| 2022 | €304/MWh | €282/MWh |
| 2023 | €127/MWh | €121/MWh |
| 2024 | €109/MWh | €101/MWh |
The historical relationship explains why reducing the frequency with which gas plants set the marginal electricity price can have value beyond simply reducing annual gas consumption.
Again, this does not guarantee that nuclear would set a lower market price.
Market-design effects depend on:
- bidding;
- scarcity;
- demand;
- renewables;
- interconnections.
But reducing exposure to the variable cost of gas can reduce one important source of wholesale volatility.
CCS alters but does not remove gas dependence
A gas plant with CCS remains:
GAS PLANT
It still requires gas.
CCS changes its emissions architecture.
It does not turn the fuel domestic.
Therefore a no-nuclear pathway with significant gas CCS can achieve climate objectives while retaining a degree of fuel-import exposure.
That may still be economically rational.
But the geopolitical property should be recognised.
Nuclear creates different strategic concentrations
Conversely, an imported reactor can create long-term technological dependence on:
- vendor software;
- spare parts;
- engineering data;
- fuel;
- maintenance support.
This can persist for sixty years.
Therefore:
NUCLEAR REDUCES
COMMODITY-FLOW DEPENDENCE
BUT CAN INCREASE
TECHNOLOGY / VENDOR DEPENDENCE
The procurement rules developed earlier in this book are intended precisely to prevent the second problem from replacing the first.
Table 15.4-A — Dependency comparison
| Dependency | High-renewable/no-nuclear pathway | Nuclear-containing pathway |
|---|---|---|
| Natural gas | Higher residual potential | Lower potential |
| CO₂ transport/storage | Higher if CCS used | Lower in modelled scenario |
| Biomass | Higher if BECCS used | Lower in modelled scenario |
| Electricity imports | Higher in Terna comparison | Lower but still material |
| Solar/wind equipment | Very high deployment requirement | Very high deployment requirement |
| Battery supply chain | Higher | High |
| Uranium | None | Required |
| Enrichment/fabrication | None | Required |
| Reactor vendor | None | Long-term dependency |
| Grid | Very high | Very high |
| Critical minerals | High | High |
| Long-duration storage | Greater need | Still potentially required |
| Radioactive waste | No new nuclear waste | New nuclear lifecycle obligation |
The strategic conclusion is not that one column is independent and the other dependent.
It is:
Italy chooses between different portfolios of dependency.
15.5 The correct policy is to preserve the nuclear option until evidence shows whether it improves the Italian system
The counterfactual analysis produces a conclusion more nuanced than either side of the political debate normally presents.
A deeply decarbonised Italy can be modelled without nuclear power.
The official PNIEC explicitly contains such a scenario.
It relies on a combination including:
- very high renewable generation;
- large storage;
- hydro;
- bioenergy;
- CCS;
- imports;
- Power-to-X;
- significant grid infrastructure.
Therefore the proposition:
“Italy cannot reach net zero without nuclear”
is stronger than the official modelling supports.
But the reverse proposition is equally weak.
The official modelling does not indicate that removing nuclear is costless.
It indicates that nuclear is replaced by additional:
- variable renewable generation;
- storage;
- programmable low-carbon generation;
- import dependency;
- CCS infrastructure.
Terna’s direct equal-demand comparison makes this particularly clear.
Table 15.5-A — What the official modelling actually establishes
| Question | Evidence-based answer |
|---|---|
| Can Italy model net zero without nuclear? | Yes |
| Does no-nuclear mean no renewables? | No — renewables dominate both scenarios |
| Does nuclear eliminate storage? | No |
| Does nuclear eliminate imports? | No |
| Does nuclear reduce the quantity of additional renewables required? | Yes, in Terna’s scenario |
| Does nuclear reduce storage requirement? | Yes, moderately in Terna’s scenario |
| Does nuclear reduce other programmable generation? | Yes, in the modelled case |
| Does nuclear reduce imports? | Yes, in Terna’s scenario |
| Does PNIEC find lower total system cost with conservative nuclear deployment? | Yes — ~€17bn in the stated model |
| Is €17bn a guaranteed future saving? | No |
| Is nuclear necessary for 2030 targets? | No |
| Could poor nuclear delivery destroy its modelled benefit? | Yes |
| Could storage/CCS costs falling faster than expected weaken nuclear economics? | Yes |
| Could nuclear costs falling through fleet learning strengthen nuclear economics? | Yes |
This table is perhaps the most important decision summary in the book.
Italy should therefore maintain two live system pathways during the 2020s
The State does not need to resolve every 2050 technology choice in 2026.
Instead it can maintain optionality.
Pathway N — nuclear-compatible transition
Proceed now with:
- renewables;
- storage;
- grid;
- efficiency;
- electrification;
while simultaneously building:
- nuclear law;
- regulator capability;
- sites;
- technology selection;
- financing architecture.
Nuclear enters only if it passes defined economic and technical gates.
Pathway R — nuclear-independent transition
Proceed with the same immediate:
- renewables;
- storage;
- grid;
- efficiency;
- electrification;
while also developing:
- additional renewable sites;
- long-duration flexibility;
- CCS;
- interconnection;
- dispatchable renewable capacity;
- hydrogen.
The near-term programmes overlap significantly.
Text schematic — the two paths
2026–2030
│
┌───────────────┼───────────────┐
│ │
▼ ▼
RENEWABLES GRID
STORAGE EFFICIENCY
ELECTRIFICATION INTERCONNECTORS
│ │
└───────────────┬───────────────┘
▼
2030s
│
┌───────────┴───────────┐
▼ ▼
NUCLEAR READY? NUCLEAR FAILS
│ ECONOMIC /
│ TECHNICAL GATES
▼ ▼
NUCLEAR + RENEWABLES ADDITIONAL RENEWABLES
+ STORAGE + STORAGE
+ CCS WHERE NEEDED + CCS / H₂
+ IMPORTS + IMPORTS
This strategy minimises the cost of being wrong.
If nuclear succeeds internationally and Italian FOAK economics are credible, Italy retains the ability to deploy.
If nuclear costs remain excessive or schedules fail, Italy has not delayed the renewable/grid programme required anyway.
The nuclear programme should therefore have an economic entry price
A particularly important discipline would be to define a maximum acceptable system cost before FID.
Italy should not ask:
“How much does the reactor cost?”
It should ask:
At what reactor cost does the nuclear-containing system cease to outperform the best credible no-nuclear alternative?
This threshold will change as:
- batteries become cheaper;
- CCS develops;
- gas prices change;
- reactor projects abroad deliver actual evidence.
Therefore the technology decision should be updated continuously.
The no-nuclear pathway should face the same evidence gates
Symmetry is essential.
If nuclear must prove:
- cost;
- schedule;
- fuel;
- waste;
then the competing system must prove:
- storage cost;
- storage duration;
- renewable permitting;
- grid delivery;
- CCS;
- biomass sustainability;
- import availability.
Otherwise the comparison becomes ideological.
Proposed decision matrix
| Evidence by early/mid-2030s | Strategic implication |
|---|---|
| Foreign SMRs on time and near target cost | Nuclear case strengthens |
| SMR serial construction demonstrates cost decline | Nuclear case strengthens |
| Italian financing produces low WACC | Nuclear case strengthens |
| HALEU/MOX problems persist | Advanced-reactor case weakens |
| Battery/long-duration storage cost collapses | No-nuclear case strengthens |
| Renewable permitting/grid bottlenecks persist | Firm-generation value increases |
| CCS demonstrates low-cost scale | No-nuclear case strengthens |
| CCS remains expensive/unproven for power | Nuclear case strengthens |
| Gas remains geopolitically volatile | Nuclear case strengthens |
| Nuclear FOAK costs escalate materially | Nuclear case weakens |
| Public/site acceptance impossible | Domestic nuclear pathway may become infeasible |
| Industrial heat/data-centre demand materialises near sites | Nuclear system value may increase |
This is a decision framework.
It is not a ranking or endorsement.
Industrial competitiveness should be tested through system scenarios
Italy should eventually calculate, for each pathway:
- industrial wholesale price;
- volatility;
- network charges;
- support mechanism cost;
- gas exposure;
- curtailment;
- carbon cost.
A nuclear system that costs more in average accounting terms but materially reduces industrial price volatility might possess strategic value.
Conversely, a nuclear system requiring a very high long-term CfD could impose a competitiveness burden.
The result cannot be assumed in advance.
Macroeconomic value requires a separate Italian input-output analysis
The final comparison should extend beyond electricity.
Variables should include:
IMPORT BILL
↓
TRADE BALANCE
LOCAL SUPPLY CHAIN
↓
DOMESTIC VALUE ADDED
CAPITAL IMPORTS
↓
TRADE / INVESTMENT OUTFLOW
ELECTRICITY COST
↓
INDUSTRIAL COMPETITIVENESS
ENERGY SECURITY
↓
MACROECONOMIC VOLATILITY
RSE already possesses a methodology linking TIMES-RSE energy modelling with the GEM-E3-ITA macroeconomic framework for assessing Italian energy scenarios.
The nuclear counterfactual should eventually be run through that type of macroeconomic framework before Italy commits to a large multi-unit fleet.
The final comparison should be probabilistic, not deterministic
Government should not compare:
NUCLEAR BASE CASE
versus
RENEWABLE BASE CASE
It should compare distributions.
For nuclear:
- low cost;
- central cost;
- high cost;
- early;
- delayed.
For storage:
- rapid cost decline;
- central;
- slow decline.
For gas:
- low;
- central;
- high geopolitical price.
For CCS:
- successful;
- expensive;
- delayed.
The correct output should look conceptually like:
TOTAL SYSTEM COST
LOW CENTRAL HIGH
NUCLEAR
NO NUCLEAR
combined with:
ENERGY SECURITY
EMISSIONS
INDUSTRIAL COST
IMPORT EXPOSURE
This would reveal where one pathway is robust and where conclusions depend heavily on uncertain assumptions.
The sovereign question is resilience under uncertainty
A national electricity system designed for 2050 will operate under conditions that cannot be forecast precisely in 2026.
Unknowns include:
- gas prices;
- battery chemistry;
- AI electricity demand;
- hydrogen economics;
- nuclear costs;
- climate;
- European market conditions.
The objective should therefore not be:
identify the perfect 2050 technology mix today.
It should be:
build a pathway that preserves enough options to adapt as evidence emerges.
This is one reason why the immediate Italian energy strategy is less polarised than the political debate suggests.
Regardless of the nuclear decision, Italy should accelerate:
- renewable permitting;
- transmission investment;
- storage;
- efficiency;
- electrification;
- interconnectors.
The nuclear programme is an additional option-development programme until the moment of irreversible investment.
Master nuclear counterfactual
ITALY 2050
│
▼
~583 TWh SYSTEM
│
┌──────────────┴──────────────┐
▼ ▼
WITH NUCLEAR WITHOUT NUCLEAR
│ │
▼ ▼
VERY HIGH RENEWABLES EVEN MORE RENEWABLES
│ │
▼ ▼
~196 GWh STORAGE ~216 GWh STORAGE
│ │
▼ ▼
69 TWh NUCLEAR 0 TWh NUCLEAR
│ │
▼ ▼
42 TWh OTHER 66 TWh OTHER
PROGRAMMABLE PROGRAMMABLE
│ │
▼ ▼
48 TWh NET IMPORT 57 TWh NET IMPORT
│ │
▼ ▼
LESS CCS / FIRM MORE CCS /
REPLACEMENT FIRM REPLACEMENT
│ │
└──────────────┬──────────────┘
▼
BOTH REQUIRE MASSIVE
GRID + RES + FLEXIBILITY
│
▼
NET-ZERO ITALY
The figures in this schematic reflect Terna’s 2025 equal-demand comparison and should not be confused with the original PNIEC TIMES-RSE optimisation.
Final government conclusion — Chapter 15
The strongest argument for nuclear energy in Italy is not that renewable energy cannot work.
Official Italian modelling demonstrates that a no-nuclear net-zero pathway is technically modelled.
The strongest nuclear argument is instead that, under the assumptions currently used by Italian energy-system modelling, a moderate quantity of firm low-carbon nuclear generation can reduce the amount of other infrastructure required to solve the hardest portion of deep decarbonisation.
It can reduce, depending on the scenario:
- additional renewable capacity;
- storage;
- CCS generation;
- bioenergy with CCS;
- net electricity imports.
The PNIEC optimisation additionally indicates an estimated total-system saving of approximately €17 billion in its conservative nuclear case.
But this benefit exists only if the nuclear programme actually performs near the economic assumptions embedded in the model.
If nuclear construction:
- overruns severely;
- arrives too late;
- requires excessive WACC;
- fails to achieve fleet replication;
the theoretical system benefit can be destroyed.
The strongest argument for the no-nuclear pathway is not that nuclear technology has no value.
It is that Italy can attempt to satisfy the same strategic requirement through:
- additional renewable generation;
- more storage;
- additional grid capacity;
- imports;
- CCS;
- hydrogen;
- other programmable low-carbon resources.
But this pathway also requires technologies and infrastructures whose future costs and deployment rates are uncertain.
The no-nuclear scenario is therefore not:
RENEWABLES ONLY
and the nuclear scenario is not:
NUCLEAR INSTEAD OF RENEWABLES
The genuine comparison is:
VERY HIGH RENEWABLES
+
NUCLEAR
+
STORAGE
+
GRID
+
LIMITED OTHER FIRM CAPACITY
versus:
EVEN HIGHER RENEWABLES
+
MORE STORAGE
+
GRID
+
MORE CCS / PROGRAMMABLE CAPACITY
+
MORE IMPORTS
The Italian decision should therefore remain conditional on evidence.
Before committing to a multi-reactor fleet, government should require a refreshed counterfactual incorporating actual information from:
- Darlington;
- Wylfa;
- Natrium;
- NUWARD;
- other reference projects;
- Italian renewable costs;
- storage auctions;
- Ravenna CCS;
- gas markets;
- interconnector development;
- actual 2030–2035 electricity demand.
The nuclear programme should proceed to large-scale fleet commitment only where the updated analysis demonstrates that:
NUCLEAR SYSTEM VALUE
>
ADDITIONAL LIFECYCLE COST
+
DELIVERY RISK
+
WASTE LIABILITY
+
FINANCIAL RISK
relative to the strongest available non-nuclear alternative.
Equally, Italy should not reject nuclear merely because an individual renewable technology has a lower standalone generation cost.
That would compare different products.
The correct national metric is:
the cost, resilience and strategic dependency of the complete electricity and energy system capable of delivering net zero continuously throughout the year.
The most defensible policy position in 2026 is consequently not technological absolutism.
It is strategic optionality combined with evidence gates.
Italy should proceed immediately with those investments needed under every plausible pathway:
- renewables;
- grids;
- storage;
- efficiency;
- electrification.
At the same time it should continue developing the nuclear option far enough to determine its real Italian:
- cost;
- site feasibility;
- financing;
- licensing;
- industrial value.
By the point at which an irreversible nuclear FID must be taken, substantially more foreign FOAK evidence should exist.
The State can then compare a real nuclear proposition with a real no-nuclear proposition rather than comparing political narratives.
The ultimate nuclear question is therefore not:
“Does Italy need nuclear power?”
It is:
“When Italy reaches the most difficult and expensive stages of deep decarbonisation, does a demonstrated Italian nuclear programme reduce the total economic, industrial and geopolitical cost of providing reliable energy compared with the best credible system that Italy could build without it?”
That is the counterfactual that should determine the final decision.
Closing Chapter — From Nuclear Option to National Decision
Italy has already crossed an important threshold.
The question of nuclear power is no longer situated exclusively in historical debate, political memory or technological speculation.
It has returned to the domain of national policy.
Parliament has approved the delegation framework for rebuilding the legal architecture of sustainable nuclear energy.
Government institutions are evaluating technology.
Industry is reorganising.
The regulator has begun participating in international review processes.
European nuclear policy has shifted toward SMRs, supply-chain resilience and strategic autonomy.
The national electricity system is simultaneously moving toward much higher electrification, much larger renewable capacity and increasingly complex requirements for firm power, storage, flexibility and grid resilience.
These developments make the Italian nuclear question legitimate.
They do not make the answer predetermined.
That is the central conclusion of this book.
Italy has not yet reached the point where it must decide whether to operate a national nuclear fleet.
It has reached the point where it must decide whether to build the capability to make that decision intelligently.
The distinction is fundamental.
What the study establishes
Several conclusions emerge strongly from the evidence assembled across the preceding chapters.
First, Italy’s return to nuclear policy is real but still institutionally preliminary.
The State has reopened the legal and strategic possibility of nuclear generation.
It has not yet authorised a reactor.
There is:
- no selected national lead design;
- no approved new-build site;
- no construction licence;
- no final investment decision;
- no new reactor under construction.
The programme therefore remains reversible.
That reversibility is valuable.
It permits Italy to obtain additional evidence before accepting the much greater financial and technological lock-in associated with construction.
Second, Italy is not beginning from zero.
It retains:
- nuclear research;
- industrial engineering capability;
- specialised suppliers;
- decommissioning expertise;
- regulatory institutions;
- international nuclear participation.
The country’s nuclear-industrial history continues to have value.
But it should not be confused with continuous domestic new-build capability.
Italy must still reconstruct:
- new-reactor regulatory practice;
- owner/operator competence;
- commercial operating capability;
- nuclear workforce scale;
- complete programme governance.
Third, the current international SMR market contains real progress but not yet the mature fleet-scale evidence sometimes suggested by political or commercial rhetoric.
Darlington, Natrium, Wylfa, Xe-100, NUWARD, EAGLES and other programmes are creating increasingly valuable data.
But the critical evidence Italy ultimately needs is not:
whether a design can be drawn or licensed.
It is:
whether it can be built repeatedly, financed competitively and operated reliably.
The distinction between:
DESIGN MATURITY
and:
FLEET ECONOMIC MATURITY
should remain central to every subsequent Italian decision.
Fuel and waste remain strategic constraints, not technical footnotes
One of the strongest findings of the report is that reactor technology and fuel-cycle architecture cannot be separated.
A conventional LWR-SMR using established LEU fuel presents one category of strategic dependency.
A HALEU reactor presents another.
A MOX/closed-cycle fast reactor can create a much larger national infrastructure requirement.
Therefore Italy should never procure only:
a reactor design.
It must procure:
a reactor-and-fuel system.
The same principle applies downstream.
New nuclear power creates new waste.
This remains true whether the reactor is:
- small;
- modular;
- advanced;
- Generation IV.
Waste characteristics may differ substantially.
Waste does not disappear.
The unresolved Italian geological-disposal question is therefore not an issue that can be transferred indefinitely to a later government.
The historical Italian nuclear programme already demonstrates the consequences of postponing end-state decisions.
A new programme should institutionalise the opposite principle:
Every new liability should be accompanied by an identified technical pathway and a funded financial mechanism.
That applies equally to:
- radioactive waste;
- spent fuel;
- decommissioning.
Site selection will be one of the first tests of political seriousness
Italy possesses several locations with potentially attractive nuclear characteristics.
Former nuclear sites and large thermal-generation sites can offer:
- grid infrastructure;
- industrial land;
- cooling options;
- logistics;
- existing energy-sector familiarity.
But infrastructure memory is not a licence.
Every candidate location must still pass:
- seismic;
- hydrological;
- climate;
- water;
- environmental;
- population;
- emergency-planning;
- security;
- grid;
- political tests.
The history of Italian nuclear politics makes another requirement equally important:
territorial legitimacy.
A national programme cannot reasonably assume that technical suitability will automatically produce local acceptance.
The new voluntary-siting approach therefore deserves serious institutional design.
If local benefits are used, they should be:
- transparent;
- durable;
- proportional;
- legally defined.
They should not appear as payments intended to purchase silence.
The State must build trust before it asks communities to accept nuclear infrastructure.
Grid integration changes the nuclear value proposition
The Italian system of 2050 will not resemble the system in which Caorso or Trino operated.
It will contain:
- hundreds of gigawatts of renewable capacity;
- storage;
- HVDC;
- electric transport;
- heat pumps;
- hydrogen production;
- large digital loads.
Nuclear therefore enters not a fossil-dominated grid but a highly renewable one.
Its value must be assessed accordingly.
Firm generation can potentially reduce:
- storage requirements;
- residual gas dependence;
- CCS generation;
- imports.
But nuclear itself requires:
- strong grid connection;
- off-site electrical supply;
- contingency planning;
- reinforcement.
A reactor is not a substitute for the transmission grid.
It becomes one of the largest and most important nodes within it.
Safety remains design-specific
The report’s safety assessment leads to another clear conclusion.
New reactor technologies may possess significant advantages.
SMRs may benefit from:
- smaller core inventories;
- lower absolute decay heat;
- passive systems;
- simplified architecture.
Advanced fuels may retain radionuclides more effectively.
But none of these features should be credited through labels.
The correct sequence remains:
DESIGN
↓
ACCIDENT
↓
SOURCE TERM
↓
CONSEQUENCE
Similarly:
SMALL MODULE
≠
AUTOMATICALLY SMALL SITE CONSEQUENCE
Multi-module sites, spent-fuel inventories and common external hazards must still be evaluated.
Italy should therefore buy demonstrated safety performance, not terminology.
Financing will decide whether the programme becomes physical
One of the strongest conclusions of the later chapters is that nuclear cost is not principally a reactor-price question.
It is a:
risk-allocation question.
Capital expenditure, construction time and WACC interact.
A project that appears technically competitive can become economically unattractive if:
- construction is delayed;
- financing costs rise;
- political-risk premiums remain high.
Italy therefore needs a financing model before it needs a construction contract.
That model must determine:
- who provides equity;
- who provides debt;
- whether CfD or RAB support exists;
- how State aid is structured;
- who bears overruns;
- how consumers are protected;
- how State contingent liabilities are controlled.
No financing model makes risk disappear.
It determines who carries it.
The State should therefore reject both extremes:
ALL RISK TO PRIVATE MARKET
and:
ALL RISK TO TAXPAYERS
The correct architecture allocates each risk to the actor best able to control it.
Italy must build institutions before it builds reactors
Perhaps the most important non-technical conclusion of the entire study concerns the State itself.
Nuclear power requires a durable institutional system.
Italy must distinguish clearly between:
- government;
- programme coordination;
- regulator;
- owner;
- operator;
- vendor;
- safeguards authorities.
These functions must cooperate.
They must not become interchangeable.
The regulator must be independent enough to say no.
The operator must be technically strong enough to challenge its vendor.
The programme office must be politically strong enough to coordinate multiple ministries without absorbing the regulator.
The State must also create:
- workforce;
- training;
- safeguards;
- radiation protection;
- quality infrastructure.
A reactor cannot be operated safely by institutions created after construction begins.
Institutional capacity is therefore an early critical path.
Procurement must create the second reactor, not merely the first
The first Italian unit should be judged partly by a criterion rarely used in political debate:
Does it make the next unit easier?
That is the test of modular and fleet economics.
A successful FOAK should create:
- regulator learning;
- qualified suppliers;
- trained operators;
- standard procedures;
- stable fuel arrangements;
- lower financing uncertainty.
The second unit should therefore ideally become:
- cheaper;
- faster;
- easier to license.
If this does not occur, the supposed factory-learning benefit is not being demonstrated.
Italy should therefore avoid creating one highly customised reactor that cannot be reproduced.
The economic logic of a national programme depends on standardisation.
The no-nuclear pathway is real and must remain part of the decision
Another important conclusion is that Italy can model a deeply decarbonised system without nuclear power.
That fact should be stated clearly.
It means nuclear is not logically indispensable.
But the alternative system is not costless.
Official modelling indicates that removing nuclear requires varying combinations of:
- more wind and solar;
- more storage;
- more programmable low-carbon generation;
- more CCS;
- more imports.
The correct comparison is therefore not:
NUCLEAR
versus
RENEWABLES
Both pathways contain enormous renewable deployment.
The comparison is:
VERY HIGH RENEWABLES
+
NUCLEAR
+
STORAGE
+
GRID
versus:
EVEN HIGHER RENEWABLES
+
MORE STORAGE
+
MORE OTHER FIRM RESOURCES
+
GRID
This is the nuclear counterfactual that should determine final policy.
The programme should be governed through evidence gates
The strongest overall recommendation arising from this book is procedural rather than technological.
Italy should not make one irreversible nuclear decision now.
It should make a sequence of decisions.
OPTION DEVELOPMENT
↓
EVIDENCE
↓
GATE
↓
ADDITIONAL COMMITMENT
↓
NEW EVIDENCE
↓
NEXT GATE
This structure protects Italy from two opposite errors.
Error 1 — premature commitment
POLITICAL ENTHUSIASM
↓
VENDOR SELECTED TOO EARLY
↓
TECHNOLOGY LOCK-IN
Error 2 — permanent indecision
ENDLESS STUDIES
↓
NO INSTITUTIONAL CAPABILITY
↓
OPTION DISAPPEARS
The State should preserve the option while progressively raising the evidence threshold.
What should happen immediately
Several actions have value regardless of the eventual reactor choice.
Italy should continue:
- rebuilding regulator capability;
- strengthening nuclear education;
- qualifying industrial suppliers;
- participating in foreign regulatory reviews;
- monitoring foreign FOAKs;
- improving waste planning;
- developing geological-disposal research;
- screening sites;
- developing financing structures.
These actions preserve optionality.
They do not require an irreversible reactor order.
At the same time Italy should continue at full pace with:
- renewable deployment;
- storage;
- grid reinforcement;
- efficiency;
- electrification.
A future nuclear programme cannot replace those investments.
What should not happen yet
Italy should not yet:
- commit the entire national programme to one immature reactor;
- publish unsupported first-power dates as project schedules;
- promise localisation percentages without qualified work packages;
- assume a foreign licence automatically transfers to Italy;
- assume HALEU availability;
- assume repository deadlines;
- treat vendor cost estimates as bankable construction prices.
These are precisely the areas where future evidence has the greatest value.
The programme needs explicit stop conditions
A credible strategic programme must define the conditions under which it will stop.
This is especially important because large projects generate political pressure to continue after sunk costs accumulate.
Italy should therefore establish kill-switches before FID.
For example:
NO BANKABLE FUEL
↓
NO FID
NO ACCEPTABLE SITE
↓
NO PROJECT
REGULATOR NOT READY
↓
NO LICENSING ACCELERATION
FINANCING REQUIRES
UNLIMITED STATE GUARANTEE
↓
REASSESS
FOAK COST EXCEEDS
PREDEFINED SYSTEM-VALUE THRESHOLD
↓
REOPEN COUNTERFACTUAL
This discipline distinguishes strategic policy from technological advocacy.
The central geopolitical choice
Italy’s nuclear decision is ultimately a decision about the structure of future dependence.
A gas-dominant system depends on:
- foreign fuel;
- pipelines;
- LNG.
A renewable-heavy system depends on:
- grids;
- storage;
- materials;
- manufacturing.
A nuclear system depends on:
- uranium;
- enrichment;
- fuel fabrication;
- reactor technology.
None is independent.
The objective should be diversification.
Italy should avoid replacing one dominant dependency with another.
A successful nuclear procurement strategy would therefore seek:
- diversified fuel;
- European/Italian supply chains;
- lifecycle IP access;
- multiple qualified suppliers;
- strategic spares;
- software sovereignty.
The geopolitical objective is resilience, not autarky.
The decision Italy ultimately faces
After fifteen chapters, the Italian nuclear question can be reduced to four strategic choices.
Option A — Deploy a mature Western LWR-SMR pathway
Potential strengths:
- mature fuel family;
- greater regulatory familiarity;
- earlier evidence base.
Trade-off:
- greater foreign reactor-IP dependency.
Option B — Build toward Italian/European advanced-reactor sovereignty
Potential strengths:
- higher Italian technology ownership;
- advanced heat/fuel-cycle potential.
Trade-off:
- later deployment;
- higher technology and fuel-cycle uncertainty.
Option C — Preserve nuclear industrial capability without domestic new build
Italy could remain:
- supplier;
- engineer;
- research participant;
- exporter;
without operating a domestic fleet.
This avoids domestic project risk while retaining industrial value.
Option D — Maintain the option while waiting for stronger evidence
Italy could delay irreversible FID while:
- strengthening institutions;
- observing foreign FOAKs;
- accelerating the non-nuclear transition.
This reduces first-mover risk but may sacrifice some industrial timing advantages.
None of these options can be declared universally correct.
Each becomes rational under different assumptions.
Final synthesis
The evidence assembled in this study does not support a simplistic conclusion that Italy must build nuclear power.
It also does not support a conclusion that Italy should exclude it again before the emerging technology, financing and system evidence is tested.
The stronger conclusion is institutional.
Italy should maintain the ability to choose.
That requires a programme rigorous enough that nuclear can be selected if it demonstrates value — and rejected if it does not.
The country’s earlier nuclear history was characterised by abrupt policy reversal.
A more mature strategy would replace reversal with conditional progression.
EVIDENCE
↓
DECISION
↓
EVIDENCE
↓
DECISION
rather than:
ENTHUSIASM
↓
COMMITMENT
or:
FEAR
↓
PERMANENT EXCLUSION
The ultimate standard should therefore be demanding.
Italy should build nuclear power only if it can demonstrate that the complete national programme is:
- safe;
- financeable;
- institutionally sustainable;
- fuel-secure;
- waste-manageable;
- industrially valuable;
- systemically competitive;
- geopolitically resilient.
All of those conditions must be satisfied simultaneously.
The decision should not be driven by whether nuclear power is politically fashionable in 2026.
The installations, if built, will operate long after today’s political cycle has ended.
The relevant perspective is therefore not the next election.
It is the next century.
The final question for the Italian State is:
Can Italy build a nuclear system whose value remains defensible not only when the reactor is ordered, but when it is commissioned, when it has operated for thirty years, when its first major components require replacement, when its fuel is still being supplied, when its spent fuel must be managed, and when the plant eventually reaches decommissioning?
If the answer becomes demonstrably yes, Italy will possess a credible basis for nuclear deployment.
If the answer remains no, preserving the option will still have produced valuable regulatory, industrial and strategic knowledge without forcing an irreversible investment.
That is the principal conclusion of this book:
The objective is not to prove that Italy should return to nuclear power. It is to ensure that, if Italy chooses to return, it does so with full knowledge of the cost, risk, dependency and institutional obligations that decision creates — and with the capacity to stop if those conditions are not met.
That is the standard appropriate to a national nuclear programme.
And it is the standard against which Italy’s nuclear return should ultimately be judged.